Salient Characteristics 97 and 509.pdf
PDF 281 KB Posted
- Attached to
- FY24 Lift Station Repair - Bldg 97 & 509
- Solicitation number
- F1M3E34115AQ01
About this file
This document is a set of salient characteristics for the lift station pumps and control panels required for the Building 97 and Building 509 sewage lift stations on Joint Base Charleston Air Base.
The key details are:
- Building 97 requires 4 HP, 208V, 3-phase grinder pumps with 32-foot cables and a duplex control panel in a NEMA 4X 304 stainless steel enclosure.
- Building 509 requires 208V, 3-phase, 15 HP pumps with 49-foot cables and a quadraplex control panel with a range of features including automatic switchover, seal fail indicators, and overtemp lights.
- The pumps and control panels are critical to the proper operation of the base's sewer system, transferring sewage from the buildings to the main waste system and wastewater treatment facility.
- This requirement is part of a federal contract opportunity, Solicitation Number F1M3E34115AQ01, for FY24 Lift Station Repair at Buildings 97 and 509.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALIENT CHARACTERISTICS
Building 97 Sewage Lift Station Pumps/Control Panel
I. GENERAL OVERVIEW.
628 CES Water and Fuel Systems shop requires the purchase of the following lift station pumps to ensure the proper operation of the base’s sewer system.
II. SPECIFICATIONS.
At a minimum the equipment and accessories shall possess the following specifications:
- Specifications:
- 4 HP
- 208v
- 3 phase grinder pumps
- 32’ cables
- Duplex DEP Economy Pump Control Panel In A NEMA 4X 304 SS
- Enclosure With Main & Emergency Circuit Breakers Interlocked
- Pump Circuit Breakers, Generator Receptacle, Alarm Light And
- Horn For Operation with Floats
III. APPLICATION.
These pumps will be installed in the wet well at the building 97 sewage lift station. See attached Statement of Work for installation requirements in conjunction with the Water and Fuel Shop. The pumps are critical in transferring the sewage from building 97 to the waste system.
Flight Line Building 509 Sewage Lift Station Pumps/Control Panel
I. GENERAL OVERVIEW.
628 CES Water and Fuel Systems shop requires the purchase of the following lift station pumps and control panel to ensure the proper operation of the base’s sewer system.
II. SPECIFICATIONS.
At a minimum the equipment and accessories shall possess the following specifications:
- Specifications:
- 208v
- 3 phase
- 49’ cables
- XFP 150E CB-1.4 PE-105/4, 208v / 3 Phase,
- With 49' Cables & SS Lifting Bails
- Equipment To Include: Main Power Distribution Block, Individual Pump
- Circuit Breakers Inner Door Operable, IEC Rated Starters With 3 Leg
- Overload Protection, Power/Phase Monitoring Relay With Circuit Breaker
- Protection, Dual LED Interior Lights Motion Activated, Condensation Heater
- With Thermostat, GFI Convenience Receptacle, 120 Volt Control Transformer
- With Circuit Breaker Protection, Primary Level Control HydroRanger 200 HMI
- With XPS-15 Transducer, Back-Up Level Control System, Intrinsically Safe,
- Float Back-Up Active Light Inner Door Mounted, Seal Fail Relays With Seal
- Fail Indicator Lights, Motor Overtemp Lights, Pump Failed To Run Lights,
- Pump Run Lights, Hand-Off-Auto Selector Switches, Elapsed Time Meters,
- Quadraplex Alternator With Pump Omit Selector Switch, Panel Will Operate
- As A Duplex System With Automatic Switchover On Pump Failure, Dead Front
- Anodized Aluminum Inner Doors, Alarm Light For High Level Enclosure
- Mounted, Alarm Telemetry Dry Contacts And Relays, Spare Space For Existing
- Alarm Dialer, Terminals And Ground Bar For Field Connections, UL Listed,
- Quadraplex, 208 Volt, 3 Phase, 15 HP Pumps
III. APPLICATION.
These pumps will be installed in the wet well at the building 509 sewage lift station. See attached Statement of Work for installation requirements in conjunction with the Water and Fuel Shop. The pumps are critical in transferring the sewage from the flight line buildings to the force main that runs off base to the wastewater treatment facility.