EXHIBIT A- CDRL.pdf
PDF 236 KB Posted
- Attached to
- DIESEL GENERATOR Federal contract opportunity
- Solicitation number
- SPMYM225Q2263
About this file
This document is a Contract Data Requirements List (CDRL) for a Technical Data Package related to a Transmission Jack/Lift, with a specific focus on Air Emissions Requirements Data. The CDRL, identified with Data Item Number A001, requires the contractor to provide detailed information about air pollution-generating equipment and processes that may require a Notice of Construction (NOC) permit under PSCAA Regulation I.
Key requirements include identifying portable and stationary internal combustion engines, addressing compliance with specific federal regulations (40 CFR 60 Subpart IIII, 40 CFR 63 Subpart ZZZZ), and preparing permit application packages for the NBK Air Program Manager. The contractor must obtain NOC permits, which can take up to 120 days, before starting work. This includes providing data such as filter capture efficiencies, equipment make/model, and airflow specifications. The contractor is responsible for permit fees and must ensure all equipment and work comply with applicable federal, state, and local air pollution-control regulations. The distribution of this document is limited to DoD and DoD contractors, with an effective date of 7/29/2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EXHIBIT C- CDRL.pdf | ||
| SALIENT CHARACTERISTICS_25Q2263.pdf | ||
| SPMYM2-25-Q-2263.pdf | ||
| SPECIFICATION_25Q2263.pdf | ||
| EXHIBIT B- CDRL.pdf | ||
| EXHIBIT D- CDRL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ____________ OTHER SESS
D. SYSTEM/ITEM
Transmission Jack/Lift
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Data Package
3. SUBTITLE
Aur Emissions Requirements Data
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776A NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
Purchasing Activity
. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE
Final
N/A Draft Reg Repr
16. REMARKS
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 7/29/2024. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 – Documentation shall be delivered after contract award, but before manufacturer of the equipment.
GENERAL AIR EMISSIONS REQUIREMENTS DATA:
1 The contractor shall identify any air pollution generating equipment or processes that may require a Notice of Construction pursuant to PSCAA Regulation I - Article 6 New Source Review. Identify portable and stationary internal combustion engines (ICEs) that will must be supplied, used, or serviced for this project. Address compliance with 40 CFR 60 Subpart IIII, 40 CFR 63 Subpart ZZZZ, and PSCAA Regulation I - Article 15 Nonroad Engines, as applicable.
2 Notice of Construction (NOC) permits may require up to 120 days to receive approval from outside regulatory agencies. Examples of taskings that may require an NOC include, but are not limited to, the following:
2.1 Installation of stationary combustion sources such as electrical generators, certain portable combustion sources (not including motor vehicles),
2.2 Fuel storage tanks, dispensers, and loading racks,
2.3 Prepare and forward all data required for the permit application package to the NBK Air Program Manager for review and submittal to the applicable regulatory agency.
Examples of relevant data include filter capture efficiencies, make/model of equipment being supplied, and intake/exhaust airflow (in cfm). The Contractor is responsible for paying associated permit fees. Permit approval must be obtained prior to the start of work covered by the permit. Upon completion of work, notify the NBK Air Program Manager, who will submit the Notification of Completion to the applicable regulatory agency.
Equipment and work provided as part of this Contract must comply with the terms and conditions of the permit, and other applicable federal, state, and local air pollution-control regulations.
N68438 (TRF, Bangor) 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Carl S Jaeckel 7/3/2025
X Carl S Jaeckel Carl S Jaeckel
7/3/2025
Carl S Jaeckel 7/3/2025
X Carl S Jaeckel Carl S Jaeckel
7/3/2025
DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0002AA A
A001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001