SOW - Bldg 97 and 509 Liftstations 2024.pdf
PDF 144 KB Posted
- Attached to
- FY24 Lift Station Repair - Bldg 97 & 509
- Solicitation number
- F1M3E34115AQ01
About this file
This document is a Statement of Work (SOW) that describes the requirements for replacing the pumps and control panels on the sewer lift stations at Buildings 97 and 509 on Joint Base Charleston Air Base in South Carolina.
The SOW outlines the specific work to be performed by the contractor, which includes removing and disposing of the existing components, installing new control panels and pumps, and testing the equipment for functionality. The Water and Fuels Shop (CE) will be responsible for disconnecting power, lifting out the old pumps, and lowering the new pumps into place. All products and materials used must be warranted for one year. The contractor must comply with OSHA safety regulations, avoid damage to government property, and maintain a clean and orderly work site.
The related federal contract opportunity is Solicitation Number F1M3E34115AQ01 for the "FY24 Lift Station Repair - Bldg 97 & 509" project, which is being issued by the Department of the Air Force Air Mobility Command. The solicitation seeks to provide all plant, labor, material, parts and equipment necessary to replace the pumps and control panels at the two lift station locations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 628TH AIR BASE WING (AMC)
JOINT BASE CHARLESTON SC
CUI
Statement of Work
Replace Panel and Pumps at Bldg 97 Sewer Lift Station
Joint Base Charleston Air Base
South Carolina 25 March 2024
Statement of Work: The project consists of providing all plant, labor, material, parts and equipment necessary to replace the two pumps and control panel on the sewer lift station at building 97 on Joint Base Charleston Air Base, South Carolina. The project requirements include, but are not limited to the following major items of work:
Sewer Lift station Contractor Requirements:
• All the existing components and the standing control panel shall be removed and properly disposed of.
• A new control panel will be mounted and installed.
• All equipment listed for the control panel shall be installed according to manufacturer’s specifications.
• Once installed, all components will be tested for functionality to ensure normal operations.
• Once the new pumps are set in place by the water and fuels shop, contractor must properly wire into the new control panel and test each for functionality.
Water and Fuel Shop (CE) Requirements:
• Following OSHA safety standards, disconnect power to pumps and control panel. Lock out and tag out pumps at the panel.
• Using proper heavy equipment, attach to and lift out each of the two existing sewage pumps.
• Power cables must be disconnected from existing pumps. Old pumps are property of the US government and will be retained by the water and fuels shop.
• Using proper heavy equipment, attach to and lower each of the two new sewage pumps.
• After all equipment has been installed and in coordination with contractor for timing, all locks will be removed, and power will be turned back on.
Replace Panel and Pumps at Bldg 509 Sewer Lift Station
Joint Base Charleston Air Base
South Carolina
30 January 2024
Statement of Work: The project consists of providing all plant, labor, material parts, and equipment necessary to replace the four pumps and control panel on the sewer lift station at building 509 on Joint Base Charleston Air Base, South Carolina. The project requirements include, but are not limited to the following major items of work:
Sewer Lift station Contractor Requirements:
• All the existing components within the standing control panel shall be removed and properly disposed of.
• A new pre-wired back panel for mounting into existing enclosure will be installed.
• New pre-wired dead front inner doors that mount into existing enclosure will be installed.
• All equipment listed for the control panel shall be installed according to manufacturer’s specifications.
• Once installed, all components will be tested for functionality to ensure normal operations.
• Once the new pumps are set in place by the water and fuels shop, they must each be properly wired into the new control panel and tested for functionality.
Water and Fuel Shop (CE) Requirements:
• Set up a bypass pump to continue normal sewage pumping operations while old equipment is being removed.
• Following OSHA safety standards, disconnect power to pumps and control panel. Lock out and tag out pumps at the panel.
• Using proper heavy equipment, attach to and lift out each of the four existing sewage pumps.
• Power cables must be disconnected from existing pumps. Old pumps are property of the US government and will be retained by the water and fuels shop.
• Using proper heavy equipment, attach to and lower each of the four new sewage pumps.
• After all equipment has been installed and in coordination with contractor for timing, all locks will be removed, and power will be turned back on.
Required Warranty Period:
All products and materials used under this project requirement shall be warranted against defective workmanship and material failure for a period of one year from the completion date.
Products:
All products and materials shall be installed in accordance with the manufacturer’s technical instructions and specifications. All excess material and products shall be turned over to the government.
Applicable Instructions:
Work areas around project site will be occupied by the using activity during the course of work.
Caution must be taken to ensure all safety work practices are adhered to while construction work requirements are performed at the facility work site.
Caution must be taken in all work areas of the site to avoid physical or cosmetic damage to existing government property. Any damage to government property resulting from construction procedures shall be the responsibility of the contractor.
Special Instructions:
Project site shall be kept clean and orderly daily.
Work methods and practices shall be accomplished in a safe manner abiding by work safety and base safety standards. Work site is subject to OSHA inspections.
Work site areas shall be returned to existing conditions at completion of work requirements.
D. ENVIRONMENTAL: The contractor shall comply with all applicable requirements stated in the Toxic Substances Control Act of 2016. All materials used in the performance of this contract shall be applied in strict accordance with manufacturer’s printed label instructions and all applicable standards. The use of Class I ozone depleting substances, asbestos containing materials, and lead paints are strictly prohibited.
E. SAFETY: The contractor shall comply with all OSHA safety regulations during the performance of this delivery order. Install and maintain barricades and barriers as needed. Lay down areas are to be as designated by the Contracting Officer. Work methods and practices shall be accomplished in a safe manner complying with work safety and base safety standards.