36C25923Q0084 0002.docx

DOCX document 2 MB Posted

Attached to
Z2DA--VA Montana-Roche Lab Project 436-23-117 (VA-23-00016475)
Solicitation number
36C25923Q0084
Issued by

View the file

Other files

File Type Posted
36C25923Q0084 0004.docx DOCX document
S02-ICRA 2.0 Amend 4.pdf PDF
S05-RFI Questions_Amend 4.docx DOCX document
Bid Schedule Amend 4.docx DOCX document
S05-436-23-117- Lab Project-Questions and Responses.docx DOCX document
36C25923Q0084 0003.docx DOCX document
S06-KIMG0808.jpg JPG image
S06-KIMG0811.jpg JPG image
S06-KIMG0806.jpg JPG image
S06-B154_Architectural_First_Floor_RocheLabProject.pdf PDF
S06-KIMG0807.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject 02.pdf PDF
S06-436-23-117 VA Montana-Roche Lab Project MTVA ASHE ICRA 2.0.pdf PDF
S06-KIMG0812.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject.pdf PDF
S06-Roche lab 1st floor plumbing.pdf PDF
S06-KIMG0809.jpg JPG image
36C25923Q0084 0001.docx DOCX document
S02-Past Performance Questionnaire.docx DOCX document
S02-VAMC_FtHarrison_ConstructionPlan110222fm-1.pdf PDF
S02-Roche Automation and Analyzer Spec Sheets.pdf PDF
S02-Roche 8100 Pre-Site CHECKLIST.pdf PDF
36C25923Q0084_1.docx DOCX document
S02-Roche 8100 PowerVAR UPS 3300 30-40kVA for PCDU.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rocky Mountain Network 19 | Montana VA Health Care System (436) 3687 Veterans Drive | P.O. Box 1500 Fort Harrison, MT 59636-1500

1.877.468.8387 | 406.442.6410 www.montana.va.gov

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 436-23-117 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Timothy Verburgt Timothy.Verburgt@va.gov

To all Offerors/Bidders

36C25923Q0084 11-29-2022

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 12-09-2022 at 10:00 AM (MST) x See Page 2

Ilse Karklins-Powers Contract Officer

AN AMENDMENT TO SOLICITATION 36C25923Q0084

The purpose of this amendment is as follows:

1. Extend proposal due date to 12/9/22 at 10:00 AM (MT)

1. Addition of a revised SOW. “Contractor responsible for reading all changes to SOW”

1. Addition of ICRA document.

1. Addition of 3 floor plan files.

1. Addition of 6 photos.

1. Answers to RFI’s.

1. All offers will be emailed to Timothy Verburgt at Timothy.Verburgt@va.gov by new established due date and time above.

All other items and conditions remain the same.

Acq-Plan 36C259-23-AP-0371 (NRM) Roche Lab Project (FTH) Questions

1. Please clarify PoP and consider extending if appropriate. 14 days seems tight even for construction alone. If submittals, lead times, punch list, and closeout are included in the PoP, it might not be achievable. We recommend a longer PoP and a separate Administrative PoP for submittals and material ordering, and then an NTP with the Construction PoP, even then we recommend a longer PoP than 14 days to keep costs lower. CONCUR – ADMIN PoP will be determined by the lead time and discussions will be held with all appropriate parties. Construction PoP to be 30 days from start of project.

2. Please provide scaled PDF floor plan of each floor affected by construction. If key rooms are marked that would help as well. See attached.

3. Please clarify type and quantities of utilities to remove from the half wall. If lines must be removed to the source, please provide estimated lengths for each utility. Photos show a line of receptacles that need to be terminated back to the junctions in the ceiling, as well as the airline which is currently not pressurized since the compressor was removed. Estimated length of the half wall is 18’ plus 6’ vertical (24’ total)

4. In the half wall there appears to be some sort of air, is that the pneumatic line to be demolished coming from the maintenance room in the hallway? See attached.

