S2726 Cost Schedule.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Northern Nevada Child and Adolescent Playground Replacement
Solicitation number
40DHHS-S2726
Issued by
Washoe County, Nevada

About this file

The document provided is a cost schedule for a state and local contract opportunity related to the Northern Nevada Child and Adolescent Playground Replacement project, involving the jurisdictions of Washoe County and Reno City in Nevada. The project includes the demolition, flooring, playground equipment, shade structures, and safety signage for two separate playgrounds, labeled as Playground A (East facing) and Playground B (West facing). The cost schedule outlines the various scope of work items and associated material and labor costs for each playground, with a subtotal provided for each.

The total cost for the project is not specified. The document does not provide any additional details about the response deadlines, award dates, contract term, or renewal options for this opportunity.

View the file

Other files

File Type Posted
S2726 Standard Form Contract.docx DOCX document
S2726 satellite view.pdf PDF
Copy of Bid_Q_A_for_S2726.pdf PDF
S2726 Terms and Conditions for Services.pdf PDF
S2726 Attachments for Signatures.pdf PDF
S2726 Proposed Staff Resume.docx DOCX document
Quote Instructions.pdf PDF
40DHHS-S2726 RFP NNCAS Playground Replacement V2.docx DOCX document
S2726 Reference Questionnaire.docx DOCX document
Site Visit Registration Form S2726 (002).doc DOC document
S2726 Scope of Work.docx DOCX document
LetterOfIntent S2726.pdf PDF
S2726 INSURANCE REQUIREMENTS.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Cost Schedule
Vendor Name:
Playground A (East facing)
Scope of Work ItemDescriptionCost
1Demolition Labor
2aFlooring Materials
2bFlooring Labor
3aPlayground Materials
3bPlayground Labor
4aShade Structure Materials
4bShade Structure Labor
5aSafety Signs Materials
5bSafety Signs Labor
Subtotal:- 0
Playground B (West facing)
Scope of Work ItemDescriptionCost
1Demolition Labor
2aFencing Materials
2bFencing Labor
3aFlooring Materials
3bFlooring Labor
4aPlayground Materials (2-5)
4bPlayground Labor (2-5)
5aPlayground Materials (5-12)
5bPlayground Labor (5-12)
6aShade Structure Materials
6bShade Structure Labor
7aPaint Materials
7bPaint Labor
8aSafety Signs Materials
8bSafety Signs Labor
Subtotal:- 0
Total:- 0

File details come from the government source that posted it. Updated .