This document is a Pre-Bid Meeting Memorandum for a federal contract opportunity to reconfigure the cable rack system, install circuit breakers, wiring, receptacles, and conduit at the Western Colorado Healthcare System (WCHCS) located in Grand Junction, Colorado.
The key details are: the contractor is required to provide all labor, tools, materials, equipment, and supervision to complete the work in accordance with the Statement of Work, Drawings, and Specifications; the work must comply with applicable OSHA, EPA and federal/state environmental regulations; the pre-bid meeting/site walk is non-mandatory, and any questions from prospective bidders must be submitted to the Contracting Officer by July 17, 2024 for answers in an amendment; bids are due by July 31, 2024; the contract value is under $25,000 and requires a bid guarantee and payment/performance bonds; the contractor shall begin performance within 10 days of the Notice to Proceed and complete the work within 120 days; and the contractor shall comply with Davis Bacon wage requirements and submit certified payrolls with monthly invoices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0535 0004.docx | DOCX document | |
| S02 - Building 33.pdf | ||
| S02 - JSA and FDS Zone Power Distribution 1 0 12-04-20.pdf | ||
| 36C25924Q0535 0003.docx | DOCX document | |
| S04 - Site Visit Attendance - FE.docx | DOCX document | |
| S05 - RFI Questions - EHRM Data Center Upgrade for JSA and FDS - Electrical Conduit - FE.docx | DOCX document | |
| S02 - Amendment 1 - Page 1 Block 10.docx | DOCX document | |
| 36C25924Q0535 0001.docx | DOCX document | |
| S02 - Site Instructions.docx | DOCX document | |
| S22 - LOS - Attachment - 852.219-75 Blank.docx | DOCX document | |
| 36C25924Q0535_1.docx | DOCX document | |
| PPQ Blank.docx | DOCX document | |
| S02 - SPECS - JSA and FDS Zone Power Distribution.pdf | ||
| S02 - Drawing - Building 33.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Meeting
FOR
575-23-710 EHRM Data Center Upgrade for JSA and FDS
- Electrical Conduit
The contractor is to provide all labor, tools, materials, equipment, and supervision required to reconfigure the cable rack system, install circuit breakers, wiring, receptacles, and conduit in building 33 in accordance with the Statement of Work, Drawings, and Specifications. The work will be taking place at the Western Colorado Healthcare System (WCHCS) located at 2121 N Ave, Building 33, Grand Junction, Colorado 81501 as outlined in the Statement of Work and associated documents.
All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.
Location: Western Colorado Healthcare System (WCHCS)
Introductions: Ilze Karklins-Powers CO and John Gordan (Goes by Travis) COR Site Visit:
· The pre-bid meeting/site walk is not mandatory.
· Questions during site visit must be written down and submitted to the Contracting Officer to provide answers in an amendment to all interested parties.
Pertinent Dates:
· Questions are due by July 17, 2024, before 2:00 PM, MT. Any questions submitted after this time will not be reviewed or answered. Please submit to Timothy.Verburgt@va.gov
· Bids are due on July 31, 2024, no later than 2:00 PM MT. Submit via email to Timothy.Verburgt@va.gov.
Site Visit Guidelines:
· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.
· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.
· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.
Solicitation Information:
· Confirmation of construction range: Under $25,000
· Bid Guarantee & Payment/Performance Bonds: are required as outlined in the solicitation.
· Special Standards of Responsibility: Please note solicitation requirements for submittal of OSHA and EMR ratings.
· VAAR clause 852.219-75 Limitation on Subcontracting: please ensure you provide a signed copy of this clause with your bid package.
· Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 120 days.
Post Award Compliance:
· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor shall submit their weekly certified payrolls with their monthly invoice.