S2-1.pdf

PDF 2 MB Posted

Attached to
Y1DA--RENOVATE OPERATING ROOMS 541-19-101
Solicitation number
36C25026R0054Amend0001
Issued by

About this file

This is an architectural roof framing plan for Wade Park VA/DoD Accelerator Addition project. The document is a technical construction drawing (Sheet S2-1) prepared by Architectural Management showing the structural framing layout for a roof system. The plan includes detailed dimensions, grid references (marked A through W and 1 through 34), and various structural elements with specifications. Key details include framing members with sizes, connection points, openings for mechanical systems, and load-bearing structural components laid out on a grid system. The drawing references revision dates (9/3/04) and includes a keyplan indicating the project location. Construction notes at the bottom specify framing requirements, material specifications, and references to additional sheets for structural details. The document bears the signature/seal of a registered design professional and includes standard architectural drawing conventions with cross-references to related plans and details. This appears to be a working construction document intended for contractors and construction management rather than a federal contract solicitation document.

View the file

Other files

File Type Posted
943805-Submittal-02_Phase-2_Boom-Replacement.pdf PDF
1-9.pdf PDF
1-S2.pdf PDF
S06. 36C25026R0054 Amend 0001.pdf PDF
1-S5.pdf PDF
S02. RFI Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .