SAFCA Job Order Contract 2026 - Contract Documents Summary
This is a Contract Specifications document for the Sacramento Area Flood Control Agency (SAFCA) establishing four Job Order Contracts (JOC-025, JOC-026, JOC-027, and JOC-028) for general engineering construction services in California. The contracts cover ongoing repair, remodeling, and general engineering site improvements throughout the SAFCA service area, including earthwork, utilities, paving, concrete, demolition, sign installation, drainage, landscaping mitigation, and site clearing. Sealed bids must be submitted electronically through the Sacramento County Electronic Bidding Portal (OpenGov) by July 30, 2026, at 2:00 PM. Pre-bid presentation review is mandatory, and all pre-bid questions must be submitted in writing via the Q&A portal no later than July 17, 2026, at 5:00 PM. Award of contracts is expected within 30 calendar days of bid opening, with contracts awarded to the four lowest responsive and responsible bidders. Each contract has a maximum estimated value of $2,000,000 with a term of 365 calendar days or expenditure of the maximum contract value, whichever occurs first, and there is no guaranteed minimum contract value or volume of job orders.
Bidders must hold a valid California General Engineering Contractor "A" license and must be registered with the Department of Industrial Relations. Each bid requires a bid guarantee of not less than $25,000, and the successful bidder must provide Performance and Payment Bonds of not less than 100 percent of the maximum contract value. All unit prices in the Construction Task Catalog are based on local labor, material, and equipment costs, with contractors bidding two adjustment factors for work performed during normal and other than normal working hours. The contractor will pay a 1 percent JOC System License Fee on all job order prices for access to Gordian's JOC Solution proprietary information management system. The contract is subject to California Labor Code prevailing wage requirements, Federal Labor Standards Provisions under the Davis-Bacon Act, and Equal Employment Opportunity requirements. Work must be performed within SAFCA's jurisdiction, which includes areas outside agency boundaries needed for property protection. The contractor must perform at least 50 percent of work with its own organization, and all subcontractors must perform at least 75 percent of their designated work items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office 916-874-7606 Fax 916-874-8289
1325 J Street, Suite 1700 Sacramento, CA 95814
SACRAMENTO AREA FLOOD CONTROL AGENCY
CONTRACT SPECIFICATIONS
Job Order Contract 2026
1. SAFCA JOC-025
2. SAFCA JOC-026
3. SAFCA JOC-027
4. SAFCA JOC-028
ISSUED FOR BID
June 2026
Approved On: May 21, 2026
SAFCA Resolution No. 2026-037
By:
JASON D. CAMPBELL
Executive Director
By:
JOSE R. GOMEZ
Director of Engineering
Docusign Envelope ID: 0C4931C8-3DBE-862B-8036-DFDF6AFD92F2
SAFCA Job Order Contract 2026 Issued for Bid SAFCA JOC-025, 026, 027, 028 June 2026 i
TABLE OF CONTENTS
NOTICE TO CONTRACTORS
PART I GENERAL SPECIFICATIONS
SECTION 1 TERMS AND DEFINITIONS
SECTION 2 BID REQUIREMENTS AND CONDITIONS
SECTION 3 AWARD AND EXECUTION OF CONTRACT
SECTION 4 SCOPE OF WORK
SECTION 5 CONTROL OF WORK AND MATERIALS
SECTION 6 LEGAL RELATIONS AND RESPONSIBILITIES
SECTION 7 PROSECUTION OF THE WORK
SECTION 8 MEASUREMENT AND PAYMENT
SECTION 9 CHANGES AND CLAIMS
SECTION 10 ENVIRONMENTAL CONTROLS AT WORK SITE
SECTION 11 PRECONSTRUCTION PHOTOGRAPHS AND RECORD DRAWINGS
SECTION 12 SAFETY, PUBLIC CONVENIENCE, AND TRAFFIC CONTROL
PART II JOB ORDER CONTRACT SPECIAL CONDITIONS
JOC-1 DEFINITIONS
JOC-2 SCOPE OF WORK
JOC-3 BEGINNING OF WORK
JOC-4 TIME OF COMPLETION
JOC-5 PROJECT LOCATION
JOC-6 SANITARY REGULATIONS
JOC-7 SUBMISSION OF BIDS AND AWARD OF CONTRACT
JOC-8 CONTRACTOR SELECTION
JOC-9 CONTRACTOR’S PERSONNEL
JOC-10 ORDER OF PRECEDENCE OF CONTRACT DOCUMENTS
JOC-11 INITIATION OF A JOB ORDER
JOC-12 PREPARATION OF A JOB ORDER PROPOSAL
JOC-13 SUBCONTRACTORS
JOC-14 REVIEW OF THE JOB ORDER PROPOSAL AND ISSUANCE OF THE
JOB ORDER
JOC-15 CHANGES IN THE WORK
JOC-16 CONTRACT MODIFICATIONS
SAFCA Job Order Contract 2026 Issued for Bid ii
JOC-17 LIQUIDATED DAMAGES
JOC-18 PAYMENTS
JOC-19 MATERIAL PRICE SPIKE ADJUSTMENT
JOC-20 JOC ORDER CONTRACTING SOFTWARE
PART III FEDERAL FUNDED PROJECTS SPECIAL CONDITIONS
FEDERAL-1.1 DEBARMENT
FEDERAL-1-2 COST PLUS PERCENTAGE NOT ALLOWED
FEDERAL-1.3 ADDITIONAL FEDERAL CONTRACTING REQUIREMENTS
PART IV CONSTRUCTION TASK CATALOG AND TECHNICAL
SPECIFICATIONS (attached separately)
PART V STANDARD FORMS
FO-I AGREEMENT
FO-II PERFORMANCE BOND
FO-III PAYMENT BOND
FO-IV ESCROW AGREEMENT FOR DEPOSIT OF SECURITIES IN LIEU OF CASH
RETENTION ON SAFCA PROJECT
FO-V PROPRIETARY INFORMATION AGREEMENT BETWEEN THE SACRAMENTO
AREA FLOOD CONTROL AGENCY AND CONTRACTOR
FO-VI GUARANTEE
PART VI BID FORM
SAFCA Job Order Contract 2026 NTC-1 Issued for Bid
NOTICE TO CONTRACTORS
Notice is hereby given that the Executive Director of the Sacramento Area Flood Control Agency
(SAFCA), Sacramento, California, will receive sealed bids as follows:
BID DATE: July 30, 2026
SUBMIT SEALED BIDS TO:
Department of General Services
Contract & Purchasing Services Division
SUBMIT ELECTRONIC RESPONSES VIA THE
SACRAMENTO COUNTY ELECTRONIC
BIDDING PORTAL (OPENGOV)
(https://procurement.opengov.com/portal/saccou nty/projects/265428)
BIDDERS MUST ELECTRONICALLY SUBMIT
THEIR BID ONLINE NO LATER THAN 2:00 PM
ON THE DAY OF THE BID.
BID OPENING(S) WILL BE ONLINE AT 2:00
PM AT THE FOLLOWING LINK:
SACCOUNTYEBIDS.
FOR: FOUR (4) JOC CONTRACTS 2026 SAFCA JOC-025, SAFCA JOC-026,
SAFCA JOC-027, and SAFCA JOC-028
MAXIMUM ESTIMATED VALUE: $2,000,000 each Job Order Contract
CONTRACTOR’S CALIFORNIA LICENSE
AND/OR CLASS REQUIRED:
General Engineering Contractor “A”
MANDATORY PRE-BID PRESENTATION: An in person or online meeting will NOT be held.
A review of the SAFCA JOC 2026 Pre-Bid
Presentation is mandatory. The presentation can be found in the Attachments section of the bid.
PROJECT DESCRIPTION: The work performed under this Contract includes the furnishing of all labor, materials, equipment and supervision for a Job Order
Contract.
An in person or online meeting will NOT be held. A MANDATORY review of the entire pre-bid presentation PDF is required for the purpose of reviewing the JOC program. To be eligible to have a bid accepted on these JOCs, the Bidder must confirm in the Vendor Submissions section of the bid attesting that the Bidder reviewed the information of the pre-bid presentation PDF in its entirety. The presentation can be found in the Attachments section of the bid.
Award of this contract requires the Bidder to have a valid California contractor’s license with the classification(s) identified above. This requirement shall be met at the time of the bid opening.
It is intended that four contracts will be awarded – one to each of the four lowest responsive and responsible bids.
Contract Documents may be downloaded at http://www.dgs.saccounty.net/capsd/Pages/Construction.aspx and https://procurement.opengov.com/portal/saccounty Contractors will need to register on the County of
Docusign Envelope ID: 0C4931C8-3DBE-862B-8036-DFDF6AFD92F2 https://procurement.opengov.com/portal/saccounty/projects/265428 https://procurement.opengov.com/portal/saccounty/projects/265428 https://procurement.opengov.com/portal/saccounty http://www.dgs.saccounty.net/capsd/Pages/Construction.aspx https://procurement.opengov.com/portal/saccounty
SAFCA Job Order Contract 2026 NTC-2 Issued for Bid
Sacramento’s third party eProcurement site OpenGov.com to download the contract documents. If you have any technical difficulties with OpenGov, support is available on the site and for further assistance, contact
Jennifer Heredia at herediaj@saccounty.gov.
Bids must be submitted on the Agency's eProcurement system website as indicated in the Notice to Bidders.
All Bid pricing, forms, and attachments requested in the online Bid posting must be completed and submitted by the date and time indicated in the Notice to Bidders or subsequent Addendum in order for the Bid to be considered by the Agency. Bidders will receive a confirmation email from the Agency’s eProcurement system providing the date and time that the Bid was received by the Agency’s eProcurement system. Late Bids will not be accepted by the Agency. Bids delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted by the Agency. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier’s check payable to SAFCA, or cash for an amount not less than $25,000.
The successful bidder shall be required to execute a Material and Labor Payment Bond and a Performance
Bond, issued by a corporate surety, acceptable to SAFCA, each for not less than one hundred percent (100%) of the Maximum Contract Value.
SAFCA encourages the submission of bids and sub-bids by minority-owned and women-owned business enterprises.
This is a public works project in accordance with Section 1720 of the California Labor Code. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
SAFCA uses the County of Sacramento’s Labor Compliance program. The County of Sacramento received final approval from the Director of the California Department of Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program should be directed to the Labor Compliance Section at (916) 875-2711.
This is a construction project in accordance with Section 1771.5 of the California Labor Code. This contract is subject to: (1) Federal Labor Standards Provisions as required by the Davis-Bacon Act and other applicable Federal requirements, (2) Equal Employment Opportunity requirements pursuant to Executive
Order 11246, and (3) Minority Business Enterprise (MBE) development pursuant to Executive Order 12432.
All labor on the project shall be paid no less than the minimum wage rates as established by the U.S.
Secretary of Labor or as determined by the Director of the California Department of Industrial Relations.
The higher of the two rates will be paid in accordance with the following acts and codes:
(1) The Davis-Bacon Act, and
(2) Section 1770, and following, of the California Labor Code.
Copies of the minimum wage rates established by the Secretary of the U.S. Department of Labor (www.wdol.gov) and the prevailing rate of per diem wages as determined by the Director of the California
Department of Industrial Relations (http://www.dir.ca.gov/OPRL/PWD/index.htm ) are on file at the office of the Labor Compliance Program, 9700 Goethe Road, Suite D, Sacramento, CA 95827. These copies shall be made available to any interested party upon request.
Docusign Envelope ID: 0C4931C8-3DBE-862B-8036-DFDF6AFD92F2 mailto:herediaj@saccounty.gov http://www.wdol.gov/ http://www.dir.ca.gov/OPRL/PWD/index.htm
SAFCA Job Order Contract 2026 NTC-3 Issued for Bid
SAFCA will not accept lower State wage rates not specifically included in the Federal Minimum Wage
Decision. This includes “helper” (or other classifications based on hours of experience) or any other classification not appearing in the Federal Wage Decision. Where the Federal Wage Decision does not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate which most closely approximates the duties of the employees in question.
Pursuant to California Public Contract Code Section 22300, the contractor may, at its own expense, substitute securities for any money being withheld by SAFCA to ensure performance under this contract.
JOC DESCRIPTION AND SCOPE:
A Job Order Contract (JOC) is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at different locations throughout the SAFCA service area. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All
Unit Prices are based on local labor, material and equipment prices and are for the direct cost of construction.
This Contract will be awarded to the lowest, responsive, responsible bidder.
SAFCA selected The Gordian Group’s (Gordian) Job Order Contracting (JOC) Solution for their JOC program. The Gordian JOC SolutionTM includes Gordian’s proprietary JOC Information Management
System (“JOC IMS”), construction cost data, and Construction Task Catalog® which shall be used by the
Contractor solely for the purpose of fulfilling its obligations under this Contract, including the preparation and submission of Job Order Proposals, Price Proposals, subcontractor lists, and other requirements specified by the Owner. The Contractor shall be required to execute Gordian’s SaaS Terms of Use and pay a 1% JOC System License Fee to obtain access to the Gordian JOC SolutionTM. The JOC System License Fee applies to all Job Orders issued to the Contractor under the terms of this Contract. The JOC System
License Fee shall be equal to 1% of the Job Order Price.
ADJUSTMENT FACTORS: The Contractor will bid two (2) Adjustment Factors to be applied to the Unit Prices. These two (2) Adjustment Factors shall apply to every Pre-priced Task in the Construction Task
Catalog®.
1. Adjustment Factor for performing work during Normal Working Hours
2. Adjustment Factor for performing work during Other Than Normal Working Hours
For bid evaluation purposes only, the following work distributions shall be used to determine the Evaluation
Criteria Figure:
Adjustment Factor
% Weight (For Bid Evaluation Only)
Normal Working Hours 80%
Other than Normal Working Hours 20%
All Unit Prices listed in the Construction Task Catalog® are priced at a net value of 1.0000. The Adjustment
Factors shall be an increase or decrease to all the Unit Prices listed in the Construction Task Catalog®. For example, 1.1000 would be a 10% increase to the Unit Prices and 0.9500 would be a 5% decrease to the Unit
SAFCA Job Order Contract 2026 NTC-4 Issued for Bid
Prices. Bidders who submit separate Adjustment Factors for separate Unit Prices will be considered non-responsive and their bid will be rejected.
REQUEST FOR JOB ORDER PROPOSAL: Thereafter, as projects are identified, the Contractor will jointly scope the work with the Agency Project Manager. The Agency Project Manager will prepare a Detailed Scope of Work and issue a Request for Job Order Proposal to the Contractor.
JOB ORDER PROPOSAL: The Contractor will then prepare a Job Order Proposal for the Project including a Job Order Price Proposal, drawings and sketches, a list of subcontractors and material suppliers, construction schedule, and other requested documentation. The Job Order Price shall equal the value of the approved Job Order Price Proposal. The value of the Job Order Price Proposal shall be calculated by summing the total of the calculation for each Pre-priced Task (Unit Price x quantity x Adjustment Factor) plus the value of all Non Pre-priced Tasks. If the Job Order Proposal is found to be complete and reasonable, a Job Order may be issued.
JOB ORDER: A Job Order will include the Detailed Scope of Work, Completion Time, and the Job Order
Price. The Job Order incorporates by reference all clauses, provisions and Exhibits of the Contract, unless otherwise specified on the Job Order. The Job Order Price shall be a lump sum, fixed price for the completion of the Detailed Scope of Work. A separate Job Order will be issued for each Project. Extra work, credits, and deletions will be contained in a Change Order. The Contractor is required to complete each Detailed Scope of Work for the Job Order Price within the Job Order Completion Time.
SCOPE OF SERVICES: The anticipated scope of work for this JOC General Engineering Construction
Services contract primarily consists of repair, remodeling, or other repetitive work for, general engineering and site improvements, which includes, but is not limited to, earthwork, utilities, paving, concrete, demolition, sign installation, drainage, landscaping mitigation, site clearing, and all required incidental professional and technical services for projects.
Each Job Order will include the specific and detailed scope of work for the construction and completion of the Job Order, which the Contractor undertakes to perform in accordance with the terms of the Contract, including the manufacture and furnishing of all equipment and materials necessary for the construction and completion of the scope of work.
This Contract is for construction work and related services to be performed within the jurisdiction of the
Agency, which includes areas outside of the boundaries of the Agency which may be required for the protection of property within the boundaries of the Agency.
Where the plans or specifications describe portions of the Job Order in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the Work involved in executing the Contract in a satisfactory manner.
CONTRACT VALUE AND PERIOD: The Maximum Contract Value of each Contract is $2,000,000 each. There is no Minimum Contract Value. One (1) contract each will be awarded to the successful four lowest bidders. Only one bid per Contractor shall be submitted for all contracts.
The term of each Contract will be 365 calendar days or the expenditure of the Maximum Contract Value, whichever occurs first. The counting of contract days (365) shall be calculated pursuant to Section 3 of the
JOC Special Conditions.
SAFCA Job Order Contract 2026 NTC-5 Issued for Bid
The apparent lowest responsive and responsible bidder on one JOC contract will be excluded from consideration for the subsequent contract.
The Contractor is not guaranteed to receive any volume of Job Orders. The Maximum Contract Value is merely an estimate of the total volume of Job Orders that may be entered into over the term of the Contract.
All Job Orders issued during the term of this Contract shall be valid and in effect notwithstanding that the
Detailed Scope of Work may be performed, payments may be made, and the guarantee period may continue, after the Contract Time Period has expired.
SAFCA reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in the judgment of the agency, is the lowest responsive bid of a responsible bidder.
NOTE ALL QUESTIONS AND CORRESPONDENCE CONCERNING THIS NOTICE TO
CONTRACTORS SHALL BE DIRECTED AS FOLLOWS:
Direct pre-bid questions to Jennifer Heredia, Contract Specialist, via the Q&A section in the portal.
ALL PRE-BID QUESTIONS MUST BE SUBMITTED IN WRITING VIA THE Q&A PORTAL NO
LATER THAN Friday, July 17, 2026 BY 5:00 pm. Questions received after that time will not be answered.
Responses will be by addenda to the bid documents.
By order of the Board of Directors of the Sacramento Area Flood Control Agency at Sacramento, California, dated May 21, 2026.
Clerk, Board of Directors
Sacramento Area Flood Control Agency
GENERAL SPECIFICATIONS
TABLE OF CONTENTS
Section Page
SECTION 1 TERMS AND DEFINITIONS ...................................................................................... 1-1 1-1 GENERAL .................................................................................................................................... 1-1 1-2 ABBREVIATIONS ...................................................................................................................... 1-1 1-3 DEFINITIONS .............................................................................................................................. 1-3
SECTION 2 BID REQUIREMENTS AND CONDITIONS ............................................................ 2-1 2-1 BID FORM ................................................................................................................................... 2-1 2-2 PREPARATION AND SUBMISSION OF BIDS ........................................................................ 2-1 2-3 EXAMINATIONS OF PLANS, SPECIFICATIONS, AND SITE OF WORK ........................... 2-2 2-4 SUBSURFACE CONDITIONS ................................................................................................... 2-2 2-5 CONTRACTORS/SUBCONTRACTORS REQUIRED TO BE LICENSED ............................. 2-3 2-6 COMPETENCY OF BIDDERS ................................................................................................... 2-3 2-7 JOINT VENTURE BIDS .............................................................................................................. 2-3 2-8 SUBCONTRACTORS ................................................................................................................. 2-4 2-9 ADDENDA ................................................................................................................................... 2-5 2-10 ASSIGNMENT OF ANTITRUST ACTIONS ............................................................................. 2-5 2-11 BID GUARANTEE ...................................................................................................................... 2-5 2-12 WITHDRAWAL OF BID ............................................................................................................. 2-5 2-13 PUBLIC OPENING OF BIDS ...................................................................................................... 2-5 2-14 REJECTION OF BIDS ................................................................................................................. 2-6 2-15 RELIEF OF BIDDERS ................................................................................................................. 2-6
2-16 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, PROPOSED
DEBARMENT OR SUSPENSION, AND OTHER RESPONSIBILITY MATTERS................. 2-6
2-17 CONTRACTORS/SUBCONTRACTORS REQUIRED TO BE REGISTERD ........................... 2-7
SECTION 3 AWARD AND EXECUTION OF CONTRACT ......................................................... 3-1 3-1 TIME OF AWARD....................................................................................................................... 3-1 3-2 CONSIDERATION OF BIDS ...................................................................................................... 3-1 3-3 AWARD OF CONTRACT ........................................................................................................... 3-1 3-4 PERFORMANCE, PAYMENT, AND MAINTENANCE BONDS ............................................ 3-2 3-5 NOTIFICATION OF SURETY COMPANIES ............................................................................ 3-2 3-6 RETURN OF BID GUARANTEES ............................................................................................. 3-2 3-7 EXECUTION OF CONTRACT ................................................................................................... 3-3 3-8 FAILURE TO EXECUTE CONTRACT ...................................................................................... 3-3 3-9 INSURANCE ................................................................................................................................ 3-3 3-10 ESCROW BID DOCUMENTS .................................................................................................. 3-12
SECTION 4 SCOPE OF WORK ....................................................................................................... 4-1 4-1 INTENT OF CONTRACT DOCUMENTS .................................................................................. 4-1 4-2 PLANS AND SPECIFICATIONS FURNISHED ........................................................................ 4-1 4-3 CONFORMANCE WITH CODES AND STANDARDS ............................................................ 4-2 4-4 SUPPLEMENTAL DRAWINGS ................................................................................................. 4-2 4-5 FIELD INSTRUCTIONS OR OTHER WRITTEN DIRECTIVES ............................................. 4-2 4-6 DOCUMENT PRECEDENCE ..................................................................................................... 4-3 4-7 REQUESTS FOR INFORMATION ............................................................................................. 4-3 4-8 DELETED ITEMS........................................................................................................................ 4-4 4-9 EXTRA WORK ............................................................................................................................ 4-4
SAFCA ii General Specifications
4-10 USE OF COMPLETED PORTIONS ........................................................................................... 4-4 4-11 LANDS AND RIGHTS-OF-WAY ............................................................................................... 4-4 4-12 WARRANTY ............................................................................................................................... 4-5
SECTION 5 CONTROL OF WORK AND MATERIALS .............................................................. 5-1 5-1 AUTHORITY OF AGENCY ....................................................................................................... 5-1 5-2 ATTENTION AND COOPERATION OF CONTRACTOR ....................................................... 5-1 5-3 SUGGESTIONS TO CONTRACTOR ......................................................................................... 5-1 5-4 SEPARATE CONTRACTS .......................................................................................................... 5-1 5-5 COOPERATION WITH OTHER CONTRACTORS AND OTHER ENTITIES ........................ 5-1 5-6 CONTRACTOR’S DISMISSAL OF UNSATISFACTORY EMPLOYEES ............................... 5-2 5-7 CONTRACTOR’S EQUIPMENT ................................................................................................ 5-2 5-8 CONTRACTOR’S SUBMITTALS .............................................................................................. 5-2 5-9 SURVEYS .................................................................................................................................... 5-5 5-10 RESPONSIBILITY FOR ACCURACY ....................................................................................... 5-9 5-11 DUTIES AND POWERS OF INSPECTORS .............................................................................. 5-9 5-12 INSPECTION ............................................................................................................................... 5-9 5-13 QUALITY OF MATERIALS AND WORKMANSHIP .............................................................. 5-9 5-14 SUBSTITUTIONS ...................................................................................................................... 5-10 5-15 PREPARATION FOR TESTING ............................................................................................... 5-10 5-16 MATERIALS SAMPLING AND TESTING ............................................................................. 5-10 5-17 APPROVAL OF MATERIALS ................................................................................................. 5-11 5-18 PROVISIONS FOR EMERGENCIES ....................................................................................... 5-11 5-19 RIGHT TO RETAIN IMPERFECT WORK .............................................................................. 5-11 5-20 REMOVAL OF REJECTED MATERIALS OR WORK ........................................................... 5-12 5-21 TEMPORARY SUSPENSION OR DELAY OF WORK .......................................................... 5-12 5-22 TERMINATION OF CONTRACT ............................................................................................ 5-12 5-23 TERMINATION OF UNSATISFACTORY SUBCONTRACTS .............................................. 5-15
SECTION 6 LEGAL RELATIONS AND RESPONSIBILITIES ................................................... 6-1 6-1 COMPLIANCE WITH LAWS AND REGULATIONS .............................................................. 6-1 6-2 INDEMNIFICATION................................................................................................................... 6-4 6-3 CONTRACTOR’S LEGAL ADDRESS ....................................................................................... 6-5 6-4 CONTRACTOR NOT AN AGENT OF AGENCY ..................................................................... 6-5 6-5 SUBSTITUTION OF SUBCONTRACTORS .............................................................................. 6-6 6-6 ASSIGNMENT OF CONTRACT ................................................................................................ 6-6 6-7 ASSIGNMENT OF MONIES ...................................................................................................... 6-6 6-8 PROTECTION OF AGENCY AGAINST PATENT CLAIMS ................................................... 6-6 6-9 RESPONSIBILITY OF THE CONTRACTOR ............................................................................ 6-7 6-10 PERMITS AND LICENSES ........................................................................................................ 6-7 6-11 EXISTING UTILITIES ................................................................................................................ 6-8 6-12 APPROVAL OF CONTRACTOR’S PLANS NO RELEASE FROM LIABILITY .................. 6-12 6-13 CONTRACTOR SHALL NOT MORTGAGE EQUIPMENT ................................................... 6-12 6-14 PROPERTY RIGHTS IN MATERIALS .................................................................................... 6-12 6-15 PRESERVATION OF PROPERTY ........................................................................................... 6-12 6-16 OVERLOADING ....................................................................................................................... 6-12
SECTION 7 PROSECUTION OF THE WORK .............................................................................. 7-1 7-1 BEGINNING OF WORK ............................................................................................................. 7-1 7-2 AMOUNT OF WORK UNDER CONSTRUCTION ................................................................... 7-1 7-3 PRECONSTRUCTION CONFERENCE AND PROGRESS MEETINGS ................................. 7-1
SAFCA iii
7-4 WORK TO BE PROSECUTED WITH ADEQUATE SUPERVISION, LABOR FORCE,
EQUIPMENT AND METHODS ................................................................................................. 7-1
7-5 SCHEDULES ............................................................................................................................... 7-2 7-6 UNUSUAL SITE CONDITIONS ................................................................................................. 7-5 7-7 PURSUANCE OF WORK DURING INCLEMENT WEATHER .............................................. 7-6 7-8 PEAK HOURS, HOURS OF DARKNESS, HOLIDAYS, AND WEEKENDS .......................... 7-6 7-9 TEMPORARY FACILITIES AND SERVICES .......................................................................... 7-7 7-10 PROTECTION OF WORK, PERSONS AND PROPERTY ........................................................ 7-7 7-11 PROOF OF COMPLIANCE WITH CONTRACT ....................................................................... 7-7 7-12 DELAYS ....................................................................................................................................... 7-7 7-13 NOTICE OF DELAYS ................................................................................................................. 7-9
7-14 CARELESS DESTRUCTION OF STAKES AND MARKS NO CAUSE FOR DELAY ........... 7-9
7-15 TIME OF COMPLETION ............................................................................................................ 7-9 7-16 EXTENSION OF TIME NOT A WAIVER ............................................................................... 7-10 7-17 INCLEMENT WEATHER AND CONTRACT TIME .............................................................. 7-10 7-18 EXTENSION OF TIME ............................................................................................................. 7-10 7-19 SUBSTANTIAL COMPLETION .............................................................................................. 7-11 7-20 CLEANING UP .......................................................................................................................... 7-11 7-21 FINAL INSPECTION AND FIELD ACCEPTANCE ............................................................... 7-11 7-22 FINAL ACCEPTANCE AND NOTICE OF COMPLETION.................................................... 7-12
SECTION 8 MEASUREMENT AND PAYMENT ........................................................................... 8-1 8-1 BASIS AND MEASUREMENT OF PAYMENT QUANTITIES ............................................... 8-1 8-2 SCOPE OF PAYMENT ................................................................................................................ 8-2 8-3 WORK TO BE DONE WITHOUT DIRECT PAYMENT........................................................... 8-3 8-4 PAYMENT FOR USE OF COMPLETED PORTIONS OF WORK ........................................... 8-3 8-5 PROGRESS PAYMENT PROCEDURES ................................................................................... 8-3
8-6 INSPECTION AND PROGRESS PAYMENTS NOT A WAIVER OF CONTRACT
PROVISIONS ............................................................................................................................... 8-4 8-7 RETENTION ................................................................................................................................ 8-4 8-8 WITHHOLDINGS/DENIAL OF PROGRESS PAYMENT REQUEST ..................................... 8-5 8-9 DEDUCTIONS FOR IMPERFECT WORK ................................................................................ 8-5 8-10 LIQUIDATED DAMAGES FOR DELAY .................................................................................. 8-5 8-11 FINAL ESTIMATE AND PAYMENT ........................................................................................ 8-6 8-12 FINAL PAYMENT TO TERMINATE LIABILITY OF AGENCY ............................................ 8-6 8-13 DISPUTED PAYMENTS ............................................................................................................. 8-6
SECTION 9 CHANGES AND CLAIMS ........................................................................................... 9-1 9-1 AUTHORITY FOR CHANGES ................................................................................................... 9-1 9-2 ORDERING OF CHANGES ........................................................................................................ 9-1 9-3 CONSTRUCTION INCENTIVE CHANGE PROPOSAL (CICP) .............................................. 9-1 9-4 CHANGES TO THE CONTRACT .............................................................................................. 9-3 9-5 PROSECUTION OF CHANGES TO THE CONTRACT............................................................ 9-4 9-6 COST AND PRICING DATA ...................................................................................................... 9-4 9-7 ACCESS TO RECORDS .............................................................................................................. 9-4 9-8 PAYMENT FOR CHANGES ....................................................................................................... 9-4 9-9 MARKUPS FOR FORCE ACCOUNT WORK ........................................................................... 9-7 9-10 COMPENSABLE UNAVOIDABLE DELAYS .......................................................................... 9-7 9-11 LIMITATIONS ON PAYMENTS FOR CHANGED WORK ..................................................... 9-8 9-12 TIME EXTENSIONS FOR CHANGES ...................................................................................... 9-8 9-13 EFFECT ON SURETIES OF CHANGES TO THE WORK........................................................ 9-8
SAFCA iv
9-14 CONTRACT CHANGE ORDER (CCO) ..................................................................................... 9-9 9-15 ACCEPTANCE OF ORDERS FOR CHANGES ......................................................................... 9-9 9-16 DISPUTE REGARDING CONTRACT REQUIREMENTS ....................................................... 9-9 9-17 NOTICE OF POTENTIAL CLAIM ............................................................................................. 9-9 9-18 SUBMISSION OF CONSTRUCTION CLAIMS ...................................................................... 9-10 9-19 RESERVED ................................................................................................................................ 9-14 9-20 RESERVED ................................................................................................................................ 9-14 9-21 NO ALTERNATIVE CLAIMS PROCEDURE ......................................................................... 9-14 9-22 ASSIGNMENT OF CLAIMS ..................................................................................................... 9-14 9-23 NO WAIVER OF GOVERNMENT CLAIM PROCESS ........................................................... 9-14
SECTION 10 ENVIRONMENTAL CONTROLS AT WORK SITE ............................................. 10-1 10-1 DUST CONTROL ...................................................................................................................... 10-1 10-2 AIR POLLUTION CONTROL .................................................................................................. 10-2 10-3 BURNING .................................................................................................................................. 10-3 10-4 EROSION, SEDIMENT, AND WATER POLLUTION CONTROL ........................................ 10-3 10-5 CONTROL OF WATER IN THE WORK ............................................................................... 10-10 10-6 NOISE CONTROL ................................................................................................................... 10-10
10-7 CONTAMINATED AND HAZARDOUS MATERIALS OR ENVIRONMENTS ................ 10-11
10-8 USE OF EXPLOSIVES ............................................................................................................ 10-12 10-9 SANITARY REGULATIONS ................................................................................................. 10-12 10-10 CONFINED SPACES ............................................................................................................... 10-13 10-11 CLEANING UP ........................................................................................................................ 10-13
10-12 ARCHAEOLOGICAL, PALEONTOLOGICAL, AND CULTURAL RESOURCES ............ 10-13
10-13 PROTECTION OF EXISTING TREES ................................................................................... 10-14
10-14 CONSTRUCTION CONTRACTOR PROTOCOLS FOR AVOIDING AND
MINIMIZING IMPACTS TO RAPTORS, SPECIAL STATUS, AND OTHER
NESTING BIRDS ..................................................................................................................... 10-16
10-15 CONSTRUCTION CONTRACTOR PROTOCOLS FOR AVOIDING AND
MINIMIZING IMPACTS TO THE GIANT GARTER SNAKE (THAMNOPHIS GIGAS) .... 10-19
10-16 CONSTRUCTION CONTRACTOR PROTOCOLS FOR AVOIDING AND
MINIMIZING IMPACTS TO WETLANDS AND SENSITIVE HABITATS ........................ 10-23
10-17 CONSTRUCTION PROTOCOLS FOR FIRE PREVENTION AND FIRE
SUPPRESSION ........................................................................................................................ 10-26
10-18 GROUND VIBRATION MONITORING AND CONTROL PROGRAM .............................. 10-28 10-19 CONSTRUCTION PROTOCOLS FOR ELDERBERRY SHRUBS ....................................... 10-29 10-20 CONSTRUCTION PROTOCOLS FOR USE OF PESTICIDES ............................................. 10-29
SECTION 11 PRECONSTRUCTION PHOTOGRAPHS AND RECORD DRAWINGS ........... 11-1
11-1 GENERAL .................................................................................................................................. 11-1 11-2 PRECONSTRUCTION PHOTOGRAPHS ................................................................................ 11-1 11-3 RECORD DRAWINGS .............................................................................................................. 11-1 11-4 PAYMENT ................................................................................................................................. 11-2
SECTION 12 SAFETY, PUBLIC CONVENIENCE, AND TRAFFIC CONTROL ..................... 12-1 12-1 SAFETY ..................................................................................................................................... 12-1 12-2 PUBLIC CONVENIENCE AND SAFETY ............................................................................... 12-6 12-3 PUBLIC SAFETY AND TRAFFIC CONTROL ..................................................................... 12-10 12-4 TRAFFIC CONTROL AND HAUL ROUTE PLANS (TCP) .................................................. 12-16 12-5 BARRICADING OPEN TRENCHES ...................................................................................... 12-19 12-6 EXCAVATION AND TRENCH SAFETY .............................................................................. 12-19
SAFCA 1-1
SECTION 1 TERMS AND DEFINITIONS
1-1 GENERAL
Whenever the following terms, titles, or abbreviations are used in these Specifications, or in any document or instrument where these Specifications govern, the intent and meaning shall be as herein defined.
Working titles having a masculine gender, such as "workman" and "journeyman" and the pronoun "he,” are utilized in the Specifications for the sake of brevity, and are intended to refer to persons of either gender.
1-2 ABBREVIATIONS
AAN American Association of Nurserymen AASHTO American Association of State Highway and Transportation Officials AB Aggregate Base AC Asphalt Concrete ACI American Concrete Institute AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute APA American Plywood Association ASA American Standards Association ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG American Wire Gage AWS American Welding Society AWWA American Water Works Association BMP Best Management Practice Cal-OSHA California Occupational Safety and Health Administration Caltrans California Department of Transportation CBC California Building Code CFR Code of Federal Regulations CICP Construction Incentive Change Proposal CIH Certified Industrial Hygienist CIP Cast-In-Place CL Centerline CMU Concrete Masonry Unit CPM Critical Path Method CRM Crumb Rubber Modifier CSI Construction Specifications Institute CY Cubic Yards DEWR Daily Extra Work Report DBE Disadvantaged Business Enterprise DI Drop Inlet
SAFCA 1-2
EA Each ESCP Erosion and Sediment Control Program EP Edge of Pavement F Fahrenheit FHWA Federal Highway Administration FS Federal Specifications ICC International Code Council Inv Invert ISA International Society of Arboriculture ISO Insurance Services Office ITE Institute of Transportation Engineers LB Pound LF Linear Feet LS Lump Sum MUTCD Manual on Uniform Traffic Control Devices - latest California version NBFU National Board of Fire Underwriters NEC National Electrical Code NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association NPDES National Pollution Discharge Elimination System NPT National Pipe Thread Taper NSF National Sanitation Foundation OSHA Occupational Safety and Health Act PCC Portland Cement Concrete PSI Pounds Per Square Inch PSIG Pounds per square inch, gauge QA Quality Assurance QC Quality Control RSP Rock Slope Protection RWQCB Regional Water Quality Control Board SD Storm Drain SDS Safety Data Sheets SF Square Foot/Feet SS Sanitary Sewer STA Station SWPPP Storm Water Pollution Prevention Plan TIA Time Impact Analysis Title 8 Title 8 (Construction Safety Orders) of the California Code of Regulations Title 19 Title 19 (Public Safety) of the California Code of Regulations Title 24 Title 24 (Building Standards) of the California Code of Regulations TOC Top of Curb
SAFCA 1-3
Typ. Typical UL Underwriters' Laboratories, Inc.
UBC Uniform Building Code (latest edition adopted by Agency) USBR United States Bureau of Reclamation UMC Uniform Mechanical Code (latest edition adopted by Agency) UPC Uniform Plumbing Code (latest edition adopted by Agency) U.S.C. United States Code WCLA West Coast Lumbermen's Association WIC Woodwork Institute of California WPCP Water Pollution Control Program
1-3 DEFINITIONS
Agency – Shall mean the Sacramento Area Flood Control Agency (SAFCA), a joint powers authority established pursuant to the laws of the State of California, acting through its authorized representatives.
Allowance – An amount of money set aside under the Contract for a special purpose identified in the Contract. See Section 8-2.05, "Allowances."
Architect and/or Consulting Engineer – A person or persons, firm, partnership, joint venture, corporation, or combination thereof or authorized representative thereof, acting in the capacity of consultant to the Agency. The Architect or Consulting Engineer shall issue directions to the Contractor only through the Agency. When the Specifications require that approval be obtained from the Architect or Consulting Engineer, such approval shall be requested from and be given by the Agency.
Asphalt Concrete, or AC – Is the same as "Hot Mix Asphalt" or "HMA."
Asphalt Rubber Hot Mix or ARHM – Is the same as "Rubberized Hot Mix Asphalt" or "RHMA."
As Shown, Etc. – Where "as shown,” "as latest indicated,” "as detailed,” or words of similar import are used, the reference is to the Contract unless specifically stated otherwise. Where "as directed,” "as permitted,” "approved,” or words of similar import are used, they shall mean the direction, permission, or approval of the Agency.
As-built Drawings – Shall mean “Record Drawings.”
Bid – When submitted on the prescribed bid form, properly signed and guaranteed, the Bid constitutes the offer of the Bidder to complete the Work at the price shown on the Bidder’s bid form.
Bidder – Any person, persons, firm, partnership, joint venture, corporation, or combination thereof, submitting a Bid for the Work, acting directly or through a duly authorized representative.
Bid Documents – The sum of the documents that comprise the Bid by a Bidder to perform the Work.
Bid Opening – The event conducted by the Agency during which the sealed Proposals submitted by Bidders to perform the Work are opened and publicly read.
Board of Supervisors – The Board of Supervisors of the County of Sacramento, a political subdivision of the State of California, or the Board of Supervisors of the County of Sutter, a political subdivision of the State of California, depending on whose jurisdictional area the Work, or portion of the Work, is in. Also referred to as “County Board.”
Board of Directors – The Board of Directors of the Sacramento Area Flood Control Agency. Also referred to as “Board.”
SAFCA 1-4
Calendar Day – Every day shown on the calendar including weekends and legal holidays. When the Contract Time is stated in Calendar Days, every day will be charged toward the Contract Time. See Section 7-17 for the sole exception.
Contract – The written agreement signed by the Agency and the Contractor covering the Work and the furnishing of labor, materials, tools, and equipment in the construction of the Work. The Contract shall include the Notice to Contractors, Addendums, Bid and all attachments thereto, Plans, General Specifications, Special Provisions, Technical Specifications, contract bonds, and any project-specific specifications or documents; also any and all supplemental agreements amending or extending the Work contemplated and which may be required to complete the Work in a substantial and acceptable manner.
Supplemental agreements are written agreements covering alterations, amendments, or extensions to the Contract and include Contract Change Orders.
Contract Change Order – A Contract amendment approved by the Agency or by the Board that includes, but is not limited to, alterations, deviations, additions to, or deletions from, the Contract which are required for the proper completion of the Work. A single Contract Change Order may address one or more contract changes.
Contract Completion Date – Contract Time as may be adjusted by additional days granted for unavoidable delays.
Contract Documents – The documents that describe the Work to be performed, including the Notice to Contractors, Addendums, Bid and all attachments thereto, Plans, General Specifications, Special Provisions, Technical Specifications, contract bonds, and any project-specific specifications or documents;
and all supplemental agreements covering alterations, amendments, or extensions to the Contract, including, but not limited to, Field Instructions or other written directives, responses to Requests for Information, and Contract Change Orders. Also reference Section 4-1, "Intent of Contract Documents", of these Specifications.
Contractor – The person or persons, firm, partnership, joint venture, corporation, or combination thereof, private or municipal, who (that) has (have) entered into a Contract, as defined in these Specifications, with the Agency. Also referred to as Prime Contractor.
Contract Time – The time stated in the Contract for completion of the Work. The Contract Time may be a single allotment of time, milestones, or a group of times or milestones specific to portions of the Work, or a combination of the two, or a specified completion date.
County – The County of Sacramento, a political subdivision of the State of California, or the County of Sutter, a political subdivision of the State of California, depending on whose jurisdictional area the Work, or portion of the Work, is in.
Engineer – The Director of Engineering of the Sacramento Area Flood Control Agency, acting personally or through agents or assistants duly authorized by the Engineer.
Estimated Quantities – The list of items of work and the estimated quantities associated with the Work.
The Estimated Quantities provide the basis for the Bid.
Final Completion – Completion of all of the Work including work directed by Field Instructions, written directives, or Contract Change Orders, punchlists, correcting defective work and submittal of O&M manuals, as-built drawings and test reports. Also reference Section 7-22, "Final Acceptance and Notice of Completion", of these Specifications.
Inspector – The person or persons authorized to act as agent(s) for the Agency in the inspection of the Work.
Legal Holidays – For purposes of Agency construction contracts, the following days are recognized as “legal holidays” by the Agency:
SAFCA 1-5
New Year’s Day January First
Martin Luther King, Jr. Day Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June Nineteenth
Independence Day July Fourth
Labor Day First Monday in September
Veteran’s Day November Eleventh
Thanksgiving Day Fourth Thursday in November
Thanksgiving Friday Friday after Thanksgiving
Christmas December Twenty-fifth
Notice To Contractors – The written notice whereby interested parties are informed of the date, location, and time of the Bid Opening of a proposed Agency Project and the terms and conditions of submitting Bids to perform the Work. Also, Notice to Bidders, Invitation to Bid.
Notice To Proceed – The written authorization by the Agency to the Contractor specifying the…