J-15_DB WD.doc
DOC document 7 KB Posted
- Attached to
- Operation of the Shreveport Job Corps Center
- Solicitation number
- S09F6LA013
About this file
RFP J-15 Davis Bacon WD
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend3_PPP RevPgs.doc | DOC document | |
| PrePropPowerpoint.ppt | PPT presentation | |
| Amend2_Q A.doc | DOC document | |
| 2181 Staff Comp Supplement.xls | XLS spreadsheet | |
| J-12_SF table.pdf | ||
| J-8_UtilityReport.xls | XLS spreadsheet | |
| J-23_Master Inventory.pdf | ||
| J-20_OMS-10 Ctr.pdf | ||
| J-16_SCA WD.doc | DOC document | |
| Amend 1-J attchmts.doc | DOC document | |
| J-13_EPMS.pdf | ||
| J-20_MSO-20.pdf | ||
| J-22_CDSS Plan.doc | DOC document | |
| J-20_OMS-10 CTS.pdf | ||
| J-20_MPO-35.pdf | ||
| J-19_Facility Survey.pdf | ||
| J-20_OMS-10 OA.pdf | ||
| J-14_Site Map.pdf | ||
| J-20_VTRC.pdf | ||
| RFP.doc | DOC document | |
| synopsis-amend.doc | DOC document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: LA080010 09/05/2008 LA10
Superseded General Decision Number: LA20070015
State: Louisiana
Construction Type: Building
Counties: Bossier, Caddo, Ouachita, Rapides and Webster Counties in Louisiana.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 03/07/2008 2 04/04/2008 3 06/06/2008 4 07/04/2008 5 09/05/2008
* ELEC0194-005 09/04/2008
BOSSIER, CADDO, AND WEBSTER PARISHES
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 23.95 8.61
ELEC0446-006 01/01/2008
OUACHITA PARISH
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 19.40 7.66
ELEC0576-005 01/01/2008
RAPIDES PARISH:
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 21.40 5.06
PLUM0141-004 08/01/2006
BOSSIER, CADDO, AND WEBSTER PARISHES
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 21.95 8.74
PLUM0247-003 05/01/2008
RAPIDES PARISH
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 22.90 6.60
PLUM0659-002 07/01/2008
OUACHITA PARISH
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 20.15 6.90
SHEE0361-003 07/01/2008
BOSSIER, CADDO, OUACHITA, RAPIDES, AND WEBSTER PARISHES:
Rates Fringes
Sheet Metal Worker (includes HVAC duct).......................$ 23.75 9.08
SULA2004-001 03/24/2004
Rates Fringes
CARPENTER (includes acoustical; drywall hanging/framing; metal stud installation; formbuilding;
and formsetting).................$ 13.77 0.00
Cement Mason/Concrete Finisher...$ 12.92 0.00
GLAZIER..........................$ 14.00 0.81
HVAC MECHANIC (setting system only)............................$ 9.00 0.00
IRONWORKER
Metal Building Erection.....$ 11.48 2.71 Structural..................$ 15.76 4.30
Laborer, common..................$ 9.00 0.00
Power Equipment Operators Backhoe/Excavator...........$ 13.05 2.30 Crane.......................$ 17.36 0.00 Forklift....................$ 13.00 0.00 Trackhoe....................$ 10.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .