This is a comprehensive set of construction documents for a Department of Veterans Affairs (VA) HVAC replacement project at the Salem, Virginia Veterans Affairs Medical Center. The project, numbered 20065, involves replacing the HVAC system in multiple wings (H, J, and J1) of Building 143 in three phases. Key details include:
The project scope involves completely demolishing and replacing existing air handling units (AHUs), variable air volume (VAV) terminal units, exhaust fans, piping, ductwork, and associated mechanical systems. The new systems will feature custom air handling units with redundant fan arrays, steam-to-steam heat exchangers, humidifiers, chilled water coils, and steam pre-heat coils. The design includes detailed specifications for mechanical, plumbing, electrical, and fire alarm systems, with specific attention to maintaining hospital operations during phased construction. The project is set for final submission on November 21, 2025, with the consulting team including Freedom Engineering and KCI Technologies, and will utilize Siemens Desigo control systems throughout the facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626B0005 0005.docx | DOCX document | |
| S05 RFI_ Upgrade HVAC System Phase II pt.2.pdf | ||
| 143- LS B143-2ND FL.pdf | ||
| S05 RFI_ Upgrade HVAC System Phase II.pdf | ||
| 36C24626B0005 0004.docx | DOCX document | |
| S05 RFI_Salem VAMC HVAC Phase II Drawings.pdf | ||
| S05 RFI_Salem VAMC - Final CD Submission - Spec.pdf | ||
| S06 36C24626B0005 0003.pdf | ||
| S04 Site Visit Upgrade HVAC Phase II.pdf | ||
| 36C24626B0005 0002.docx | DOCX document | |
| 36C24626B0005 0001.docx | DOCX document | |
| 36C24625B0029_ Amendment A00002.pdf | ||
| Salem VAMC FP Drawings.pdf | ||
| Salem VAMC ELECT Drawings.pdf | ||
| 36C24626B0005_1.docx | DOCX document | |
| Replace HVAC Phase II _ Final Spec.pdf | ||
| P01 Upgrade HVAC Phase II - Drawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMPUS MAP
SALEM, VIRGINIA
VETERANS AFFAIRS MEDICAL CENTER
REPLACE HVAC PHASE II
N
PROJECT # 20065
FINAL SUBMISSION
NOVEMBER 21, 2025
AREA OF WORK BUILDING 143
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:0
P
M
143-GI1
COVERSHEET
Revisions: Date:
MECHANICAL SYMBOLS
RTU-1 MECHANICAL EQUIPMENT IDENTIFICATION
X NEW WORK PLAN NOTE IDENTIFICATION
X DEMOLITION PLAN NOTE IDENTIFICATION
M-6
DETAIL IDENTIFICATION
DETAIL NUMBER AND DRAWING NUMBER AS INDICATED
END OF DEMOLITION
POINT OF CONNECTION TO EXISTING
EXISTING TO BE REMOVED
EXISTING TO REMAIN
NEW WORK
SUPPLY DIFFUSER/TYPE IDENTIFICATION
AIR QUANTITY (CFM) AS INDICATED
SX-X
CFM
SX-X
CFM
LINEAR SUPPLY DIFFUSER/TYPE IDENTIFICATION
AIR QUANTITY (CFM) AS INDICATED
RX-X LINEAR RETURN GRILLE/TYPE IDENTIFICATION
AIR QUANTITY (CFM) AS INDICATED
RX-X RETURN REGISTER/TYPE IDENTIFICATION
AIR QUANTITY (CFM) AS INDICATED
EX-X EXHAUST REGISTER/TYPE IDENTIFICATION
AIR QUANTITY (CFM) AS INDICATED
AIR FLOW DIRECTION
DUCTWORK
FLEXIBLE DUCTWORK-PROVIDE VOLUME DAMPER
ON ALL FLEX DUCT TAKEOFFS
SUPPLY AIR DUCTWORK
RETURN AIR DUCTWORK
EXHAUST AIR DUCTWORK
DUCTWORK TURNED UP OR TOWARDS
DUCTWORK TURNED DOWN OR TOWARDS
FIRE/SMOKE DAMPER WITH ACCESS DOOR
FIRE DAMPER WITH ACCESS DOOR
MANUAL VOLUME DAMPER WITH LOCKING QUADRANT
ACTUATOR
THERMOSTAT AND ASSOCIATED EQUIPMENT
100 DOOR UNDERCUT (CFM)
SD SMOKE DETECTOR
VAV-X
MIN/MAX
SINGLE DUCT VAV BOX (MIN/MAX CFM)
PIPE TURN DOWN - SINGLE LINE
PIPE TURN UP - SINGLE LINE
PIPE TURN DOWN - DOUBLE LINE
PIPE TURN UP - DOUBLE LINE
CHWS CHILLED WATER SUPPLY PIPING
CHWR CHILLED WATER RETURN PIPING
D CONDENSATE DRAIN
CW COLD WATER
LPS LOW PRESSURE STEAM PIPING
LPC LOW PRESSURE STEAM CONDENSATE RETURN PIPING
HWS HEATING HOT WATER SUPPLY PIPING
HWR HEATING HOT WATER RETURN PIPING
CHECK VALVE
SHUT-OFF VALVE
F
P
T
BALANCING VALVE
ATC CONTROL VALVE
STRAINER WITH 3/4" DRAIN VALVE AND CAP
THERMOMETER IN THERMOWELL
ATC FLOW METER
ATC PRESSURE SENSOR
ATC IMMERSION TEMPERATURE SENSOR
FLEXIBLE PIPE CONNECTION
PRESSURE / TEMPERATURE RELIEF VALVE
PRESSURE GAUGE W/ ISOLATION VALVE
PIPE UNION
DRAIN VALVE W/ HOSE CONNECTION
AIR VENT
PRESSURE / TEMPERATURE TEST PORT
CFM
CFM
CFM
BACKDRAFT DAMPER
MOTORIZED DAMPER
CABLE-OPERATED DAMPER
FROM SHOWN
SECTION IDENTIFICATION
MECHANICAL ABBREVIATIONS
AA AUXILIARY AIR
ABV ABOVE
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT CONTROL SIGNAL
AO ANALOG OUTPUT CONTROL SIGNAL
ATC AUTOMATIC TEMP. CONTROLS
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BDD BACK DRAFT DAMPER
BSC BIOSAFETY CABINET
CS CLEAN STEAM
CSC CLEAN STEAM CONDENSATE
CLG CEILING
CP CONDENSATE PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CW DOMESTIC COLD WATER
CV CONSTANT VOLUME
CD CONDENSATE DRAIN
DN DOWN
(E) EXISTING
EA EXHAUST AIR
EF EXHAUST FAN
ETR EXISTING TO REMAIN
F FAN
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
HW DOMESTIC HOT WATER
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
IU INDUCTION UNIT
LPC LOW PRESSURE STEAM CONDENSATE
LPS LOW PRESSURE STEAM
MD MOTORIZED DAMPER
MHP MOTOR HORSEPOWER
(N) NEW
NC NORMALLY CLOSED
NO NORMALLY OPEN
OA OUTSIDE AIR
OED OPEN ENDED DUCT W/ MESH
PA PRIMARY AIR
PC PLUMBING CONTRACTOR
PRV PRESSURE REDUCING VALVE
RA RETURN AIR
RDPS ROOM DIFFERENTIAL PRESSURE SENSOR
(R) RELOCATED
RTU ROOFTOP UNIT
SA SUPPLY AIR
SF SAFETY FACTOR
SS STAINLESS STEEL
SW SOFTENED WATER PIPING
T/A TRANSFER AIR ABV CEILING
TOD TOP OF DUCT
UH UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W/O WALL OPENING ABOVE CEILING
(X) EQUIPMENT TO BE DEMOLISHED
GENERAL MECHANICAL NOTES
1. PROVIDE FIRE STOPPING FOR ALL PIPE AND DUCT PENETRATIONS THROUGH WALLS AND FIRE-RATED WALLS AND FLOOR
SLABS. ALL PENETRATIONS SEALED/CAULKED BY FM CERTIFIED INSTALLER.
2. INSULATION FLAME/SMOKE RATING: PROVIDE COMPOSITE MECHANICAL INSULATION JACKETS, COVERINGS, SEALERS, MASTIC, AND ADHESIVES WITH FLAME-SPREAD INDEX OF 25 OR LESS AND SMOKE DEVELOPED INDEX OF 50 OR LESS AS TESTED BY ASTM E4 AND THE APPROVED METHOD OF NFPA 255. INSULATION MUST BE U.L. LISTED AND LABELED.
3. DUCTWORK AND PIPING PASSING THROUGH AREAS OF RENOVATION AND SERVING ADJACENT SPACES SHALL BE PROTECTED IN PLACE. WHERE IT IS DETERMINED THAT THESE DUCTWORK AND PIPING MUST BE RELOCATED, CONTRACTOR SHALL REROUTE AND RESTORE SERVICES WITH MINIMAL DISRUPTION. COORDINATE WORK WITH THE
OWNER AND APPROPRIATE USERS.
4. BALANCING: SYSTEM SHALL BE BALANCED TO DELIVER AIR AND WATER QUANTITIES INDICATED ON DRAWINGS. WORK SHALL BE PERFORMED BY FIRM(S) CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR THE ASSOCIATED AIR BALANCE COUNCIL (AABC). MECHANICAL CONTRACTOR SHALL PROVIDE ALL NECESSARY MANUAL VOLUME DAMPERS TO ACHIEVE AIR QUANTITIES INDICATED ON DRAWINGS. AIR BALANCE SHALL BE PERFORMED PRIOR TO OCCUPANCY. THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR THE TESTS. CONTRACTOR WILL NEED TO BALANCE THE SYSTEM AT THE END OF EACH PHASE AS DUCTING SYSTEM
CHANGES.
5. THE CONTRACTOR SHALL SUBMIT FOUR (4) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND
MATERIALS TO THE ENGINEER FOR REVIEW.
6.
1. FINAL BALANCING REPORTS
2. ALL SCHEDULED EQUIPMENT
3. DUCTWORK, PIPING, VALVES, AND INSULATION
7. SUPPORT ALL RIGID AND FLEXIBLE DUCTWORK AND PIPING FROM STRUCTURE ABOVE, AS REQUIRED TO PREVENT
SAGGING. AND LEAKAGE. MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE 6'-0".
8. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS PUBLISHED INSTALLATION LITERATURE.
9. PROVIDE ALL WORK, EQUIPMENT, AND MATERIALS INDICATED. PROVIDE ALL INTERLOCKS, RELAYS, CONTROLS, ETC., FOR A FULLY FUNCTIONAL SYSTEM.
10. SUPPORT EQUIPMENT WITH VIBRATION ISOLATORS.
11. PROVIDE DIELECTRIC COUPLINGS AT ALL FERROUS TO NON-FERROUS PIPE CONNECTIONS AND FLANGE UNION ISOLATING JOINTS TO PREVENT ANY ELECTROLYTIC ACTION BETWEEN DISSIMILAR METAL. DIELECTRIC FITTINGS SHALL BE EQUAL TO EPCO SALES, INC. ALL CONNECTIONS TO STEEL PIPES SHALL BE MADE WITH WELDING FITTINGS.
12. INSULATE ALL SUPPLY, PRIMARY, AND OUTSIDE AIR DUCTWORK.
13. PROVIDE ONE SPARE SET OF ALL AIR FILTERS TO OWNER.
14. PIPES PENETRATING RATED WALLS, PARTITIONS, CEILINGS, AND FLOOR SLABS SHALL BE STOPPED AT RATED OUTER
SURFACES. INSULATION ENDS SHALL BE SEALED VAPORTIGHT.
15. ALL DUCTWORK SHALL BE IDENTIFIED AS TO SERVICE (SUPPLY/RETURN/EXHAUST) AND DIRECTION OF AIRFLOW. SELF ADHESIVE TYPE IDENTIFICATION SHALL BE APPLIED TO DUCT INSULATION AT REGULAR INTERVALS, MAXIMUM 10 FEET
BETWEEN MARKERS.
16. PROVIDE UNIONS AT PIPE CONNECTIONS TO EQUIPMENT TO FACILITATE REMOVAL OF EQUIPMENT.
17. ALL NEW PIPING SHALL BE PAINTED, STRIPED, AND LABELED TO BE CONSISTENT WITH EXISTING CONDITIONS. PIPE IDENTIFICATION LABELS SHALL HAVE 2" HIGH LETTERS WITH BACKGROUND COLOR THAT CONTRASTS BOTH THE COLOR OF PAINT AND LETTERING. FLOW DIRECTIONAL ARROWS SHALL MATCH PIPE IDENTIFICATION. PAINT SHALL BE DURON EPOXY MODIFIED ENAMEL WITH COLORS DEFINED BY THE PIPING SPECIFICATIONS OR TO MATCH BUILDING STANDARD.
18. INSULATE ALL HVAC WATER, DRAIN, AND COLD WATER PIPING PER SPECIFICATIONS. ALL INSULATED EXTERIOR PIPING
SHALL BE FITTED WITH ALUMINUM JACKETING.
19. COORDINATE HOURS OF ALL WELDING AND HOT WORK WITH THE OWNER. TEMPORARY POWER REQUIREMENTS MUST
BE COORDINATED WITH ELECTRICAL CONTRACTOR.
20. ALL PIPING JOINTS SHALL BE LEAK TESTED PRIOR TO BEING PUT IN SERVICE. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED, TO TWICE THE MAXIMUM SYSTEM OPERATING PRESSURE, AND FLUSHED PRIOR TO SYSTEM STARTUP.
21. PROVIDE 1-1/2" ROUND BRASS VALVE IDENTIFICATION TAGS FOR ALL NEW VALVES.
22. SUPPORT ALL NEW PIPING FROM EXISTING BUILDING STRUCTURE AT A MAXIMUM OF 10'-0" INTERVALS OR AS REQUIRED
TO PREVENT SAGGING.
23. TEST WATER PIPING UNDER ACTUAL OPERATING CONDITIONS. REPAIR LEAKS AND RETURN TO SERVICE. TEST WATER PIPING AT 125 PSI FOR 2 HOURS. MAKE REPAIRS WITH NEW MATERIALS. REPLACE LEAKING MATERIALS, DO NOT REPAIR
BY PATCHING.
24. ALL NEW CONSTRUCTION SHALL MATCH BUILDING STANDARD (MATERIALS, INSTALLATION METHODS AND QUALITY). ANY MAJOR DEVIATIONS SHALL REQUIRE APPROVAL OF THE ENGINEER AND/OR BUILDING OWNER PRIOR TO PROCEEDING.
25. ALL NEW AND EXISTING WALL AND FLOOR PENETRATIONS THRU FIRE RATED WALL / FLOOR SHALL BE COMPLETELY SEALED WITH AN APPROVED U.L. LISTED FIRESTOPPING MATERIAL. ALL OTHERS SHALL BE SEALED WITH CAULK
26. ALL WORK AND MATERIAL SHALL BE PROVIDED TO ACCOMPLISH THE INTENT OF THE PLANS. WORK INDICATED HAVING MINOR DETAILS NOT SHOWN SHALL BE PROVIDED COMPLETELY TO PERFORM THE FUNCTIONS INTENDED.
27. ALL SPRINKLER HEADS AND PIPING SHALL BE RELOCATED AS NECESSARY TO PROVIDE THE REQUIRED SCOPE OF WORK.
APPROVAL FROM THE DIVISION OF FIRE MARSHALL SHALL BE OBTAIN PRIOR TO ANY WORK.
28. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONSARE TO BE DEMOED
BACK TO SOURCE UNLESS TOLD OTHERWISE.
GENERAL PROJECT NOTES
1. SCOPE: PROVIDE AND INSTALL ALL WORK, EQUIPMENT, AND MATERIALS AS INDICATED ON THE PROJECT DRAWINGS AND IN THE SPECIFICATIONS TO PROVIDE A COMPLETELY OPERATIONAL SYSTEM. THE DRAWINGS DO NOT INDICATE EVERY FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION DRAWINGS IF NECESSARY FOR, OR AS REQUIRED TO, INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS, FITTINGS, AND AUXILIARY ITEMS SUCH AS RELAYS, CONTROL MODULES, CABINETS, ETC. TO INSTALL THE SYSTEMS AS DIAGRAMMED AT NO ADDITIONAL COST.
2. APPLICABLE CODES AND REGULATIONS: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES, REFERENCES AND REGULATIONS. THE CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES HAVING JURISDICTION AND OF THE PUBLIC UTILITIES HAVING JURISDICTION OVER ANY OF THE SYSTEMS HEREIN SPECIFIED. SEE CONTRACT SPECIFICATIONS FOR ADDITIONAL INFORMATION. VETERANS AFFAIR SPECIFICATIONS SHALL TAKE PRECEDANCE OVER DRAWINGS IN CASE OF ANY
CONFLICT.
A. VIRGINIA CONSTRUCTION CODE 2021
B. VIRGINIA PLUMBING CODE 2021
C. VIRGINIA MECHANICAL CODE 2021
D. VIRGINIA ENERGY CONSERVATION CODE 2021
E. NATIONAL ELECTRIC CODE 2020
3. SITE VISITS AND COORDINATION: THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND SHALL CONFIRM AND EVALUATE EXISTING CONDITIONS AND INSTALLED EQUIPMENT, DUCTWORK, PIPING, FINISHES, ETC. PRIOR TO START OF WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR COORDINATING HIS/HER WORK WITH THE OTHER TRADES AND EXISTING CONDITIONS. IF ANY DISCREPANCY OR CONFLICT IS DETECTED AT THE JOB SITE, IT SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND ARCHITECT IMMEDIATELY, PRIOR TO DOING ANY WORK, WITH
RECOMMENDATIONS FOR PROPER CORRECTION FOR THE ENGINEER'S APPROVAL.
4. EXISTING CONDITIONS: THE ENGINEERING DESIGN DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE NOT CONSIDERED CONSTRUCTION SHOP DRAWINGS. ALL CRITICAL DIMENSIONS SHALL BE CONFIRMED BY THE CONTRACTOR IN THE FIELD. THE LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, DUCTWORK, FIXTURES, ETC.
ARE APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE, BY THE CONTRACTOR.
5. CONNECTION TO, REMOVAL OR RELOCATION OF EXISTING EQUIPMENT, PIPING AND DUCTWORK SHALL BE DONE IN SUCH A MANNER AS NOT TO DAMAGE THE EXISTING FIXTURES OR EQUIPMENT. ANY EQUIPMENT, DUCTWORK, PIPING ETC.
DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR TO THE SATISFACTION OF THE OWNER, AND AT NO ADDITIONAL COST TO THE OWNER.
A. THE CONTRACTOR SHALL PROTECT ALL EXISTING FIRE SUPPRESSION AND FIRE ALARM SYSTEMS AS NECESSARY TO AVOID FALSE ALARMS AND NUISANCE TRIPS. ALL SUCH SYSTEMS SHALL REMAIN OPERATIONAL DURING
CONSTRUCTION AS REQUIRED BY THE LOCAL FIRE MARSHAL.
6. SERVICE INTERRUPTIONS AND WORKING HOURS: PRIOR TO THE START OF WORK, CONTRACTOR SHALL OBTAIN THE PERMISSION OF THE PROJECT OWNER FOR INTERRUPTION OF EXISTING SERVICES AND FOR CONNECTION TO THE SAME. CONTRACTOR SHALL COORDINATE THE TIME OF WORK AND INTERRUPTION OF SERVICES IN ACCORDANCE WITH THE INSTRUCTIONS OF THE PROJECT OWNER. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AS DEFINED BY THE PROJECT OWNER. WORK PERFORMED OUTSIDE OF NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH OWNER PRIOR TO THE CONSTRUCTION PHASE. REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED IN WRITING WITH THE PROJECT OWNER'S REPRESENTATIVE A MINIMUM OF 15 WORKING DAYS IN
ADVANCE.
7. SCAFFOLDING, RIGGING AND HOISTING: CONTRACTOR SHALL PROVIDE ALL SERVICES REQUIRED FOR INSTALLATION, ERECTION AND DELIVERY OF ALL MATERIALS AND EQUIPMENT TO THE SITE AND FOR REMOVAL OF TRASH, CONSTRUCTION DEBRIS, WASTE, AND DEMOLISHED ITEMS FROM THE PREMISES.
8. PROVIDE DAILY CLEAN UP OF CONSTRUCTION AND DEMOLITION DEBRIS ON ALL FLOORS SURFACES AND ON ALL EQUIPMENT BEING OPERATED BY VA. MAINTAIN ALL EGRESS ROUTES AND SAFETY SYSTEMS/DEVICES.
9. INSTALLATION: INSTALLATION OF EQUIPMENT, PIPING, FIXTURES, WIRING, ETC. SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER, AND SHALL CONFORM TO THE LATEST TRADE PRACTICES. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND THE CURRENT MODEL, FOR WHICH REPLACEMENT PARTS IS AVAILABLE. SUBSTITUTIONS SHALL ONLY BE ACCEPTED AT THE DISCRETION OF THE PROJECT OWNER OR THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, UNLESS INDICATED OTHERWISE. ALL EQUIPMENT SHALL BE MOUNTED VIBRATION FREE.
A. THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALLS, CEILINGS, FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND/OR NEW PROJECT WORK. THE REPAIRS SHALL BE WITH MATERIALS AND FINISHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS IN FIRE RATED PARTITIONS OR DUCTWORK SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RESISTANT INTEGRITY. DUCTWORK AND PIPING
SHALL BE CAPPED, SEALED AIR AND WATERTIGHT AND INSULATED TO MATCH EXISTING.
B. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED TO PROVIDE THE MANUFACTURER'S REQUIRED SERVICE CLEARANCES, AND ANY AIR AND WATER BALANCING DEVICES SHALL BE ACCESSIBLE FOR ADJUSTMENT.
PROVIDE ACCESS DOORS IN DRYWALL CEILINGS AND PARTITIONS AS REQUIRED TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSED JUNCTION BOXES. COORDINATE THE EXACT LOCATIONS AND STYLE OF
FLANGELESS ACCESS DOORS WITH THE ENGINEER.
C. THE CONTRACTOR SHALL INSTALL ALL DUCTWORK, PIPING, RACEWAYS, CIRCUITRY, CONDUIT, ETC., AS HIGH AS
POSSIBLE TO MAXIMIZE HEADROOM.
10. PROJECT CLEANING: ALL MATERIAL NOT TO BE USED SHALL BE REMOVED FROM THE SITE AND ALL DEBRIS SHALL BE CLEARED. THE AREA OF WORK SHALL BE LEFT IN CLEAN CONDITION PRIOR TO TURNOVER TO OWNER. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO WASHING AND/OR REPAIRING GLASS, REMOVING SPOTS AND STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALLS AND CEILINGS IF
APPROPRIATE.
11. PROJECT CLOSEOUT, COMMISSIONING, AND PUNCH LISTS: UPON COMPLETING APPROXIMATELY 75% OF THE REQUIRED WORK, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ARCHITECT IN ORDER TO SCHEDULE A PRE-FINAL REVIEW OF CONSTRUCTION. NO WORK SHALL BE CONCEALED BY CEILINGS, WALLS, ETC. FINAL REVIEW SHALL BE SCHEDULED AT 100% COMPLETION OF CONSTRUCTION. ALL PUNCH LIST ITEMS MUST BE ACCOMPLISHED PRIOR TO FINAL
ACCEPTANCE.
A. ALL EQUIPMENT WARRANTIES AND OPERATIONS AND MAINTENANCE MANUALS SHALL BE FULLY TRANSFERRED TO THE PROJECT OWNER PRIOR TO FINAL ACCEPTANCE. ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FULL FROM DEFECT FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS
WORK BY THE PROJECT OWNER.
B. UNLESS OTHERWISE SPECIFIED IN THE COMMISSIONING SPECIFICATIONS, THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE PROJECT OWNER ITS PROPER
OPERATION(S).
C. PROVIDE OPERATION AND MAINTENANCE MANUALS IN 3-RING BINDER. LIST ALL DESIGN FIRMS, CONTRACTORS AND PRIMARY SUPPLIERS; PROVIDE A POINT OF CONTACT WITH PHONE NUMBER AND E-MAIL ADDRESS FOR EACH FIRM. INCLUDE WARRANTY STATEMENTS, COPY OF APPROVED SUBMITTAL AND OPERATION AND MAINTENANCE PROCEDURES FOR EACH PIECE OF EQUIPMENT. INCLUDE A COPY OF THE FINAL, APPROVED
WATER AND AIR BALANCE REPORT.
D. PROVIDE PREVENTATIVE MAINTENANCE MANUALS SEPARATE FROM OPERATION AND MAINTENANCE MANUALS.
PREVENTATIVE MAINTENANCE MANUALS SHALL BE TURNED OVER TO THE OWNER.
12. PROJECT WARRANTY: ALL WORK SHALL BE FULLY WARRANTED FOR A PERIOD OF ONE YEAR UNLESS SPECIFICALLY NOTED OTHERWISE. DURING THE CORRECTION PERIOD, THE CONTRACTOR SHALL CORRECT ANY WORK FOUND NOT TO BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS BY REPAIRING OR REPLACING THE DEFECTIVE WORK AT NO ADDITION TO THE CONTRACT SUM. ALL MANUFACTURE EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO THE PROJECT OWNER UPON SUBSTANTIAL COMPLETION. THE WARRANTY SHALL BEGIN AT SUBSTANTIAL PROJECT
COMPLETION.
13. AHUs SHALL BE FULLY CUSTOM AND BUILT-IN-PLACE. CONTRACTOR SHALL SHALL GET EXACT CUSTOM UNIT DIMENSIONS TO ACCOMMODATE EXISTING UTILITIES WITHIN MECHANICAL ROOMS AND PROJECT AREA OF WORK. CONTRACTOR SHALL COORDINATE WITH ENGINEER FOR UTILITIES TO BE RELOCATED, AND PROVIDE RECOMMENDED ROUTING FOR
RELOCATION.
14. CONTRACTOR SHALL REMOVE AND REPLACE CEILING AS REQUIRED TO ACCOMMODATE NEW WORK. CONTRACTOR SHALL MATCH EXISTING CEILING GRID, CEILING TILES, HARD CEILINGS AND CEILING HEIGHT.
SHEET NUMBER SHEET NAME
GENERAL
143-GI1 COVERSHEET
MECHANICAL
143-MH1 SPECIFICATIONS, ABBREVIATIONS & SYMBOLS
143-MH2 PHASING PLAN - MECHANICAL
143-MH3 PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL - DEMOLITION
143-MH4 PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL PIPING - DEMOLITION
143-MH5 PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL - DEMOLITION
143-MH6 PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL PIPING - DEMOLITION
143-MH7 PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL - DEMOLITION
143-MH8 PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL PIPING - DEMOLITION
143-MH9 PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL - NEW WORK
143-MH10 PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL PIPING - NEW WORK
143-MH11 PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL - NEW WORK
143-MH12 PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL PIPING - NEW WORK
143-MH13 PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL - NEW WORK
143-MH14 PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL PIPING - NEW WORK
143-MH15 PARTIAL 2ND FLOOR PLAN - PART A - MECH RM ENLARGED PLAN - NEW WORK
143-MH16 PARTIAL 2ND FLOOR PLAN - PART B - MECH RM ENLARGED PLAN - NEW WORK
143-MH17 PARTIAL 2ND FLOOR PLAN - PART C - MECH RM ENLARGED PLAN - NEW WORK
143-MH18 DETAIL - MECHANICAL
143-MH19 DETAIL - MECHANICAL
143-MH20 DETAIL - MECHANICAL
143-MH21 DETAIL - MECHANICAL
143-MH22 DETAIL - MECHANICAL
143-MH23 SCHEDULES - MECHANICAL
143-MH24 SCHEDULES - MECHANICAL
143-MH25 SCHEDULES - MECHANICAL
143-MH26 CONTROLS - MECHANICAL
143-MH27 CONTROLS - MECHANICAL
PLUMBING
143-PL1 SPECIFICATIONS, ABBREVIATIONS & SYMBOLS
143-PL2 PARTIAL 2ND FLOOR PLAN - PART A - MECH RM ENLARGED PLAN PLUMBING - DEMOLITION 143-PL3 PARTIAL 2ND FLOOR PLAN - PART B - MECH RM ENLARGED PLAN PLUMBING - DEMOLITION 143-PL4 PARTIAL 2ND FLOOR PLAN - PART C - MECH RM ENLARGED PLAN PLUMBING - DEMOLITION 143-PL5 PARTIAL 2ND FLOOR PLAN - PART A - MECH RM ENLARGED PLAN PLUMBING - NEW WORK 143-PL6 PARTIAL 2ND FLOOR PLAN - PART B - MECH RM ENLARGED PLAN PLUMBING - NEW WORK 143-PL7 PARTIAL 2ND FLOOR PLAN - PART C - MECH RM ENLARGED PLAN PLUMBING - NEW WORK
143-PL8 PARTIAL 2ND FLOOR PLAN - PART A - PLUMBING - NEW WORK
143-PL9 PARTIAL 2ND FLOOR PLAN - PART B - PLUMBING - NEW WORK
143-PL10 PARTIAL 2ND FLOOR PLAN - PART C - PLUMBING - NEW WORK
ELECTRICAL
143-ES1 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS - ELECTRICAL
143-ES2 PHASING PLAN - ELECTRICAL
143-ES3 PARTIAL 2ND FLOOR PLAN - PART A - POWER - DEMOLITION
143-ES4 PARTIAL 2ND FLOOR PLAN - PART B - POWER - DEMOLITION
143-ES5 PARTIAL 2ND FLOOR PLAN - PART C - POWER - DEMOLITION
143-ES6 PARTIAL 2ND FLOOR PLAN - PART A - POWER - NEW WORK
143-ES7 PARTIAL 2ND FLOOR PLAN - PART B - POWER - NEW WORK
143-ES8 PARTIAL 2ND FLOOR PLAN - PART C - POWER - NEW WORK
143-ES9 DETAILS - ELECTRICAL
143-ES10 ONE-LINE DIAGRAMS
143-ES11 PANEL SCHEDULES
FIRE ALARM
143-FA0 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS - FIRE ALARM
143-FA1 PARTIAL 2ND FLOOR PLAN - PART A - FIRE ALARM - DEMOLITION
143-FA2 PARTIAL 2ND FLOOR PLAN - PART B - FIRE ALARM - DEMOLITION
143-FA3 PARTIAL 2ND FLOOR PLAN - PART C - FIRE ALARM - DEMOLITION
143-FA4 PARTIAL 2ND FLOOR PLAN - PART A - FIRE ALARM - NEW WORK
143-FA5 PARTIAL 2ND FLOOR PLAN - PART B - FIRE ALARM - NEW WORK
143-FA6 PARTIAL 2ND FLOOR PLAN - PART C - FIRE ALARM - NEW WORK
143-FA7 FIRE PROTECTION GENERAL NOTES AND LEGEND
143-FA8 SPRINKLER FLOOR PLAN
143-FA9 ENLARGED SPRINKLER PLANS
143-FA10 SPRINKLER CONCEPTUAL RISER
SHEETLIST
DEDUCT ALTERNATES
1. ALTERNATE AHU MANUFACTURERS CAN BE CONSIDERED, SUBJECT TO COMPLIANCE WITH REQUIREMENTS.
2. ALTERNATE MANUFACTURERS FOR STEAM TO CLEAN STEAM HEAT EXCHANGER CAN BE CONSIDERED, SUBJECT TO
COMPLIANCE WITH REQUIREMENTS.
3. BASE BID SHALL INCLUDE REPLACING ALL EXISTING DUCTWORK AND AIR DEVICES SHOWN ON FLOOR PLAN WITH
NEW DUCTWORK AND AIR DEVICES. DEDUCT ALTERNATE SHALL INCLUDE RE-USING EXISTING DUCTWORK AND AIR
DEVICES INDICATED.
4. BASE BID SHALL INCLUDE SPLIT CHILLED WATER COIL FOR ALL (3) AHUs. DEDUCT ALTERNATE SHALL INCLUDE
PROVIDING A SINGLE CHILLED WATER COIL FOR EACH AHU.
CONTRACTOR BIDDING NOTES
1. CONTRACTOR SHALL VISIT SITE, MECHANICAL ROOMS AND VISUALLY INSPECT ABOVE CEILING TO GET A FULL AND
COMPREHENSIVE UNDERSTANDING OF ALL THE EXISTING UTILITIES THAT WILL NEED TO BE REROUTED/RELOCATED TO ACCOMMODATE AND INSTALL NEW WORK. THESE UTILITIES SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL WALL METAL STUDS, HANGERS SUPPORTS, MECHANICAL, PLUMBING, FIRE PROTECTION PIPING, ELECTRICAL CONDUIT, ELECTRICAL EQUIPMENT, AND ELECTRICAL DISCONNECTS, ETC. DUE TO THE NATURE OF THE EXISTING CONDITIONS OF THE BUILDING, CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL NECESSARY RE-ROUTING
AND RELOCATION OF EXISTING UTILITIES AT NO EXPENSE TO THE VA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:0
P
M
143-MH1
SPECIFICATIONS, ABBREVIATIONS & SYMBOLS
PHASING NOTES
• EACH WING SHALL BE SHUTDOWN AND ISOLATED FROM THE REST OF THE HOSPITAL.
• ALL WORK SHALL BE FINISHED AND COMMISIONED BEFORE ANY WORK IS TO BE PERFORMED IN OTHER WINGS.
0'
SCALE : 1/4" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
2'4' 4' 8'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:1
P
M
143-MH2
PHASING PLAN - MECHANICAL
N.T.S
2ND FLOOR PLAN - H WING - PHASE 1
N.T.S
2ND FLOOR PLAN - J WING - PHASE 2
N.T.S
2ND FLOOR PLAN - J1 WING - PHASE 3
4 5 6 7
K
L
PRE-OP
SCREENING
2H-118
PATIENT
2H-118A
PATIENT
2H-118B
PATIENT
2H-118C
PATIENT
2H-119
PATIENT
2H-117
WAITING
2H-117A
EXAM
2H-120
PATIENT
2H-112
EXAM
2H-121A
EXAM
2H-121B
EXAM
2H-122A
EXAM
2H-122B
EXAM
2H-125A
EXAM
2H-125B
EXAM
2H-127
EXAM
2H-127A
EXAM
2H-128A
EXAM
2H-128
EXAM
2H-129
EXAM
2H-130
EXAM
2H-132
WAITING ROOM
EXAM-1
EXAM-2
EXAM-3
EXAM-4
EXAM-5
EXAM-6
EXAM-7
EXAM-8
EXAM-9
TOILET 1
WAITING
STORAGE
2H-103I
OFFICE
2H-102
HYDRO TUB
2H-110
NURSE OFFICE
2H-115 NURSE STATION
C2-19
ELEC.
2H-113
NURSE STATION
C2-23
WORKROOM
2H-114
EXAM
2H-124
SOIL UTILITY
2H-131
NOURISHMENT
2H-116
CLEAN UTILITY
2H-133
MEDICINE RM
2H-116A
CLEAN LINEN
2H-123
TOILET
2H-121C
TOILET
2H-122C
TOILET
2H-121C
TOILET
2H-125C
TOILET
2H-129A
TOILET
2H-101
TOILET
2H-130A
TOILET
2H-134B
MECH ROOM
2H-111
10"x12" SA (X)
36"x16" SA (X)
24"x16" RA (X)36"x16" SA (X)
24"x16" RA (X)
8" x1
0" E
A
X
"x
S A
X
10"x12" SA (X)
"x
S A
X
8"x8" EA (X)
4" x4
S
A
X
6"x12" SA
8"x8" SA (X)
"x
R A
X
"x
S A
X
"x
S
A
X
8"x6" RA (X)
10"x12" SA (X)
6" x8
S
A
X
10"x6" RA (X) 8"x6" RA (X)
10"x8" RA (X) 8"x8" RA (X)
8"x6" RA (X)
8"x12" SA (X) 6"x8" SA (E)
"x
8" S
A
X
8"x4" RA (X)
10" x8" R A
( x)
MECH ROOM
2J-179
18"x12" RA (X)
9" x6
S
A
E
6 "x 12 " S A
(E
8"x10" EA (X)
10"x12" SA (X)
8" x8
S
A
X
"x
5" E
A
X
10"x8" EA (X)
14"x10" SA (X)
"x
S A
X
) 20 "x12" E A
( X
18"x10" EA (X) 16"x10" EA (X)
10"x10" SA (X)
12"x10" EA (X)
12"x10" EA (X)
1 4 "x
E A
X
24"x16" RA
143-AHU-2H1(X)
143-AHU-2H2(X)
GLYCOL COIL(X)
FCU(X)
FCU(X)
FCU(X)
8" x6
E
A
X
321.3
M
N
O
P
8"x6" SA (X)
8"x6" SA (X)
10"x10" SA (X)
UNIT
HEATER(R)
SD(X)
RG(X)
SD(X)
SD(X)
RG(X)
RG(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)SD(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)EG(X)EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
EG(X)
RG(X)
RG(X)
RG(X)
RG(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
ALL MECHANICAL EQUIPMENT, CONTROLS, DUCTWORK AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
CEILING RADIANT PANEL, CONTROLS AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
SD(X) SD(X)
SD(X)
18"x12" SA (X)
8"x12" SA
SD(X)
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT EXISTING
CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING
CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE VA. IF THE VA DEEMS THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER MANNER.
MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE ABANDONED IN
PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. COORDINATE ALL WORK WITH PHASING PLAN.
7. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONS ARE
TO BE DEMOED BACK TO THERE SOURCE UNLESS OTHERWISE INDICATED.
8. BASE BID SHALL REPLACE ALL DUCTWORK INDICATED AS EXISTING.
9. CONTRACTOR SHALL ENSURE ANY MECHANICAL PIPING AND DUCTWORK SERVING AREAS OUTSIDE
THE AREA OF WORK IS NOT REMOVED AND ENGINEER SHOULD BE NOTIFIED FOR FURTHER
INSTRUCTIONS.
X
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:1
P
M
143-MH3
PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL
- DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL - DEMOLITION
1 REMOVE FAN COIL UNITS, ASSOCIATED DUCTWORK AND CHILLED/HEATING WATER PIPING
SERVING PERIMETER AREA. AIR DEVICES SHALL BE REMOVED IN THEIR ENTIRETY.
2 REMOVE RADIANT PANEL INCLUDING ALL PIPING ACCESSORIES BACK TO SOURCE.
3 AHU'S 143-AHU-2H1 AND 143-AHU-2H2 SHALL BE COMPLETELY DEMOLITIONED AND REMOVED
INCLUDING ALL ASSOCIATED DUCTWORK, CONTROLS AND PIPING BACK TO SOURCE. GLYCOL
HEAT EXCHANGER COIL SHALL BE REMOVED INCLUDING ALL ASSOCIATED PIPING. EXHAUST DUCT AND RELIEF DUCT UP SHALL REMOVED IN ITS ENTIRETY TO FANS. COORDINATE WIHT COR FOR
EXTENT OF DEMOLITION AND LOCATION OF FANS.
4 LOUVER SHALL BE REMOVED IN ITS ENTIRETY. PATCH WALL TO MATCH EXISTING. COORDINATE
WITH NEW WORK LOUVER.
5 REMOVE DUCTWORK, HEATING COIL AND ALL ASSOCIATED ACCESSORIES TO POINT INDICATED.
6 REMOVE EXHAUST GRILLE AND DUCTWORK IN ITS ENTIRETY.
7 REMOVE LADDER UP TO LOWER ROOF TO ACCOMIDATE NEW RELIEF AIR LOUVER. RELOCATE
LADDER TO OTHER SIDE OF OF STAIRWELL.
8 RELOCATE EXISTING UNIT HEATER INCLUDING ALL CONTROLS. PROVIDE NEW CONTROL VALVE
ANDBALANCING VALVE AND BALANCE UNIT HEATER TO PRE-DEMO TAB FLOW.
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT EXISTING
CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING
CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE VA. IF THE VA DEEMS THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER MANNER.
MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE ABANDONED IN
PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. COORDINATE ALL WORK WITH PHASING PLAN.
7. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONS ARE
TO BE DEMOED BACK TO THERE SOURCE UNLESS OTHERWISE INDICATED.
8. CONTRACTOR SHALL ENSURE ANY MECHANICAL PIPING AND DUCTWORK SERVING AREAS OUTSIDE
THE AREA OF WORK IS NOT REMOVED AND ENGINEER SHOULD BE NOTIFIED FOR FURTHER
INSTRUCTIONS.
X
4 5 6 7
K
L
PRE-OP
SCREENING
2H-118
PATIENT
2H-118A
PATIENT
2H-118B
PATIENT
2H-118C
PATIENT
2H-119
PATIENT
2H-117
WAITING
2H-117A
EXAM
2H-120
PATIENT
2H-112
EXAM
2H-121A
EXAM
2H-121B
EXAM
2H-122A
EXAM
2H-122B
EXAM
2H-125A
EXAM
2H-125B
EXAM
2H-127
EXAM
2H-127A
EXAM
2H-128A
EXAM
2H-128
EXAM
2H-129
EXAM
2H-130
EXAM
2H-132
WAITING ROOM
EXAM-1
EXAM-2
EXAM-3
EXAM-4
EXAM-5
EXAM-6
EXAM-7
EXAM-8
EXAM-9
TOILET 1
WAITING
STORAGE
2H-103I
OFFICE
2H-102
HYDRO TUB
2H-110
NURSE OFFICE
2H-115
NURSE STATION
C2-19
ELEC.
2H-113
NURSE STATION
C2-23
WORKROOM
2H-114
EXAM
2H-124
SOIL UTILITY
2H-131
NOURISHMENT
2H-116
CLEAN UTILITY
2H-133
MEDICINE RM
2H-116A
CLEAN LINEN
2H-123
TOILET
2H-121C
TOILET
2H-122C
TOILET
2H-121C
TOILET
2H-125C
TOILET
2H-129A
TOILET
2H-101
TOILET
2H-130A
TOILET
2H-134B
MECH ROOM
2H-111
MECH ROOM
2J-179
2" HWR (X)
GLYCOL
COIL(X)
143-AHU-2H2(X)
143-AHU-2H1(X)
321.3
M
N
O
P
RADIANT PANEL PUMPS(X)
UH(R)
COIL(X)
COIL(X)
COIL(X)
UNIT HEATER(R)
COIL(X)
2 1/2" CHWS
2" HWS (X)
2 1/2" CHWR (X)
2" HWR (X)
2" HWS (X)
2 1/2" CHWS (X)
2 1/2" CHWR (X)
3/4" HWR (X)
3/4" HWS (X)
12 12 12 12 12
FCU(X)
FCU(X)
FCU(X)
ALL MECHANICAL EQUIPMENT, CONTROLS, DUCTWORK AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
CEILING RADIANT PANEL, CONTROLS AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
GLYCOL PIPING(X)
4" CHWR (E)
4" CHWS (E)
3 1/2" LPC (E)
4" LPS (E)
4" HWS (E)
4" HWR (E)
CHW PUMP(X)
HW PUMP(X)
GLYCOL COIL(X)143-AHU-2H1(X)
143-AHU-2H2(X)
3" CHWR (X)
3" CHWS (X)
2" HWR (X)
2" HWS (X)
2" LPS (X)
2" LPS (X)
2 1/2" CHWR (X)
2 1/2" CHWS (X)
2" HWS (X)
2" HWR (X)
6 6
321.3
M
1 1/2" LPC (X)
2" LPS (X)
3" CHWR (X)
3" CHWS (X)
UNIT HEATER(R)
MECH ROOM
2H-111
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:2
P
M
143-MH4
PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL
PIPING - DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART A - MECHANICAL PIPING - DEMOLITION
1 REMOVE FAN COIL UNITS, ASSOCIATED DUCTWORK AND CHILLED/HEATING WATER PIPING
SERVING PERIMETER AREA. AIR DEVICES SHALL BE REMOVED IN THEIR ENTIRETY.
2 REMOVE RADIANT PANEL INCLUDING ALL PIPING ACCESSORIES BACK TO SOURCE.
3 AHU'S 143-AHU-2H1 AND 143-AHU-2H2 SHALL BE COMPLETELY DEMOLITIONED AND REMOVED
INCLUDING ALL ASSOCIATED DUCTWORK, CONTROLS AND PIPING BACK TO SOURCE. GLYCOL
HEAT EXCHANGER COIL SHALL BE REMOVED INCLUDING ALL ASSOCIATED PIPING. EXHAUST
DUCT AND RELIEF DUCT UP SHALL REMOVED IN ITS ENTIRETY TO FANS. COORDINATE WIHT COR
FOR EXTENT OF DEMOLITION AND LOCATION OF FANS.
4 LOUVER SHALL BE REMOVED IN ITS ENTIRETY. PATCH WALL TO MATCH EXISTING. COORDINATE
WITH NEW WORK LOUVER.
5 REMOVE CORRIDOR MECHANICAL PIPING ROUTED IN CORRIDOR INCLUDING BRANCH
MECHANICAL HEATING AND CHILLED WATER PIPES TO COILS AND FAN COIL UNITS.
6 AHU SHALL BE COMPLETELY DEMOLITIONED AND REMOVED INCLUDING ALL ASSOCIATED
DUCTWORK, CONTROLS AND PIPING BACK TO SOURCE. RELIEF DUCT SHALL BE REMOVED BACK
TO RELIEF DUCT RISER.
7 REMOVE EXISTING GLYCOL ENERGY RECOVERY SYSTEM IN ITS ENTIRETY.
8 REMOVE ALL CHILLED WATER, STEAM AND HEATING HOT WATER PIPNIG BACK TO RISER WITHIN
MECHANICAL ROOM.
9 CHILLED WATER AND HEATING WATER PUMPS SHALL BE REMOVED IN THEIR ENTIRETY
INCLUDING ALL CONTROLS, PIPING AND PIPING ACCESSORIES.
10 EXISTING HOT WATER UNIT HEATER SHALL REMAIN EXISTING AND RECONNECTED AND RE-USED
IN NEW WORK. ALL CONTROLS AND AND ELECTRICAL SHALL BE RE-USED AND RELOCATED TO
ACCOMMODATE NEW WORK IN THE MECHANICAL ROOM.
11 LOW PRESSURE CONDENSATE PIPING SHALL BE REMOVED IN ITS ENTIRETY. CONDENSATE
ROUTES THRU FLOOR SLAB TO MECHANICAL ROOM BELOW AND SHALL BE REMOVED TO RISER
CONNECTION AND CAPPED.
12 REMOVE FULL EXTENT OF HEATING AND CHILLED WATER PIPING SERVING MECHANICAL
EQUIPMENT INCLUDING ALL PIPING ACCESSORIES AND CONTROL DEVICES.
SCALE: 1/4" = 1'-0"
MECH RM 2H-111 ENLARGED MECHCHANICAL PIPING - DEMOLITION
G
H
I
J
K
L
DIAL. PREP
2J-174
CLEAN AREA ISO
2J-164A
STORAGE
2J-161
PATIENT RM
2J-159
PATIENT RM
2J-158
PATIENT RM
2J-157
TOILET
2J-156A
PATIENT RM
2J-156
WORKROOM
2J-153
NURSE STATION
C2-15
WATER
TREATMENT
2J-177
CAPD
2J-176
DIAL. PREP
2J-175
JAN.
2J-173
STORAGE
2J-163
SOILED UTILITIES
2J-162
CLEAN UTILITIES
2J-160
LOUNGE
2J-155
BIO CHEM LAB
2J-165
STORAGE CLEAN
2J-164
MECH ROOM
2J-179 36"x16" SA (X)
"x
S A
X
"x
S
A
X
"x
S A
X
"x
S
A
X
12"x12" SA (X)
8"x8" SA (X)
"x
8" S
A
X
12"x8" SA (X)
12"x8" SA (X)
16"x8" SA (X)
18"x10" SA (X)
12"x10" SA (X)
"x
6" S
A
E
8"x6" EA (E)
8" x6
S
A
X
10"x8" SA (X)10 "x
S A
X
12"x10" SA (X)
"x
S A
E
6" x1 0"
S A
E
8" x8
S
A
E
8"x6" EA (E)
10"x6" EA (E)
8"x8" EA (E)
"x
R A
X
8" x6
R
A
X
8" x6
R
A
X
4"x8" SA (X)
12"x12" RA 18"x12" RA (E)
"x
R A
E
"x
R
A
X
"x
R A
X
8"x8" SA (X)
8"x8" SA (X)
8"x8" EA (E) 22"x14" EA (E)
4"x8" SA (E)
36"x14" REA (X)
"x
R A
X
"x
R
A
X
"x
E A
E
12"x10" EA (E)
36"x14" REA (X)
8" x1
0 " E
A
E
4" x8
S
A
E
6" x8
S
A
E
"x
6" S
A
E
143-AHU-J2(X)
10"x6" RA (X)
8" x8
R
A
X
"x
6" S
A
X
EG(E)
EG(E)
EG(E)
RG(E)
UH(R)
EG(E)
EG(E)
EG(E)
22"x14" EA (E)
RG(X) RG(X)
RG(X)
RG(X)
RG(X)
RG(X)
RG(X)
RG(X)
RG(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(E)
SD(E)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X) SD(X) SD(X)
SD(X)
RG(X)
PLAN NOTES X
GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT EXISTING
CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING
CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE VA. IF THE VA DEEMS THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER MANNER.
MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE ABANDONED IN
PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. COORDINATE ALL WORK WITH PHASING PLAN.
7. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONS ARE
TO BE DEMOED BACK TO THERE SOURCE UNLESS OTHERWISE INDICATED.
8. BASE BID SHALL REPLACE ALL DUCTWORK INDICATES AS EXISTING.
9. CONTRACTOR SHALL ENSURE ANY MECHANICAL PIPING AND DUCTWORK SERVING AREAS OUTSIDE
THE AREA OF WORK IS NOT REMOVED AND ENGINEER SHOULD BE NOTIFIED FOR FURTHER
INSTRUCTIONS.
10. RENAL DEPARTMENT HAS BEEN RELOCATED AND NO LONGER OCCUPYING SPACE.
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:2
P
M
143-MH5
PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL
- DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL - DEMOLITION
1 EXISTING EXHAUST FAN SHALL BE LOCATED AND REPLACED IN KIND. CONTRACTOR SHALL
COORDINATE WITH FACILITIES FOR REMOVAL AND REPLACEMENT OF EXHAUST FAN.
CONTRACTOR SHALL PERFORM PRE-DEMO TAB REPORT. PER EXISTING DRAWINGS ESTIMATED
AIRFLOW IS 2375 CFM.
2 REMOVE RELIEF DUCTWORK UP TO FAN AND FAN IN ITS ENTIRETY. COORDINATE WITH COR AND
BUILDING FACILITIES FOR LOCATION OF FAN.
3 REMOVE ALL DUCTWORK TO POINT INDICATED INCLUDING HEATING COIL AND CONTROLS.
4 REMOVE DUCTWORK AT POINTS INDICATED. SEE NEW WORK FOR NEW CONNECTION,
H
I
J
K
L
DIAL. PREP
2J-174
CLEAN AREA ISO
2J-164A
STORAGE
2J-161
PATIENT RM
2J-159
PATIENT RM
2J-158
PATIENT RM
2J-157
TOILET
2J-156A
PATIENT RM
2J-156
WORKROOM
2J-153
NURSE STATION
C2-15
WATER
TREATMENT
2J-177
CAPD
2J-176
DIAL. PREP
2J-175
JAN.
2J-173
STORAGE
2J-163
SOILED UTILITIES
2J-162
CLEAN UTILITIES
2J-160
LOUNGE
2J-155
BIO CHEM LAB
2J-165
STORAGE CLEAN
2J-164
MECH ROOM
2J-179
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
COIL(X)
1/
4" H
W S
E
1/ 2"
H W
R
E
3/4" HWS (E)
1 1/2" LPS (X)
2" CHWS (X)
2" CHWR (X)
143-AHU-J2(X)
UNIT HEATER(R)
3/4" HWR (X)
3/4" HWS (X)
2" HWR (E)
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT EXISTING
CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING
CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE VA. IF THE VA DEEMS THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER MANNER.
MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE ABANDONED IN
PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. COORDINATE ALL WORK WITH PHASING PLAN.
7. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONS ARE
TO BE DEMOED BACK TO THERE SOURCE UNLESS OTHERWISE INDICATED.
8. CONTRACTOR SHALL ENSURE ANY MECHANICAL PIPING AND DUCTWORK SERVING AREAS OUTSIDE
THE AREA OF WORK IS NOT REMOVED AND ENGINEER SHOULD BE NOTIFIED FOR FURTHER
INSTRUCTIONS.
X
0'
SCALE : 1/4" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
2'4' 4' 8'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:3
P
M
143-MH6
PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL
PIPING - DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART B - MECHANICAL PIPING - DEMOLITION
1 REMOVE HEATING COIL AND PIPING BACK TO MAIN.
2 EXISTING HOT WATER RETURN AND SUPPLY PIPING SHALL REMAIN EXISTING. HEATING WATER
LOOP SERVES ADDITONAL SPACES BEYOND THE AREA OF WORK.
3 REMOVE CHILLED WATER AND LOW PRESSURE STEAM PIPING BACK TO RISER AND PREPARE FOR
NEW CONNECITON SEE, NEW WORK.
4 EXISTING HOT WATER UNIT HEATER SHALL REMAIN EXISTING AND RECONNECTED AND RE-USED IN
NEW WORK. ALL CONTROLS AND AND ELECTRICAL SHALL BE RE-USED AND RELOCATED TO
ACCOMMODATE NEW WORK IN THE MECHANICAL ROOM.
5 REMOVE AHU IN ITS ENTIRETY INCLUDING ALL PIPING CONNECTION AND PIPING SPECIALTIES
ASSOCIATED WITH REMOVEAL OF EXISTING AHU.
8 9 10 11 12 13 14
E
F
G
H
I
J
WAITING
2J-103
INFECTIOUS
DISEASE
2J-105A
INFECTIOUS
DISEASE
2J-108A
PATIENT
2J-111
PATIENT
2J-113
PATIENT
2J-114
PATIENT
2J-114A
PATIENT
2J-114C
PATIENT
2J-114B
PATIENT
2J-114D
PATIENT
2J-115
PATIENT
2J-127A
PATIENT
2J-127
PATIENT
2J-128
PATIENT
2J-128A
PATIENT
2J-138
EXAM
2J-138A
PATIENT
2J-137A
PATIENT
2J-137
PATIENT
2J-142
PATIENT
2J-142A
PATIENT
2J-134A
PATIENT
2J-134B
PATIENT
2J-131A
PATIENT
2J-131B
PATIENT
2J-130A
PATIENT
2J-130B
PATIENT
2J-116
PATIENT
2J-117
PULMONARY
SLEEP
2J-120
WAITING
2J-126
WAITING
2J-136
PATIENT
2J-139
NURSE STATION
C2-4
OFFICE
2J-109
PATIENT
2J-110
TUB
2J-118
NURSE STATION
C2-8
NURSE OFFICE
2J-123
MED ROOM
2J-141
SOILED UTILITIES
2J-140
CLEAN UTILITIES
2J-124
EXAM
2J-133
OFFICE
2J-122
TOILET
2J-105B
ANTE
2J-105
TOILET
2J-113A
TOILET
2J-111A
TOILET
2J-108B
TOILET
2J-116A
JAN
2J-112
ELEC.
2J-121
OFFICE
2J-125
TOILET
2J-138A
TOILET
2J-130C
TOILET
2J-131C
CL. LINEN
2J-132
TOILET
2J-134C
MECH ROOM
2J-119
34"x16" SA (X)
28"x16" RA (X)
12"x8" RA (X)
12"x10" RA (X)
24"x12" RA (X)
"x
S A
X
"x
S
A
X
12"x12" SA (X)
20 "x12" E A
( X
20 "x12" E A
( X
8"x6" EA (X)
8"x6" EA (X)
12"x12" SA (E)
10"x12" SA (X) 16"x12" SA (X)
24"x12" RA (X)
8"x12" SA (X) 8" x1
2" S
A
X
12"x8" RA (X)
6"x8" SA (X)
"x
R A
X
"x
" S
A (E
8" x8
" S A (E
12"x12" SA (E)8"x8" SA (E)
8" x8
S
A
E
4" x8
S
A
E
8"x4" RA (X)
8"x6" RA (X) 8" x6
R A
X
10"x8" SA (X)
8"x8" SA (X)
6"x8" SA (X) 14"x12" SA (X)
8" x4
R
A
X
16"x12" SA (X)
" x
E A
X
"x
S A
X
12"x10" SA (X)10"x10" SA (X)
8" x8
S
A
X
8" x8
S
A
X
8" x4
S
A
X
8"x6" SA (X)
8" x6
S
A
X
8" x6
S
A
X
8" x4" S A
( X
"x
S A
E
143-AHU-2J2(X)
143-AHU-2J2(X)
18"X24" OA(X)34"x16" SA (X)
24"x16" RA (X)
LSD(X)
LSD(X)
LSD(X)
LSD(X)
EF(R)
OA PLENUM(X)
FCU (X)
20"x12" SA (X)
16"x10" SA (X) 16"x12" SA (X)
16"x10" EA (X) 16"x12" EA (X)16"x8" SA (X)14"x8" SA (X)12"x10" EA (X)
8"x6" EA (X) 8"x6" SA (X)
8"x6" SA (X)
10"x8" SA (X)
8"x6" EA (X)
8"x4" SA (X)
8"x6" SA (X)
8"x6" EA (X) 8"x6" EA (X)
8"x6" SA (X)
8"x6" SA (X)
20"x12" SA (X)
FCU (X)
FCU (X)
FCU (X)
FCU (X)
FCU(X)
FCU (X)
FCU (X)
LSD(X)
LSD(X)
LSD(X)
LSD(X)
LSD(X) LSD(X)
SD(X) SD(X)
SD(X) SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
EG(X) EG(X)
EG(X)
SD(X)
SD(X)
SG(X)SG(X)
SD(X)
SG(X) SG(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
SD(X)
EG(X)
EG(X)
RG(X)
RG(X)
RG(X)
RG(X)
RG(X)
SD(X)
ALL MECHANICAL EQUIPMENT, CONTROLS, DUCTWORK AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
CEILING RADIANT PANEL, CONTROLS AND PIPING SHALL BE REMOVED IN ITS ENTIRETY
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT EXISTING
CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING
CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE VA. IF THE VA DEEMS THE EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER MANNER.
MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE ABANDONED IN
PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. COORDINATE ALL WORK WITH PHASING PLAN.
7. NO DEAD LEGS ARE ALLOWED AND ALL DUCTING , PIPES, DATA AND ELECTRICAL CONNECTIONS ARE
TO BE DEMOED BACK TO THERE SOURCE UNLESS OTHERWISE INDICATED.
8. BASE BID SHALL REPLACE ALL DUCTWORK INDICATES AS EXISTING.
9. CONTRACTOR SHALL ENSURE ANY MECHANICAL PIPING AND DUCTWORK SERVING AREAS OUTSIDE
THE AREA OF WORK IS NOT REMOVED AND ENGINEER SHOULD BE NOTIFIED FOR FURTHER
INSTRUCTIONS.
X
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:3
P
M
143-MH7
PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL
- DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART C - MECHANICAL - DEMOLITION
1 REMOVE DUCTWORK, HEATING COIL AND ALL ASSOCIATED ACCESSORIES TO POINT INDICATED.
2 LOUVER SHALL BE REMOVED IN ITS ENTIRETY. PATCH WALL TO MATCH EXISTING. COORDINATE
WITH NEW WORK LOUVER.
3 DISCONNECT EXHAUST FAN FOR RELOCATION SEE NEW WORK. PROVIDE AIRFLOW TAB OF
EXHAUST FAN FOR REBALANCING IN NEW WORK. COORDINATE WITH FACILITIES FOR SPACES
EXHAUST FAN SERVES.
4 REMOVE FAN COIL UNITS, ASSOCIATED DUCTWORK AND CHILLED/HEATING WATER PIPING
SERVING PERIMETER AREA. AIR DEVICES SHALL BE REMOVED IN THEIR ENTIRETY.
5 REMOVE RADIANT PANEL INCLUDING ALL PIPING ACCESSORIES BACK TO SOURCE.
6 AHU'S 143-AHU-2J1 AND…