This document provides detailed technical specifications and installation guidance for the power distribution infrastructure required to support the Joint Security Architecture (JSA) and Forward Deployed Services (FDS) IT equipment sets as part of the EHRM (Electronic Health Records Modernization) program.
The key details include:
- Specifications for the 30A 120/208V 3-phase Zone Power Distribution Units (PDUs) that will provide redundant power feeds to the IT equipment racks/cabinets
- Diagrams and schematics showing the interconnections between the Zone PDUs, Rack PDUs, and IT equipment power supplies
- Materials lists and installation task matrices clarifying the responsibilities of the facility engineering, local FMS, and OIT staff for acquiring, installing, and configuring the power distribution components
- Grounding and bonding specifications to properly connect the IT devices and infrastructure to a common signal ground
This document does not appear to be a solicitation or contract opportunity, but rather a technical design guide for the local facility teams preparing to deploy the EHRM IT hardware.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0535 0004.docx | DOCX document | |
| S02 - Building 33.pdf | ||
| S02 - JSA and FDS Zone Power Distribution 1 0 12-04-20.pdf | ||
| 36C25924Q0535 0003.docx | DOCX document | |
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| S04 - Site Visit Attendance - FE.docx | DOCX document | |
| S05 - RFI Questions - EHRM Data Center Upgrade for JSA and FDS - Electrical Conduit - FE.docx | DOCX document | |
| S02 - Amendment 1 - Page 1 Block 10.docx | DOCX document | |
| 36C25924Q0535 0001.docx | DOCX document | |
| S02 - Site Instructions.docx | DOCX document | |
| S22 - LOS - Attachment - 852.219-75 Blank.docx | DOCX document | |
| 36C25924Q0535_1.docx | DOCX document | |
| PPQ Blank.docx | DOCX document | |
| S02 - Drawing - Building 33.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM Infrastructure Readiness - Zone Power Distribution Installation Guide
References
OIT Infrastructure Standards for Telecommunication Spaces (ISTS) v. 3.0
This package follows the OIT ISTS Design Guide convention of using contrasting Blue and Yellow color highlights to emphasize diverse power sources and paths.
Relevant extracts from the OIT ISTS Design Guide have been included. The complete Design Guide pages and can be found in Appendix B of ISTS 3.0 published in the OIT Technical Reference Model (TRM) database and on the VHA CFM Technical Information Library (TIL). Additional discussion of Zone-based three-phase power distribution to the rack/cabinet level can be found in OIT ISTS 3.0, Section 4.2, Electrical Power and Grounding Standards, beginning on Page 21.
Each IT equipment set will require a specific configuration of electrical power to be delivered to its IT cabinets, compliant with OEHRM Site Infrastructure and End User Requirements (SIEUR) and with OIT Infrastructure Standards for Telecommunication Spaces (ISTS). This document clarifies circuit requirements, materials, and task responsibilities which are common across most installations. Details which are specific to each particular installation, such as compatible brands of circuit breakers, cannot be determined at this level and are left for qualified local staff to specify.
OIT Design Guide Sheet 18 - 30A Zone PDU Power Distribution This sheet explains how to implement Zone power distribution among multiple cabinets in a standardized cabinet row.
OIT Design Guide Sheet 23 - Equipment Bonding and Grounding This sheet describes how to properly connect IT devices, enclosures, and other infrastructure to a common signal ground, in accordance with J-STD-607.
30 Amp Zone PDU Detail - Circuits and Connections These diagrams and schematics describe three-phase 30A 120/208V L21-30 circuits supporting Zone PDU inputs and Rack PDU connections to Zone PDU outputs.
Zone and Rack Power Distribution Detail - JSA and FDS Cabinets These cabinet-based schematics show cable routing and connections among Zone PDU's, Rack PDU's, and IT Equipment Power Supply Units (PSU).
Power Cable Examples These diagrams give visual examples of various power distribution and interconnection cables and connectors.
Contents
Material Lists for JSA and FDS Power Distribution These lists call out the components the facility is responsible for acquiring and installing. For clarity, JSA and FDS materials are listed separately.
Task Matricies for JSA and FDS Installation These matrices clarify power chain connections, installation tasks, and responsibilities for performing them. For clarity, JSA and FDS tasks are listed separately.
Frequently Asked Questions Frequently Asked - and Answered - Questions.
The enclosed material provides supplemental details and explanations to local facility OIT and Engineering staff when preparing for EHRM hardware deployments. As discussed during the HEFP Scoping sessions, EHRM hardware will consist of a Joint Security Architecture (JSA) IT equipment set and a Forward Deployed Services (FDS) IT equipment set.
https://www.cfm.va.gov/til/dguide/OIT‐InfrastrucStdsTelecommSpaces.pdf
OEHRM Site Infrastructure and End User Requirements (SIEUR) v. 1.8 (Draft)
Qty Unit Item Description 2 each 30A 120/208V TPST Circuit Breaker Site-specific 30A 120/208V Triple Pole, Single Throw (TPST) circuit breaker compatible with existing distribution panelboards.
Additional detail to be determined by qualified local electrical staff.
2 sets L21-30R Distribution Circuit Whip Site-specific materials such as conductors, conduit, connectors, and outlet boxes necessary to install one 30A 120/208V distribution circuit (3L+N+G) with upsized Neutral supporting one NEMA L21-30R receptacle, as described in OIT Design Guide Templates, Sheet 18.
Additional detail to be determined by qualified local electrical staff.
1 each [Contingent] IT Equipment Rack/Cabinet (11 contiguous Rack Units available space and 2.5 kW available power)
[Contingent] If the site cannot allocate sufficient space or power for JSA within an existing rack or cabinet, the site will need to procure a new cabinet.
Refer to OIT Design Guide Template Sheets 31, 33, and 36 for specific application.
1 each Zone Power Distribution Unit (Dual 30A 120/208V L21-30P Inputs)
ZONIT ZPDS-208V30A-L21-4L21-20R-CR or equivalent, as specified in OIT Design Guide Templates, Sheet 18.
2 each Rack Power Distribution Unit (5.7 kW L21-20P Input, 208V IEC C13 and C19 Output)
CHATSWORTH ECONNECT PDU; VERTICAL; MONITORED; L21-20 PLUG; THREE PHASE; 120/208V
INPUT; 20A; (30) C13 (6) C19 OUTLETS; 208V OUTPUT; 3 X 2P 20A HYDRAULIC MAGNETIC
BREAKERS; LCD; ETHERNET, USB, AND ENVIRONMENTAL SENSOR PORTS; IP AND SERIAL
MONITORING; IP CONSOLIDATION (PDU LINKING); TOOL-LESS MOUNTING; 70.5"H (1791 MM) X 2.2"W (56 MM) X 2.2"D (56 MM) or equivalent, as specified in OIT Design Guide Templates, Sheet 18.
10 each C14-C13 Power Interconnect Cables (first color option)
IEC 60320 shrouded C14 to IEC 60320 C13 Power Interconnect Cables,
1.0 Meters (3 feet), minimum electrical rating 10A/250V.
Contrasting cable color indicating power path diversity recommended.
Locking connectors recommended.
10 each C14-C13 Power Interconnect Cables (second color option)
IEC 60320 shrouded C14 to IEC 60320 C13 Power Interconnect Cables,
1.0 Meters (3 feet), minimum electrical rating 10A/250V.
Contrasting cable color indicating power path diversity recommended.
Locking connectors recommended.
Qty Unit Item Description 2 each 30A 120/208V TPST Circuit Breaker Site-specific 30A 120/208V Triple Pole, Single Throw (TPST) circuit breaker compatible with existing distribution panelboards.
Additional detail to be determined by qualified local electrical staff.
2 sets L21-30R Distribution Circuit Whip Site-specific materials such as conductors, conduit, connectors, and outlet boxes necessary to install one 30A 120/208V distribution circuit (3L+N+G) with upsized Neutral supporting one NEMA L21-30R receptacle, as described in OIT Design Guide Templates, Sheet 18.
Additional detail to be determined by qualified local electrical staff.
1 each Zone Power Distribution Unit (Dual 30A 120/208V L21-30P Inputs)
ZONIT ZPDS-208V30A-L21-4L21-20R-CR or equivalent, as specified in OIT Design Gude Templates, Sheet 18.
FDS Materials Required (Zone Power Distribution)
JSA Materials Required (Zone Power Distribution)
VHAGRJGordoJ Rectangle
Notes
Device Input Connections Powered from
Output Connections Acquisition
Receipt and Warehouse
Physical Installation
Cable Management
Electrical Connections
Network Connections Power On
Admin and Config
Fixed Power Distribution Circuits
30A 120/208V 3-phase "Y" Distro Whip
Emergency Branch / UPS (Source A)
L21-30R Receptacle (Source A)
Facility Engineering
(EHRM PM)
Facility Engineering (EHRM PM) Local FMS Local FMS Local FMS
One Source A circuit (30A, 120/208V, 3L+N+G) required for every Zone PDU
30A 120/208V 3-phase "Y" Distro Whip
Emergency Branch / UPS (Source B)
L21-30R Receptacle (Source B)
Facility Engineering
(EHRM PM)
Facility Engineering (EHRM PM) Local FMS Local FMS Local FMS
One Source B circuit (30A, 120/208V, 3L+N+G) required for every Zone PDU
JSA Cabinet
Existing or Facility Eng
(EHRM PM)
Facility Logistics
OIT EUO with Local FMS
One cabinet required with at least 11 Rack Units (11 RU) available space
Zone PDU
Facility Engineering
(EHRM PM)
Facility Logistics
Local FMS with
OIT EUO
OIT EUO with Local FMS
OIT EUO with Local FMS
One 30A Zone PDU required for every two cabinets
L21-30P Plug (Source A)
Fixed Power L21-30R (Source A)
Two L21-20R Receptacles (Source A)
L21-30P Plug (Source B)
Fixed Power L21-30R (Source B)
Two L21-20R Receptacles (Source B)
JSA Cabinet Rack PDU (A) (Source A) L21-20P Plug
Zone PDU L21-20R (Source A)
Rack PDU (A)
208V IEC C13
Receptacles
Facility Engineering
(EHRM PM)
Facility Logistics
OIT EUO with Local FMS
OIT EUO with Local FMS OIT EUO
OIT EUO with Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
JSA Cabinet Rack PDU (B) (Source B) L21-20P Plug
Zone PDU L21-20R (Source B)
Rack PDU (B)
208V IEC C13
Receptacles
Facility Engineering
(EHRM PM)
Facility Logistics
OIT EUO with Local FMS
OIT EUO with Local FMS OIT EUO
OIT EUO with Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
JSA "Stack" Devices
Redundant Rack PDU Outlet Banks
OIT ESL (WAN)
with OEHRM
Facility Logistics
OIT EUO with Local FMS OIT EUO
OIT EUO with Local FMS OIT EUO OIT EUO
OIT ESL (WAN)
with OIT EUO
Load balance device power connections among Rack PDU outlet banks/phases
JSA Device Pwr Supply
PSU-01
Rack PDU (A)
208V IEC C13
Receptacle OIT EUO
OIT EUO with Local FMS
JSA Device Pwr Supply
PSU-02
Rack PDU (B)
208V IEC C13
Receptacle OIT EUO
OIT EUO with Local FMS
JSA Device Pwr Supply
PSU-03
Rack PDU (A)
208V IEC C13
Receptacle OIT EUO
OIT EUO with Local FMS
Included for devices with more than two Power Supply Units (PSU's)
JSA Device Pwr Supply
PSU-04
Rack PDU (B)
208V IEC C13
Receptacle OIT EUO
OIT EUO with Local FMS
Included for devices with more than two Power Supply Units (PSU's)
"Rack and Stack" Tasks "Bring Up" TasksPower Chain Logistics Tasks
JSA Installation Task Matrix (Zone Power Distribution)
Notes
Device Input Connections Powered from
Output Connections Acquisition
Receipt and Warehouse
Physical Installation
Cable Management
Electrical Connections
Network Connections Power On
Admin and Config
Fixed Power Distribution Circuits
30A 120/208V 3-phase "Y" Distro Whip
Emergency Branch / UPS (Source A)
L21-30R Receptacle (Source A)
Facility Engineering
(EHRM PM)
Facility Engineering (EHRM PM) Local FMS Local FMS Local FMS
One Source A circuit (30A, 120/208V, 3L+N+G) required for every Zone PDU
30A 120/208V 3-phase "Y" Distro Whip
Emergency Branch / UPS (Source B)
L21-30R Receptacle (Source B)
Facility Engineering
(EHRM PM)
Facility Engineering (EHRM PM) Local FMS Local FMS Local FMS
One Source B circuit (30A, 120/208V, 3L+N+G) required for every Zone PDU
FDS Cabinets
OEHRM
(Cerner Task Order)
Facility Logistics
Cerner OSDT OIT EUO and Local FMS Space required for two full cabinets
Zone PDU
Facility Engineering
(EHRM PM)
Facility Logistics
Local FMS with
OIT EUO
Cerner OSDT OIT EUO and Local FMS
Cerner OSDT OIT EUO and Local FMS
One 30A Zone PDU required for every two cabinets
L21-30P Plug (Source A)
Fixed Power L21-30R (Source A)
Two L21-20R Receptacles (Source A)
L21-30P Plug (Source B)
Fixed Power L21-30R (Source B)
Two L21-20R Receptacles (Source B)
FDS Cabinet 1 Rack PDU (A) (Source A) L21-20P Plug
Zone PDU L21-20R (Source A)
Rack PDU (A)
208V IEC C13
Receptacles
OEHRM
(Cerner Task Order)
Facility Logistics
Cerner OSDT OIT EUO and Local FMS
Cerner OSDT OIT EUO and Local FMS OIT EUO
Cerner OSDT OIT EUO and Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
FDS Cabinet 1 Rack PDU (B) (Source B) L21-20P Plug
Zone PDU L21-20R (Source B)
Rack PDU (B)
208V IEC C13
Receptacles
OEHRM
(Cerner Task Order)
Facility Logistics
Cerner OSDT OIT EUO and Local FMS
Cerner OSDT OIT EUO and Local FMS OIT EUO
Cerner OSDT OIT EUO and Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
FDS Cabinet 2 Rack PDU (A) (Source A) L21-20P Plug
Zone PDU L21-20R (Source A)
Rack PDU (A)
208V IEC C13
Receptacles
OEHRM
(Cerner Task Order)
Facility Logistics
Cerner OSDT OIT EUO and Local FMS
Cerner OSDT OIT EUO and Local FMS OIT EUO
Cerner OSDT OIT EUO and Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
FDS Cabinet 2 Rack PDU (B) (Source B) L21-20P Plug
Zone PDU L21-20R (Source B)
Rack PDU (B)
208V IEC C13
Receptacles
OEHRM
(Cerner Task Order)
Facility Logistics
Cerner OSDT OIT EUO and Local FMS
Cerner OSDT OIT EUO and Local FMS OIT EUO
Cerner OSDT OIT EUO and Local FMS
OIT EUO with Local FMS
Rack PDU network connection not required until monitoring system is available
FDS "Stack" Devices
Redundant Rack PDU Outlet Banks
OEHRM
(Cerner Task Order)
Facility Logistics Cerner OSDT Cerner OSDT Cerner OSDT Cerner OSDT Cerner OSDT
Cerner OSDT OIT ESL's and
OIT EUO
Load balance device power connections among Rack PDU outlet banks/phases
FDS Device Pwr Supply
PSU-01
Rack PDU (A)
208V IEC C13
Receptacle Cerner OSDT Cerner OSDT
FDS Device Pwr Supply
PSU-02
Rack PDU (B)
208V IEC C13
Receptacle Cerner OSDT Cerner OSDT
FDS Device Pwr Supply
PSU-03
Rack PDU (A)
208V IEC C13
Receptacle Cerner OSDT Cerner OSDT
Included for devices with more than two Power Supply Units (PSU's)
FDS Device Pwr Supply
PSU-04
Rack PDU (B)
208V IEC C13
Receptacle Cerner OSDT Cerner OSDT
Included for devices with more than two Power Supply Units (PSU's)
Power Chain Logistics Tasks "Rack and Stack" Tasks "Bring Up" Tasks
FDS Installation Task Matrix (Zone Power Distribution)
PROJECT:
DRAWING No:
DEPARTMENT OF VETERANS
AFFAIRS
IT OPERATIONS AND SERVICES
SOLUTION DELIVERY
DATE
ISSUE:
DESCRIPTIONMARK
FILE: OIT_DESIGN_GUIDE_TEMPLATES-
07312020-V3.VSD
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE: JUN 11, 2020
SHEET: 18 OF 38
MICHAEL JULIAN, RCDD
KELLY BATES, DCIE
3.0
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
30A ZONE PDU POWER
DISTRIBUTION
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45
SEVEN ZONE PDUs PER SERVER ROW
(MEDIUM AND LARGE)
A B A B
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
HIGH
DENSITY
A B
SUBZONE TO ZONE PDU CONNECTION MAP FOR TYPICAL (12 RACK) SERVER ROWS (MEDIUM AND LARGE)1
A B A B A B A
TYPICAL ZONE PDU UNIT WITH REAR DETAIL 2
ZONE PDU
INPUTS REQUIRE
TWO L21-30Rs
THE CORRECT SPECIFICATION FOR THE ZONE PDU IS TO ENERGIZE IT
FROM TWO INDEPENDENT POWER SOURCES. EACH INPUT WILL USE
IDENTICAL SPECS: WYE (5-WIRE), 208V, 30A, THREE-PHASE,
TERMINATING IN A NEMA L21-30R LOCKING RECEPTACLE. THE NEUTRAL
CONDUCTOR SHOULD BE UPSIZED ONE GAUGE TO MATCH THE UPSIZED
NEUTRAL CONDUCTORS IN THE ZONE PDU UNITS. THE NEUTRAL
"UPSIZING" SHOULD IDEALLY BE CONTINUED IN THE POWER
DISTRIBUTION SYSTEM BACK TO THE UPS OR TRANSFORMER WINDING
POLE. THIS INCREASES THE EFFICIENCY OF THE POWER DISTRIBUTION
SYSTEM AND SUPPRESSES HARMONICS IN THE SYSTEM.
NOTE:
208 VOLT RACK PDU FOR EQUIPMENT POWER – TO BE
ENERGIZED BY ZONE PDU3
CHATSWORTH ECONNECT PDU; VERTICAL; MONITORED; L21-20
PLUG; THREE PHASE; 120/208V INPUT; 20A; (30) C13 (6) C19
OUTLETS; 208V OUTPUT; 3 X 2P 20A HYDRAULIC MAGNETIC
BREAKERS; LCD; ETHERNET, USB, AND ENVIRONMENTAL
SENSOR PORTS; IP AND SERIAL MONITORING; IP
CONSOLIDATION (PDU LINKING); TOOL-LESS MOUNTING; 70.5"H
(1791 MM) X 2.2"W (56 MM) X 2.2"D (56 MM)
C H
A
TS
W O
R T
H P
R O
D U
C T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
POWER SCHEMATIC FOR POWER RACK- LEVEL REDUNDANCY4
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
HIGH
DENSITY
A B A B A B
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
A B A B
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
B
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
30 AMP 3-PHASE ZONE PDU BASE UNIT – REAR
CIRCUITS WITH FOUR L21-20R AND SIX NEMA 5-20 OUTLETS AND TWO 10'
POWER CORDS TERMINATING IN L21-30P
ZONIT ZPDS-208V30A-L21-4L21-20R-CR OR EQUIVALENT
CHATSWORTH
P R O D U C T
Te mp/Humidity Ou t
In / IOIOIO10 /100
Reset
Warning
OK
Crit ical
C B2C
B2
C B1C
B1
C B
1C B1
C B3C
B3
C B3C
B3
C B2C
B2
OFF
O
ON
I
CB2
OFF
O
ON
I
CB1
OFF
O
ON
I
CB3
REQUIRES ONE
L21-20R20A 120/208V
Y
HIGH DENSITY –
ONE ZONE PDU PER
RACK
THIS DESIGN PROVIDES DIVERSE POWER INPUTS FOR
ACTIVE EQUIPMENT BY SPLITTING THE SOURCE POWER
ACROSS TWO BUSWAYS. EACH SERVER CABINET WILL
CONTAIN A MINIMUM OF TWO EQUIPMENT-FACING ZERO
U VERTICAL RACK PDUS – EACH WILL BE ENERGIZED BY
SEPARATE BUSWAY TAP INPUTS ON DISPARATE
BUSWAYS.
STANDARD DENSITY –
ONE ZONE PDU PER TWO
RACKS
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2
RACK/ENCLOSURE
ZONE PDU
PDU
B
PDU
A
LEG1 LEG2
BUS
A
BUS
B
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B1
PDU
A2 PS1 PS2
RACKED
EQUIPMENT
PS1 PS2
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
ZONE PDU
LEG1 LEG2
BUS
A
BUS
B
PDU
A1
PDU
B2
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B L EG 1
L EG 2
SMALL SERVER ROWS AND ALL MDA
ROWS FOLLOW THE SAME SCHEMA WITH
ONE ZONE PDU PER TWO STANDARD
RACKS/CABINETS AND ONE FOR EACH
HIGH DENSITY CABINET
NOTE:
120/208V Distribution Panelboard
120/208V 30A 3-Phase Wye
[3L+N+G]
NEMA
L21-30R
Receptacle
EMT Conduit or Flexible whip
Triple Pole, Single Throw (TPST) 30 Amp Circuit Breaker
30 A 120/208V
Y
120/208V
Emergency Branch Distribution
Switchgear and Generator ATS
30A 30A 30A
Uninterruptible Power Supply
Double Conversion
AC-DC-AC
1 FIXED DISTRIBUTION SCHEMATIC FOR 120/208V SUPPLY TO L21-30R TWISTLOCK RECEPTACLE (2 REQUIRED PER ZONE PDU)2 NEMA TWISTLOCK L21-30R CIRCUIT WIRING DIAGRAM (3L+N+G)
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2
CONNECTION DETAIL FOR 30A ZONE PDU UNIT SUPPLYING THREE-PHASE 20A (L21-20P) RACK PDU’S IN STANDARD DENSITY ENCLOSURES
3 0 A 1 2 0 / 2 0 8 V
Y
3 0 A 1 2 0 / 2 0 8 V
Y
L21-30R
FIXED
POWER
SOURCE A
L21-30P
ZONE PDU
INPUT A
L21-30R
FIXED
POWER
SOURCE B
L21-30P
ZONE PDU
INPUT B
L21-20R
ENERGIZES
FIRST
ENCLOSURE
RACK PDU A
L21-20R
ENERGIZES
FIRST
ENCLOSURE
RACK PDU B
L21-20R
ENERGIZES
SECOND
ENCLOSURE
RACK PDU A
L21-20R
ENERGIZES
SECOND
ENCLOSURE
RACK PDU B
NOTE:
WHEN ONLY ONE ENCLOSURE
IS POWERED AT STANDARD
DENSITY, ONE A/B PAIR OF
L21-20 RECEPTACLES WILL
REMAIN UNUSED
C H
A
TS
W O
R
TH
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C H
A
TS
W O
R
TH
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
2 ZONE POWER DISTRIBUTION DETAIL – JSA CABINET 1 ZONE POWER DISTRIBUTION DETAIL – FDS CABINETS
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
A B A B
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
A B A B
C H
A
TS
W O
R
TH
P R
O D
U C
T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C H
A
TS
W O
R
TH
P R
O D
U C
T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C H
A
TS
W O
R
TH
P R
O D
U C
T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C H
A
TS
W O
R
TH
P R
O D
U C
T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2 GRP A
GRP B LEG 1
LEG 2
FACILITY STAFF
INSTALLS ZONE PDU
IN FDS CABINET AND
ENERGIZES ALL
PDU’S.
First FDS Cabinet
Second FDS Cabinet
JSA
Cabinet
Future Standard Density Cabinet
2 U
1 U
2 U
1 U
2 U
1 U
1 U
1 U
C H
A
TS
W O
R
TH
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C H
A
TS
W O
R
TH
P R
O D
U C
T
Te m p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
FACILITY STAFF
INSTALLS ZONE PDU,
RACK PDU’S, AND ALL
JSA DEVICES IN JSA
CABINET AND
ENERGIZES ALL PDU’S
AND DEVICES.
CONNECT JSA DEVICE
PSU’S TO RACK PDU
OUTLET BANKS USING
IEC C14-C13 POWER
INTERCONNECT
CABLES (MINIMUM
RATING 10A/250V)
USE RACK PDU
METERS TO LOAD
BALANCE DEVICE
POWER DEMANDS
AMONG RACK PDU
OUTLET BANKS
(ELECTRICAL PHASES)
CONNECT JSA DEVICE
PSU’S TO SEPARATE
POWER PATHS SHOWN
BY CONTRASTING
COLORS
CERNER OSDT
INSTALLS ALL FDS
DEVICES AND
ESTABLISHES ALL
FDS DEVICE POWER
CONNECTIONS TO
RACK PDU’S.
USE RACK PDU
METERS TO LOAD
BALANCE DEVICE
POWER DEMANDS
AMONG RACK PDU
OUTLET BANKS
(ELECTRICAL PHASES)
DEVICE MOUNTING
LOCATIONS SHOWN
WITHIN JSA CABINET
ARE NOTIONAL, NOT
REQUIRED.
PROJECT:
DRAWING No:
DEPARTMENT OF VETERANS
AFFAIRS
IT OPERATIONS AND SERVICES
SOLUTION DELIVERY
DATE
ISSUE:
DESCRIPTIONMARK
FILE: OIT_DESIGN_GUIDE_TEMPLATES-
05082020-V3.VSD
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
BONDING
ISSUE DATE: MAY 7, 2020
SHEET: 23 OF 36
MICHAEL JULIAN, RCDD
KELLY BATES, DCIE
3.0
OIT DESIGN GUIDE TEMPLATES
N/A
BONDING
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
12"
4"
ANSI/EIA/TIA COMPLIANT BUSBAR
CHATSWORTH P/N: 40158-012
ALL GROUNDING SHALL BE DONE IN ACCORDANCE WITH J-STD-607 “COMMERCIAL
BUILDING GROUNDING (EARTHING) AND BONDING REQUIREMENTS FOR
TELECOMMUNICATIONS”, NFPA 70, AND IN COMPLIANCE WITH LOCAL CODES.
ALL EQUIPMENT SHALL BE GROUNDED PER MANUFACTURER’S INSTRUCTIONS.
DIRECTLY BONDED TO
RBB
TELECOMMUNICATIONS SECONDARY BONDING BUSBAR (SBB)
NETWORK EQUIPMENT MUST BE GROUNDED. NEVER DEFEAT THE GROUND CONDUCTOR
OR OPERATE THE EQUIPMENT IN THE ABSENCE OF A SUITABLY INSTALLED GROUND
CONDUCTOR. THESE DEVICES WILL BE BONDED TO THE RACK BONDING BUSBAR (RBB) IN
THE SAME RACK. EACH DEVICE WILL HAVE A DEDICATED UNIT BONDING CONDUCTOR
(UBC). THE UBC WILL NOT BE SHARED.
UNIT BONDING CONDUCTOR (6 AWG)
Telecommunications Equipment Bonding Conductor (TEBC) – 6AWG
RACK BONDING CONDUCTOR (6 AWG)
RACK BONDING
CONDUCTOR
(6 AWG)
IRREVERSIBLE
COMPRESSION
CONNECTION
TEBC
(TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR – 6 AWG)
RACK BONDING
CONDUCTORS –
ALL
CONDUCTORS
ROUTED TO
PBB/SBB
TWO-HOLE
COMPRESSION LUGS
(RACKS SHALL NOT BE
MODIFIED IF ONLY
ONE-HOLE IS
PROVIDED; USE ONE-
HOLE COMPRESSION
LUGS IN THIS CASE)
INDIVIDUAL EQUIPMENT BONDING
CONDUCTORS FROM EACH PIECE OF
EQUIPMENT AND RACK TO THE RACK
BONDING CONDUCTOR
RACK BONDING CONDUCTOR
EXTENDED TO BOTTOM OF RACK TO
ACCOMMODATE FUTURE GROWTH
RACK ISOLATION PADS (IF
APPLICABLE)
EXAMPLE
“A”
EXAMPLE
“B”
TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR (TEBC) –
6 AWG
CABLE TRAY BONDING
CONDUCTOR. TYPICAL
AT EACH SECTION
CONNECTION POINT
IRREVERSIBLE
CRIMP CONNECTOR
TO PBB/SBB
TO PBB/SBB
IRREVERSIBLE CRIMP
CONNECTOR
TOP-MOUNTED
RBB
PATHWAY, RACK, BONDING CONDUCTOR JOIN REQUIREMENTS1
EARTHING EXAMPLE (CISCO 6509/9606)
Ref: CISCO PRODUCT INSTALLATION GUIDE
NOTES:
O I
O I
Catalyst 9600 Series
RFID
C9606R
C9606-FAN
RFID
O I
O I
C9600-SUP-1
SS
SS
Catalyst 9600 Series Supervisor Module
C9600-SUP-1
SS
SS
Catalyst 9600 Series Supervisor Module
C9600-LC-48YLCatalyst 9600 Series Ethernet Switching Module
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
C9600-LC-24CCatalyst 9600 Series Ethernet Switching Module
17 18 19 20 21 22 23 249 10 11 12 13 14 15 161 2 3 4 5 6 7 8
C9600-LC-48YLCatalyst 9600 Series Ethernet Switching Module
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
C9600-LC-48YLCatalyst 9600 Series Ethernet Switching Module
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
TWO-HOLE
COMPRESSION
LUG
UBC
SYSTEM
GROUND
LOCATION
CISCO 9606CISCO 6509
SYSTEM GROUND
LOCATION
TWO-HOLE
COMPRESSION LUG
GROUNDING PAD
UBC SCREWS
(M4)
1 120/208V 30A DISTRIBUTION CIRCUIT WHIP EXAMPLES (ROOM UPS TO ZONE PDU) DRAWINGS SOURCED FROM HTTPS://WWW.LOCKINGPOWERCABLES.COM
2 208V IEC C14 TO IEC C13 LOCKING POWER CABLE EXAMPLES (RACK PDU TO IT DEVICE) DRAWINGS SOURCED FROM HTTPS://WWW.LOCKINGPOWERCABLES.COM
CONNECT IT DEVICES TO RACK
PDU OUTLET BANKS USING
IEC C14-C13 POWER
INTERCONNECT CABLES
(MINIMUM RATING 10A/250V)
LOCKING CONNECTORS
ON IEC C14-C13 POWER
INTERCONNECT CABLES
(EXAMPLES SHOWN) ARE
RECOMMENDED BUT NOT
REQUIRED.
POWER CABLE LENGTHS
SHOULD BE SPECIFIED AS
SHORT AS FEASIBLE TO
REDUCE CABLE CLUTTER
WITHIN CABINETS.
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Frequently Asked Questions (Zone Power Distribution) This is all too complicated. Make it simple, and just tell me what I need to buy.
See Materials list attached.
However, your detailed understanding of how these components connect will still be necessary for a successful deployment.
This diverse path and redundancy stuff is confusing. Why do we need it?
The intent is to provide highly available (2N Redundant) power to IT devices. What that means is that either path can carry the entire load if the other path is lost.
Under normal operation, the two paths will share the load and neither path should exceed 50% of its rating.
My room has only one UPS and you're asking for power path diversity, which I can't provide. What do I do?
This is a common issue in older power chain designs. Make the circuits as diverse as possible downstream of the single UPS. You should NOT use workarounds such as convenience outlets ("wall power") and extension cords to provide a second path. Future construction should provision a properly sized and matched second UPS to permit full path diversity. This limitation should have been (or will be) identified during your HEFP scoping session, and construction funds allocated to remedy it.
You're asking for two circuits, but only one Zone PDU for each stack. Doesn't using only one Zone PDU break your path diversity?
As shown in multiple diagrams, the Zone PDU is a single enclosure which is designed to accept two input circuits from diverse power distribution sources and to distribute power to multiple outputs while preserving path diversity. Internal design avoids Single Points of Failure (SPOF).
With four L21-20R outputs, two from each source, each Zone PDU can support two Standard Density cabinets with 2N power redundancy at 3.5 kW apiece.
Your Zone PDU power values don't make sense. Derated to 80% per NEC/NFPA, each L21-30P circuit path can provide 8640 Watts, but each pair of L21-20 Rack PDU's they support are rated for 5760 Watts apiece. So it looks like you will overload the distribution circuits. How do you explain this?
We do not expect to load the L21-20 Rack PDU's to their full rated capacity. Standard Density cabinets in legacy spaces are scaled for an expected load of 3500 Watts (3.5 kW) per cabinet due to other constraints. A single 8640 Watt circuit can support two cabinets at a combined 7000 Watts with reserve for variations, contingencies, and inefficiencies.
The JSA and FDS devices referenced here were distributed among cabinets to keep their expected loads below the 3.5 kW per cabinet threshold.
I need to [want to] use a completely different power distribution circuit/voltage/scheme for this equipment. Can't I just ignore all this and do it my way?
Briefly, No.
This represents OIT's standardized power distribution topology to support increasingly power-hungry IT devices, and it is what the EHRM systems have been designed to use. It has also been coordinated with VHA Engineering and published interally and externally.
If you believe you have a unique power situation or limitation, please contact your VISN EHRM PM or HEFP for further discussion.
The newest Infrastructure Standards for Telecommunication Spaces published on the TIL uses 60A direct-wired Zone PDU's to support up to three cabinets. Why aren't you following that design? Can I do it that way?
The EHRM hardware deployment was designed before the newest version was published and requires no more than two cabinets together. The 30A Zone PDU is still used within the newest ISTS 3.0 version to support one or two cabinets. The 60A Zone PDU's are scaled to support higher power densities per cabinet (5 kW/cab) in conjunction with more rigorous room analysis and construction.
You are free to use 60A Zone PDU distribution if you desire; follow the ISTS 3.0 and Design Guide templates for branch distribution details.
| JSA and FDS Zone Power Distribution 1.0 12-03-20 |
| ISTS Template Sheet 18 - Zone Power Distribution |
| Visio-JSA-FDS Power Distro - L21-30 and Zone PDU |
| Visio-JSA-FDS Power Distro - Zone JSA and FDS Cabinets |
| Bonding - Pages from OIT_Design_Guide_Templates-05082020-v3 |
| Visio-JSA-FDS Power Distro - Whips |
| JSA and FDS Zone Power Distribution 1.0 12-03-20 |
File details come from the government source that posted it. Updated .