S02-Roche Automation and Analyzer Spec Sheets.pdf

PDF 2 MB Posted

Attached to
Z2DA--VA Montana-Roche Lab Project 436-23-117 (VA-23-00016475)
Solicitation number
36C25923Q0084
Issued by

View the file

Other files

File Type Posted
36C25923Q0084 0004.docx DOCX document
S02-ICRA 2.0 Amend 4.pdf PDF
S05-RFI Questions_Amend 4.docx DOCX document
Bid Schedule Amend 4.docx DOCX document
S05-436-23-117- Lab Project-Questions and Responses.docx DOCX document
36C25923Q0084 0003.docx DOCX document
S06-KIMG0808.jpg JPG image
S06-KIMG0811.jpg JPG image
S06-KIMG0806.jpg JPG image
S06-B154_Architectural_First_Floor_RocheLabProject.pdf PDF
S06-KIMG0807.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject 02.pdf PDF
36C25923Q0084 0002.docx DOCX document
S06-436-23-117 VA Montana-Roche Lab Project MTVA ASHE ICRA 2.0.pdf PDF
S06-KIMG0812.jpg JPG image
S06-B154_Architectural_Second_FloorPlan_RocheLabProject.pdf PDF
S06-Roche lab 1st floor plumbing.pdf PDF
S06-KIMG0809.jpg JPG image
36C25923Q0084 0001.docx DOCX document
S02-Past Performance Questionnaire.docx DOCX document
S02-VAMC_FtHarrison_ConstructionPlan110222fm-1.pdf PDF
S02-Roche 8100 Pre-Site CHECKLIST.pdf PDF
36C25923Q0084_1.docx DOCX document
S02-Roche 8100 PowerVAR UPS 3300 30-40kVA for PCDU.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document ID: 0000000000001200000485818 000 01 005 Title: RPS-FS.1.C.1-FM-CPRO V2s1 Document Valid From / Version: 11-Mar-2021 19:44:25 (UTC) / 01

KTemplate - Copying permitted / Kopieren erlaubt Page 1 (9) cobas® pro integrated solutions

Site Requirements V2s1

Disclaimer

This Pre-Installation Site Checklist does not replace any user or service manual.

The site requirement document can be used as a basis for the pre-installation discussion with the customer.

Dimensions:

☐ W x D x H

SSU

Including monitor

ISE module c 503 including sample buffer e801 Including sample buffer

52 x 38 x 56 in. 18 x 46 x 46 in. 61 x 46 x 53 in 61 x 46 x 53 in

☐ Weight

551 lbs.

337 lbs. 1336 lbs.

1448 lbs

☐ The floor should have a grade (rise or fall) less than 1/200 within the footprint of the system.

Electrical Power Requirements

☐ Source

·Two 115 VAC +/- 10% / 60Hz -standard wall receptacle [5-15R connection] ·208 VAC 50 amp 1 connection required (2 modules) ·208 VAC 50 amp 2 connections required (3-4 modules)

Two 15 Amp circuits will supply power to:

1. Roche Service use.

2. HP LaserJet Printer

50 AMP (Load tested) - Two (2) options: United States

1. Wall mounted Hubbell # 3771, 3-Wire 50 A, 250VDC - 600VAC

2. Cord mounted Hubbell# 3762C, 3 Wire 50 A, 250VDC - 600VAC

Note: All of the above are Locking Single Receptacles 50 AMP (Load tested) – Two (2) options: Canada

1. Wall mounted Hubbell #6369CR, Outlet twist lock non-NEMA 50A

2. Cord mounted Hubbell # CS6364, 50A, 125/250VAC Female Power Plug

Note: All of the above are Locking Single Receptacles

☐ Power Consumption - Entire System 10 kVA (ISE, c503, and e801 plus sample supply unit and sample buffers)

☐ Power outlet (208V 50 amp) must be within 30 ft of the analyzer.

Sample Supply unit ISE Unit cobas c 503 unit cobas e 801 unit

Up to 1000 samples per hour processing capacity Up to 300 samples direct loading Up to 300 samples direct unloading or bi-directional connectivity to lab automation

Up to 300 samples per hour Up to 900 tests per hour

Up to 1000 tests per hour

Reaction time : 3-10 minutes Up to 60 reagent positions

RFID label

Up to 300 tests per hour Up to 48 reagent positions Reaction time: 9/18/27

KTemplate - Copying permitted / Kopieren erlaubt Page 2 (9)

☐ Power outlet (115V 15 amp) must be within 8 ft of the printer/firewall/cobas link cart.

☐ It is recommended for the power to be fed from Emergency power (Generator backed up).

☐ A ground lead measuring less than 10 ohm with respect to earth ground is required. Safety ground must not be able to assume any potential above any grounded fixture located in the immediate vicinity of the analyzer (0.1 VAC maximum).

NOTE: Roche through an agreement with a power supply vendor provides an Uninterruptible Power Supply or Supplies (UPS) as part of the cobas pro analyzer series shipment. These UPS(s) provide power conditioning and short term AC power (5-10 minutes). If the site already has an

Uninterruptible Supply built-into the facility, then it is not recommended that the Roche provided supplies be utilized (Uninterruptible supply should not be powered by another uninterruptible supply).

Liquid Waste Volume

ISE module

Concentrated liquid waste volume: < 2.0 L/h c 503

Concentrated liquid waste volume: < 2 L/h

E 801

Concentrated liquid waste volume: ≤ 7

L/h

Normal liquid waste volume:<30 L/h

Normal liquid waste volume: <22 L/h

☐ Floor drain required ≥ 2 inches ID and within 4 inches of the floor

☐ Floor drain must be located within 16 ft of the analyzer

☐ Waste is by gravity discharge

Deionized Water Consumption

☐ Average in Operation: 2 L/h 32 L/h 30 L/h

☐ Clinical Laboratory Reagent Water (CLRW)

● Bacteria <10 CFU/mL Resistivity >10 MΩ.cm Total Organic Carbon(TOC) 500 PPB Particles 0.2um filtration or better

☐ Pressure 7.3 to 49.3 psi. Customer supplies a gauge and regulator valve to monitor and adjust water pressure.

☐ Temperature 54 to 86 °F (10 – 30°C)

☐ Customer supplies an approved shutoff valve near the analyzer. 5/8 hose barb with an internal diameter of 1/2 inch supplied by customer. DI water components must be either PVC or Stainless steel.

☐ Any dead leg tubing must be < 10 feet.

Note: It has been found that systems utilizing a re-circulation/polishing loop, with a minimal velocity of 5 ft/sec. and a 0.2 micron output filter, have been extremely effective in minimizing bacterial growth and maintaining overall water quality.

Note: If an acceptable floor or wall drain cannot be provided, the facility may provide, at their own discretion, an automated waste pumping solution

(ie. separate waste container and “sump pump”) capable of safely and effectively eliminating analyzer waste at the specified discharge rate.

SSU ISE module c 503 e 801

Environmental ☐ Ambient Temperature 64 - 89° F in operation ≤ 3.6° F Δ/h

☐ Relative Humidity

☐ Noise emissions to Environment

30 – 85% non-condensing

<65 dbA in Operation/<56 dbA in STBY

☐ Heat Dissipation

(BTU/h)w/SB 2730 1365 8190 6824

KTemplate - Copying permitted / Kopieren erlaubt Page 3 (9)

☐ Normal altitude above sea level 6562 ft 6562 ft

☐ Max. altitude above sea level with high altitude kit 9843 ft 9843 ft

☐ The environment should be relatively dust and vibration free.

☐ The cobas pro integrated solutions should be located ample distance away from any equipment generating electromagnetic noise or electromagnetic wave interference (such as centrifuge, electric discharge machine, mobile telephone, transceiver, cordless telephone, etc

Routing Considerations (Uncrated)

☐ Is there a loading dock or other suitable facility to allow the analyzer to be safely unloaded?

☐ Truck with lift gate or Forklift needed? Is a forklift available onsite?

☐ Is there any restriction to the length of truck that will be used to deliver the analyzer?

☐ Is there any restriction on delivery times/days?

☐ Is there an unpacking location available?

Additional Considerations

☐ Installation Clearance: Minimum door width (opening) – 36 in. Minimum door height – 69 in. Minimum turning radius – 60 in.

☐ Elevator Clearance (if necessary): Width - 36 in. Depth - 48 in.

☐ Clearance for proper circulation and accessibility: Right: 24 in. Front: 39 in. Back: 28 in.

☐ Adequate ventilation in the immediate area of operation should be provided without airflow directly onto or across the top of the analyzer.

☐ The cobas pro analyzer should be located ample distance away from any equipment generating electromagnetic noise or electromagnetic wave interference such as centrifuge, electric discharge machine.

☐ System should be protected from direct sunlight.

☐ Adequate refrigerated storage at 2 to 8 °C must be available.

☐ Access for Maintenance is as follows:

It is recommended to have at least 16" on the right side, 40" at the front and a necessary space of 28" at the back to ensure proper air circulation and accessibility for maintenance and operation.

Network Connections

☐ A wired 10/100/1000 RJ45 female connection (1 drop per system) to the customer’s network

☐ Roche provides a Firewall. The use of the Firewall is mandatory and requires a static IP address. See separate Firewall pre-site document.

☐ The communication is outbound through port 443 (HTTPS) and port 80 (HTTP with secure payload). Secure payload means that the data is encrypted, signed, and zipped. Protocols used are HTTP, HTTPS, SSH, SOAP, and BITS.

☐ For outbound LIS communication the Firewall will require access to the customers LIS over specific ports.

☐ For inbound LIS communication, the LIS will require access to the Firewall’s static IP address.

☐ If installing at a VA account please follow IPB for Axeda setup – Veterans Affairs VPN Procedure

☐ For Roche remote diagnostics, Axeda, the Firewall’s static IP address will need access to:

IP Address Outbound Port

Host name

196.3.50.39 80 teleservice.roche.com**

62.209.44.11 443 remoteservice.roche.com

209.202.167.21 443 remoteservice-dr.roche.com

62.209.44.21 443 remoteservice-gas1.roche.com

62.209.44.22 443 remoteservice-gas2.roche.com

209.202.167.19 443 remoteservice-gas3.roche.com

209.202.167.20 443 remoteservice-gas4.roche.com

120.136.45.231 443 remoteservice-gas5.roche.com

120.136.45.230 443 remoteservice-gas6.roche.com

KTemplate - Copying permitted / Kopieren erlaubt Page 4 (9)

Cart

☐ A cart will be optional. There are two options: 24 in wide standing cart and a 36 in wide sitting cart.

☐ Cart must be on the left side of the instrument under the monitor

Configurations

Total length

Including Monitor

(To stat port) in

<ISE | c503> 129 (113)

<ISE | c503 | e801> 188 (172)

<ISE | c503 | ISE | c503> 206 (190)

<ISE | c503 | ISE | c503 | e801> 265 (249)

<ISE | c503 | e801 | e801> 247 (231)

<ISE | c503 | ISE | c503 | e801 | e801> 324 (308)

<ISE | c503 | e801 | e801 | e801> 307 (291)

<e801> 111 (95)

<e801 | e801> 171 (155)

<e801 | e801 | e801> 230 (214)

<e801 | e801 | e801 | e801> 289 (273)

KTemplate - Copying permitted / Kopieren erlaubt Page 5 (9)

KTemplate - Copying permitted / Kopieren erlaubt Page 6 (9)

KTemplate - Copying permitted / Kopieren erlaubt Page 7 (9)

KTemplate - Copying permitted / Kopieren erlaubt Page 8 (9)

Important: The strict adherence to the site requirements contained in this document is an essential component in achieving a successful and compliant installation. Any delays in site requirement implementation over the jointly agreed dates can have a negative impact on and delay instrument shipment and/or installation. Deviations from these site specifications should be reported to the Roche Technical

Support Center (1-800-428-2336).

KTemplate - Copying permitted / Kopieren erlaubt Page 9 (9)

Notes

File details come from the government source that posted it. Updated .