5. Please clarify HVAC scope in section k. There was discussion on the job walk calculations would not be required. More detail on the scope will be needed to provide accurate pricing. There was some discussion on potentially eliminating the HVAC scope all together as well. See Revised SOW

6. Please specify if after hours work will be required or an estimate on amount of afterhours work. VA prefers that work inside the Lab itself be done after hours and/or weekends to minimize impact and possible danger to the staff; this can be scheduled with the VA COR Lab Manager to ensure Safety & ICRA guidelines are being adhered to. VA COR will have to coordinate with VA Facilities Maintenance team to execute shutdowns (i.e. for the water line installation). Work that occurs in Mechanical or Electrical rooms can be scheduled for M-F normal business time.

7. Please clarify if the pneumatics copper line is still connected and active referenced in section i. Can anyone demo the line (if it was abandoned), or will it have to be someone qualified in pneumatics / plumber if still connected. Piping can be demolished by anyone; the line was previously supplied by a dedicated air compressor that was removed by Siemens Field Engineers

8. Please provide a picture or more details of the rubberized cover and floor drain assembly referenced in section h. Photo provided to Contracting

9. Would the government consider extending the bid date based on the information from the RFIs will be needed to properly price project? With Thanksgiving coming up, possibly the 2nd or 9th of December would be appreciated if acceptable for VA schedule. Bid date has been extended to 12/9/22 at 10:00 AM (MT)

10. Please clarify and specify if there are any specific VA or Roche testing (electrical, plumbing, or HVAC) that will be required for this scope of work. Negative – utilities to be delivered by the Project; Roche will follow up with commissioning of the automation line and rearranging of the existing analyzers

11. Please clarify if there are any insulation requirements for the plumbing scope. If there are please specify the requirement. Pipe insulation should be adequate to ensure that condensation (sweating) does not occur

12. Current bid date is the day before Thanksgiving? Can this date be changed to after holiday? SEE ANSWER TO QUESTION 9

13. Please confirm VA is responsible to remove existing equipment in the work area? YES

14. Please confirm VA is responsible for installing new equipment into new locations. YES

15. Please provide ICRA requirements. Will hard barriers be required? Please define ICRA limits. ICRA Provided to Contracting Officer, no hard barrier needed, but close coordination with the VA COR and Lab Manager must be followed to ensure that sensitive Lab equipment gets shut down and/or encapsulated prior to any localized work

16. Please confirm that the VA is providing the PowerVAR 3300 Series UPS, battery cabinet and PDCU(s)? Confirmed – Roche labs to deliver the system during the Project when appropriate

17. Also please confirm that the VA is providing the (2) Roche cobas pro analyzers and (1) cobas c8100 automation system? Confirmed – Roche labs to deliver the c8100 automation during the Project when appropriate; the Cobas Pro analyzers are already in place (one of those will be moved to the current half-wall location)

18. Will Roche be responsible for final connections to units and start up? YES

19. SOW (9.k) Indicates to contractor to modify existing exhaust ductwork. Please provide HVAC layout for this area. SOW also indicates that contractor to evaluate heat loads for existing space. Please provide this data to along with size of existing exhaust fan etc. See Revised SOW.

20. Please define locations of new exhaust and whether exhaust is to be directly connected to units or ceiling grille only. Confirmed – Roche labs to deliver the system during the Project when appropriate

21. Please confirm the VA will provide the appropriate personnel for startup of equipment? Roche will execute commissioning of the automation line, UPS, etc. This project is to provide utilities and demo previous as requested in the SOW

22. Will the VA provide the appropriate personnel to do the pre-startup checklist from the equipment manufacturer? YES – That document will be completed by the VA COR and was provided for reference only

23. Can the new conduits be floor/surface mounted in the lab area? Or will electrical contractor need to provide a Unistrut rake to support electrical and data outlets? VA prefers circuits to be either in the ceiling and dropped down to individual systems on Unistrut similar to existing power for the analyzers, OR located in the ceiling space below the lab and individually drilled up to each location; feasibility of each TBD by Electrical Contractor

24. You provide the TIL in the solicitation. Is this a design-build project? If, so how many drawings are required? Are we required to create specs? The Project is only to deliver utilities as described in the Roche technical documents and the SOW; utility follow up and drawings will be generated by VA CM Services following completion of the Project

25. Does the VA have an asbestos survey for this area? VA does not have a survey for asbestos abatement in the Lab, but the Lab does not look to have anything between the rubber flooring and the concrete slab. Best Practice for the water line penetration, which will require an ICRA boundary during the drilling procedure, would be to wear appropriate PPE and utilize localized filtration

26. Please confirm if the work in the lab can be completed during normal business hours. VA prefers that work inside the Lab itself be done after hours and/or weekends to minimize impact and possible danger to the staff; this can be scheduled with the VA COR Lab Manager to ensure Safety & ICRA guidelines are being adhered to. VA COR will have to coordinate with VA Facilities Maintenance team to execute shutdowns (i.e. for the water line installation). Work that occurs in Mechanical or Electrical rooms can be scheduled for M-F normal business time.

27. Does the VA have extra flooring to patch any holes from demolition? Will floor patching be acceptable or do we need to replace full sheets? Please define flooring scope. Flooring scope would be to fill in the space under the half wall with similar material; VA COR is checking to see if we have it in stock, if not then it will be acquired by VA COR to fill in that area

28. Will the first-floor work be able to be completed during normal work hours? YES, the first-floor work in Outpatient Behavioral Health is primarily plumbing inside a Mechanical Room. The line will need to be isolated and this will impact water to the area, so the shutdown must be coordinated with the VA COR to ensure proper notification to customers.

29. Can you provide a panel schedule for 154-2-LABNP? Need information to coordinate the appropriate temporary power during shutdown. See photo below, and please refer to the answer to Question # 31. VA COR will coordinate shutdowns with the Lab Manager to ensure overlap and continued delivery of services

30. Please provide existing floor plan for the work area. See answer to Question 2 and attachment.

31. Current lead time on a 150A Square D Breaker is 50+ weeks. Does the VA have a breaker available in its “stockpile”? Does this lead time effect the VA’s projected schedule? SCOPE REVISION: Panel 154-2-LABNP – Siemens Analyzer temporary power wiring will be migrated to the panel 154-LAB1(2) which is in the adjacent Electrical Room 221L. That panel is currently full of spare breakers (see photo below). The power for the exhaust fan will also be migrated to that panel. Panel 154-2-LABNP will then be removed, and a 150A disconnect installed to supply the PowerVAR 3300 UPS. The PowerVAR 3300 would then feed into the Lab to the MLB panel, which in turn would be distributed as per the Roche technical information.

32. SOW (9.a) indicates the intent of work is to utilize existing material to expedite the project. What existing material is required to be used. Have the materials been inspected by the VA? Please clarify what material if any is to be used for project. Please bid the Project with the assumption that VA does not have any useful material on hand; the awarded Contractor can then survey what we do have, and if utilized, can reflect this in invoicing. The other option is to perform an additional Site Visit to review what is in stock (material is stored in one of our out-buildings on station).

33. For bidding purposes, what is the distance that should be used for length of circuits extending from the new UPS panel to the locations of the equipment drawn? Approximately 150 feet from the UPS Room to the area of the Lab in question

34. For bidding purposes, what is the distance that should be used for length of feeders from “facility” power to the location of the UPS, and from the UPS to the location of the Output panel? Please see answer to Question # 31, which eliminates the need for a new circuit to be run from the MER below the Lab

35. Does the VA intend on using a “recommended emergency bypass switch” as shown on drawing 4 of 4? YES

Schedule of Panel 154-2-LABNP Locations 2-4-6 and 8-10-12 currently supply the Siemens Analyzers’ temporary power setups; The UPS circuit is to be eliminated, the air compressor has been removed and that circuit is to be eliminated, and the window fan is the only load that will remain for heat rejection purposes. The remainder of panel 154-2-LABNP is spare

Panel 154-LAB1 (2) – All breakers in this panel are spares – migrate both Siemens analyzer temporary supply wiring, 50A breakers, and exhaust fan circuit wiring and breaker here. This will free up 154-2-LABNP panel for elimination and replacement with a 150A disconnect that feeds the 3300 PowerVAR UPS A.1 Updated Statement of Work

Scope of Work 11-28-2022 Project: 436-23-117 Project Name: VA Montana-Roche Lab Project Table of Contents

Schedule of Panel 154-2-LABNP6
A.1 Updated Statement of Work7
I.Table of Contents8
II.Project Scope9
III.Tasks and Requirements10
A.Electrical Contractor Requirements10
IV.Period of Performance12
V.Work Schedule13
VI.Privacy Statement13
VII.Appendix – Drawings and Photos13

I. Project Scope

1. The VA Montana Healthcare System at Fort Harrison, MT requires the services of a Licensed General Contractor to install necessary power circuits and plumbing to supply future Roche Laboratory equipment, as well as remove multiple designated electrical and IT circuits. Contractor will also eliminate a metal chase / half wall, remove all utilities within, and modify the sink drain to become a floor drain.

2. The Contractor shall be responsible for all damage to persons or property that occurs due to the Contractor’s fault or negligence.

3. The Contractor shall also be responsible for all work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract by the VA COR (Project Engineer).

4. Existing Site Conditions: Execution of this system relocation will occur within the Bldg. 154 healthcare facility, primarily in the 2nd Floor Laboratory and in the Outpatient Treatment center below. Therefore, all activities will require construction to be phased in such a way as to minimize impact to staff and patients. Infection Control measures will be always required as defined in the associated ICRA assessment.

5. Construction activity will require constant coordination with VA Project Engineering and Facilities personnel.

6. Site Investigation is required for this project to ensure correct power source and circuit routing from source locations to the laboratory. The Contractor shall be responsible for field verifying all conditions that may affect the project work prior to bid of this project. Site investigation is to be included in the cost proposal. This work can be performed directly by the General Contractor, or indirectly via contract to a third parties (Sub-Contractors). The person(s) conducting the site investigation(s) are to check in with the VA Facilities Management Services Engineering department and will be escorted to review the project by the VA Contracting Officer Representative (COR) / Healthcare Engineer. This work must be done in advance and is intended to limit unforeseen site conditions and ensure acquisition of all necessary material prior to execution of the work.

7. The final construction shall conform to all VA requirements outlined in the FGI Guidelines for Design and Construction of Hospitals, ADA, ANSI, SMACNA, IBC, NEC, NEMA, NFPA, as well all requirements of the VA design manuals posted by discipline in the VA Technical Information Library at the following web address: http://www.cfm.va.gov/til/dManual.asp

8. Work shall be completed in conformance with the time schedule requested by the VA Contracting Officer’s Representative (COR) / Healthcare Engineer (HE). The Contractor is solely responsible for preparing all necessary regulatory notifications to meet the time schedule.

9. Due to requirements in NFPA 101 Life Safety Code, a minimum of two egress routes for each occupied space must be maintained. To ensure the safety of VA patients, staff, and tenants, work is to be structured to allow for egress routes to be maintained throughout the course of construction. Work requiring relocation of staff is subject to notification requirements. Impact to the VA Lab staff operations must be communicated and coordinated prior to work execution. If Contractor provides a schedule resulting in any violations of NFPA 101 Life Safety Code during any work, they must also submit proposed interim life safety measures (ILSM) for VA review. Any action necessitated by NFPA 101 Life Safety Code will be the responsibility of the Contractor.

II. Tasks and Requirements A. Electrical Contractor Requirements

1. Submittals must be reviewed and approved by the VA prior to the start of work.

2. All demolition shall be required to remove abandoned utilities back to active main.

3. Installation shall minimize penetrations in finished walls to the extent possible and with any such penetrations repaired to match existing construction or meet and/or exceed required sound transmission coefficient (STC), smoke/fire partition rating requirements after completion of work.

4. Any new construction shall match surrounding finishes unless indicated otherwise.

5. Contractor and their Sub-Contractors are to provide necessary submittals and plans for approval prior to commencing with any “new work” not shown/provided in the construction documents.

6. All damage to floors, walls, ceilings, or any other VA property to be repaired/replaced by the Contractor.

7. Contractor shall be responsible for all construction debris removal. The Contractor shall provide their own dumpster as needed.

a. For interior construction the Contractor shall provide dump carts and HEPA carts as needed. Dump carts are to be sealed with a tight-fitting lid during travel to and from the jobsite to the designated dumpster location. Dumpster location and debris removal pathway to be approved by the VA COR.

8. Temporary egress and life safety signage to be provided by contractor and any ILSMs required shall be coordinated with VA COR and VA Safety Personnel.

9. Description of Work:

a. A Lab Project Survey and Site Inventory for plumbing, HVAC, and electrical material for material installations will be required prior to bidding and execution; Fort Harrison VA currently has material in stock in a storage area which the Contractor shall utilize (as possible) in this effort. Material that is not in stock will be acquired by the Contractor and billed as per their normal rates. This process will be coordinated with the Fort Harrison VA Project Engineer and/or Facility Electrician(s). The intent of this work is to utilize existing government material, as well as help expedite the project

b. The Lab Project will require removal of the previous breakers, power circuits, 208V-240V transformer, and local disconnects that previously supplied the Siemens automation systems and UPS. Material that can be reused will remain for execution of the Lab Project; all other material will be delivered to the VA COR / Facilities Department for project inventory

c. SCOPE REVISION: Panel 154-2-LABNP – Siemens Analyzer temporary power wiring will be migrated to the panel 154-LAB1(2) located in the adjacent Electrical Room 221L. That panel is currently set up with spare breakers (see photo below). Panel 154-2-LABNP will then be removed, and a 150A disconnect installed to supply the PowerVAR 3300 UPS. The PowerVAR 3300 would then feed into the Lab to the MLB panel, which in turn would be distributed as per the Roche technical information.

d. The power for the outside wall exhaust fan in the UPS / Electrical Room will also be migrated to panel 154-LAB1(2).

e. The Lab Project will require wiring of the PowerVAR 3300 UPS Battery Cabinet Connection terminals to the manufacturer-supplied Battery Cabinet (See document titled “8100 UPS 3300 30-40kVA for PCDU”)

f. The Lab Project will require an output circuit to be run from the PowerVAR 3300 UPS to a rated panel to be designated “154 LAB MLB” that will be installed in the locale of the Roche Laboratory Equipment (See document titled “8100 UPS 3300 30-40kVA for PCDU”)

g. The Lab Project will require all circuits in Roche project documentation to be installed as per manufacturer design (documents provided by Roche to VA Engineering and attached to this procurement package); equipment includes 2 Roche cobas pro analyzers and 1 cobas c8100 automation system as well as required PowerVAR 3300 UPS

h. The Lab Project will require removal (demolition) of a “Utility Ceiling Chase” and “Utility Half-Wall”. This consists of metal paneling with various utilities inside. Demolition of these systems must include removal of all wiring, conduit, and associated material back to their individual supply locations

i. Half-Wall work will also require termination of lab sink drain piping to the floor and installation of a floor drain setup with a rubberized cover that is similar in type to the existing floor drains throughout the Lab

j. The Lab Project will require removal of a copper piping line and associated fittings that previously supplied pneumatics to the Siemens automation line

k. The Lab Project will require installation of a Domestic Cold Water supply line, to be supplied from the 1-1/4” piping system located in the ceiling of the space below the Lab; installation to include an isolation valve, piping, floor penetration and appropriate sealing/anchoring system, 1-1/4” piping up to a tee, reduction to two (2) ¾” supplies with pressure gauges and ¾” female NPT ball valves (brass or stainless steel)

l. Industry standard suspension and anchoring devices will be installed to support the new conduit, wiring, devices, and material

m. Ceiling work and any structural penetrations must comply with all NFPA, NEMA, Federal and State of MT Building codes. Fire barrier and/or sealant will be applied to ensure NFPA is met

n. Energized work is not permitted; supply panel breaker shutdown(s) must be coordinated and scheduled with Fort Harrison VA Project COR/ Healthcare Engineer and VA Facilities staff. VA Engineer will be tasked with facility customer notifications for scheduled shutdowns and departmental impacts

o. NFPA and OSHA LOTO procedures will be followed; all circuits and equipment will be “checked safe” prior to any work commencement; where necessary and/or applicable, grounding systems will be utilized. When working within flash boundaries, appropriate PPE will be utilized

p. Electrical Circuits and Water piping will be labeled for easy identification, including updating of electrical panel schedules and labeling systems for piping

q. All Roche Lab Equipment specifications will be provided to the Contractor by the VA COR / Healthcare Engineer. Component selection must be coordinated with the manufacturer’s specifications to ensure the circuit delivers the required power to the equipment. Specifications for the UPS and the system power requirements are also included in the project package

r. Following completion of Contractor work, designated Schneider Electric vendor for VA Fort Harrison (FICO) will install electrical power monitoring stations typical to similar systems that have been used in past projects, and will fully connect to the existing Schneider Electric / FICO Building Automation System for power monitoring and trending III. Period of Performance Period of performance from commencement of the described above statement of work is 30 business days. It may be possible to request an extension to the contract period of performance. Notify the VA of any exceptions before submitting proposal for increase to cost or changes to project schedule.

IV. Work Schedule

1. Normal working hours are from 7:30 AM to 4:30 PM.

2. Work Performed After Hours: To maintain schedule, work performed over the weekend may be allowed. Contractor to coordinate these efforts with VA COR with a minimum 48-hour notice.

V. Privacy Statement Information Security: The C&A requirements do not apply; a Security Accreditation Package is not required. Incidental exposure to protected Health Information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures. A Handbook 6500.6 Contract Security document will still be completed and submitted by the VA COR.

VI. Appendix – Drawings and Photos

IMAGE 1: This panel will supply power to the PowerVAR 3300 Series UPS

IMAGE 2: This supply breaker to panel 154 2 LABNP will require de-energization and gang LOTO device(s) to be utilized to ensure no energized work during breaker installation and circuit connections

IMAGE 3: This disconnect previously powered the Siemens automation line; it will be removed along with all wiring and conduit and delivered to VA Engineering for project inventory

IMAGE 4: This disconnect and transformer and all associated conduits will be removed along with all associated conduit and wiring and delivered to VA Engineering for project inventory

IMAGE 5: This UPS will be removed along with all associated conduit and wiring and delivered to VA Engineering for inventory

IMAGE 6: VA Facilities & Engineering electrical inventory photos – this only depicts a portion of material that VA has in stock, which also includes electrical devices, conduit, and plumbing inventory MORE PHOTOS AND DOCUMENTS CAN BE PROVIDED TO AWARDED CONTRACTOR UPON REQUEST; PHOTOS CAN ALSO BE ACQUIRED DURING PROJECT SITE REVIEW See attached document: S06-436-23-117 VA Montana-Roche Lab Project MTVA ASHE ICRA 2.0.

See attached document: S06-Roche lab 1st floor plumbing.

See attached document: S06-B154_Architectural_Second_FloorPlan_RocheLabProject 02.

See attached document: S06-B154_Architectural_First_Floor_RocheLabProject.

See attached document: S06-B154_Architectural_Second_FloorPlan_RocheLabProject.

See attached document: S06-KIMG0806.

See attached document: S06-KIMG0807.

See attached document: S06-KIMG0808.

See attached document: S06-KIMG0809.

See attached document: S06-KIMG0811.