S2-1.pdf
PDF 2 MB Posted
- Attached to
- Y1DA--RENOVATE OPERATING ROOMS 541-19-101
- Solicitation number
- 36C25026R0054Amend0001
About this file
This is an architectural roof framing plan for Wade Park VA/DoD Accelerator Addition project. The document is a technical construction drawing (Sheet S2-1) prepared by Architectural Management showing the structural framing layout for a roof system. The plan includes detailed dimensions, grid references (marked A through W and 1 through 34), and various structural elements with specifications. Key details include framing members with sizes, connection points, openings for mechanical systems, and load-bearing structural components laid out on a grid system. The drawing references revision dates (9/3/04) and includes a keyplan indicating the project location. Construction notes at the bottom specify framing requirements, material specifications, and references to additional sheets for structural details. The document bears the signature/seal of a registered design professional and includes standard architectural drawing conventions with cross-references to related plans and details. This appears to be a working construction document intended for contractors and construction management rather than a federal contract solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 943805-Submittal-02_Phase-2_Boom-Replacement.pdf | ||
| 1-9.pdf | ||
| 1-S2.pdf | ||
| S06. 36C25026R0054 Amend 0001.pdf | ||
| 1-S5.pdf | ||
| S02. RFI Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .