S02 SELF-PERFORMED CALCULATIONS.docx

DOCX document 26 KB Posted

Attached to
Z2DA--554-23-102 Re-Stripe, Seal, and Maintenance on Parking Garages
Solicitation number
36C25923B0005
Issued by

About this file

This statement of work describes a federal contract opportunity for re-striping, sealing, and maintenance of parking garages at the Rocky Mountain Regional VA Medical Center. The scope of work includes cleaning, sealing, and re-striping concrete surfaces on all levels of three parking structures. Additional options include similar work on an underground loading dock. The contract is with the Department of Veterans Affairs Veterans Health Administration VISN 19. The period of performance is 90 calendar days from notice to proceed. Bidders must attend a pre-bid meeting and site walk. The contractor must follow all applicable federal, state, and local safety regulations and codes, and have a competent person and OSHA-certified employees on site. Work may only be performed Monday through Friday from 7:30 am to 4:00 pm except as indicated.

View the file

Other files

File Type Posted
S06- 2nd Questions and Responses_updated.docx DOCX document
36C25923B0005 0004.docx DOCX document
S06- 2nd Questions and Responses_updated.docx DOCX document
00.LS.328 PVN Loading Dock Roof Elevation.pdf PDF
36C25923B0005 0003.docx DOCX document
S06- 2nd Questions and Responses.docx DOCX document
13.AS.301 PVS Elevations.pdf PDF
XX.AS.570-A.pdf PDF
S04- 2nd Site Vist Sign-in sheet.pdf PDF
13.AS.302 PVS Elevations.pdf PDF
2nd Site Visit Meeting Doc.docx DOCX document
36C25923B0005 0002.docx DOCX document
ACI RAP-13.pdf PDF
SOW 554-23-102_revised 1JUN23.docx DOCX document
S05- Questions and Responses.docx DOCX document
S04- Site Visit sign in sheet.docx DOCX document
36C25923B0005 0001.docx DOCX document
S04- Site Visit Meeting Doc.docx DOCX document
S02- 36C25923B0005_Solicitation.docx DOCX document
S22- 852.219-75 LOS Certificaiton.docx DOCX document
36C25923B0005_1.docx DOCX document
Bldg 11 Parking Staff North PSN Drawings.zip ZIP file
Bldg 12 Parking Visitor North PVN Drawings.zip ZIP file
Bldg 13 Parking Visitor South PVS Drawings.zip ZIP file
Attachment A - OSHA form - pdf.pdf PDF
Loading Dock Drawings.zip ZIP file
Combined Spec.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price$ __________
b) Subtract profit$ __________
c) Subtract cost of materials$ __________

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c =d) $ __________

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel of the Offeror’s or personnel of other SDVOSB concerns (Self-Performed) $ __________

f) Offeror’s percentage of estimated self-performed work (e/d X 100 = %) __________%

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .