SALIENT CHARACTERISTICS_25Q2263.pdf

PDF 193 KB Posted

Attached to
DIESEL GENERATOR Federal contract opportunity
Solicitation number
SPMYM225Q2263
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a detailed specification sheet for a Triton 750kW Diesel Generator for a federal contract opportunity. The generator features a Cummins-powered Tier 2 engine enclosed in a 20' container, with an integrated tank providing approximately 8 hours of runtime. Key specifications include 277/480V 3-phase 60Hz power (adjustable to 450V), DSE controllers, and EPA compliance for emergency use in the United States and Canada. The configuration includes custom components such as a 2500W hot start forced circulation heater, battery rack with 2x series batteries, 10 amp UL-listed battery charger, and a padlock device for open position. Additional custom features include ABB MLCB (T7) and J Series Camlock devices with specific color-coded connections for each phase and ground. The lead time is estimated at 8-10 months, and the document is associated with Project #265-340 and Solicitation Number SPMYM225Q2263 from the Defense Logistics Agency Land and Maritime.

View the file

Other files for this federal contract opportunity

Other files attached to DIESEL GENERATOR, newest first.
File Type Posted
EXHIBIT B- CDRL.pdf PDF
EXHIBIT D- CDRL.pdf PDF
EXHIBIT A- CDRL.pdf PDF
EXHIBIT C- CDRL.pdf PDF
SPMYM2-25-Q-2263.pdf PDF
SPECIFICATION_25Q2263.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Triton 750kW Diesel Generator - Pony Diesel - S34025D0532 Project # 265-340

June,5, 2025, Triton 750kW Diesel Generator 1 Cummins Powered 750kW - Tier 2 Integrated tank (aprox. 8 hours - pending capacity confirmation) Enclosed in 20' Container Controllers: DSE Non-UL Listed EPA Compliant for Emergency use in United States and Canada Lead time estimate of 8-10 months 220000 Reinforce lift points 1 220015 277/480 V 3 Phase 60Hz High Wye **adjust to 450V** 1 Battery, Battery Rack & Cables for OC Series - Includes 1 2 x Series Batteries, Battery Cable & Rack 10AMP B... 10 Amp Battery Charger - UL Listed 1 CUSTOM PARTS Hot start Forced Circulating Heater 1 2500 Watt / 240VAC Labor For Installation of Block Heaters 1 CUSTOM PARTS Padlock Device for OPEN Position - 1 ABB MLCB (T7) or similar CUSTOM PARTS J Series Camlock Devices - installed 1

Qty 3 / E1017-1625 (female black) (Phase 1) Qty 3 / E1017-1635 (female white) (Phase 2) Qty 3 / E1017-1629 (female red) (Phase 3) Qty 1 / E1017-1608 (male green) (Ground) Camlock Devices installed on end of Connex (8’ side)

Labor and material included

File details come from the government source that posted it. Updated .