This document is an amendment to a solicitation for the USCG MIDGETT (WMSL 757) Drydock Repairs in Honolulu, HI. The key details are:

The amendment extends the solicitation close date to May 17, 2024 and provides responses to vendor questions. The questions address the requirement for C5ISC qualified personnel, the correct reference drawing for auxiliary seawater piping modifications, the applicability of specification requirements for temporary fire prevention systems, and instructions for organizing the technical capability, price, and past performance proposal sections. The original solicitation is for drydock repairs on the USCG cutter MIDGETT, with a closing date extended to May 17, 2024. Responses must be submitted according to the specified proposal content and formatting requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE
OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment 00005
7 May 2024
6. ISSUED BY
CODE
70Z085
7. ADMINISTERED BY (If other than Item 6)
CODE
70Z085

USCG Surface Forces Logistics Center

U.S. Coast Guard Island, Building 55

Alameda CA 94501

USCG Surface Forces Logistics Center

U.S. Coast Guard Island, Building 55

Alameda CA 94501

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code)
(
9.A AMENDMENT OF SOLICITATION NO.

70Z08524PLREP0007

X
9B. DATE (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO. ?

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

Contract Clause, H.4 Option Item; FAR 17.207©

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CGC MIDGETT FY24 Drydock Repair Solicitation

The purpose of this amendment is to:

1. Extend the solicitation close date out to 17 May 2024.

2. Provide the following responses to vendor questions:

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Kiya Plummer-Dantzler

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
BY
7 May 2024

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)PREVIOUS EDITION UNUSABLE

Prescribed by GSA, FAR (48 CFR) 53.243

Standard Form 30 Continued WI 6 para. 3.1.2.2

Question 1: Could the U.S. Coast Guard provide any known C5ISC qualified POC? Many known qualified electricians are issuing a “no bid” because of this requirement.

Coast Guard Response: The USCG does not intend to provide a list of known C5ISC qualified POC. Please see REV3 of the specification for the clarification of “electronics technician” language.

WORK ITEM 44: Auxiliary Seawater Piping (Availability No.2), Modify

Paragraph 2. REFERENCES

Question 2: The reference listed in the work specification is "Coast Guard Drawing 750-WMSL-520-506, Rev E, Auxiliary Seawater Piping Mods FWD Fr 52", however, the reference provided by the USCG was "750-WMSL-520-507, Rev G, Auxiliary Seawater Piping Mods FWD Fr 52". Please confirm the correct reference KTR should be using and also confirm that there are a total of ~146 line items of KTR furnished material, less the items that have been crossed out on the drawing, including a few hundred feet of CU-NI pipe and fittings. Please provide a copy of the reference listed in the work specification titled "418A-WMSL-437-001, Rev -, Electrical Flowmeter Installation Auxiliary Seawater".

Coast Guard Response: “750-WMSL-520-506, Rev E, Auxiliary Seawater Piping Mods FWD Fr 52" is the correct one to use. 750-wmsl-520-507 is for modifications aft of Fr 52 and it is NOT applicable. The consolidated reference list was missing 750-WMSL-520-506, Rev E. The line items of the KTR furnished material should be pulled from the correct drawing “750-WMSL-520-506, Rev E, Auxiliary Seawater Piping Mods FWD Fr 52". Drawing to be provided to approved vendors upon request.

WORK ITEM 43: Fire Prevention, Provide

Question 3: Please confirm that the requirements of paragraph 3.7 of SFLC STANDARD SPECIFICATION 5550 do not apply since they are not explicitly called out in the work item. If it is the government’s interpretation that these requirements do apply, please provide a list of spaces where a temporary system will be required.

Coast Guard Response: Paragraph 3.7 of SFLC Std Spec 5550 does not apply because it is not invoked in the work item specification Requirements for Proposal Content Question 4: There are inconsistencies in the solicitation as to which portion of submittal should be labelled Part I, Part II, and Part III. Please clarify which parts are Price, Technical Capability, and Past Performance.

Coast Guard Response: Please label content as: Part I, Price; Part II, Technical Capability; Part III, Past Performance.

Requirements for Proposal Content Question 5: Please confirm requirements on Technical Capability submittal. The Solicitation states, “Part II – Technical Capability, is limited to one Gantt chart and ten standard 81/2” by 11’’ pages submitted in times new roman 12 point font.”

Shall the contractor submit one Technical Capability document that is limited to 10 pages AND a Gantt Chart (aka Planning Document) provided separately that does not have a page limitation?

Are title pages, table of contents, and blank pages included in the ten page limit of the Technical Capability document?

Coast Guard Response: The submission should be one Gantt Chart and a Technical Capability document that is no more the 10 pages in length.