About this file
This document is a set of construction documents for a Department of Veterans Affairs (VA) project to replace HVAC systems at a medical facility located at 1970 Roanoke Blvd. The project is a fully sprinklered renovation spanning three wings (H, J, and J1) and involves phased electrical, fire alarm, and mechanical system upgrades. The work includes disconnecting and removing existing air handling units (AHUs), exhaust fans, pumps, and associated electrical and fire alarm equipment, and replacing them with new systems across multiple mechanical rooms. The project will be completed in three phases, with each wing being isolated and upgraded sequentially. Key components include installing new variable frequency drives (VFDs), heat exchangers, panelboards, fire alarm devices, and duct smoke detectors, while maintaining existing building systems and fire alarm functionality throughout construction.
The documents detail precise demolition and new work requirements, with extensive general notes covering contractor responsibilities, coordination, equipment specifications, and system integration. The electrical plans specify new power connections for AHUs, exhaust fans, and mechanical equipment, with provisions for reusing existing circuits where possible. Fire alarm modifications involve integrating new duct smoke detectors and relay modules with the existing fire alarm control panel, ensuring all new devices are compatible and programmed to match the existing sequence of operations. The project is set to be completed on 11.21.2025, with consultants including Freedom Engineering and KCI Technologies, and is categorized under the VA Office of Construction and Facilities Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S05 RFI_ Upgrade HVAC System Phase II pt.2.pdf | ||
| 143- LS B143-2ND FL.pdf | ||
| 36C24626B0005 0005.docx | DOCX document | |
| 36C24626B0005 0004.docx | DOCX document | |
| S05 RFI_Salem VAMC HVAC Phase II Drawings.pdf | ||
| S05 RFI_Salem VAMC - Final CD Submission - Spec.pdf | ||
| S05 RFI_ Upgrade HVAC System Phase II.pdf | ||
| S06 36C24626B0005 0003.pdf | ||
| S04 Site Visit Upgrade HVAC Phase II.pdf | ||
| 36C24626B0005 0002.docx | DOCX document | |
| 36C24626B0005 0001.docx | DOCX document | |
| 36C24625B0029_ Amendment A00002.pdf | ||
| Replace HVAC Phase II _ Final Spec.pdf | ||
| Salem VAMC FP Drawings.pdf | ||
| 36C24626B0005_1.docx | DOCX document | |
| Salem VAMC MECH Drawings.pdf | ||
| P01 Upgrade HVAC Phase II - Drawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
ELECTRICAL SYMBOLS
WIRING DEVICES
EQUIPMENT
PLAN SYMBOLS
ONE-LINE DIAGRAM
T
CB
30/15
30/15
NOTE: ALL SYMBOLS LISTED MAY NOT APPEAR ON THE DRAWINGS
COORDINATE
IN FIELD
1'-6"
1'-6"
1'-6" UON
1'-6" UONDUPLEX RECEPTACLE - NEMA 5-20R
TWO DUPLEX RECEPTACLE - NEMA 5-20R
DUPLEX RECEPTACLE NEMA 5-20R WITH INTEGRAL GROUND FAULT PROTECTION
SPECIAL RECEPTACLE - NEMA CONFIGURATION AS NOTED
NON-FUSED SAFETY DISCONNECT SWITCH - NUMERAL DENOTES SWITCH SIZE - 3 POLE, UON
TRANSFORMER
SWITCH SIZE, LOWER NUMERAL DENOTES FUSE SIZE - 3 POLE, UON
FUSED SAFETY DISCONNECT SWITCH - UPPER NUMERAL DENOTES
MOTOR CONNECTION
PANELBOARD, BRANCH
COMBINATION MOTOR STARTER DISCONNECT W/ HOA SWITCH AND PILOT LIGHT
JUNCTION BOX
ENCLOSED CIRCUIT BREAKER
PANELBOARD, DISTRIBUTION
LP-10,12
HOMERUN TO PANELBOARD. NUMERALS AND LETTERS ADJACENT TO ARROW HEAD(S)
INDICATE ASSIGNED PANEL AND CIRCUIT(S) NUMBERS(S). SEE PANEL SCHEDULE(S) FOR
CIRCUIT WIRE AND CONDUIT SIZES/QUANTITIES.
EXISTING TO REMAIN
EXISTING TO BE REMOVED
PLAN REFERENCE NOTE SYMBOL - DEMOLITION & NEW WORK
NEW WORK
DATA/TELEPHONE OUTLET STUB 1 1/4" C INTO CEILING SPACE. ROUTE
CONDUIT FROM OUTLET LOCATION CONCEALED IN WALL TO ABOVE
CEILING HEIGHT, THEN OUT TO CORRIDOR AND TERMINATE AND BOND
TO NEAREST CABLE TRAY - UON
PANEL, SWITCHBOARD, OR BUSDUCT - SEE ONE-LINE DIAGRAM FOR EXACT SPECIFICATION
ELECTRICAL FEEDER - SEE ONE-LINE DIAGRAM FOR EXACT SPECIFICATION
CIRCUIT BREAKER
FUSED DISCONNECT SAFETY SWITCH, 3 POLE UON
TRANSFORMER
UTILITY METER
EQUIPMENT ENCLOSURE - SEE ONE-LINE DIAGRAM FOR EXACT SPECIFICATION
X
ELECTRICAL ABBREVIATIONS
FIRE ALARM ANNUNCIATOR PANEL
FLA
HP
GFI
HOA
(ER)
FA
FACP
FAAP
EMER
ELEC
(E)
FULL LOAD AMPS
GROUND FAULT INTERRUPTER
HANDS OFF AUTOMATIC
HORSEPOWER
GROUND
EXISTING TO REMAIN
RELOCATED EQUIPMENT
FIRE ALARM CONTROL PANEL
FIRE ALARM
EMERGENCY
ELECTRIC
AFF
CKT
CT
CLG
C
AWG
CB
A
AIC
ABOVE FINISHED FLOOR
CURRENT TRANSFORMER
AMERICAN WIRE GAGE
CIRCUIT BREAKERS
CIRCUIT
CEILING
CONDUIT
AMPS INTERRUPTING CAPACITY
AMPS
KILOVOLT AMPERE
MAIN CIRCUIT BREAKER
MAIN LUGS ONLY
MAIN DISTRIBUTION PANEL
LIGHTINGLTG
MLO
MCB
MIN
MDP
MINIMUM
KVA
KW KILOWATTS
G
NOT TO SCALE
EQUIPMENT TO BE RELOCATED
WEATHERPROOF
UNLESS OTHERWISE NOTED
WP
W
V
UON
WATTS
VOLTS
T
SW
TELE
TYP
NTS
(R)
PBO
TRANSFORMER
SWITCH
TELEPHONE
TYPICAL
PROVIDED BY OTHERS
NATIONAL ELECTRIC CODENEC
(N) NEW
PH PHASE
REMOVE(X)
M
M
X
ELECTRICAL GENERAL NOTES
1. GENERAL
1. THE CONTRACTOR SHALL COMPLY WITH ALL THE LATEST LAWS, ORDINANCES, RULES AND REGULATIONS OF ALL LOCAL AND STATE GOVERNMENTAL AUTHORITIES, THE RULES OF THE NATIONAL FIRE PROTECTION ASSOCIATION AS INTERPRETED BY THE ENFORCING AUTHORITY HAVING JURISDICTION AND OF THE PUBLIC
UTILITIES HAVING CONNECTION WITH ANY OF THE SYSTEMS HEREIN SPECIFIED.
2. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED BY ANY OF THE FOREGOING AUTHORITIES, AND PAY FOR ALL OTHER COSTS IN CONNECTION WITH THE WORK. ALL
CERTIFICATES SHALL BE IN DUPLICATE AND SHALL BE DELIVERED TO THE OWNER.
3. THE SITE, LOCATION AND ROUTING OF SYSTEMS INDICATED TO HAVE NEW CONNECTIONS MADE TO THEM ARE SHOWN AS ACCURATELY AS FIELD CONDITIONS WOULD PERMIT. BIDDERS ARE STRONGLY ENCOURAGED TO VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT DRAWINGS. DURING SITE VISIT, EXAMINE ALL EXISTING CONDITIONS AND VERIFY THEIR EXACT LOCATIONS. THE CONTRACTOR SHOULD REPORT TO THE ARCHITECT, ENGINEER AND OWNER BEFORE SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE INSTALLATION OF REQUIRED EQUIPMENT A PROBLEM. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED UNDER CONDITIONS WHEN CONTRACTOR DECIDES NOT TO INVESTIGATE CONDITIONS OR MISUNDERSTANDS
THE CONTRACTUAL REQUIREMENTS.
4. THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT NOT INDICATED TO BE REUSED TO A DESIGNATED LOCATION AT THE PROJECT SITE. AFTER THE EQUIPMENT HAS BEEN ASSEMBLED FOR THE OWNER'S INSPECTION AND POSSIBLE RETENTION, ALL EQUIPMENT NOT TO BE RETAINED BY THE OWNER SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR. ALL BUILDING SYSTEMS SHALL REMAIN IN SERVICE UNLESS INDICATED OTHERWISE. ALL OUTAGES OR INTERRUPTIONS SHALL BE KEPT TO MINIMUM DURATION. NOTIFY
THE OWNER 15 BUSINESS DAYS IN ADVANCE OF ANY OUTAGE OR INTERRUPTION.
5. THE CONTRACTOR SHALL INSTALL AND CONNECT ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE
BEST ENGINEERING PRACTICE AND, UNLESS OTHERWISE SHOWN OR SPECIFIED, FOLLOW THE
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS AND FURNISH AND INSTALL ALL REQUIRED
AUXILIARY ITEMS COMPLETE.
6. DRAWINGS SHALL BE CONSIDERED DIAGRAMMATIC AND FOR BIDDING PURPOSES ONLY. WHILE THE DRAWINGS ARE GENERALLY TO SCALE AND ARE AS ACCURATE AS THE SCALE WILL PERMIT, ALL IMPORTANT DIMENSIONS
SHALL BE DETERMINED IN THE FIELD.
7. COORDINATE WITH ALL TRADES TO AVOID INTERFERENCE AMONG MECHANICAL, ELECTRICAL, ARCHITECTURAL AND STRUCTURAL ITEMS. PROVIDE ALL NECESSARY OFFSETS AND FITTINGS IN CIRCUITRY AND OTHER ITEMS
REQUIRED TO INSTALL THE WORK WITHOUT INTERFERENCES.
8. THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE OWNER ITS PROPER OPERATIONS. ALL NEW EQUIPMENT SHALL BE MOUNTED VIBRATION FREE.
9. ALL EQUIPMENT AND WORKMANSHIP SHALL BE GUARANTEED IN FULL FROM ALL DEFECTS FOR ONE (1) YEAR
FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK.
10. ALL EQUIPMENT INSTALLED SHALL BE NEW AND SHALL CONFORM IN ALL RESPECTS TO THE LATEST APPROVED STANDARDS OF IEEE, ANSI, NEMA AND UNDERWRITERS LABORATORIES, INC., (UNLESS INDICATED OTHERWISE). SUBSTITUTIONS SHALL ONLY BE ACCOMPLISHED AT THE DISCRETION OF THE ENGINEER. SHOP DRAWINGS ARE TO BE SUBMITTED AND APPROVED BEFORE THE EQUIPMENT IS ORDERED. SUBMIT SIX (6) COPIES OF SHOP DRAWINGS TO THE ENGINEER OF THE FOLLOWING: LIGHTING FIXTURES, PANELBOARDS, TRANSFORMER, DISCONNECT SWITCHES AND WIRING DEVICES.
11. THE CONTRACTOR SHALL REPAIR ALL WALL, CEILING, FLOOR, OR ROOF OPENINGS WHICH ARE CREATED BY DEMOLITION OR PENETRATION. THE REPAIRS SHALL BE WITH MATERIALS AND FINISHES TO MATCH EXISTING.
ALL FIRE RATED PENETRATIONS SHALL BE SEALED WITH SUITABLE MATERIALS TO PRESERVE FIRE RATED
INTEGRITY.
12. DEFINITIONS
A. "PROVIDE" UNDER THIS CONTRACT IS DEFINED AS FURNISH AND INSTALL.
B. "CONCEALED" UNDER THIS CONTRACT IS DEFINED AS HIDDEN BY ARCHITECTURAL WALLS AND CEILINGS.
C. "EXPOSED" UNDER THIS CONTRACT IS DEFINED AS VISIBLE TO VIEW.
D. "INDICATED" UNDER THIS CONTRACT IS DEFINED AS SHOWN IN THE CONTRACT DOCUMENTS.
13. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND
ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC.
14. THE CONTRACTOR SHALL NOTIFY THE OWNER WHEN THE PROJECT IS APPROXIMATELY 75% COMPLETED IN ORDER TO SCHEDULE A PRE-FINAL REVIEW OF CONSTRUCTION. NO WORK SHALL BE CONCEALED BY CEILINGS, WALLS, ETC. FINAL REVIEW SHALL BE SCHEDULED AT 100% COMPLETION. ALL PUNCH LIST ITEMS MUST BE
ACCOMPLISHED PRIOR TO FINAL ACCEPTANCE.
15. THE CONTRACTOR SHALL PREPARE A COMPREHENSIVE METHOD OF PROCEDURE AND SUBMIT IT TO THE OWNER WITH SHOP DRAWINGS FOR REVIEW. THE SUBMITTAL SHALL ITEMIZE METHODS OF PROCEDURE FOR ALL POTENTIAL EMERGENCY SITUATIONS AND SHALL INCLUDE A LIST OF PERSONS REPRESENTING THE OWNER AND THE CONTRACTOR ALONG WITH DAYTIME AND EMERGENCY PHONE NUMBERS AND PAGER NUMBERS WHO SHALL BE CONTACTED IN THE EVENT OF AN EMERGENCY. THIS LIST SHALL BE DISTRIBUTED TO THE OWNER'S REPRESENTATIVE AND THE CONTRACTORS SUPERINTENDENT OR FOREMAN AT THE SITE.
EMERGENCY SITUATIONS SHALL INCLUDE BUT NOT BE LIMITED TO POWER OUTAGES, CHILLED AND CONDENSER WATER SYSTEM RUPTURES, AUTOMATIC TEMPERATURE CONTROL OUTAGES AND OWNER'S EQUIPMENT DAMAGE. THE COMPREHENSIVE METHOD OF PROCEDURE SHALL BE APPROVED BY THE OWNER
PRIOR TO COMMENCEMENT OF ANY WORK.
16. THE USE OF POWDER DRIVEN FASTENERS OR IMPACT TOOLS SHALL NOT BE PERMITTED.
17. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS MONDAY THROUGH FRIDAY - 7:00 A.M.
TO 5:00 P.M. WORK PERFORMED OUTSIDE OF NORMAL WORKING HOURS WILL BE REIMBURSED AT PREMIUM
RATES AND SHALL BE NEGOTIATED WITH THE OWNER PRIOR TO THE CONSTRUCTION PHASE.
18. PROVIDE TEMPORARY SERVICE FOR LIGHTING AND POWER EQUIPMENT (DRILLS, SAW, ETC.). VERIFY TEMPORARY REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND POWER SHALL MEET
OSHA REQUIREMENTS AND LOCAL CODE. TEMPORARY POWER SHALL BE 120 VOLTS.
19. UNLESS SPECIFICALLY NOTED ON THE DEMOLITION PLANS, REMOVE ALL LIGHTING, SWITCHES, RECEPTACLES AND CLOCK OUTLETS AND ASSOCIATED CIRCUITRY INDICATED. CIRCUITRY TO BE REMOVED SHALL BE ALL CONDUCTORS AND ANY EXPOSED RACEWAYS INCLUDING WIREMOLD AND ALL RACEWAY THAT BECOMES EXPOSED UPON REMOVAL OF WALLS AND CEILINGS. NOT ALL DEVICES TO BE REMOVED ARE SHOWN ON
PLANS.
20. UNLESS SPECIFICALLY NOTED ON THE PLANS, ALL CIRCUITRY, EQUIPMENT, DEVICES, ETC., NOT NOTED AS EXISTING TO REMAIN OR TO BE RELOCATED, SHALL BE NEW. THE CONTRACTOR MAY REUSE ALL EXISTING CIRCUITRY AS FIELD CONDITIONS PERMIT. REMOVE ALL DEVICES AND CIRCUITRY NOT BEING REUSED.
CIRCUITRY TO BE REMOVED SHALL BE REMOVED BACK TO THE SOURCE AND ALL HOLES SHALL BE REPAIRED TO CONFORM TO FINISHED SURFACE. ALL CIRCUITS THAT ARE TO REMAIN IN SERVICE UPON COMPLETION OF
THIS PROJECT WHICH ARE COORDINATED WITH THE OWNER.
21. PROTECT ADJACENT MATERIALS INDICATED TO REMAIN. INSTALL AND MAINTAIN DUST AND NOISE BARRIERS TO KEEP DIRT, DUST, AND NOISE FROM BEING TRANSMITTED TO ADJACENT AREAS. REMOVE PROTECTION AND
BARRIERS AFTER DEMOLITION OPERATIONS ARE COMPLETE.
22. LOCATE, IDENTIFY AND PROTECT ELECTRICAL SERVICES PASSING THROUGH DEMOLITION AREA AND SERVING OTHER AREAS OUTSIDE THE DEMOLITION LIMITS. MAINTAIN SERVICES TO AREAS OUTSIDE DEMOLITION LIMITS.
WHEN SERVICES MUST BE INTERRUPTED, INSTALL TEMPORARY SERVICES FOR AFFECTED AREAS.
23. FINAL TESTING: AT THE TIME OF FINAL INSPECTION AND TESTS, ALL CONNECTIONS AT PANELBOARDS, DEVICES AND EQUIPMENT AND ALL SPLICES MUST BE COMPLETED. EACH BRANCH CIRCUIT AND ITS RESPECTIVE CONNECTED EQUIPMENT MUST TEST FREE OF SHORT CIRCUITS. UPON COMPLETION OF THE WORK, CLEAN AND POLISH ALL EXPOSED SURFACES IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
24. REMOVE UNUSED CONDUIT AND CONDUCTORS BACK TO SOURCE. COORDINATE WORK WITH THE VA PRIOR TO
REMOVAL.
BOD BASIS OF DESIGN
SM MANUAL MOTOR STARTER SWITCH WITH THERMAL OVERLOAD PROTECTION
VFD VARIABLE FREQUENCY DRIVE
CONTRACTOR BIDDING NOTES
1. CONTRACTOR SHALL VISIT SITE, MECHANICAL ROOMS AND VISUALLY INSPECT ABOVE CEILING TO GET A FULL AND
COMPREHENSIVE UNDERSTANDING OF ALL THE EXISTING UTILITIES THAT WILL NEED TO BE REROUTED/RELOCATED TO ACCOMMODATE AND INSTALL NEW WORK. THESE UTILITIES SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL WALL METAL STUDS, HANGERS SUPPORTS, MECHANICAL, PLUMBING, FIRE PROTECTION PIPING, ELECTRICAL CONDUIT, ELECTRICAL EQUIPMENT, AND ELECTRICAL DISCONNECTS, FIRE ALARM CONDUIT, ETC. DUE TO THE NATURE OF THE EXISTING CONDITIONS OF THE BUILDING, CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL NECESSARY RE-ROUTING AND RELOCATION OF EXISTING
UTILITIES AT NO EXPENSE TO THE VA.
G
SUBMETERDM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES1
GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
- ELECTRICAL
Revisions: Date:
PHASING PLAN NOTES
• EACH WING SHALL BE SHUTDOWN AND ISOLATED FROM THE REST OF THE HOSPITAL.
• ALL WORK SHALL BE FINISHED AND COMMISIONED BEFORE ANY WORK IS TO BE PERFORMED IN OTHER WINGS.
• NEW PANEL 2MCPA-3 TO BE INSTALLED UNDER PHASE 1.
• NEW PANEL 2MCPB-3 TO BE INSTALLED UNDER PHASE 3.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES2
PHASING PLAN - ELECTRICAL
SCALE: 1/16" = 1'-0"
2ND FLOOR PLAN - H WING - PHASE 1
SCALE: 1/16" = 1'-0"
2ND FLOOR PLAN - J WING - PHASE 2
SCALE: 1/16" = 1'-0"
2ND FLOOR PLAN - J1 WING - PHASE 3
G
J J
GENERAL NOTES
PLAN NOTES
1. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND SHOW INTENT OF DEMOLITION WORK TO BE DONE. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED FOR A COMPLETE
DEMOLITION.
2. ANY SHUTDOWN OF POWER SERVICES SHALL BE COMPLETED AT TIMES OUTSIDE OF NORMAL WORKING HOURS AS APPROVED BY THE OWNER. PROVIDE A MINIMUM OF 15 BUSINESS DAYS ADVANCED NOTICE
PRIOR TO ANY SHUTDOWN.
3. EXISTING EQUIPMENT INDICATED TO REMAIN ARE TO REMAIN ACTIVE THROUGHOUT CONSTRUCTION.
PROVIDE TEMPORARY FEEDERS IF REQUIRED TO MAINTAIN SERVICE.
4. PROVIDE TEMPORARY SERVICE AS DIRECTED FOR LIGHTING AND POWER EQUIPMENT (DRILLS, SAWS, ETC.). VERIFY TEMPORARY REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND
POWER SHALL MEET OSHA REQUIREMENTS AND LOCAL CODES.
5. LOCATE, IDENTIFY AND PROTECT ELECTRICAL SERVICES PASSING THROUGH DEMOLITION AREA AND SERVING OTHER AREAS OUTSIDE DEMOLITION LIMITS. MAINTAIN SERVICES TO AREAS OUTSIDE DEMOLITION LIMITS. WHEN SERVICES MUST BE INTERRUPTED, INSTALL TEMPORARY SERVICES FOR
AFFECTED AREAS.
6. ADVANCE NOTICE SHALL BE GIVEN TO OWNER BEFORE COMMENCEMENT OF WORK ON ANY ELECTRICAL
CIRCUITRY, WHETHER OR NOT AN OUTAGE IS REQUIRED.
7. PROTECT ADJACENT MATERIALS INDICATED TO REMAIN. INSTALL AND MAINTAIN DUST AND NOISE BARRIERS TO KEEP DIRT, DUST AND NOISE FROM BEING TRANSMITTED TO ADJACENT AREAS. REMOVE
PROTECTION AND BARRIERS AFTER DEMOLITION OPERATIONS ARE COMPLETE.
8. ALL EXISTING DEVICES MAY NOT BE SHOWN ON PLANS. REMOVE ALL DEVICES ON WALLS SHOWN TO BE
DEMOLISHED.
9. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
10. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS NEEDED TO
FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW EQUIPMENT. REFER TO
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS OF DUCTWORK AND CONDUIT.
CONTRACTOR SHALL CIRCUIT TRACE EXISTING CONDUITS, IDENTIFY SOURCE, AND COORDINATE
OUTAGES AS NEEDED WITH THE COR.
11. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE CONSTRUCTION OF
DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING EQUIPMENT/DEVICES AS
NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK. ALL EQUIPMENT/DEVICES SHALL BE RETURNED
TO THEIR ORIGINAL LOCATION AND OPERATING CONDITION.
12. DISCONNECT AND SALVAGE SIX (6) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2H-111. REINSTALL
SALVAGED LIGHTING FIXTURES IN NEW LOCATION UNDER NEW WORK.
4 5 6 7
K
L
PRE-OP
SCREENING
2H-118
PATIENT
2H-118A
PATIENT
2H-118B
PATIENT
2H-118C
PATIENT
2H-119
PATIENT
2H-117
WAITING
2H-117A
EXAM
2H-120
PATIENT
2H-112
EXAM
2H-121A
EXAM
2H-121B
EXAM
2H-122A
EXAM
2H-122B
EXAM
2H-125A
EXAM
2H-125B
EXAM
2H-127
EXAM
2H-127A
EXAM
2H-128A
EXAM
2H-128
EXAM
2H-129
EXAM
2H-130
EXAM
2H-132
WAITING ROOM
EXAM-1
----EXAM-2
EXAM-3
EXAM-4
EXAM-5
EXAM-6
EXAM-7
EXAM-8
EXAM-9
TOILET 1
WAITING
STORAGE
2H-103I
OFFICE
2H-102
HYDRO TUB
2H-110
NURSE OFFICE
2H-115 NURSE STATION
C2-19
ELEC.
2H-113
NURSE STATION
C2-23
WORKROOM
2H-114
EXAM
2H-124
SOIL UTILITY
2H-131
NOURISHMENT
2H-116
CLEAN UTILITY
2H-133
MEDICINE RM
2H-116A
CLEAN LINEN
2H-123
TOILET
2H-121C
TOILET
2H-122C
TOILET
2H-121C
TOILET
2H-125C
TOILET
2H-129A
TOILET
2H-101
TOILET
2H-130A
TOILET
2H-134B
MECH ROOM
2H-111
MECH ROOM
2J-179
JAN.
2H-109
AREA OF WORK
321.3
M
N
O
P
2EELA-3
1 6
(E) SF-2J3
(E) 2EMCPB
(E) 2MCPA
(E) 2MCPA-2
2HA 2LB 2ELHA
2LF
2ELLA2ECLC2ECHA
2EELA (E) (E) (E)
(E)
(E)
(E)
(X)
(E)
AREA OF WORK
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
AREA OF WORK
MECH ROOM 2H-111
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES3
PARTIAL 2ND FLOOR PLAN - PART A - POWER -
DEMOLITION
1 DISCONNECT AND REMOVE AHU 143-AHU-2H1, AHU 143-AHU-2H2, AND ALL ASSOCIATED EQUIPMENT
WITHIN MECHANCIAL. REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 DISCONNECT AND REMOVE FAN COIL UNITS SERVICING HATCHED AREA. REMOVE ALL ASSOCIATED CONDUIT AND CONDUCTORS BACK TO SOURCE. REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT
LOCATIONS.
3 DISCONNECT POWER CONNECTION TO HVAC CONTROL PANEL. SALVAGE CIRCUIT FOR RE-USE.
4 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
5 DISCONNECT AND REMOVE POWER TO CHW, HW, AND GLYCOL PUMPS. REMOVE ALL ASSOCIATED EQUIPMENT WITHIN MECHANICAL ROOM. REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE
LOCATED IN MECH ROOM 2J-179
6 RELOCATE RECEPTACLE. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
7 DISCONNECT AND REMOVE POWER TO HUMIDIFIER. REMOVE ALL ASSOCIATED EQUIPMENT WITHIN ROOM.
REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE.
8 DISCONNECT AND REMOVE PANELBOARD. PANELBOARD SHALL BE REPLACED WITH NEW PANELBOARD CONTAINING ADDITIONAL POLE SPACE. SALVAGE EXISTING FEEDER AND BRANCH CIRCUITS FOR
RECONNECTION UNDER NEW WORK.
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART A - ELECTRICAL - DEMOLITION
J
J
4 5 6 7
G
H
I
J
K
L
DIAL. PREP
2J-174
CLEAN AREA ISO
2J-164A
STORAGE
2J-161
PATIENT RM
2J-159
PATIENT RM
2J-158
PATIENT RM
2J-157
TOILET
2J-156A
PATIENT RM
2J-156
WORKROOM
2J-153
NURSE STATION
C2-15
WATER
TREATMENT
2J-177
CAPD
2J-176 DIAL. PREP
2J-175
JAN.
2J-173
STORAGE
2J-163
SOILE DUTILITIES
2J-162
CLEAN UTILITIES
2J-160
LOUNGE
2J-155
BIO CHEM LAB
2J-165
STORAGE CLEAN
2J-164
MECH ROOM
2J-179 ELEC CLOSET
2J-167
AREA OF WORK
(X) 2MCPA
(X) 2MCPA-2
(E) 2EMCPB
(X) SF-2J3
2EELA
2HA 2LB 2ELHA
2LF
2ELLA
2ECLC2ECHA
(E) (E) (E)
(E)
(E) (E)
(E) (E)
AREA OF WORK
GENERAL NOTES
PLAN NOTES
1. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND SHOW INTENT OF DEMOLITION WORK TO BE DONE. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED FOR A COMPLETE
DEMOLITION.
2. ANY SHUTDOWN OF POWER SERVICES SHALL BE COMPLETED AT TIMES OUTSIDE OF NORMAL WORKING HOURS AS APPROVED BY THE OWNER. PROVIDE A MINIMUM OF 15 BUSINESS DAYS ADVANCED NOTICE
PRIOR TO ANY SHUTDOWN.
3. EXISTING EQUIPMENT INDICATED TO REMAIN ARE TO REMAIN ACTIVE THROUGHOUT CONSTRUCTION.
PROVIDE TEMPORARY FEEDERS IF REQUIRED TO MAINTAIN SERVICE.
4. PROVIDE TEMPORARY SERVICE AS DIRECTED FOR LIGHTING AND POWER EQUIPMENT (DRILLS, SAWS, ETC.). VERIFY TEMPORARY REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND
POWER SHALL MEET OSHA REQUIREMENTS AND LOCAL CODES.
5. LOCATE, IDENTIFY AND PROTECT ELECTRICAL SERVICES PASSING THROUGH DEMOLITION AREA AND SERVING OTHER AREAS OUTSIDE DEMOLITION LIMITS. MAINTAIN SERVICES TO AREAS OUTSIDE DEMOLITION LIMITS. WHEN SERVICES MUST BE INTERRUPTED, INSTALL TEMPORARY SERVICES FOR
AFFECTED AREAS.
6. ADVANCE NOTICE SHALL BE GIVEN TO OWNER BEFORE COMMENCEMENT OF WORK ON ANY ELECTRICAL
CIRCUITRY, WHETHER OR NOT AN OUTAGE IS REQUIRED.
7. PROTECT ADJACENT MATERIALS INDICATED TO REMAIN. INSTALL AND MAINTAIN DUST AND NOISE BARRIERS TO KEEP DIRT, DUST AND NOISE FROM BEING TRANSMITTED TO ADJACENT AREAS. REMOVE
PROTECTION AND BARRIERS AFTER DEMOLITION OPERATIONS ARE COMPLETE.
8. ALL EXISTING DEVICES MAY NOT BE SHOWN ON PLANS. REMOVE ALL DEVICES ON WALLS SHOWN TO BE
DEMOLISHED.
9. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
10. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS NEEDED TO
FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW EQUIPMENT. REFER TO
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS OF DUCTWORK AND CONDUIT.
CONTRACTOR SHALL CIRCUIT TRACE EXISTING CONDUITS, IDENTIFY SOURCE, AND COORDINATE
OUTAGES AS NEEDED WITH THE COR.
11. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES/FIXTURES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE
CONSTRUCTION OF DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING
EQUIPMENT/DEVICES/FIXTURES AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK. ALL
EQUIPMENT/DEVICES/FIXTURES SHALL BE RETURNED TO THEIR ORIGINAL LOCATION AND OPERATING
CONDITION.
12. DISCONNECT AND SALVAGE SIX (8) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2H-111. REINSTALL
SALVAGED LIGHTING FIXTURES IN NEW LOCATION UNDER NEW WORK.
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
AREA OF WORK
MECH ROOM 2J-179
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES4
PARTIAL 2ND FLOOR PLAN - PART B - POWER -
DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART B - ELECTRICAL - DEMOLITION
1 DISCONNECT AND REMOVE AHU 143-AHU-2J3 AND ALL ASSOCIATED EQUIPMENT WITHIN MECHANICAL
ROOM. REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 DISCONNECT AND REMOVE POWER TO HUMIDIFIER. REMOVE ALL ASSOCIATED EQUIPMENT WITHIN
ROOM. REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE.
3 DISCONNECT POWER CONNECTION TO HVAC CONTROL PANEL. SALVAGE CIRCUIT FOR RE-USE.
4 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
5 DISCONNECT AND REMOVE EXHAUST FAN. REMOVE CONDUIT AND CONDUCTOR BACK TO SOURCE.
J J
8 9 10 11 12 13 14
E
F
G
H
I
J
WAITING
2J-103
INFECTIOUS
DISEASE
2J-105A
INFECTIOUS
DISEASE
2J-108A
PATIENT
2J-111
PATIENT
2J-113
PATIENT
2J-114
PATIENT
2J-114A
PATIENT
2J-114C
PATIENT
2J-114B
PATIENT
2J-114D
PATIENT
2J-115
PATIENT
2J-127A
PATIENT
2J-127
PATIENT
2J-128
PATIENT
2J-128A
PATIENT
2J-138
EXAM
2J-138A
PATIENT
2J-137A
PATIENT
2J-137
PATIENT
2J-142
PATIENT
2J-142A
PATIENT
2J-134A
PATIENT
2J-134B
PATIENT
2J-131A
PATIENT
2J-131B
PATIENT
2J-130A
PATIENT
2J-130B
PATIENT
2J-116
PATIENT
2J-117
PULMONARY
SLEEP
2J-120
WAITING
2J-126
WAITING
2J-136
PATIENT
2J-139
NURSE STATION
C2-4
OFFICE
2J-109
PATIENT
2J-110
TUB
2J-118
NURSE STATION
C2-8
NURSE OFFICE
2J-123
MED ROOM
2J-141
SOILED UTILITIES
2J-140
CLEAN UTILITIES
2J-124
EXAM
2J-133
OFFICE
2J-122
TOILET
2J-105B
ANTE
2J-105 TOILET
2J-113A
TOILET
2J-111A
TOILET
2J-108B
TOILET
2J-116A
JAN
2J-112
ELEC.
2J-121
OFFICE
2J-125
TOILET
2J-138A
TOILET
2J-130C
TOILET
2J-131C
CL. LINEN
2J-132
TOILET
2J-134C
MECH ROOM
2J-119
AREA OF WORK
(X)2MCPB
(X) 2EMCPA
(X)2MCPB-2
GENERAL NOTES
PLAN NOTES
1. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND SHOW INTENT OF DEMOLITION WORK TO BE DONE. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED FOR A COMPLETE
DEMOLITION.
2. ANY SHUTDOWN OF POWER SERVICES SHALL BE COMPLETED AT TIMES OUTSIDE OF NORMAL WORKING HOURS AS APPROVED BY THE OWNER. PROVIDE A MINIMUM OF 15 BUSINESS DAYS ADVANCED NOTICE
PRIOR TO ANY SHUTDOWN.
3. EXISTING EQUIPMENT INDICATED TO REMAIN ARE TO REMAIN ACTIVE THROUGHOUT CONSTRUCTION.
PROVIDE TEMPORARY FEEDERS IF REQUIRED TO MAINTAIN SERVICE.
4. PROVIDE TEMPORARY SERVICE AS DIRECTED FOR LIGHTING AND POWER EQUIPMENT (DRILLS, SAWS, ETC.). VERIFY TEMPORARY REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND
POWER SHALL MEET OSHA REQUIREMENTS AND LOCAL CODES.
5. LOCATE, IDENTIFY AND PROTECT ELECTRICAL SERVICES PASSING THROUGH DEMOLITION AREA AND SERVING OTHER AREAS OUTSIDE DEMOLITION LIMITS. MAINTAIN SERVICES TO AREAS OUTSIDE DEMOLITION LIMITS. WHEN SERVICES MUST BE INTERRUPTED, INSTALL TEMPORARY SERVICES FOR
AFFECTED AREAS.
6. ADVANCE NOTICE SHALL BE GIVEN TO OWNER BEFORE COMMENCEMENT OF WORK ON ANY ELECTRICAL
CIRCUITRY, WHETHER OR NOT AN OUTAGE IS REQUIRED.
7. PROTECT ADJACENT MATERIALS INDICATED TO REMAIN. INSTALL AND MAINTAIN DUST AND NOISE BARRIERS TO KEEP DIRT, DUST AND NOISE FROM BEING TRANSMITTED TO ADJACENT AREAS. REMOVE
PROTECTION AND BARRIERS AFTER DEMOLITION OPERATIONS ARE COMPLETE.
8. ALL EXISTING DEVICES MAY NOT BE SHOWN ON PLANS. REMOVE ALL DEVICES ON WALLS SHOWN TO BE
DEMOLISHED.
9. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
10. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS NEEDED TO
FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW EQUIPMENT. REFER TO
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS OF DUCTWORK AND CONDUIT.
CONTRACTOR SHALL CIRCUIT TRACE EXISTING CONDUITS, IDENTIFY SOURCE, AND COORDINATE
OUTAGES AS NEEDED WITH THE COR.
11. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES/FIXTURES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE
CONSTRUCTION OF DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING
EQUIPMENT/DEVICES/FIXTURES AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK. ALL
EQUIPMENT/DEVICES/FIXTURES SHALL BE RETURNED TO THEIR ORIGINAL LOCATION AND OPERATING
CONDITION.
12. DISCONNECT AND SALVAGE SIX (8) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2H-111. REINSTALL
SALVAGED LIGHTING FIXTURES IN NEW LOCATION UNDER NEW WORK.
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
AREA OF WORK
MECH ROOM 2J-119
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES5
PARTIAL 2ND FLOOR PLAN - PART C - POWER -
DEMOLITION
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART C - ELECTRICAL - DEMOLITION
1 DISCONNECT AND REMOVE AHU 143-AHU-2J3 AND ALL ASSOCIATED EQUIPMENT WITHIN MECHANICAL
ROOM. REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 DISCONNECT AND REMOVE FAN COIL UNITS SERVICING HATCHED AREA. REMOVE ALL ASSOCIATED CONDUIT AND CONDUCTORS BACK TO SOURCE. REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT
LOCATIONS.
3 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
4 DISCONNECT AND REMOVE POWER TO HUMIDIFIER. REMOVE ALL ASSOCIATED EQUIPMENT WITHIN
ROOM. REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE.
5 DISCONNECT AND REMOVE RECEPTACLE. CIRCUIT TRACE AND SALVAGE EXISTING CIRCUIT FOR
RE-USE.
6 DISCONNECT POWER CONNECTION TO HVAC CONTROL PANEL. SALVAGE CIRCUIT FOR RE-USE.
7 DISCONNECT AND REMOVE POWER TO CHW, HW, AND GLYCOL PUMPS. REMOVE ALL ASSOCIATED EQUIPMENT WITHIN MECHANICAL ROOM. REMOVE ALL CONDUIT AND CONDUCTORS BACK TO SOURCE
LOCATED IN MECH ROOM 2J-179
8 RELOCATE EXHAUST FAN AND ASSOCIATED EQIUPMENT ON ROOF. EXTEND CONDUIT AND
CONDUCTORS TO NEW LOCATION.
M
SM
S M
S M
S M
M S M
M
M
J
G
VFDVFD
M M
M
M
M
M
VFD VFD
V F
D V
F D
V F
D V
F D
M M
J
G
4 5 6 7
K
L
PRE-OP
SCREENING
2H-118
PATIENT
2H-118A
PATIENT
2H-118B
PATIENT
2H-118C
PATIENT
2H-119
PATIENT
2H-117
WAITING
2H-117A
EXAM
2H-120
PATIENT
2H-112
EXAM
2H-121A
EXAM
2H-121B
EXAM
2H-122A
EXAM
2H-122B
EXAM
2H-125A
EXAM
2H-125B
EXAM
2H-127
EXAM
2H-127A
EXAM
2H-128A
EXAM
2H-128
EXAM
2H-129
EXAM
2H-130
EXAM
2H-132
WAITING ROOM
EXAM-1
EXAM-2
EXAM-3
EXAM-4
EXAM-5
EXAM-6
EXAM-7
EXAM-8
EXAM-9
TOILET 1
WAITING
STORAGE
2H-103I
OFFICE
2H-102
HYDRO TUB
2H-110
NURSE OFFICE
2H-115
NURSE STATION
C2-19
ELEC.
2H-113
NURSE STATION
C2-23 WORKROOM
2H-114
EXAM
2H-124 SOIL UTILITY
2H-131
NOURISHMENT
2H-116
CLEAN UTILITY
2H-133
MEDICINE RM
2H-116A
CLEAN LINEN
2H-123
TOILET
2H-121C
TOILET
2H-122C
TOILET
2H-121C
EF-1
TOILET
2H-125C
TOILET
2H-129A
EF-2
EF-3
TOILET
2H-101
TOILET
2H-130A
TOILET
2H-134B
EF-5
MECH ROOM
2H-111
ELEC ROOM
2J-167
2HA 2LB 2ELHA
2ECLC2ECHA
2EELA
AREA OF WORK
(E) 2EMCPB
2LF
2LF-9
2LF-9 1
2LF-9
2LF-10
EF-4
2LF-10
AREA OF WORK
MECH ROOM
2J-179
(E) (E)(E)
(E) (E) (E)
(E)
2ELLA
143-ES6
2MCPA-3
MECH ROOM
2H-111
(E) 2MCPA
(E) 2MCPA-2
(E) SF-2J3
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD
DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL
EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF
EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT
PREVENT THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK
UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT SHOWN SHALL BE NEW UON.
3. REFERENCE SHEET 143-ES10 & 143-ES11 FOR PANEL SCHEDULES AND ONE LINE DIAGRAM.
4. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
5. PROVIDE NEMA 12 TYPE ENCLOSURE FOR ALL VFDS. VFDS SHALL BE ULTRA LOW HARMONIC
TYPE WITH INPUT LINE REACTORS AND CIRCUIT BREAKER DISCONNECT. BASIS OF DESIGN
SHALL BE ABB ACH580-031 OR EQUIVALENT. REFER TO SHEET 143-ES9 FOR VFD SCHEDULE.
6. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS
NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW
EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND
LOCATIONS OF DUCTWORK AND CONDUIT. CONTRACTOR SHALL CIRCUIT TRACE EXISTING
CONDUITS, IDENTIFY SOURCE, AND COORDINATE OUTAGES AS NEEDED WITH THE COR.
7. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES/FIXTURES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE
CONSTRUCTION OF DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING
EQUIPMENT/DEVICES/FIXTURES AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK.
ALL EQUIPMENT/DEVICES/FIXTURES SHALL BE RETURNED TO THEIR ORIGINAL LOCATION AND
OPERATING CONDITION.
8. RELOCATE SIX (6) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2H-111. COORDINATE FINAL
LOCATIONS IN FIELD WITH NEW EQUIPMENT LAYOUT, DUCTWORK, AND SUPPORTS. LOCATED
FIXTURES ALONG WALK-ABLE AROUND EQUIPMENT. REWORK AND EXTEND EXISTING CONDUIT
AND CONDUCTORS AS REQUIRED. PROVIDE ADD ALTERNATE LINE ITEM PRICING FOR TO
REPLACE THE SIX (6) LIGHTING FIXTURES WITH NEW 48" LED STRIP LIGHTS WITH FROSTED
LENS. BASIS OF DESIGN SHALL BE COOPER SNLED SERIES OR EQUIVALENT.
GENERAL NOTES
PLAN NOTES
2LF-8
2MCPA-3-3
2MCPA-3-1
2MCPA-3-2
2MCPA-3-4
2MCPA-3-5
2MCPA-3-6SSHX-H1
AHU-H1
HWP-1A-H1 HWP-1B-H1
6 MECH ROOM
2H-111
2MCPA-3-7
2MCPA-3-8
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
AREA OF WORK
MECH ROOM 2H-111
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:1
P M
143-ES6
PARTIAL 2ND FLOOR PLAN - PART A - POWER -
NEW WORK
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART A - ELECTRICAL - NEW WORK
1 POWER CONNECTION FOR NEW EXHAUST FAN. FAN TO OPERATE CONTINUOUSLY.
2 PROVIDE ELECTRICAL CONNECTION FOR AHU-H1 SUPPLY FAN.
3 PROVIDE RECEPTACLE FOR NEW SIEMENS DDC PANEL. CONNECT TO CIRCUIT SALVAGE
UNDER DEMOLITION. COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH VENDOR IN
FIELD.
4 PROVIDE POWER CONNECTION TO NEW STEAM TO STEAM HEAT EXCHANGER.
5 PROVIDE ELECTRICAL CONNECTION FOR AHU-H1 RETURN FAN.
6 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
7 RELOCATE RECEPTACLE. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
8 CONNECT NEW RECEPTACLE TO SALVAGED CONVENIENCE RECECTACLE CIRCUIT IN ROOM.
EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
9 PROVIDE NEW PANELBOARD 2EELA TO REPLACE EXISTING. RECONNECT SALVAGED FEEDER
AND BRANCH CIRCUITS. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
SCALE: 1/4" = 1'-0"
ENLARGED PLAN - PART A - ELECTRICAL - NEW WORK - MECH RM 2H-111
S
MM
V F
D V
F D
M
V F
D V
F
DM M
G
J
J
J
J
4 5 6 7 8
G
H
I
J
K
L
DIAL. PREP
2J-174
CLEAN AREA ISO
2J-164A
PATIENT RM
2J-159
PATIENT RM
2J-158
PATIENT RM
2J-157
TOILET
2J-156A
PATIENT RM
2J-156
WORKROOM
2J-153
NURSE STATION
C2-15
WATER
TREATMENT
2J-177
CAPD
2J-176
DIAL. PREP
2J-175
JAN.
2J-173
STORAGE
2J-163
MECH ROOM
2J-179
STORAGE
2J-161
BIO CHEM LAB
2J-165
STORAGE CLEAN
2J-164
SOILED UTILITIES
2J-162
CLEAN UTILITIES
2J-160
LOUNGE
2J-155
SSHX-J1
2ECHA
2LB2HA
2EELA
2ELHA
2ECLC
ELEC ROOM
2J-167
EF
(E) (E)
(E) (E)
(E) (E)
(E) (E)
AREA OF WORK
AREA OF WORK
30/15
(E) 2EMCPB2
2LF-12 2LF
AHU-J1
2MCPA-3-10
2MCPA-3-9
2MCPA-3-11
2MCPA-3-12
2LF-15
2ELLA
2EELA-25
2EELA-25
2MCPA-3
(E)
2LF-17,19
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT SHOWN SHALL BE NEW UON.
3. REFERENCE SHEET 143-ES10 & 143-ES11 FOR PANEL SCHEDULES AND ONE LINE DIAGRAM.
4. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
5. PROVIDE NEMA 12 TYPE ENCLOSURE FOR ALL VFDS. VFDS SHALL BE ULTRA LOW HARMONIC TYPE WITH INPUT LINE REACTORS AND CIRCUIT BREAKER DISCONNECT. BASIS OF DESIGN SHALL BE ABB ACH580-031 OR
EQUIVALENT. REFER TO SHEET 143-ES9 FOR VFD SCHEDULE.
6. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS OF DUCTWORK AND CONDUIT. CONTRACTOR SHALL CIRCUIT TRACE EXISTING CONDUITS, IDENTIFY SOURCE, AND COORDINATE OUTAGES AS NEEDED WITH THE
COR.
7. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES/FIXTURES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE CONSTRUCTION OF DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING EQUIPMENT/DEVICES/FIXTURES AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK. ALL EQUIPMENT/DEVICES/FIXTURES SHALL BE
RETURNED TO THEIR ORIGINAL LOCATION AND OPERATING CONDITION.
8. RELOCATE EIGHT (8) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2J-179. COORDINATE FINAL LOCATIONS IN FIELD WITH NEW EQUIPMENT LAYOUT, DUCTWORK, AND SUPPORTS. LOCATED FIXTURES ALONG WALK-ABLE AROUND EQUIPMENT. REWORK AND EXTEND EXISTING CONDUIT AND CONDUCTORS AS REQUIRED. PROVIDE ADD ALTERNATE LINE ITEM PRICING FOR TO REPLACE THE EIGHT (8) LIGHTING FIXTURES WITH NEW 48" LED STRIP LIGHTS WITH FROSTED LENS. BASIS OF DESIGN SHALL BE COOPER SNLED SERIES OR EQUIVALENT.
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
AREA OF WORK
MECH ROOM 2J-179
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:2
P M
143-ES7
PARTIAL 2ND FLOOR PLAN - PART B - POWER -
NEW WORK
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART B - ELECTRICAL - NEW WORK
1 PROVIDE RECEPTACLE FOR NEW SIEMENS DDC PANEL. CONNECT TO CIRCUIT SALVAGE UNDER DEMOLITION.
COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH VENDOR IN FIELD.
2 PROVIDE ELECTRICAL CONNECTION FOR AHU-J1 SUPPLY FAN.
3 PROVIDE ELECTRICAL CONNECTION FOR AHU-J1 RETURN FAN.
4 PROVIDE POWER CONNECTION FOR FIRE SMOKE DAMPER.
5 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
MM
SM
SM
S M
S M
S M
M
M
M
SM
J
J
G
VFD VFD
M
M
M
M
M
M
VFD VFDVFDVFD
G
MM
V F
D V
F D
J
8 9 10 11 12 13 14
E
F
G
H
I
J
WAITING
2J-103 INFECTIOUS
DISEASE
2J-105A
INFECTIOUS
DISEASE
2J-108A
PATIENT
2J-111 PATIENT
2J-113
PATIENT
2J-114
PATIENT
2J-114A
PATIENT
2J-114C
PATIENT
2J-114B
PATIENT
2J-114D
PATIENT
2J-115
PATIENT
2J-127A
PATIENT
2J-127
PATIENT
2J-128
PATIENT
2J-128A
PATIENT
2J-138
EXAM
2J-138A
PATIENT
2J-137A
PATIENT
2J-137
PATIENT
2J-142
PATIENT
2J-142A
PATIENT
2J-134A
PATIENT
2J-134B
PATIENT
2J-131A
PATIENT
2J-131B
PATIENT
2J-130A
PATIENT
2J-130B
PATIENT
2J-116
PATIENT
2J-117
PULMONARY
SLEEP
2J-120
WAITING
2J-126
WAITING
2J-136
PATIENT
2J-139
NURSE STATION
C2-4
OFFICE
2J-109
PATIENT
2J-110
TUB
2J-118
NURSE STATION
C2-8
NURSE OFFICE
2J-123
MED ROOM
2J-141
SOILED UTILITIES
2J-140
CLEAN UTILITIES
2J-124
EXAM
2J-133
OFFICE
2J-122
TOILET
2J-105B
ANTE
2J-105
EF-6
EF-8
TOILET
2J-113A
TOILET
2J-111A
TOILET
2J-108B
TOILET
2J-116A
JAN
2J-112
EF-9
ELEC.
2J-121
OFFICE
2J-125
TOILET
2J-138A
TOILET
2J-130C
TOILET
2J-131C
CL. LINEN
2J-132
EF-10
TOILET
2J-134C
EF-11
MECH ROOM
2J-119
AREA OF WORK
2LF-142ELLA-14
2LF-13
2LF-13
2LF-14
EF-7
2ELLA-20
143-ES8
GENERAL NOTES
PLAN NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS PROVIDED.
2. ALL EQUIPMENT SHOWN SHALL BE NEW UON.
3. REFERENCE SHEET 143-ES10 & 143-ES11 FOR PANEL SCHEDULES AND ONE LINE DIAGRAM.
4. COORDINATE ALL WORK WITH PHASING PLAN ON SHEET 143-ES2.
5. PROVIDE NEMA 12 TYPE ENCLOSURE FOR ALL VFDS. VFDS SHALL BE ULTRA LOW HARMONIC TYPE WITH INPUT LINE REACTORS AND CIRCUIT BREAKER DISCONNECT. BASIS OF DESIGN SHALL BE ABB ACH580-031 OR
EQUIVALENT. REFER TO SHEET 143-ES9 FOR VFD SCHEDULE.
6. CONTRACTOR SHALL REROUTE/RELOCATE EXISTING CONDUITS WITHIN AREA OF WORK AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK AND INSTALLATION OF NEW EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS OF DUCTWORK AND CONDUIT. CONTRACTOR SHALL CIRCUIT TRACE EXISTING CONDUITS, IDENTIFY SOURCE, AND COORDINATE OUTAGES AS NEEDED WITH THE
COR.
7. CONTRACTOR SHALL TAKE INVENTORY OF ALL EQUIPMENT/DEVICES/FIXTURES (LOCATION AND CONDITION) INSTALLED IN CEILINGS PRIOR TO TAKING DOWN OF ANY CEILINGS TO FACILITATE CONSTRUCTION OF DUCTWORK. CONTRACTOR SHALL DISCONNECT/RECONNECT ALL CEILING EQUIPMENT/DEVICES/FIXTURES AS NEEDED TO FACILITATE CONSTRUCTION OF DUCTWORK. ALL EQUIPMENT/DEVICES/FIXTURES SHALL BE
RETURNED TO THEIR ORIGINAL LOCATION AND OPERATING CONDITION.
8. RELOCATE SIX (6) 4"W X 48"L STRIP LIGHTS IN MECH ROOM 2J-179. COORDINATE FINAL LOCATIONS IN FIELD WITH NEW EQUIPMENT LAYOUT, DUCTWORK, AND SUPPORTS. LOCATED FIXTURES ALONG WALK-ABLE AROUND EQUIPMENT. REWORK AND EXTEND EXISTING CONDUIT AND CONDUCTORS AS REQUIRED. PROVIDE ADD ALTERNATE LINE ITEM PRICING FOR TO REPLACE THE SIX (6) LIGHTING FIXTURES WITH NEW 48" LED STRIP LIGHTS WITH FROSTED LENS. BASIS OF DESIGN SHALL BE COOPER SNLED SERIES OR EQUIVALENT.
13 14
H
2LF-11
2MCPB-3
2MCPB-3-1
2MCPB-3-2
2MCPB-3-3
2MCPB-3-4
2MCPB-3-5
2MCPB-3-6
AHU-J2
SSHX-J2
30/15
2MCPB-3-7
2MCPB-3-8
HWP-1A-J2HWP-1B-J2
0'
SCALE : 1/8" = 1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
H WING
J WING
J1 WING
BUILDING 143 KEYPLAN
AREA OF WORK
MECH ROOM 2J-119
4'8' 8' 16'
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:2
P M
143-ES8
PARTIAL 2ND FLOOR PLAN - PART C - POWER -
NEW WORK
SCALE: 1/8" = 1'-0"
PARTIAL 2ND FLOOR PLAN - PART C - ELECTRICAL - NEW WORK
1 POWER CONNECTION FOR NEW EXHAUST FAN. FAN TO OPERATE CONTINUOUSLY.
2 CONNECT NEW RECEPTACLE TO SALVAGED CONVENIENCE RECECTACLE CIRCUIT IN ROOM. EXTEND
CONDUIT AND CONDUCTORS AS REQUIRED.
3 PROVIDE POWER CONNECTION TO NEW STEAM TO STEAM HEAT EXCHANGER.
4 PROVIDE ELECTRICAL CONNECTION FOR AHU-J2 SUPPLY FAN.
5 PROVIDE ELECTRICAL CONNECTION FOR AHU-J2 RETURN FAN.
6 RELOCATE UNIT HEATER. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.
7 RELOCATE EXHAUST FAN AND ASSOCIATED EQIUPMENT ON ROOF. EXTEND CONDUIT AND
CONDUCTORS TO NEW LOCATION.
8 PROVIDE RECEPTACLE FOR NEW SIEMENS DDC PANEL. CONNECT TO CIRCUIT SALVAGE UNDER
DEMOLITION. COORDINATE FINAL LOCATION AND MOUNTING HEIGHT WITH VENDOR IN FIELD.
Revisions: Date:
SCALE: 1/4" = 1'-0"
ENLARGED PLAN - PART C - ELECTRICAL - NEW WORK
RP-31/8"
PROVIDE A LABEL FOR EACH RECEPTACLE TO INDICATE PANEL AND
CIRCUIT BREAKER NO. SUPPLYING THE DEVICE. PROVIDE PRESSURE
SENSITIVE, LABEL WITH BLACK LETTERING ON CLEAR BACKGROUND.
LETTERING HEIGHT IS 1/8".
1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES OR SPECIAL CONDITIONS.
2. PROVIDE WIRING AND CONDUIT BETWEEN ALL OUTLETS/FIXTURES INDICATED WITH CIRCUIT
NUMBERS AND PANEL DESIGNATIONS.
3. ALL SWITCH CONTROLS SHALL BE PROVIDED WITH WIRING AND CONDUIT AS REQUIRED.
4. ALTHOUGH ALL BRANCH CIRCUIT WIRING AND CONDUIT IS NOT SHOWN, IT IS THE INTENT OF
THESE DOCUMENTS THAT A COMPLETE BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED.
5. BRANCH CIRCUIT WIRING IS INDICATED ON THE DRAWINGS IN ACCORDANCE FOR BOTH
LIGHTING AND POWER.
6. LIGHT SWITCH CONTROLS LIGHTS IN THE SAME ROOM UON.
HP-4a
PANEL
DESIGNATION
SWITCH
DESIGNATION
CIRCUIT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
A u to d es k
D oc s:
//2
V
A S a le m R ep la ce H
V A
C P ha se
II
/M
E P
K ic ko ff
M o d el
.r vt
/2 4/
1:
:2
P M
143-ES9
DETAILS - ELECTRICAL
NO SCALE
RECEPTACLE LABELING DETAIL
NO SCALE
BRANCH CIRCUIT WIRING NOTES
GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD
DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL
EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF
EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT
PREVENT THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK
UNTIL DIRECTION IS PROVIDED.
2. ALL FEEDERS, BRANCH CIRCUITS, AND PANELBOARD BUS SHALL BE COPPER.
3. CONTRACTOR SHALL PROVIDE AND SUBMIT FINAL SHORT CIRCUIT, OVERCURRENT
PROTECTION DEVICE COORDINATION, AND ARC FLASH STUDY FOR NEW PANELBOARDS AND
OVERCURRENT PROTECTION DEVICES FOR APPROVAL PRIOR TO ORDERING EQUIPMENT.
CONTRACTOR SHALL PROVIDE ARC FLASH LABELS FOR NEW EQUIPMENT.
4. CONTRACTOR SHALL COORDINATE FINAL ROUTING OF NEW ELECTRICAL FEEDERS AND
BRANCH CIRCUITRY IN FIELD TO FACILITATE NEW WORK. CONTRACTOR SHALL VISIT SITE AND
FIELD VERIFY EXISTING CONDITIONS AND COORDINATE ALL HORIZONTAL AND VERTICAL
PATHWAYS.
PLAN NOTES
1. PROVIDE NEW SQUARE D MASTERPACT NW08H3 BREAKER IN AVAILABLE SWITCHGEAR BUCKET
TO MATCH EXISTING.
2. UTILIZE SPARE BREAKER IN SWITCHGEAR. SET BREAKER SETTINGS PER COORDINATION
STUDY.
3. REPLACE EXISTING BREAKER IN PANEL WITH NEW BREAKER TO MATCH EXISTING TYPE AND
AIC.
4. PROVIDE NEW FEEDER CONDUCTORS WITHIN EXISTING 1" CONDUIT FROM ESWBD-E2 TO NEW
XFRM AND LOCAL DISCONNECT. CONDUCTOR LENGTH IS APPROXIMATELY 300FT.
5. REPLACE EXISTING 15KVA XFMR WITH NEW 30KVA XFMR IN SAME LOCATION.
6. PROVIDE #6 AWG SUPPLY SIDE BONDING JUMPER AT TRANSFORMER PER NEC 250.102(C).
7. PROVIDE 3-PHASE SUBMETER. METER SHALL RECORD KW PEAK DEMAND AT 15 MINUTE
INTERVALS WITH DATE/TIME STAMP AND DISPLAY KWH, KW, KW PEAK DEMAND, RMS AMPS,
RMS VOLTS (PH-NEU), RMS VOLTS (PH-PH), AND POWER FACTOR. BASIS OF DESIGN EMON
DMON CLASS 3200 (E32-480100-J-BAC-KIT) OR EQUAL. INSTALL SUBMETER ADJACENT TO PANEL.
INCOMING SERVICE
(E) DIST. PANEL "DPS1-1"
400A, 480/277V, 3W, 4PH
(E) 4160V:480/277V
750KVA
TRANSFORMER
(E) UNIT SUBSTATION "1(S1)"
1200A, 480/277V, 3W, 4PH
1600AT
1200AF
400AT
800AF
300AT
800AF
200AT
800AF
(E) DIST. PANEL "DPS1-2"
400A, 480/277V, 3W, 4PH
(E) DIST. PANEL "DPS1-3"
400A, 480/277V, 3W, 4PH
400AF
400AT
400AF
S P
A R
E
400N (N)
SEE PANEL SCHEDULE
400A
VFD
M
AHU-J2
SUPPLY
FAN #1
(10HP)
VFD
M
VFD
M
VFD
M(N) (N)
(N) (N)
(N)
(N)
(N)
(N)VFD
M
AHU-J2
RETURN
FAN #1
(15HP)
VFD
M
VFD
M
VFD
M(N) (N)
(N) (N)
(N)
(N)
(N)
(N)
(N) DIST. PANEL "2MCPB-3"
AHU-J2
SUPPLY
FAN #2
(10HP)
AHU-J2
SUPPLY
FAN #3
(10HP)
AHU-J2
SUPPLY
FAN #4
(10HP)
AHU-J2
RETURN
FAN #2
(15HP)
HWP-1A-
J2
(1.5HP)
HWP-1B-
J2
(1.5HP)
30A 30A 30A 30A50A 50A 15A 15A
INCOMING NORMAL SERVICE
(E) DIST. PANEL "DPS3-1"
480/277V, 3W, 4PH
(E) 4160V:480/277V
750KVA
TRANSFORMER
(E) UNIT SUBSTATION "3(S3)"
1200A, 480/277V, 3W, 4PH
1600AT
1200AF
300AT
800AF
250AT
800AF
400AT
800AF
(E) DIST. PANEL "DPS3-2"
480/277V, 3W, 4PH
(E) DIST. PANEL "DPS3-1"
480/277V, 3W, 4PH
800AF
400AT
800AF
600AT
S P
A R
E
(N) DIST. PANEL "2MCPA-3"
SEE PANEL SCHEDULE 400A
VFD
M
AHU-H1
SUPPLY
FAN #1
(7.5HP)
VFD
M
VFD
M
VFD
M
(N)
(N) (N)
(N) (N)
(N)
(N)
(N)
(N)VFD
M
AHU-H1
RETURN
FAN #1
(10HP)
VFD
M(N) (N)
(N) (N) VFD
M
AHU-J1
SUPPLY
FAN #1
(20HP)
VFD
M
VFD
M
VFD
M
AHU-J1
RETURN
FAN #1
(5HP)
(N) (N)
(N) (N)
(N)
(N)
(N)
(N)
AHU-J1
SUPPLY
FAN #2
(20HP)
AHU-H1
SUPPLY
FAN #2
(7.5HP)
AHU-H1
SUPPLY
FAN #3
(7.5HP)
AHU-H1
SUPPLY
FAN #4
(7.5HP)
AHU-H1
RETURN
FAN #2
(10HP)
AHU-J1
RETURN
FAN #2
(5HP)
20A 20A 20A 20A30A 30A 60A 60A 15A 15A
400N (N)
VFD
M
VFD
M(N)
(N)
(N)
(N)
HWP-1A-
H1
(1.5HP)
HWP-1B-
H1
(1.5HP)
15A 15A
(N)
400N
FEEDER SCHEDULE
CONDUCTOR SIZE
PER NEC TABLE 310.16 AND NEC TABLE 250.122
CONDUIT SIZE
PER NEC ANNEX C
TABLE C.1
SYMBOL
4"4 - 500 KCMIL AND A #3 GND
NOTE:
IF N IS NOT IN SYMBOL, REDUCE SYSTEM FROM 4 WIRE SYSTEM TO 3 WIRE SYSTEM GROUND
CONDUCTOR AND CONDUIT SHALL REMAIN THE SAME.
100N 1-1/2"4 -#1 AND A #6 GND
60N 1"4 -#4 AND A #10 GND
SEE PANEL SCHEDULE
(E) PANEL "2LB", 2ND LVL
150A
TRANSFORMER
45KVA
480:208/120V
70A
(E) PANEL "2HA", 2ND LEVEL
150A, 480/277V, 3W, 4PH
125A
(E) PANEL "DPS2-2", GND LVL
400A, 480/277V, 3W, 4PH
(E)
125A
INCOMING NORMAL SERVICE
(E) 4160V:480/277V
750KVA
TRANSFORMER
(E) UNIT SUBSTATION "2(S2)"
1200A, 480/277V, 3W, 4PH
1600AT
1200AF
400AT
400AF
SEE PANEL SCHEDULE
(E) PANEL "2LF", 2ND LVL
150A
TRANSFORMER
30KVA
480:208/120V
50A
(E)
SEE PANEL SCHEDULE
(E) PANEL "2ELLA", 2ND LVL
60A
TRANSFORMER
15KVA
480:208/120V
30A
(E) PANEL "2ELHA", 2ND LEVEL
60A, 480/277V, 3W, 4PH
(E)
60A
INCOMING EMERGENCY
480/277V SOURCE
SEE PANEL SCHEDULE
(N) PANEL "2EELA", 2ND LVL
100A
TRANSFORMER
30KVA
480:208/120V
60A
(E) PANEL "ESWBD-E2"
400A, 480/277V, 3W, 4PH
(N)
INCOMING EMERGENCY
480/277V SOURCE
100N (N) 10FT4
60 (N) 300FT
#6 AWG
IN 1" PVC
(N)
(N) 60A
NON-FUSED
DISCONNECT
60 (N) 10FT
DM 7(N)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
658-19-104
PW / JCKC / JC11.21.2025
1970 ROANOKE BLVD., 24153
DEPARTMENT OF VETERANS
AFFAIRS - REPLACE HVAC PHASE II
FREEDOM ENGINEERING
708 MASON ROAD
STEVENSVILLE, MD 21666
PH: 877.821.4229
POC: JAMES BECKMAN, PATRICK WOLFE
KCI TECHNOLOGIES
11830 WEST MARKET PLACE, SUITE F
FULTON, MD 20759
PH: 410.792.8086
POC: MICHAEL PRICE
FIRE PROTECTION:
A u to d e s k D o c s
/2
V
A S a le m R e p la c e H
V A
C P h a s e I I/
M E
P K ic k o ff M o d e l
.r v t
/2 /2
:1
:3
P M
143-ES10
ONE-LINE DIAGRAMS
NO SCALE
PARTIAL ONE-LINE DIAGRAM - 2MCPB-3
NO SCALE
PARTIAL ONE-LINE DIAGRAM - 2MCPA-3
NO…