S05 RFI_ Upgrade HVAC System Phase II pt.2.pdf
PDF 83 KB Posted
- Attached to
- Z1DA--Upgrade HVAC System Phase II Federal contract opportunity
- Solicitation number
- 36C24626B0005
About this file
This is a Questions and Answers document for the Upgrade HVAC System Phase II solicitation (Project #658-19-104, Solicitation #36C24626B0005) for the VA.
The Q&A addresses 12 inquiries regarding scope, existing systems, site conditions, and contract requirements. Asbestos remediation is not included in the project scope. Current system providers are identified as Johnson Controls for fire alarm systems and Siemens for DDC controls; all new control systems must have BACNET capabilities per contract drawings and specifications. The VA will provide hard ceiling identification during a December 11, 2025 site visit, and ceiling finish schedules are specified in section 09 51 00 of the updated specifications. Radiant panel removal areas and scope are detailed in the mechanical demolition drawings. Contractors will have complete unoccupied access to each wing during phasing, with responsibility to protect remaining furniture, fixtures, and equipment. Fire and smoke wall locations for ICRA requirements are identified in drawing 143-LS B143-2ND FL. Elevator use for both personnel and equipment is permitted per specification section 01 00 00 paragraph 1.16. Regarding utility relocations, contractors are directed to specification 01 00 00 paragraph 1.10; unidentified utilities requiring relocation will be handled according to that specification section rather than treated as separate latent conditions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 143- LS B143-2ND FL.pdf | ||
| 36C24626B0005 0005.docx | DOCX document | |
| 36C24626B0005 0004.docx | DOCX document | |
| S05 RFI_Salem VAMC HVAC Phase II Drawings.pdf | ||
| S05 RFI_Salem VAMC - Final CD Submission - Spec.pdf | ||
| S05 RFI_ Upgrade HVAC System Phase II.pdf | ||
| S06 36C24626B0005 0003.pdf | ||
| S04 Site Visit Upgrade HVAC Phase II.pdf | ||
| 36C24626B0005 0002.docx | DOCX document | |
| 36C24626B0005 0001.docx | DOCX document | |
| 36C24625B0029_ Amendment A00002.pdf | ||
| Salem VAMC MECH Drawings.pdf | ||
| P01 Upgrade HVAC Phase II - Drawings.pdf | ||
| Replace HVAC Phase II _ Final Spec.pdf | ||
| Salem VAMC FP Drawings.pdf | ||
| Salem VAMC ELECT Drawings.pdf | ||
| 36C24626B0005_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions for Upgrade HVAC System Phase II Project # 658-19-104
Solicitation # 36C24626B0005
1. Asbestos (A.C.M.). Is there any Asbestos remediation or abatement within the scope of this project?
No
2. Fire Alarm: Can the VA please provide the name and contact information for the current fire alarm provider?
Johnson Controls
3. DDC controls: Can the VA please provide the name and contact information for the current controls provider?
Siemens
4. DDC controls: can the VA please provide make and model of head end equipment?
Ref contract drawings and specifications for required controls. All systems shall be BACNET capabilities
5. Elevators: Will the government allow use of the elevators both for personnel and equipment?
Ref specification section 01 00 00 paragraph 1.16
6. Ceilings: Can the VA please identify any areas that have hard ceilings?
Site visit on December 11, 2025, provide identification of hard ceilings
7. Ceilings: As large areas of ceiling will need to be demoed and replaced. Can the VA please provide a finish schedule for ceiling replacement?
See updated specifications with section 09 51 00
8. Radiant panel removal. Can the government please provide drawing/ SOW for areas where radiant panels are removed (ceiling Type)?
See mechanical demolition drawings
9. Drawing 143-MH2 phasing notes "each wing shall be shut down and isolated from the rest of the hospital" Will we "own" this area completely unoccupied by the VA?
Yes, contractor shall protect any remaining furniture, fixtures, or equipment.
10. Fire and smoke walls for ICRA: Can the VA please provide a drawing identifying smoke and fire walls so that ICRA requirements can be priced?
See attached drawing 143-LS B143-2ND FL
11. Drawing Numerous sheets I.E.143-MH9 general notes 4 calls for elec. fire protection and plumbing to be relocated but does not identify or quantify. Can the VA please identify all relocations that are within the scope of this project?
No, ref specification 01 00 00 paragraph 1.10
12. Reference previous question: Will the Government treat all unidentified utilities etc. that require relocation to install or remove the HVAC system as drawn as a latent condition and address it with a MOD when a no cost reroute is unavailable?
Ref to specifications 01 00 00 paragraph 1.10