S05 - RFI Questions - EHRM Data Center Upgrade for JSA and FDS - Electrical Conduit - FE.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C25924Q0535
About this file
This document contains questions and answers related to a Request for Information (RFI) for the EHRM Data Center Upgrade for JSA and FDS - Electrical Conduit project, Solicitation Number 36C25924Q0535.
The key details are:
- The project involves installing electrical conduit for an EHRM data center upgrade at the VA hospital.
- Contractors may use existing laydown space if available, otherwise they can use the fenced portion of building 33. Parking will be provided for one vehicle.
- The contractor will only be required to run conduit from the proposed west rack location to the circuit breaker panel, not to the second rack location.
- Work can be performed during normal hours with minimal power interruptions, if possible; otherwise, work before 7am or after 4:30pm may be required.
- The expected award date is shortly after the August 2, 2024 close date, with a 120-day period of performance.
- The contractor will need to have past performance relevant to the NAICS code, though a teaming partner's commercial past performance can be considered.
- Floor plans and power distribution details are provided in attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0535 0004.docx | DOCX document | |
| S02 - Building 33.pdf | ||
| S02 - JSA and FDS Zone Power Distribution 1 0 12-04-20.pdf | ||
| 36C25924Q0535 0003.docx | DOCX document | |
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| S04 - Site Visit Attendance - FE.docx | DOCX document | |
| S02 - Amendment 1 - Page 1 Block 10.docx | DOCX document | |
| 36C25924Q0535 0001.docx | DOCX document | |
| S02 - Site Instructions.docx | DOCX document | |
| S22 - LOS - Attachment - 852.219-75 Blank.docx | DOCX document | |
| 36C25924Q0535_1.docx | DOCX document | |
| PPQ Blank.docx | DOCX document | |
| S02 - SPECS - JSA and FDS Zone Power Distribution.pdf | ||
| S02 - Drawing - Building 33.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS VHA Network Contracting Office 19 Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300 Greenwood Village, CO 80111
CONTRACTOR Q&A’s
EHRM Data Center Upgrade for JSA and FDS - Electrical Conduit Project # 575-23-710
Q&A No 1: Bidding contractor has an existing temfacil/laydown yard at the VA hospital vicinity. Please advise if this location can be retained by the main contractor after award. This will allow contractor to use existing parking location as well.
Answer No.1: Contractors may use existing laydown space if they have space provided through other projects. All laydown space must be relinquished upon the end of the project. If a contractor does not have a dedicated laydown space, they will be able to use the fenced portion of building 33 for their conduit, etc.
Parking space will be provided for one vehicle in the vicinity of building 33 to facilitate the project.
Q&A No 2: The RFP calls out 3 spare 1" conduits from the breaker panel to the West rack location. Page 7, Task 3.
Answer No.2: Yes, the contractor will only be required to run conduit from the proposed west rack location to the circuit breaker panel. The purpose of these conduits is to facilitate future IT power requirements that have not been identified at this time.
The second intended rack locations to the east will require wire, receptacles, circuit breakers, etc.
Q&A No 3: Please confirm/ clarify if night work will be required. The panel may need to be shut down for installation of the breakers.
Answer No.3: Work during normal workday hours will be authorized if the contractor can complete the work with infrequent and brief interruptions in power. Basically minimize time to install circuit breakers and stab wire or accomplish this part of the project before 7 AM or after 4:30 PM.
Q&A No 4: Does VA have information on possible timeframe for award and construction of this project? Please advise.
Answer No.4: Expected award is date shall be sometime shortly following the close date of 08/02/24. PoP is 120 days. I do not expect the work to take more than 2 full workdays.
Q&A No 5: Is there a color requirement for the new conduits?
Answer No.5: No.
Q&A No 6: I am requesting the floor plans for an accurate bid on the conduit runs needed.
Answer No.6: See attached.
Q&A No 7: What size neutral is needed for this project?
Answer No.7: See the attached JSA and FDS Zone Power Distribution, sheet 18. Upsized. One gauge larger than the PDU neutral which can be determined onsite.
Q&A No 8: Since this is being evaluated for past performance first do we have to have past performance under this specific NAICS code?
Answer No.8: Yes
Q&A No 9: Or can our teaming partner have the past performance on commercial projects?
Answer No.9: If you are using your teaming partner as your sub we can consider their past performance but will not be graded as highly as the prime.