S02-VAMC_FtHarrison_ConstructionPlan110222fm-1.pdf

PDF 2 MB Posted

Attached to
Z2DA--VA Montana-Roche Lab Project 436-23-117 (VA-23-00016475)
Solicitation number
36C25923Q0084
Issued by

View the file

Other files

File Type Posted
36C25923Q0084 0004.docx DOCX document
S02-ICRA 2.0 Amend 4.pdf PDF
S05-RFI Questions_Amend 4.docx DOCX document
Bid Schedule Amend 4.docx DOCX document
S05-436-23-117- Lab Project-Questions and Responses.docx DOCX document
36C25923Q0084 0003.docx DOCX document
S06-KIMG0808.jpg JPG image
S06-KIMG0811.jpg JPG image
S06-KIMG0806.jpg JPG image
S06-B154_Architectural_First_Floor_RocheLabProject.pdf PDF
S06-KIMG0807.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject 02.pdf PDF
36C25923Q0084 0002.docx DOCX document
S06-436-23-117 VA Montana-Roche Lab Project MTVA ASHE ICRA 2.0.pdf PDF
S06-KIMG0812.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject.pdf PDF
S06-Roche lab 1st floor plumbing.pdf PDF
S06-KIMG0809.jpg JPG image
36C25923Q0084 0001.docx DOCX document
S02-Past Performance Questionnaire.docx DOCX document
S02-Roche Automation and Analyzer Spec Sheets.pdf PDF
S02-Roche 8100 Pre-Site CHECKLIST.pdf PDF
36C25923Q0084_1.docx DOCX document
S02-Roche 8100 PowerVAR UPS 3300 30-40kVA for PCDU.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY LEGEND

x’-x”

REFERENCE

x’-x”

WATER/DRAIN

x’-x”

POWER

NEW FLOOR DRAIN

EXISTING FLOOR DRAIN

# UTILITY LOCATION

DATA

POWER

WATER LOOP

W/SHUT OFF

CCM PSU

AIR

ROCHE DIAGNOSTICS

9115 HAGUE ROAD

INDIANAPOLIS, IN 46256

SCALE: ¼” = 1'-0" SHEET 1 OF 4

GENERAL NOTES:

1.SIZE AND CONFIGURATION OF SYMBOLS

SHOWN ON THE DRAWING ARE USED TO

REPRESENT THE EXISTENCE OF, OR NEED FOR

ADDITIONAL UTILITIES.

2.CUSTOMER IS RESPONSIBLE FOR MEETING ALL

LOCAL CODES.

3.CUSTOMER IS RESPONSIBLE FOR CONTACTING

EACH 3

RD

PARTY VENDOR TO OBTAIN TECHNICAL

EQUIPMENT SPECIFICATIONS RELATED TO

INSTALLATION OF INSTRUMENTS AND REQUIRED

UTILITIES. ROCHE WILL PROVIDE TECHNICAL

SPECIFICATIONS AND GENERAL LOCATIONS FOR

UTILITIES OF ROCHE EQUIPMENT ONLY.

CONNECTION TO 3

RD

PARTY SYSTEMS TO BE

VERIFIED BY CUSTOMER.

4.THIS DRAWING IS SUBJECT TO CHANGE.

DATE: DESCRIPTION:

PROJECT HISTORY:

UTILITIES – CONSTRUCTION PLAN VAMC FORT

HARRISON

HELENA, MT

VAMC_FTHARRISON_CONSTRUCTIONPLAN110222FM-1

LDA: FREDERICK McCARROLL

SWC: LAUREL SPRAGUE

10/25/22 DIM TOOL VERIFIED

U P

S

.0 kV A

S er ie s

B at te ry

C a b in e t

See UPS/Battery Cabinet Specs.

Power

#0

Off-site location TBD. Max distance is 250ft.

Vir tua l Server

Primary

Vir tua l Server

Shadow

Off-site location TBD.

#0

10/28/22 ADDED IT GRID

Existing

Drain

Existing

Drain

Data

Power

#1

Mobi le Table

M o b ile

T a b le

M o b ile

T a b le kg kg kg kg kg kg 7 kg kg kg kg 2 kg kg

R S

F A

O B

O B

S c o b a s o u tp u t s ta tio n kg 1 kg kg kg kg 2 kg kg kg kg kg 4 kg kg kg kg 2 kg kg kg kg 3 kg kg

D S

P A

C U w it h

A C

B

IP

B

H S c o b a s in p u t s ta ti o n

S C

M kg kg kg kg

C R

W cobas 8100 kg kg kg kg kg kg 2 kg kg kg kg 3 kg kg

T L

J

TLJ

kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg

TLJ

kg kg kg kg kg kg kg kg

TLJ

N e w

D ra in c o b a s p ro c o b a s L in k 2

R e p o rt P rin te r

Data

Power

Water Loop

C o n tr o l U n it

R e p o rt

P ri n te r

Firewall

N w

D ra in c o b a b a s L in p o rt P rin te r

Data

Power

Water Loop

B R

F c o b a s p ro kg kg kg8kg kg1 kg kg kg c o b a s p ro kg kg kg kg kg kg kg kg kg kg kg 1 kg 1 kg kg kg 2 kg kg kg 4 kg kg kg kg kg kg kg kg kg kg 8 kg kg kg kg c o b a s p ro

IS

E -5

-8

B R

F c o b a s p ro kg kg kg8kg kg1 kg kg kg c o b a s p ro kg kg kg kg kg kg kg kg kg kg kg 1 kg 1 kg kg kg 2 kg kg kg 4 kg kg kg kg kg kg kg kg kg kg 8 kg kg kg kg c o b a s p ro

IS

E -5

-8

15'-6"

8'-7"

8'-7"

Firewall Firewall

14'-10"

#2 #3

11/02/22

LAYOUT/SITE CHANGE; LDA

REMEDIATION

INSTALL

x mm.

x’-x”

REFERENCE

x’-x”

WATER/DRAIN

x’-x”

POWER

NEW FLOOR DRAIN

EXISTING FLOOR DRAIN

# UTILITY LOCATION

DATA

POWER

WATER LOOP

W/SHUT OFF

CCM PSU

AIR

ROCHE DIAGNOSTICS

9115 HAGUE ROAD

INDIANAPOLIS, IN 46256

GENERAL NOTES:

1.SIZE AND CONFIGURATION OF SYMBOLS

SHOWN ON THE DRAWING ARE USED TO

REPRESENT THE EXISTENCE OF, OR NEED FOR

ADDITIONAL UTILITIES.

2.CUSTOMER IS RESPONSIBLE FOR MEETING ALL

LOCAL CODES.

3.CUSTOMER IS RESPONSIBLE FOR CONTACTING

EACH 3

RD

PARTY VENDOR TO OBTAIN TECHNICAL

EQUIPMENT SPECIFICATIONS RELATED TO

INSTALLATION OF INSTRUMENTS AND REQUIRED

UTILITIES. ROCHE WILL PROVIDE TECHNICAL

SPECIFICATIONS AND GENERAL LOCATIONS FOR

UTILITIES OF ROCHE EQUIPMENT ONLY.

CONNECTION TO 3

RD

PARTY SYSTEMS TO BE

EQUIPMENT SPECIFICATIONS

NOT TO SCALE SHEET 2 OF 4

VAMC FORT

HARRISON

HELENA, MT

VAMC_FTHARRISON_CONSTRUCTIONPLAN110222FM-1

LDA: FREDERICK McCARROLL

SWC: LAUREL SPRAGUE

10/25/22 DIM TOOL VERIFIED

10/28/22 ADDED IT GRID

AT UTILITY

LOCATION ROCHE SUPPLIED EQUIPMENT POWERED FROM

NUMBER OF DEVICE

POWER CABLES PRIMARY POWER, VOLTS

POWER PROTECTION,

AMPS PHASE RECEPTACLE TYPE

DEVICE'S UPS

RATING, KVA

HEAT

DISSIPATION,

BTU/HR

0 UPS 40.0 kVA WITH BATTERY CABINET FACILITY 0 208 150 3 PHASE 4 CONDUCTOR WITH GROUND HARDWIRED FROM CUSTOMER'S FACILITIES DEPARTMENT 40.0 12,270

1 COBAS 8100 SYSTEM UPS 40.0 kVA MAIN LUG PANEL (MLP) 5 208 30 SINGLE PHASE NEMA L6-30R 5.2 24,064

1 REPORT PRINTER (from COBAS 8100) FACILITY 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 2,048

1 COBAS 8100 CONTROL UNIT (PC & MONITOR) UPS 40.0 kVA MAIN LUG PANEL (MLP) 2 120 20 SINGLE PHASE NEMA 5-20R 0.8 1,550

1 FORTIGATE FIREWALL UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 61

2 REPORT PRINTER (from COBAS PRO) FACILITY 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 1,877

2 COBAS_PRO <ISE/503/801> UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 208 50 SINGLE PHASE HUBBELL 3762C (CORD) OR 3771 (WALL MOUNT) 10.0 19,107

2 COBAS LINK 2 UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 0

2 FORTIGATE FIREWALL UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 61

3 REPORT PRINTER (from COBAS PRO) FACILITY 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 1,877

3 COBAS_PRO <ISE/503/801> UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 208 50 SINGLE PHASE HUBBELL 3762C (CORD) OR 3771 (WALL MOUNT) 10.0 19,107

3 COBAS LINK 2 UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 0

3 FORTIGATE FIREWALL UPS 40.0 kVA MAIN LUG PANEL (MLP) 1 120 20 SINGLE PHASE NEMA 5-20R 0.0 61

82,083

AT UTILITY

LOCATION CUSTOMER SUPPLIED DATA CONNECTION CONNECTION TYPE

1 DATA UTILITY SEE CUSTOMER PROVIDED INTERFACE CONNECTIONS

2 DATA UTILITY SEE CUSTOMER PROVIDED INTERFACE CONNECTIONS

3 DATA UTILITY SEE CUSTOMER PROVIDED INTERFACE CONNECTIONS

AT UTILITY

LOCATION CUSTOMER SUPPLIED WATER CONNECTION CONNECTION SIZE

DEIONIZED WATER

SUPPLY RATE,

LITERS/HR

MINIMUM FLOOR DRAIN

INSIDE DIAMETER,

INCHES

2 WATER UTILITY 5/8" BARBED HOSE FITTING W 1/2" ID 64 2

3 WATER UTILITY 5/8" BARBED HOSE FITTING W 1/2" ID 64 2

CUSTOMER'S POWER RESPONSIBILITY

CUSTOMER'S DATA RESPONSIBILITY

CUSTOMER'S WATER/WASTE RESPONSIBILITY

NOTE: TYPE 1 CLRW, UTILIZING A CONTINUOUS RECIRCULATION /POLISHING LOOP, WITH A MINIMAL VELOCITY OF 5 FT/SEC. AND A 0.2 MICRON OUTPUT FILTER. PLEASE REFER TO THE SPECIFIC INSTALLATION SITE REQUIREMENTS DOCUMENTATION.

TOTAL SYSTEM HEAT LOAD

BTU/HR (VALUES ROUNDED)

82,083

0 1 2 3 4 5 6 7 8 9 10 Line # Communication Type Connection Device l 1 TCP/IP (RJ45) Network to Primary l 2 TCP/IP (RJ45) Network to Shadow l 3 TCP/IP (RJ45) Network to Fortigate/Connect 2/8100 CU l 4 TCP/IP (RJ45) Network to Report Printer l 5 TCP/IP (RJ45) Network to Fortigate/Link 2/c Pro l 6 TCP/IP (RJ45) Network to Report Printer l 7 TCP/IP (RJ45) Network to Fortigate/Link 2/c Pro l 8 TCP/IP (RJ45) Network to Report Printer

2 2 2 2 0 0 0 0 0 0 0 Total ports per Power Pole

** 10/28/2022 RJW_fm v1**

Customer Provided Interface Connections

Power Poles (2 dots on one line

= point to point connection)

11/02/22

INSTALL

x mm.

x’-x”

REFERENCE

x’-x”

WATER/DRAIN

x’-x”

POWER

NEW FLOOR DRAIN

EXISTING FLOOR DRAIN

# UTILITY LOCATION

DATA

POWER

WATER LOOP

W/SHUT OFF

CCM PSU

AIR

ROCHE DIAGNOSTICS

9115 HAGUE ROAD

INDIANAPOLIS, IN 46256

SCALE: ¼” = 1'-0" SHEET 3 OF 4

GENERAL NOTES:

1.SIZE AND CONFIGURATION OF SYMBOLS

SHOWN ON THE DRAWING ARE USED TO

REPRESENT THE EXISTENCE OF, OR NEED FOR

ADDITIONAL UTILITIES.

2.CUSTOMER IS RESPONSIBLE FOR MEETING ALL

LOCAL CODES.

3.CUSTOMER IS RESPONSIBLE FOR CONTACTING

EACH 3

RD

PARTY VENDOR TO OBTAIN TECHNICAL

EQUIPMENT SPECIFICATIONS RELATED TO

INSTALLATION OF INSTRUMENTS AND REQUIRED

UTILITIES. ROCHE WILL PROVIDE TECHNICAL

SPECIFICATIONS AND GENERAL LOCATIONS FOR

UTILITIES OF ROCHE EQUIPMENT ONLY.

CONNECTION TO 3

RD

PARTY SYSTEMS TO BE

INSTALL – CONSTRUCTION PLAN VAMC FORT

HARRISON

HELENA, MT

VAMC_FTHARRISON_CONSTRUCTIONPLAN110222FM-1

LDA: FREDERICK McCARROLL

SWC: LAUREL SPRAGUE

10/25/22 DIM TOOL VERIFIED

10/28/22 ADDED IT GRID

U P

S

.0 kV A

S er ie s

B at te ry

C a b in e t

See UPS/Battery Cabinet Specs.

Power

#0

Off-site location TBD. Max distance is 250ft.

Vir tua l Server

Primary

Vir tua l Server

Shadow

Off-site location TBD.

#0

Existing

Drain

Existing

Drain

Data

Power

#1

Mobi le Table

M o b ile

T a b le

M o b ile

T a b le kg kg kg kg kg kg 7 kg kg kg kg 2 kg kg

R S

F A

O B

O B

S c o b a s o u tp u t s ta tio n kg 1 kg kg kg kg 2 kg kg kg kg kg 4 kg kg kg kg 2 kg kg kg kg 3 kg kg

D S

P A

C U w it h

A C

B

IP

B

H S c o b a s in p u t s ta ti o n

S C

M kg kg kg kg

C R

W cobas 8100 kg kg kg kg kg kg 2 kg kg kg kg 3 kg kg

T L

J

TLJ

kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg

TLJ

kg kg kg kg kg kg kg kg

TLJ

N e w

D ra in c o b a b a s L in p o rt P rin te r

Data

Power

Water Loop

C o n tr o l U n it

R e p o rt

P ri n te r

Firewall

N w

D ra in c o b a b a s L in p o rt P rin te r

Data

Power

Water Loop

B R

F c o b a s p ro kg kg kg8kg kg1 kg kg kg c o b a s p ro kg kg kg kg kg kg kg kg kg kg kg 1 kg 1 kg kg kg 2 kg kg kg 4 kg kg kg kg kg kg kg kg kg kg 8 kg kg kg kg c o b a s p ro

IS

E -5

-8

B R

F c o b a s p ro kg kg kg8kg kg1 kg kg kg c o b a s p ro kg kg kg kg kg kg kg kg kg kg kg 1 kg 1 kg kg kg 2 kg kg kg 4 kg kg kg kg kg kg kg kg kg kg 8 kg kg kg kg c o b a s p ro

IS

E -5

-8 m m

678mm.

m m m m

4285mm.

2598mm.

1842mm.

Firewall Firewall

#2 #3

11/02/22

NOT TO SCALE SHEET 4 OF 4

ROCHE DIAGNOSTICS

9115 HAGUE ROAD

INDIANAPOLIS, IN 46256

POWERVAR 3300 SERIES UPS CIRCUIT DIAGRAM CLEARANCE SPECIFICATIONS

RECOMMENDED INSTALLATION OPTIONAL PCDU OPTIONAL PCDU INSTALLATION

VAMC_FtHarrison_ConstructionPlan110222fm-1.vsdx