S2PRINT Integrated Data Collection Lab - Purchase Description (Updated 15 MAR).pdf
PDF 546 KB Posted
- Attached to
- S2PRINT Integrated Data Collection Lab
- Solicitation number
- W911QY-23-R-IDCL
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Description – Integrated Data Collection Lab
1. The contractor shall provide:
A design review of the required capabilities for the labs and spaces defined by the government and identifying hardware and software solutions that will fulfill the capability requirements of those facilities. The contractor will provide a report containing the technology systems that will meet the needs of the labs and spaces. Based on the design review the contractor will purchase, install, and integrate the proposed systems and equipment within the S2PRINT lab spaces.data collection equipment for two (2) Applied Ergonomics Team laboratories within the S2PRINT facility and a portable data gathering/integration system/equipment for field research, as well as installation, integration, and warranty of the equipment items. The contractor will also train government personnel on operation and general maintenance of the technologies. The proposed list of equipment is below:
Large UX Lab, includes 3 PTZ (pan, tilt, zoom) cameras (2 on the walls, 1 overhead) 2 Fixed Focus Cameras (mounted to computer to capture the face) 2 Screen Capture with 2 Desktop Computers MediaRecorder-8 channel 1 Ceiling Microphone 1 Push to Talk with Overhead Speaker Integrated Rack with Audio Mixing Equipment Desktop Workstation All Associated Cables and Connectors
Physiology Equipment, includes:
PPG (photoplethysmography) and EDA(electrodermal activity) Respiration Temperature Pulse Transducer Necessary Leads, Gels and Adhesives
HSI Lab, includes:
5 PTZ (pan, tilt, zoom) cameras (4 on the walls, 1 overhead) 2 Fixed Focus Cameras (mounted to computer to capture the face) 2 Screen Capture with 2 Desktop Computers 2 MediaRecorder-4 channel and 8 channel 2 Ceiling Microphones 1 Push to Talk with Overhead Speaker Integrated Rack with Audio Mixing Equipment 2 Desktop Workstations with specifications capable of smoothly running the lab software for the HSI lab as noted above and integrating the collected data All Associated Cables and Connectors
Portable Usability Lab, includes:
MediaRecorder-4 channel Windows Laptop with specifications capable of smoothly running the portable lab software as noted and integrating the collected data2 Fixed Focus Cameras with
Tripods Headphones Rugged Portable Case Associated Cables
Support for Physiology equipment and software 1 years (optional) In depth application support Experiment setup assistance Post processing guidance Creation of expression/calculation channels
3 years of warrantee and technical support (first year free) Free Software Upgrades Expedited Techincal Support
Hardware Warranty for Eligible Items (expedited repair or replacement of components or entire system if necessary for 2 years)
Lab software for observation, synchronization, integration and analysis of behavioral data collected in IDCL, including with Advanced Analysis, Multiple Media, and External Data Modules. Combines/integrates data from multiple source such as video, screen captures, location data, physiological signals, eye tracking data, and facial expression data
Eye tracking and facial analysis software (reads, classified, analyzes facial expressions from live and still inputs; tracks head orientation, eye gaze, where user is looking on screen during computer use) with capability to integrate multiple video and audio inputs
2. Delivery Date: Vendor shall ship within 30 days of contract award.
3. Travel: The contractor is expected to travel to the S2PRINT facility. Twice during the base period encompassing the design portion of the contract and twice during installation and training, if the option is exercised. The contractor shall itemize all costs (e.g., travel, lodging, transportation) in offers and invoices.
4. Security: A security clearance is not required.
5. Personnel Qualifications: Demonstrable experience in design of data acquisition and integration systems – minimum 5 years.
a. General Experience. The contractor shall have expertise in developing integrated technology solutions for data collection.
b. Specialized Experience: The Contractor must have an understanding of the state of the art in audio, visual, and human performance data collection technologies and systems.
6. Government Furnished Equipment/Information/Computer Utilization: N/A
7. Other Direct Costs (ODC's): The Government does not anticipate ODC’s.
8. Deliverables: The contractor shall provide a report identifying the technologies and systems proposed to meet the capability requirements of the IDCL. It shall include, but not be limited to, a listing of proposed technologies (including acquisition and sustainment costs and training) and detailed drawings of the proposed technologies and integrated system(s).
9. Place of Performance: The primary place of performance will be the Contractor’s facility for the design phase. It will be the S2PRINT facility for the installation and training phase.
10. Contract Management/Activity Report: N/A
11. Invoicing: The Contractor shall bill three times. First, following government acceptance of completed design report at the end of the first phase. Next, at the beginning of the second phase (acquisition, installation and training), if exercised. Finally, at the end of the contract. Invoices must include, at a minimum, the following information:
Time Period Covered, Units Covered, and Total Cost for the year or years.
Itemized travel costs if applicable
File details come from the government source that posted it. Updated .