S1.12a - Attch 2 MIDGETT DD FY24 Price Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
USCGC MIDGETT (WMSL 757) Drydock Repairs –Honolulu, HI
Solicitation number
70Z08524PLREP0007
Issued by

About this file

This document appears to be a pricing schedule for the USCGC MIDGETT (WMSL-418) drydock availability in FY2024. The schedule lists various tasks and associated pricing, including hull and superstructure preservation, shaft and propeller maintenance, valve and valve overhauls, and drydocking services. The document also includes a cost estimate breakdown template with labor rates, material costs, and overhead/profit factors.

The related federal contract opportunity is for the USCGC MIDGETT (WMSL 757) drydock repairs in Honolulu, HI, solicitation number 70Z08524PLREP0007. This is a solicitation issued by the Department of Homeland Security US Coast Guard for the required drydock repairs and services. No other details on the response dates, award, or set-asides are provided in the information given.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC MIDGETT (WMSL-418) DRYDOCK AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull 3D, Laser ScanJOB1
D-002Hull Plates (Freeboard), InspectJOB1
D-003Hull Plates (U/W Body), InspectJOB1
D-004Freeboard, Preserve (Full)JOB1
D-005Superstructure, Preserve (Partial)JOB1
D-006Mast, PreserveJOB1
D-007Deck Covering (Slip-Resistant) Mast, Renew and RepairJOB1
D-008Tenting (Mast), Provide (Option)JOB1
D-009U/W Body Hull, Preserve (Full)JOB1
D-010Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1
D-011Chain Lockers and Sump, Preserve
D-011AChain Locker, Stbd (3-9-1-Q)JOB1
D-011BChain Locker, Port (3-9-2-Q)JOB1
D-011CChain Locker Sump, CL (3-9-2-Q)JOB1
D-012Chain Lockers and Sump, Clean and Inspect
D-012AChain Locker, Stbd (3-9-1-Q)JOB1
D-012BChain Locker, Port (3-9-2-Q)JOB1
D-012CChain Locker Sump, CL (3-9-2-Q)JOB1
D-013Voids (Non-Accessible), PreserveJOB1
D-014Voids (Non-Accessible), Leak TestJOB1
D-015Sideport Shell Door, Level 2, Inspect and RepairJOB1
D-016Propulsion Shaft Alignment & Bearings (External) Clearances, CheckJOB1
D-017Propulsion Shaft Seals (Mechanical), OverhaulJOB1
D-018Propulsion Shaft Coverings (MIL-STD-2199B), Inspect and RepairJOB1
D-019Controllable Pitch Propeller Hub Assembly, General MaintenanceJOB1
D-020Controllable Pitch Propeller System, Perform General MaintenanceJOB1
D-021Doppler Speed Log, Valve, OverhaulJOB1
D-022Doppler Speed Log, General MaintenanceJOB1
D-023Fathometer Transducer (Deep Water), General MaintenanceJOB1
D-024Shallow Water Transducer, RenewJOB1
D-025Seawater Strainers (All Sizes), Overhaul or RenewJOB1
D-026Sea Valves and Waster Pieces, Overhaul or RenewJOB1
D-027Cascade Orificial Resistive Device, Clean And InspectJOB1
D-028Steering Actuator, OverhaulJOB1
D-029Steering System, Inspect and ServiceJOB1
D-030Rudder Stock Bearings, Check ClearancesJOB1
D-031Rudder Stock Seals, OverhaulJOB1
D-032Bow Thruster Unit (General), OverhaulJOB1
D-033Anchors Chains and Ground Tackles, Inspect and PreserveJOB1
D-034Impressed Current Cathodic Protection System, Inspect and MaintainJOB1
D-035Cathodic Protection (Zincs), RenewJOB1
D-039Drydocking, AccomplishJOB1
D-040Sea Trials Performance, Support, ProvideJOB1
D-041Tenting, ProvideJOB1
D-042Temporary Services, Drydock ProvideJOB1
D-043Fire Prevention, ProvideJOB1
D-044Auxiliary Seawater Piping (Availability No.2), ModifyJOB1
Total Price of Definite Items$0.00
O-34Impressed Current Cathodic Protection System Dielectric Shield, RepairJOB1
O-37Impressed Current Cathodic Protection System Anodes, RenewJOB1
O-38Impressed Current Cathodic Protection System Reference Cells, RenewJOB1
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

(2/24/2023)_x000D_ Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .