S02-Seed Project - Drawings - Building 1 Entrance Enclosure.pdf
PDF 6 MB Posted
- Attached to
- Z1DA--LOCAL minimum guarantee base Construction MATOC| Lebanon-Altoona Construction MATOC (VA-26-00000908)
- Solicitation number
- 36C24425R0084
About this file
This is a set of bid documents for the Building 1 Entrance Enclosure project at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The project involves renovating an entrance area to create an exit passageway between Stair 2 and the building's exterior, with a primary goal of ensuring Stair 2 can discharge directly to the outside. The scope includes architectural, structural, mechanical, electrical, and fire protection work, such as removing and modifying existing walls, installing a new door, relocating HVAC equipment, updating electrical systems, and ensuring fire alarm and sprinkler system compliance.
The project documents detail comprehensive modifications across multiple disciplines, including creating a new 2-hour fire-rated exit passageway, relocating and installing new mechanical equipment like fan coil units and unit heaters, updating electrical circuits and lighting, and modifying fire alarm and sprinkler systems. The work is designed to maintain the building's operational status during construction, with careful coordination required to minimize disruption to the VA Medical Center's ongoing activities. The project number is 595-20-401, and the documents are marked as bid documents dated January 12, 2023, prepared by AE Works, LTD. for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
B
IM
/V
L E
B -0
B u ild in g
E n tr a n c e E n c lo s u re /V
L E
B -0
A R
C H
-2
.r v t
/1
/2
:2
:0
P
M
G001
COVER SHEET BUILDING 1 ENTRANCE ENCLOSURE
1700 S LINCOLN AVE, LEBANON, PA 17042
595-20-401
01.12.23 FS SB
BID DOCUMENTS
BUILDING 1 ENTRANCE ENCLOSURE
PROJECT #595-20-401
1700 S LINCOLN AVENUE
LEBANON, PA 17042
PROJECT DIRECTORY
OWNER:
LEBANON VA MEDICAL CENTER
1700 S LINCOLN AVENUE
LEBANON PA 17042
(717) 272-6621
ARCHITECT/ENGINEER:
AE WORKS, LTD
418 BEAVER STREET
SEWICKLEY, PA 15143
STRUCTURAL ENGINEER:
CONTACT: MARK STERNAGLE
CIVIL ENGINEER:
PENNONI
5072 RITTER ROAD,
SUITE 102
MECHANICSBURG, PA 17055
(717) 620-5945
CONTACT: TRACEY CASE-DODDS
PENNONI
81 HIGHLAND AVENUE,
SUITE 230
BETHLEHEM, PA 18017
(610) 231-0600 VICINITY MAP
SITE
LOCATION MAP
SITE
# Revisions Date
CONTACT: GREGORY ROGALSKI CONTACT: TINA R. GAHAGAN
SHEET INDEX
GENERAL
G001 COVER SHEET
LS101 LIFE SAFETY PLAN
CIVIL
C101 EXISTING CONDITIONS AND DEMOLITION PLAN
C103 SITE PLAN
STRUCTURAL
S101 STAIR 2 - EXIT PASSAGEWAY PLANS, GENERAL NOTES, DETAILS AND SECTIONS
ARCHITECTURAL
A001 ABBREVIATIONS, NOTES AND SYMBOLS
AD101 DEMOLITION PLAN
A101 PLANS,ELEVATIONS AND FINISH SCHEDULE
A102 SCHEDULES AND DETAILS
FIRE PROTECTION
FS001 FIRE SUPPRESSION COVER SHEET
FS201 FIRE SUPPRESSION NEW WORK PLAN
FS501 FIRE SUPPRESSION DETAILS
Mechanical
M001 SYMBOLS AND GENERAL NOTES
MD101 LEVEL 1 MECHANICAL DEMOLITION PLAN
M101 LEVEL 1 HVAC PLAN
M501 HVAC SCHEDULES AND DETAILS
Electrical
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E201 ELECTRICAL FLOOR PLANS
E800 ELECTRICAL DETAIL AND SCHEDULES
SYSTEMS
FA001 FIRE ALARM COVER SHEET
FA201 FIRE ALARM NEW WORK PLAN
G006
SOILED UTILITY
ELEC. CLO.
ELEC. CLO.
G050
HAC
G051
TOILET
6A
STAFF ROOM
4A
MECH ROOM
TOILET
STAIR
CORRIDOR
AS EXISTING 43
--215
EXTERIOR
MECHANICAL
COURTYARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.comAE WORKS ®
BI
M
VL
EB
-0
0� B
XL
OG
LQ
J
EQ
WUD
QF
H
EQ
FO
RV
XU
H�
VL
EB
-0 0�
BA
R
C H
-2
0.
UY
W
�2
:2
0:
P M
BUILDING 1 ENTRANCE ENCLOSURE
1700 S LINCOLN AVE, LEBANON, PA 17042
595-20-401
01.12.23 CPA MLD
BID DOCUMENTS
# Revisions Date
K O
F F
E L
ASSOCIATES
ENGINEERS
FLUH PURWHFWLRQ
R
8815 CHQWUH PDUN DULYH, SXLWH 200 CROXPELD, MDU\ODQG 21045
410-750-2246 � ZZZ.NRIIHO.FRP
SHUYLFHV RHQGHUHG: FLUH AODUP DHVLJQ SXSSUHVVLRQ DHVLJQ LLIH SDIHW\ DUDZLQJV
1�12�2023
1. THE SOLE PURPOSE OF THIS PROJECT IS TO PROVIDE AN EXIT PASSAGEWAY BETWEEN STAIR 2 AND THE EXTERIOR OF THE BUILDING SUCH THAT STAIR 2 MAY BE CONSIDERED TO DISCHARGE TO THE EXTERIOR.
2. THE EXISTING EXIT CAPACITY OF THE EXISTING PLAN SOUTH STAIR DOOR WAS MAINTAINED AS PART OF THIS PROJECT. THE NEW EXTERIOR DOOR AT THE PLAN SOUTH OF THE EXIT PASSAGEWAY PROVIDES THE SAME CLEAR
WIDTH AS THE EXISTING PLAN SOUTH STAIR DOOR.
3. THE WIDTH OF THE EXIT PASSAGEWAY EXCEEDS THE MINIMUM WIDTH REQUIRED BY SECTION 7.2.6.4 OF NFPA 101®.
4. OTHER THAN THE NEW EXIT PASSAGEWAY, THIS DRAWING REPRESENTS FIRE BARRIERS, SMOKE BARRIERS, AND SMOKE PARTITIONS OUTSIDE THE AREA OF WORK ONLY AS SHOWN ON EXISTING LIFE SAFETY DRAWINGS PROVIDED BY THE OWNER. EXISTING FIRE PROTECTION FEATURES WERE NOT EVALUATED AS PART OF THIS PROJECT.
5. EXITING DEAD END, COMMON PATH OF TRAVEL, AND TRAVEL DISTANCE TO AN EXIT WERE NOT INCREASED AS A
RESULT OF THIS PROJECT.
6. PER THE OWNER, THIS EXIT IS INTENDED TO BE AN EMERGENCY EXIT ONLY.
GENERAL NOTES:
1/8" = 1'-0"LS101
1 LIFE SAFETY NEW WORK PLAN
LEGEND
· NFPA 101®, LIFE SAFETY CODE®, 2021 EDITION
· INTERNATIONAL BUILDING CODE, 2021 EDITION
· VA FIRE PROTECTION DESIGN MANUAL, 2021 EDITION
APPLICABLE CODES & STANDARDS
NON-HIGH RISE, COMPLETELY SPRINKLER-PROTECTED
IBC: GROUP I-2 (SECTION 308.3)
NFPA 101: EXISTING HEALTH CARE (CHAPTER 18)
USE AND OCCUPANCY TYPE
LS101
LIFE SAFETY PLAN
GROSS DOOR WIDTH
(NET CLEAR WIDTH)
(MM)
XXX XXX
XXXXXX
CAPACITY
# OF PEOPLE
STAIR WIDTH
(MM)
ACTUAL LOAD
# OF PEOPLE
EXIT
SMOKE PARTITION
1-HOUR FIRE PARTITION
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
3-HOUR FIRE WALL
AREA NOT IN SCOPE
EXIT CAPACITY
NEW EXIT PASSAGEWAY PROVIDING STAIR 2 DIRECT DISCHARGE TO THE
EXTERIOR. CEILING OF EXIT PASSAGEWAY CONSTRUCTED AS NEW 2-HOUR
FIRE RESISTANCE RATED HORIZONTAL ASSEMBLY.
SECURITY GRILLE TO PROVIDE UNOBSTRUCTED EGRESS PATH THROUGH
EXTERIOR MECHANICAL COURTYARD. EGRESS PATH PROVIDED WITH
APPROPRIATE LIGHTING.
NEW SIDEWALK TO PUBLIC WAY PROVIDED WITH APPROPRIATE LIGHTING.
DRAWING NOTES:
U:
\A cc ou nt s\A
EW
LA
\A
EW
LA
- V
AM
C Bl dg . 1
E nt ra nc e (T as k 5
-2
0-
1) \D
ES
IG
N\ _S
HE
ET
S\ C-
Ex ist ing C on dit ion s.d wg
PL
OT
TE
D:
1/
/2
9:
A
M, B Y:
Ch ris ty Iw an ow icz
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
C-101
EXISTING CONDITIONS AND
DEMOLITION PLAN
BUILDING 1 ENTRANCE ENCLOSURE
1700 S Lincoln Ave, Lebanon, PA 17042
595-20-401
1.12.23 TG CI
BID DOCUMENTS
# Revisions Date
00 5' 10'
SCALE: 1" = 5'
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.com®
PENNONI ASSOCIATES INC.
5072 Ritter Road, Suite 102 Mechanicsburg, PA 17055
T 717.975.6481 F 717.975.6480
U:
\A cc ou nt s\A
EW
LA
\A
EW
LA
- V
AM
C Bl dg . 1
E nt ra nc e (T as k 5
-2
0-
1) \D
ES
IG
N\ _S
HE
ET
S\ C-
Si te
P lan
.d wg
TE
D:
1/
/2
9:
A M, B
Y:
Ch ris ty
Iw an ow icz
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
C-103
SITE PLAN BUILDING 1 ENTRANCE ENCLOSURE
1700 S Lincoln Ave, Lebanon, PA 17042
595-20-401
1.12.23 TG CI
BID DOCUMENTS
# Revisions Date
00 5' 10'
SCALE: 1" = 5'
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.com®
PENNONI ASSOCIATES INC.
5072 Ritter Road, Suite 102 Mechanicsburg, PA 17055
T 717.975.6481 F 717.975.6480 xxx
2"
#4 DOWELS @ 12" O.C.
#4 @ 12" O.C.
COMPACTED
BACKFILL
CONC.
SIDEWALK,
SEE PLAN
NEW SIDEWALK,
SEE CIVIL DWGS.
TYP. #4
NOSING BAR
8"
8"
8" MIN. FROST WALL (TYP.)
1' -6
"M
IN
. B E
LO
W
E X
TE
R
IO
R
F
IN
IS
H
E D
G R
A D
E
T.O. SIDEWALK ELEV. 551.71'
SEE CIVIL DWGS.
T.O. SIDEWALK ELEV. 551.21'
SEE CIVIL DWGS.
PROVIDE NEW OPENING
IN EXIST. CMU WALL, COORD.
LOCATION W/ ARCH. DWGS.
GROUT CMU SOLID AT EACH
SIDE OF OPENING
ENLARGE EXIST. WINDOW OPENING
TO ALLOW FOR NEW 48" DOOR,
COORD. LOCATION W/ ARCH. DWGS
22'-4 1/4" ± 4'-4" 21'-0 1/2"
NEW CONC. SIDEWALK,
COORD. W/ CIVIL DWGS.
EXIST. MASONRY
WALL TO REMAIN,
TYP.
EXIST. WINDOW
TO REMAIN, TYP.
2'-4" ± 4'-8" 10'-0" ±
7'-0" 7"
NEW 4" CONC. SIDEWALK
W/ 6X6-W4.0XW4.0 W.W.R.,
COORD. W/ ARCH. &
CIVIL DWGS.
EXIST. GATE
TO REMAIN
EXIST. CMU WALL
TO REMAIN
EXIST. CONC.
SLAB ON GRADE
TO REMAIN
NEW CONC. STEP IN SIDEWALK,
COORD. W/ CIVIL DWGS.
NEW (4) L4"X3 1/2"X 5/16"
LINTEL AT NEW DOOR OPENING
W/ MIN. 8" BEARING ON EXIST.
MASONRY WALL AND CAST
STONE VENEER AT EACH END
S101
NEW 6" CMU WALL,
SEE ARCH. DWGS.
EXIST. MECH.
EQUIP. TO REMAIN
F.F. ELEV. 552.57'
F.F. ELEV. 552.57'
13'-11 3/8" ± 6'-0"
17'-0" ±
EXIST. GATE
TO REMAIN
S101
NEW CONC. FTG. AND
SECURITY GRILLE,
SEE ARCH.
6"X8" SOLID PRECAST CONCRETE
LINTEL W/ (1) #3 TOP & BOT.
NEW (1) L3 1/2"X3 1/2"X 5/16"
LINTEL AT NEW DOOR OPENING
W/ MIN. 8" BEARING ON EXIST.
MASONRY WALL AT EACH END.
(CONTRACTOR V.I.F. WALL THICKNESS)
EXIST. CMU WALL TO BE REMOVED
TO ALLOW FOR INSTALLATION OF
NEW WALL OPENING, COORD. LOCATION
W/ ARCH. DWGS
REMOVE EXIST. WINDOW, CMU,
AND BRICK TO ALLOW FOR
INSTALLATION OF NEW 48" DOOR,
COORD. LOCATION W/ ARCH. DWGS
EXIST. MASONRY WALL
TO REMAIN, TYP.
EXIST. WINDOW
TO REMAIN, TYP.
2'-4" ±
4'-8" 10'-0" ±
21'-11 1/4" ± 4'-8" ± 21'-1 1/2" ±
EXIST. GATE
TO REMAIN
EXIST. CONCRETE SLAB
ON GRADE TO REMAIN
EXIST. CMU WALL
TO REMAIN
REMOVE EXIST. CONC. STAIRS,
COORD. W/ ARCH. AND CIVIL DWGS.
REMOVE EXIST. CONC. RETAINING
WALL, COORD. W/ ARCH. AND CIVIL DWGS.
EXIST. GATE
TO REMAIN
EXIST. MECH. EQUIP.
TO REMAIN
EXIST. MECH.
EQUIP. TO REMAIN
REMOVE EXIST. CONC. SLAB
AND SOIL TO PROPOSED GRADE,
COORD. W/ ARCH. & CIVIL DWGS
SAW CUT EXIST. CONC.
SLAB ON GRADE, TYP.
9'-7" ± CLR.
REMOVE EXIST. SIDEWALK
AS REQUIRED FOR NEW
SIDEWALK ELEVATIONS
TO MATCH EXIST.
C
L R
GENERAL
1. The structure is designed, and all work shall conform, to the "2021 International Building Code" and to all other applicable Federal, State, and Local regulations.
2. All codes and standards referenced in these notes, including all specifications referenced within, and all federal, state and local regulations apply to the design, construction, demolition, quality control and safety of all work performed on the project. Use the latest adopted editions of the codes and standards.
3. In case of conflict between the General Notes, Specifications, and drawings, the most rigid requirements must be followed.
4. Work not indicated on a part of the drawings but similar to that shown at corresponding places shall be provided at no additional cost.
5. Minor details or incidental items not shown or specified, but necessary for a proper and complete installation, shall be included in the work.
6. All costs of investigations, redesigns and re-installation due to improper installation of structural elements and other items not in conformance with the Contract Documents shall be at the Contractor's expense, and provided at no additional cost..
7. The structural drawings shall be used in conjunction with the specifications, architectural, civil, and MEP drawings. If there is a discrepancy between drawings notify the Architect/Engineer prior to performing the work.
8. Acceptance of deviations from any of the requirements of these notes, the drawings, and specifications is at the sole discretion of the Engineer.
Acceptance of a deviation from any requirement shall not be construed as permitting any other deviation.
9. Construction materials shall be provided free from defect and installed plumb and true to the limits set forth on the Construction Documents by experienced tradesmen.
10. Verify all existing information shown (dimensions, elevations, etc.) and notify the Architect/Engineer of any discrepancies prior to fabrication of any structural component.
11. Verify and/or establish all existing conditions and dimensions at the site.
Failure to notify the Architect/Engineer of unsatisfactory conditions constitutes acceptance of existing conditions.
12. If the existing field conditions do not permit the installation of the work in accordance with the Contract Documents, notify the Architect/Engineer immediately and provide a sketch of the condition with a proposed modification of the details given on the Contract Documents. Do not commence work until the condition is resolved and the modification is approved by the Architect/Engineer.
13. Methods, procedures and the sequences (other than that noted on the Construction Documents) of construction are the responsibility of the Contractor(s). Take all necessary precautions to maintain and insure the integrity of the structure at all stages of construction.
14. Job site safety and construction procedures are the sole responsibility of the Contractor. Guidelines for construction safety shall be in accordance with, but not limited to OSHA Safety and Health Regulations for Construction and all local ordinances or codes that may be applicable.
15. All Contractors and Subcontractors on this project are responsible for the proper performance of their work, selection of means and methods, coordination with other trades, safety, and security on the job site.
16. All construction work shall be coordinated with the Owner to minimize interference with existing facility operations.
17. All Subcontractors shall be provided and must work with a full set of contract documents.
18. SHOP DRAWINGS
A. Shop drawings for all structural materials shall be submitted to the Architect/Engineer for review prior to the start of fabrication and commencement of work. The review period shall be a minimum of two (2) weeks.
B. Reproduction of any portion of the Structural Contract Drawings for resubmittal as shop drawings is prohibited. Shop drawings produced in such a manner will be rejected and returned.
C. Shop drawings submitted in hard copy shall consist of (1) print and (1) reproducible. Only one marked up reproducible will be returned. If shop drawings are submitted electronically, then only electronic copies of reviewed submittals will be returned. No paper copies will be returned.
D. Shop drawings shall bear the Contractor's stamp of approval which shall constitute certification that the Contractor has verified all construction criteria, materials, and similar data and has checked each drawing for completeness, coordination, and compliance with the Contract Documents.
E. The shop drawings shall include dimensioned floor and roof edges, openings and sleeves at all roofs, floors, and walls required for all trades.
F. The detailer must use column and lintel designations as shown on the Engineer's drawings.
G. All revisions to shop drawings after the first submission must be so identified on subsequent submissions with revision tags and clouds.
H. Review of shop drawings shall not relieve the Contractor of any contract requirement, even if such items are not shown on the shop drawings.
CAST-IN-PLACE CONCRETE
1. Concrete work shall comply with the requirements of the latest adopted editions of ACI "Building Code Requirements for Structural Concrete and Commentary (ACI 318)", ACI "Specifications for Structural Concrete (ACI 301)", and ACI "Measuring, Mixing, Transporting, and Placing Concrete (ACI 304)".
2. Reinforcing steel shall be detailed, fabricated and installed in accordance with the latest editions of CRSI "Manual of Standard Practice", CRSI "Placing Reinforcing Bars" and ACI "Detailing Manual (SP-66)".
3. Concrete shall have a minimum 28-day compressive strength as follows:
Type f'c (psi) Sidewalk/Security Grille Footing 4500
6. Maximum water/cement ratios is 0.44.
7. All concrete, unless noted otherwise, shall be normal weight concrete (145 pcf +/-) with cement conforming to ASTM C150, Type I. Maximum aggregate size shall be 1 1/2" for footings and 3/4" for all other members, confirming to ASTM C33.
8.
Reinforcing steel shall be manufactured from high-strength billet steel, deformed type, conforming to ASTM A615, Grade 60.
10. All concrete shall be vibrated. Proper use of vibrators is required.
Vibrators shall not be used to transport concrete.
11. Chamfer all exposed concrete corners/edges unless noted otherwise on Architectural Drawings.
12. Epoxy adhesives shall be used where dowels are to be installed into existing concrete. Submit manufacturer information for engineer review prior to installation.
STRUCTURAL STEEL
1. Structural steel material, design, detailing, fabrication and erection shall be in accordance with the following references:
"Specification for Structural Steel Buildings", ANSI/AISC 360-16 (dated 7 July, 2016)
"Structural Welding Code, AWS D1.1", AWS "Engineering for Steel Construction", AISC "Detailing for Steel Construction", AISC ”
2. The steel contractor shall furnish an affidavit from the producer of the steel certifying that the steel meets the minimum requirements as defined by the applicable ASTM Specification.
3. The steel contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, adequacy of connections, coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner.
4. Coordinate with architectural drawings.
5. Structural steel rolled shapes shall conform to ASTM A992, unless noted otherwise. Angles, channels, plate and rods shall conform to ASTM A36.
6. Structural steel pipe shall conform to ASTM A53, Type E or S, or ASTM A501.
7.
Bolts shall be designed as bearing type bolts, except as noted herein or on plan.
Bearing bolts shall be installed in accordance with the "snug tight" condition as outlined in the AISC "Specifications for Structural Joints Using ASTM A325 or A490 Bolts", latest revision. Connection bolts shall have a hardened washer placed under the turned element.
8.
9. Submit steel shop drawings for review and approval prior to fabrication.
10. All welding shall be done by AWS certified welders in accordance with AWS D1.1 (latest edition). Minimum fillet weld shall be 3/16".
11. Steel welding rods shall be E70XX (low hydrogen @ 50 KSI material).
12. Welds left exposed on the finished structure shall be ground smooth.
POST-INSTALLED ANCHORS
Except where indicated on the drawings, Post-installed anchors shall consist of the following anchor types as provided by Hilti, Inc. Contact Hilti at (800) 879-8000 for product related questions.
a) Anchorage to Concrete I) Adhesive Anchors for cracked and uncracked concrete use:
(1) Hilti Hit-HY 200 Safe Set System with Hilti Hit-Z Rod per ICC
ESR-3187.
II) Medium Duty Mechanical Anchors for cracked and uncracked concrete use:
(1) Hilti Kwik HUS-EZ and Kwik HUS EZ-I Screw Anchors per ICC
ESR-3027.
(2) Hilti Kwik Bolt-TZ Expansion Anchors per ICC ESR-1917.
(3) Hilti Kwik Bolt-3 Expansion Anchors (Uncracked Concrete Only) per
ICC ESR-2302.
b) Rebar Doweling Into Concrete I) Adhesive Anchors for cracked and uncracked concrete use:
(1) Hilti Hit-HY 200 Safe Set System with Hilti Hollow Drill Bit System with continuously deformed rebar per ICC ESR-3187.
Anchor capacity used in design shall be based on the technical data published by Hilti or such other method as approved by the Structural Engineer of Record. Substitution requests for alternate products must be approved in writing by the Structural Engineer of Record prior to use. Contractor shall provide calculations demonstrating that the substituted product is capable of achieving the performance values of the specified product. Substitutions will be evaluated by their having an ICC ESR showing compliance with the relevant building code for Seismic Uses, Load Resistance, Installation Category, and Availability of Comprehensive Installation Instructions. Adhesive Anchor Evaluation will also consider Creep, In-Service Temperature and Installation Temperature.
Install anchors per the Manufacturer Instructions, as included in the anchor packaging.
The Contractor shall arrange an achor manufacturer's representative to provide onsite installation training for all of their anchoring products specified.
The Structural Engineer of Record must receive documented confirmation that all of the Contractor's personnel who install anchors have specific installation training or knowledge, such as the ACI/CRSI Adhesive Anchor Installation Certification, or another training standard that is met or surpassed prior to performing on-site anchor installation.
Existing reinforcing bars in the concrete structure may conflict with specific anchor locations. Unless noted on the drawings that the bars can be cut, the Contractor shall review the existing structural drawings and shall undertake to locate the position of the reinforcing bars at the locations of the concrete anchors, by GPR or other approved means.
1.
2.
3.
4.
5.
GENERAL NOTES
5.
Welded Wire Reinforcement (W.W.R.) shall conform to ASTM A-185. Deformed W.W.R. shall conform to ASTM A497. W.W.R. shall be supplied in flat sheets.
9. Lap W.W.R. two (2) full wire spaces at splices and wire together.
4. Concrete exposed to freeze/thaw conditions and/or weather shall have 4% to 6% air-entrained in accordance with ACI.
Structural steel tubing shall conform to ASTM A500, Grade B (Fy = 46 ksi), unless noted otherwise.
MODIFY EXIST. CAST STONE
VENEER AS REQUIRED,
SEE ARCH. DWGS.
NEW DOOR, SEE ARCH.
(4) L4"X3 1/2"X5/16" (LLV) LINTEL
W/ MIN. 8" BEARING ON
EXIST. MASONRY WALL AND
CAST STONE VENEER AT
EACH END
EXIST. MASONRY WALL
BEFORE/BEYOND
EXIST. BRICK WALL
TO BE REMOVED
AND INFILLED W/
NEW CONC.
NEW 4" CONC.
SLAB ON GRADE
EXIST. CONC.
SLAB ON GRADE
EXIST. CMU
FOUNDATION WALL
EXIST. CONC.
FOUNDATION WALL FTG.
#4 BARS @ 12" O.C. (12" LONG) DRILLED/EPOXIED
INTO EXIST. CONC. SLAB ON GRADE
MIN. 6" W/ HILTI HIT-HY 200 ADHESIVE
INFILL ABOVE NEW DOOR
LINTEL W/ MASONRY &
CAST STONE TO MATCH EXIST.
EXIST. MASONRY WALL
EXIST. LINTEL AT
EXIST. WINDOW
CONC. CURB, SEE
CIVIL DWGS.
6'-0"
EXIST. CONC.
SLAB ON GRADE
(E) SLAB ON GRADE ELEV.
SEE CIVIL DWGS.
1/2" ISOLATION JOINT
1/2" ISOLATION JOINT
4" CRUSHED
STONE SUBBASE
1/2" ISOLATION JOINT
#5 @ 18" O.C.
2'-0"7" (3) #5 CONT.
SEE ARCH.
FOR SECURITY
GRILLE DETAIL
EXIST. MASONRY WALL
BEFORE/BEYOND.
COORD. WALL FINISH
W/ ARCH. DWGS.
EXIST. CMU WALL
TO BE REMOVED
AS REQ'D. FOR
NEW CONC.
NEW 4" CONC.
SLAB ON GRADE
EXIST. CMU
FOUNDATION WALL
EXIST. CONC.
FOUNDATION WALL FTG.
(4) #4 BARS (18" LONG)
1/2" ISOLATION JOINT
4" CRUSHED
STONE SUBBASE
NEW CONC. SIDEWALK,
COORD. W/ CIVIL DWGS.
T.O. SIDEWALK ELEV. 552.15'
SEE CIVIL DWGS.
UNIT MASONRY
1. Masonry work shall conform to the latest editions of the following codes and references:
“Building Code Requirements for Masonry Structures (ACI 530/ASCE 5) and Commentary”.
“Specification for Masonry Structures (ACI 530.1/ASCE 6)”.
2. Masonry walls shown are structural elements. Refer to the architectural drawings for limits and details for non-structural masonry.
3. Masonry units shall be ASTM C90, Grade N, Type 1, with minimum net area compressive strength of 2,000 PSI. Construct structural masonry assemblies to provide a minimum masonry prism strength, f'm, = 1,500 PSI.
4. Structural design has been based on use of normal weight masonry concrete units with a density of ~135 PCF. If a different unit weight is preferred by the masonry contractor, they must obtain written approval from the SER.
5. Masonry shall be laid in running bond, unless indicated otherwise by the architectural drawings, and shall be on a full bed of mortar.
6. Place and secure reinforcement in required position within tolerances stipulated by ACI.
7. Grout piers, pilasters and walls monolithically.
8. Unless noted otherwise, all mortar shall be ASTM C270 Type S with a minimum compressive strength of 1,900 PSI at 28 days. Mortar strength shall be verified from field obtained test cubes.
9. Grout placement shall not start until the placement of reinforcing has been inspected and approved by the Owner's (other) inspection agency.
10. Construct and test masonry prisms during construction to verify the assembly strength (f'm), for each class and type of masonry construction.
Prisms shall be constructed and tested in accordance with ASTM C1314.
Provide a set of prisms for each type of masonry construction for each 5,000 sq. ft. of wall. A set consists of three (3) prisms. Test one prism at 7 days and two prisms at 28 days for each set. Submit reports to Architect, SER, Owner and Building Code Official.
11. Masonry grout shall be a high slump, small aggregate concrete mix. Fill CMU lintels, bond beams, beam bearings and reinforced cells solid with grout conforming to ASTM C476 and having a minimum compressive strength of 3,000 PSI from field obtained test cylinders. Submit grout mix design to the SER for approval.
12. Masonry inspection is required per the latest effective editions of ACI530.1/ASCE 6 and local building codes by a qualified inspection agency.
13. Brick masonry units shall be Grade SW in accordance with ASTM C216 with a minimum compressive strength of 3,000 PSI and bonded together with Type S mortar.
14. Provide hot-dipped galvanized truss type joint reinforcement, min. 9 gage wire at 16” o.c. vertically in all masonry walls, unless noted otherwise in details or on plans. Coordinate with architectural drawings. Use shop fabricated special pieces at all corners and tees. Stagger lapped end joints.
15. Where new walls abut new or existing walls, provide adjustable masonry anchors at 1'-4” o.c. set in coursing.
16. All bond beams shall have one (1) continuous #5 bars, unless shown otherwise on the contract drawings or sketches.
17. Interior non-bearing masonry partitions constructed on concrete slab on grade or on elevated slabs shall be doweled to the slab and into reinforced cells with #4 bars @ 72” o.c. (max.) lapped with the vertical wall reinforcement and shall have bond beams near the top of the walls. Use an acrylic adhesive for installing the dowels in the concrete slabs.
18. Reinforcement in masonry shall be lapped 50 bar diameters, unless noted otherwise.
19. Lintels in exterior walls shall be galvanized per ASTM A123.
20. Consult with Architect regarding location of control joints around openings.
Where control joints intersect bond beams, consult with Architect regarding treatment of joint through bond beam.
21. Perpendicular intersecting walls shall be toothed together or have the horizontal truss-type wire reinforcement continuous through the intersection.
Note: Corrugated sheet metal tab anchors are not acceptable connectors at intersecting walls per ACI 530 - Empirical Design anchorage requirements.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.com
B
IM
/V L E
B -0
B u ild in g
E n tr a n c e
E n c lo s u re
/A E
W L A
V A
M C
B L D
G .1
S
T R
U C
T .r v t
/1
/2
:0
:3
P
M
S101
STAIR 2 - EXIT PASSAGEWAY PLANS BUILDING 1 ENTRANCE ENCLOSURE
1700 S. LINCOLN AVE., LEBANON, PA 17042
595-20-401
1.12.23 TRG RJK
BID DOCUMENTS
1/8" = 1'-0"
STAIR 2 EXIT PASSAGEWAY - NEW PLAN
1/8" = 1'-0"
STAIR 2 EXIT PASSAGEWAY
- DEMO PLAN
# Revisions Date
81 HIGHLAND AVENUE
BETHLEHEM, PA 18017
Pennoni
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
3/4" = 1'-0"
SECTION
3/4" = 1'-0"
SECTION
SYMBOLS LEGEND
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
SHEET NUMBER SEQUENCE
SHEET TYPE
DISCIPLINE
A 101
1t
A02
Room Name
0-0000
NET SF
X.1 GRID LINE - EXISTING
ROOM NUMBER
DOOR NUMBER
WINDOW TYPE
WALL TYPE
NORTH ARROW
N
SPECIALTY
EQUIPMENT /
FURNITURE TAG
KEYNOTE
CENTER LINE
INTERIOR
ELEVATION
DETAIL
SPOT
ELEVATION
MARKERS
REVISION NUMBER
REVISION
CLOUD
EXTERIOR
ELEVATION
BUILDING SECTION
SHEET NUMBER
A301
A201
A211
A501
4 2
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
+ 10' - 0" CEILING TAG
SD CD
CL
WALL SECTION
A301
DETAIL
SHEET
WALL FINISHPT#
DATUM POINT
X.1 GRID LINE - NEW
MATERIALS LEGEND
ALUMINUM
CONCRETE
GLASS
RIGID INSULATION
BRICK IN SECTION
CONCRETE
MASONRY UNIT
EARTH
GYPSUM / PLASTER
STEEL
PEA GRAVEL
STONE
BATT INSULATION
PRECAST
GRAVEL
SAND
WOOD - SOLID
PLYWOOD
BRICK
CULTURED STONE
EXTERIOR COMPOSITE
PANEL
WOOD BLOCKING
WOOD SHIM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
B
IM
/V
L E
B -0
B u ild in g
E n tr a n c e E n c lo s u re /V
L E
B -0
A R
C H
-2
.r v t
/2
/2
:2
:5
P
M
A001
ABBREVIATIONS, NOTES AND SYMBOLS BUILDING 1 ENTRANCE ENCLOSURE
1700 S LINCOLN AVE, LEBANON, PA 17042
595-20-401
01.12.23 FS AEW
BID DOCUMENTS
GENERAL PROJECT NOTES
1 ALL CONSTRUCTION WORK TO CONFORM WITH THE APPLICABLE CODES AND ORDINANCES OF THE
LOCAL JURISDICTION, THE COMMONWEALTH OF PENNSYLVANIA, AND THE CURRENT ADOPTED
VERSION OF THE INTERNATIONAL BUILDING CODE FAMILY. THE CONTRACTOR TO POST NOTICES
AND COMPLY WITH THE GOVERNING LAWS OF THE JURISDICTION.
2 INSTALLATIONS PERFORMED IN CONNECTION WITH THESE DRAWINGS TO COMPLY WITH THE
MOST RECENT NFPA EDITION.
3 THE SITE WORK TO BE PROPERLY SUPERVISED BY THE CONTRACTORS JOB SITE
SUPERINTENDANT. SUFFICIENT PERSONNEL WILL BE EMPLOYED TO COMPLETE THE WORK WITHIN
THE CONTRACTED TIME. PERSONNEL TO BE SKILLED IN THE TASK ASSIGNED.
4 MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD THE PUBLIC AND ALL PERSONS ENGAGED IN
THE PERFORMANCE OF THE WORK.
5 THE DRAWINGS REFLECT CONDITIONS AS CAN BE INFERRED FROM VISIBLE CONDITIONS, OR
FROM DRAWINGS AND INFORMATION FURNISHED BY THE OWNER, BUT CANNOT BE GUARANTEED.
VERIFY ALL GRADES, LINE LEVELS AND DIMENSIONS INDICATED ON THE DRAWNGS AND REPORT
ALL INCONSISTENCIES TO THE ARCHITECT PRIOR TO THE EXECUTION OF THE WORK. RECHECK
ALL DIMENSIONS PRIOR TO ORDERING MANUFACTURED AND/OR FABRICATED ITEMS.
6 PLAN DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO THE FACE OF THE WALL FINISH OR
CENTERLINE OF COLUMN.
7 ALL INDICATIONS OF MASONRY ARE SHOWN IN ACTUAL DIMENSIONS (NOT NOMINAL), UNLESS
NOTED OTHERWISE.
8 ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF PRODUCTS PURCHASED
FOR THIS PRODUCT AND STORED ON THE PROJECT SITE. COORDINATE WITH THE OWNER ON
PREFERRED LOCATIONS FOR STORED MATERIALS ON THE PROJECT SITE, IF ALLOWED AS PART
OF THE REQUIREMENTS OF THIS PROJECT.
9 MAINTAIN AREAS UNDER THE CONTRACTOR'S CONTROL TO BE FREE OF WASTE MATERIALS,
DEBRIS, AND RUBBISH. CONTAINERS FOR DEPOSIT OF DEBRIS AND RUBBISH WILL BE PROVIDED
BY THE CONTRACTOR. COORDINATE LOCATION OF CONTAINERS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT. REMOVE AND DISPOSE OF DEMOLITION MATERIAL OFF
SITE IN ACCORDANCE WITH APPLICABLE CODES AND/OR SPECIFICATIONS.
10 EXTRANEOUS MATERIALS TO BE PERIODICALLY REMOVED, AND AT THE CONCLUSION OF THE
PROJECT. ALL UNUSED TOP SOIL WILL BE STOCKPILED ON THE SITE FOR THE OWNER'S USE.
11 PROVIDE AND INSTALL ALL FIRESAFING / FIRESTOPPING MATERIALS AT ALL THROUGH-WALL AND
THROUGH-CEILING PENETRATIONS AS REQUIRED FOR THE CONSTRUCTION WORK AND TO
MAINTAIN FIRE RATINGS OF FLOORS AND WALLS. MATERIALS AND INSTALLATION DETAILS TO
CONFORM TO UNDERWRITER LABORATORIES LISTING FOR RATED ASSEMBLIES.
12 ALL WOOD FRAMING AND SHEATHING TO BE FIRE RETARDANT TREATED AS REQUIRED BY THE
BUILDING CODE CLASSIFICATION OF 'NONCOMBUSTIBLE'
13 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO
CONSTRUCTION. NOTIFY THE ARCHITECT OF ANY DEVIATIONS OR DISCREPANCIES FOUND AND
RECEIVE DIRECTION BEFORE PROCEEDING.
14 DURING CONSTRUCTION THE CONTRACTOR WILL WORK ADJACENT TO PATIENT OCCUPIED
FLOORS. CONSTRUCTION RELATED ACTIVITIES ARE NOT TO ADVERSELY IMPACT THESE AREAS.
CONSTRUCTION RELATED ACTIVITIES THAT MIGHT AFFECT THESE AREAS MUST BE COORDINATED
WITH AND APPROVED BY THE VA PRIOR TO OCCURRENCE.
15 PROVIDE TEMPORARY DUST ENCLOSURES DURING ALL DEMOLITION AND CONSTRUCTION
ACTIVITIES. CONTRACTOR TO COORDINATE LOCATIONS WITH CONTRACTING OFFICER. IF EXISTING
WALLS ARE USED, PENETRATIONS MUST BE SEALED TO CREATE A DUST PROOF ENCLOSURE.
16 MODIFICATIONS TO THE EXISTING MEP SYSTEMS WILL IMPACT ADJACENT SPACES OUTSIDE THE GENERAL SCOPE OF WORK. ANY DISTURBANCE OF EXISTING CONDITIONS AND FINISHES MUST BE
REPAIRED TO MATCH THE CONDITIONS PRIOR TO CONSTRUCTION IMPACTS.
17 THE FACILITY IS OPERATIONAL. CONTRACTOR TO MAKE PROVISIONS FOR OWNER AND PUBLIC USE OF THE BUILDING AROUND THE CONSTRUCTION AREA. DELIVERIES, STAGING, STORAGE OF
MATERIALS AND OTHER CONSTRUCTION RELATED ACTIVITIES TO BE COORDINATED WITH THE
CONTRACTING OFFICER SO AS TO NOT ADVERSELY AFFECT THE BUILDING OPERATIONS.
18 ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE ARCHITECT. OWNER /
CONTRACTOR REVISIONS MAY BE CONSIDERED INVALID.
19 ALL EXPOSED GYPSUM WALL BOARD EDGES TO HAVE METAL EDGE TRIM.
20 COMPARE AND COORDINATE ALL DRAWINGS FOR PROPER FIT AND ATTACHMENT OF ALL PARTS.
DETAILS NOT SHOWN OR DESCRIBED IN THESE NOTES TO BE CONSTRUCTED TO SAME SIZE AND
CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, SPECIFIED, OR COMMONLY
CONSTRUCTED IN THE INDUSTRY.
21 NO STRUCTURAL MEMBER TO BE OMITTED, NOTCHED, CUT, BLOCKED OUT, OR RELOCATED
WITHOUT PRIOR APPROVAL BY THE ARCHITECT OR ENGINEER.
22 PROTECTIVE MEASURES TO BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTY
AT ALL TIMES DURING CONSTRUCTION.
23 ALL TEMPORARY BRACING AND SHORING TO BE DESIGNED TO SUSTAIN ALL CONSTRUCTION
LOADS, SOIL PRESSURE, LATERAL AND OTHER LOADS TO WHICH THE STRUCTURE MAY BE
SUBJECTED.
24 COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER HEADS, REGISTERS, ETC. WITH THE
REFLECTED CEILING PLAN LAYOUT.
25 ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS TO BE CENTERED WITH SUSPENDED
ACOUSTICAL PANELS, UNLESS NOTED OTHERWISE ON DRAWINGS.
26 ALL VOIDS IN MASONRY, CONCRETE AND OTHER ASSEMBLIES CREATED AROUND PENETRATIONS
TO BE FILLED / PATCHED WITH CONSTRUCTION TO MATCH SURROUNDING CONDITIONS.
27 PAINT ALL EXPOSED STEEL, DECKING, PIPING, CONDUIT, SPRINKLER PIPING AND DUCTS WHICH
ARE EXPOSED IN AREAS WITH NO CEILINGS AND SCHEDULED TO RECEIVE PAINT FINISH AS
INDICATED ON THE FINISH SCHEDULE.
28 ASBESTOS IS ANTICIPATED TO EXIST IN THE WORK AREA AS DESCRIBED IN SPEC SECTION 028200.
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
ADDN ADDITION
A/C AIR CONDITIONER
< ANGLE
APPROX. APPROXIMATELY
BOTT BOTTOM
BLKHD BULKHEAD
CPT CARPET
CLG CEILING
CL CENTER LINE
CER CERAMIC
CLR CLEAR
COL(S) COLUMN(S)
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
COND CONDITION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CG CORNER GUARD
CCT CUBICLE CURTAIN TRACK
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIM(S) DIMENSION(S)
DR DOOR
DN DOWN
DS DOWNSPOUT
DWG(S) DRAWING(S)
DF DRINKING FOUNTAIN
EA EACH
EWC ELECTRIC WATER COOLER
EC ELECTRICAL CONTRACTOR
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
EXIST EXISTING
ETR EXISTING TO REMAIN
EXT EXTERIOR
FOS FACE OF STUD
FIN FINISH
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HORN
FHC FIRE HOSE CABINET
FPH FIRE PHONE
FP FIRE PULL
FR FIRE RATED
FS FIRE STROBE
FLR FLOOR
FD FLOOR DRAIN
FDN FOUNDATION
FURN FURNISH
GC GENERAL CONTRACTOR
GWB GYPSUM WALL BOARD
HTG HEATING
HT HEIGHT
HIR HIGH IMPACT RESISTANT
HM HOLLOW METAL
HORIZ HORIZONTAL
HC HVAC CONTRACTOR
ID INSIDE DIAMETER
INSUL INSULATION
LT LIGHT
MFR MANUFACTURER
MAS MASONRY
MO MASONRY OPENING
MECH MECHANICAL
MTL METAL
MR MOISTURE RESISTANT
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OPNG OPENING
OH OPPOSITE HAND
OD OUTSIDE DIAMETER
PERIM PERIMETER
P-LAM PLASTIC LAMINATE
P PLATE
PLBG PLUMBING
PC PLUMBING CONTRACTOR
PT POINT
RLG RAILING
RWC RAINWATER CONDUCTOR
REINF REINFORCE/ REINFORCING
REQD REQUIRED
RESIL RESILIENT
R RISER
RD ROOF DRAIN
RO ROUGH OPENING
SCW SOLID CORE WOOD
SPEC SPECIFICATION
SST STAINLESS STEEL
STL STEEL
STRUCT STRUCTURAL
TLT TOILET
T/BEAM TOP OF BEAM
T/MAS TOP OF MASONRY
T TREAD
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
V.I.F. VERIFY IN FIELD
VERT VERTICAL
W/ WITH
WD WOOD
WP WORK POINT
# Revisions Date
G042
READING ROOM
G045
WORK AREA
G005
CLEAN UTILITY
G006
SOILED UTILITY
ELEC.
ELEC.
G050
HAC
G051
TOILET
BREAK ROOM
4A
MECH ROOM
TOILET
STAIR
D12
D1
D12 D2 D2
D3 D4
AD101
D7
D8
2' - 8" 4' - 8"
D2
EXTERIOR MECHANICAL
COURTYARD
AD101
D11
D13
G005
CLEAN UTILITY
G006
SOILED UTILITY
ELEC.
ELEC.
G050
HAC
G051
TOILET
BREAK ROOM
4A
MECH ROOM
TOILET
STAIR
D5
D6
D9
EXTERIOR MECHANICAL
COURTYARD
D10
LEVEL 01
0' - 0"
REMOVE ELECTRICAL SHUT-OFFS.
REFER TO ELECTRICAL DRAWINGS.
REMOVE PORTION OF
EXTERIOR WALL AS REQUIRED
TO INSTALL NEW DOOR
REMOVE EXISTING WINDOW SYSTEM
REMOVE EXISTING CONDUIT - REFER
TO ELECTRICAL DRAWINGS.
EXISTING WALL FINISH AND
DECORATIVE JOINTS TO REMAIN.
PROVIDE OPENING IN EXISTING
MULTI-WYTHE MASONRY WALL
NEW OPENING
REMOVE AND SALVAGE EXISTING
COPING CAP FOR MODIFICATION AND
RE-INSTALLATION AT NEW OPENING.
PROTECT EXISTING WALL FINISH
DURING DEMOLITION AND REPAIR
ANY DAMAGED SURFACES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
B
IM
/V
L E
B -0
B u ild in g
E n tr a n c e E n c lo s u re /V
L E
B -0
A R
C H
-2
.r v t
/2
/2
:2
:5
P
M
AD101
DEMOLITION PLAN BUILDING 1 ENTRANCE ENCLOSURE
1700 S LINCOLN AVE, LEBANON, PA 17042
595-20-401
01.12.23 FS SB
BID DOCUMENTS
GENERAL DEMOLITION NOTES
1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION
DOCUMENTS. DO NOT SCALE DRAWINGS.
2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION
OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.
COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF
FINISHED WORK.
3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE
PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE
RESPONSIBILITY OF THE CONTRACTOR.
4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK
REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING
FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR
TO PROCEEDING WITH THE WORK.
5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE
GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT
OF CUTTING AND REMOVAL NECESSARY.
6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND
EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING
ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY
AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION
ACTIVITIES.
7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF
INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT
SCHEDULED TO REMAIN.
8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING
BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE
COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.
9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO
MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS
INDIVIDUAL ELEMENTS.
10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE
SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW
REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT
THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN
A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.
11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND
CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL
DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE
ARCHITECTURAL DEMOLITION PLANS.
12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND
PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED
TO RECEIVE NEW FINISHES.
13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE
EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF
DEMOLITION ACTIVITIES.
14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION
PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS
REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.
1/8" = 1'-0"
DEMOLITION FLOOR PLAN
1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN
# Revisions Date
DEMOLITION LEGEND
D1 REMOVE EXISTING DOOR/FRAME AND ALL ASSOCIATED HARDWARE.
D2 REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL NEW DOOR.
COORDINATE WITH NEW CONSTRUCTION PLAN.
D3 REMOVE WINDOW, FRAME AND ALL ASSOCIATED HARDWARE.
D4 REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL NEW DOOR.
COORDINATE WITH NEW CONSTRUCTION PLANS.
D5 REMOVE ACOUSTICAL CEILING TILE GRID SYSTEM, CEILING MOUNTED DEVICES,
LIGHT FIXTURES, AND ALL ASSOCIATED SUPPORT STRUCTURE.
D6 REMOVE PORTION OF ACOUSTICAL CEILING TILE GRID SYSTEM, CEILING MOUNTED
DEVICES, LIGHT FIXTURES, AND ALL ASSOCIATED SUPPORT STRUCTURE AS
REQUIRED TO INSTALL NEW CORRIDOR. COORDINATE WITH NEW CONSTRUCTION
PLANS.
D7 REMOVE FULL-HEIGHT PORTION OF EXISTING MASONRY WALL (CMU, BRICK
VENEER, FINISH BOARD AND COPING CAP) FOR NEW OPENING. COORDINATE
EXACT LOCATION WITH NEW CONSTRUCTION PLANS.
D8 REMOVE PORTION OF FURRED OUT PLASTER/GWB PARTITION, TO EXPOSE FIRE
RATED ENCLOSURE OF STAIRWAY, AS REQUIRED TO INSTALL COMPLETE 2-HR
ENCLOSURE. REFER TO NEW CONSTRUCTION PLANS.
D9 REMOVE PORTION OF GYPSUM BULKHEAD AS REQUIRED TO INSTALL NEW
FIRE-RATED PARTITION TO FLOOR DECK. REFER TO NEW CONSTRUCTION PLANS.
D10 REMOVE GWB/PLASTER CEILING AS REQUIRED TO REMOVE CEILING ITEMS.
COORDNIATE DEMOLITION WITH FIRE SUPPRESSION, MECHANICAL AND
ELECTRICAL DRAWINGS.
D11 REMOVE FLOORING TILE AS REQUIRED TO INSTALL NEW FLOORING AND WALLS.
REFER TO NEW CONSTRUCTION DOCUMENTS. TILE IN THIS AREA SHOULD BE
CONSIDERED POSITIVE FOR ASBESTOS AND REMOVED PER SPEC SECTION 028200.
D12 REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE. THIS
DOOR/FRAME SHOULD BE CONSIDERED POSITIVE FOR ASBESTOS AND REMOVED
PER SPEC SECTION 028200.
D13 REMOVE FLOORING TILE AS REQUIRED TO INSTALL NEW FLOORING AND WALLS.
REFER TO NEW CONSTRUCTION DOCUMENTS.
1/4" = 1'-0"
EXTERIOR ELEVATION - DEMOLITION
1/4" = 1'-0"
EXTERIOR ELEVATION - DEMOLITION
STAIR
MECH ROOM
4A
TOILET
BREAK ROOM
ELEC
ELEC
CLEAN UTILITY
G005
SOILED UTILITY
G006
HVAC
G050
CORRIDOR
A101
P1
P1P1
M1
P1
P1
P1
M1
M1
2' - 10"
4' - 6"
C1
C2
C3
4"
C4
C4
EXTERIOR MECHANICAL
COURTYARD
A101
C5
C1
BREAK ROOM
HVAC
G050
CORRIDOR
TOILET
MECH ROOM
4A
STAIR
ELEC
ELEC
SOILED UTILITY
G006
ETR
ETR ETR
ETR
ETR ETR
ETR
R1
R3
R2
R4
ETR
R1
EXTERIOR MECHANICAL
COURTYARD
RC
FCU FCU
UH
R5
R6
LEVEL 01
0' - 0" RELOCATE CONDUIT AROUND
NEW DOOR OPENING.
NEW HOLLOW METAL FRAME AND
DOOR - REFER TO DOOR SCHEDULE.
INFILL WINDOW OPENING WITH
STONE VENEER TO MATCH EXISTING
VENEER SIZE. REPLACE EXISTING
CUT VENEER AT JOINT LOCATIONS.
SURFACE LIGHT
RECESSED LINEAR LIGHT
REFLECTED CEILING PLAN LEGEND
UPRIGHT SPRINKLER HEAD
PENDENT SPRINKLER HEAD
RECESSED SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
EXISTING CEILING TO REMAINETR
WALL PACK LIGHT FIXTURE
ON LIFE SAFETY BRANCH -
REFER TO ELEC. DRAWINGS
LIGHT FIXTURE - REFER TO
ELECTRICAL DRAWINGS
LIGHT FIXTURE ON LIFE
SAFETY BRANCH - REFER TO
ELECTRICAL DRAWINGS
EXIT SIGN
RADIANT CEILING PANEL -
REFER TO MECH. DRAWINGSRC
FAN COIL UNT - REFER TO
MECH. DRAWINGSFCU
UNIT HEATER - REFER TO
MECH. DRAWINGS
UH
STAIR
MECH ROOM
4A
TOILET
BREAK ROOM
ELEC
ELEC
CLEAN UTILITY
G005
SOILED UTILITY
G006
HVAC
G050
CORRIDOR
LV
T-
E X
IS
T
LVT-1
EXIST
CONC
LVT-1
EXTERIOR MECHANICAL
COURTYARD
P-3
LVT-1
EXIST
LV
T-1
E X
IS
T
LVT-1
EXIST
LVT-1
EXIST
MODIFY AND RE-INSTALL
EXISTING COPING CAP AT
EACH SIDE OF OPENING.
EXISTING WALL FINISH AND
DECORATIVE JOINTS TO REMAIN.
REPAIR ANY DAMAGED
SURFACES FROM DEMOLTION
NEW OPENING
NEW SIDEWALK TO PUBLIC WAY
EXISTING MASONRY WALL. GROUT
CMU SOLID AT EACH SIDE OF
OPENING - REFER TO
STRUCTURAL DRAWINGS
EXISTING FINISHED WALL SURFACE
GALV. 1/4" BENT PLATE W/ 1/2"
DIAMETER x 4" LONG HEADED
STUD @ 24" O.C. - VERIFY DEPTH
OF WALL IN FIELD
4"
LVT FLOORING
EXISTING CONCRETE SLAB
SCHLUTER FLOOR PROFILE STRIP
VINPRO-U FROM 3MM TO CONCRETE,
BRUSHED CHROME FINISH.
DOOR WHERE OCCURS
CONCRETE OR EXISTING FLOORING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
B
IM
/V
L E
B -0
B u ild in g
E n tr a n c e E n c lo s u re /V
L E
B -0
A R
C H
-2
.r v t
/2
/2
:2
:5
P
M
A101
PLANS,ELEVATIONS AND FINISH SCHEDULE BUILDING 1 ENTRANCE ENCLOSURE
1700 S LINCOLN AVE, LEBANON, PA 17042
595-20-401
01.12.23 FS SB
BID DOCUMENTS
GENERAL CONSTRUCTION NOTES
1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE D1.
2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.
3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED
EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER
MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.
4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.
COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION
DETAILS SHOWN HERE.
5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL
CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO
COORDINATE BLOCKING REQUIREMENTS.
6. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.
ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.
7. PATCH AND REPAIR EXISTING CEILINGS AND WALLS DAMAGED DURING
CONSTRUCTION. PAINT TO MATCH EXISTING.
8. TAPE AND MUD JOINTS TO BE FLUSH WHERE NEW GYPSUM WALL BOARD MEETS
EXISTING GYPSUM BOARD.
1/8" = 1'-0"
NEW WORK PLAN
# Revisions Date
1/8" = 1'-0"
REFLECTED CEILING PLAN
1/4" = 1'-0"
EXTERIOR ELEVATION - NEW WORK
CONSTRUCTION KEYNOTES
C1 ALIGN GWB FACE OF NEW WALL WITH FACE OF EXISTING CORRIDOR WALL. SEAL JOINT.
C2 TERMINATE FIRE-RATED PARTITION INTO FACE OF EXISTING FIRE-RATED STAIRWAY WALL.
C3 INFILL DOOR OPENING WITH 3 5/8" METAL STUD AND 5/8" GWB.
C4 5'-0"H SECURITY GRILLE MOUNTED TO CONCRETE CURB WITH 2 1/2 "x 2 1/2" HHS POSTS. SEE
DETAIL ON A102.
C5 NEW OPENING IN EXISTING MASONRY WALL. SEE ELEVATION AND JAMB DETAIL ON THIS SHEET.
1/8" = 1'-0"
FINISH PLAN
FINISH LEGEND
TAG FINISH TYPE MANUFACTUERER SERIES PRODUCT NUMBER COLOR SIZE REMARKS
ACOUSTICAL CEILING TILE
ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG CEILING LYRA HIGH CAC TEGULAR 8730PB WHITE 24" X 24" X 1" 15/16 PRELUDE GRID
LUXURY VINYL TILE
LVT-1 LUXURY VINYL TILE SHAW CONTRACT TERRAIN II 30 MIL 0892V THATCH 00173 6"X48" INSTALLATION: STAGGERED
PAINT
P-1 PAINT MAIN WALL PAINT EXTRA WHITE SW7006
P-2 PAINT CEILING PAINT CEILING BRIGHT WHITE SW7007
P-3 PAINT ACCENT WALL PAINT SMOKY AZURITE SW9148
RUBBER BASE
RB-1 RUBBER BASE TARKETT DURACOVE 4" BASE MOON ROCK 29 4"H
FINISH SCHEDULE
ROOM WALL FINISH FLOOR FINISH CEILING FINISH
REMARKSNUMBER NAME FINISH ACCENT FLOOR BASE CEILING
1 CORRIDOR P-1 LVT-1 RB-1 GWB/ P-2
2 STAIR ETR ETR ETR ETR
4A MECH ROOM ETR ETR ETR ETR
5 TOILET ETR ETR ETR ETR
6 BREAK ROOM P-1/ P-3 ETR ETR ETR/ ACT-1/ P-2
9 ELEC ETR ETR ETR ETR
10 ELEC ETR ETR ETR ETR
G006 SOILED UTILITY ETR ETR ETR ETR
G050 HVAC ETR ETR ETR ETR
REFLECTED CEILING PLAN KEYNOTES
R1 MODIFY EXISTING GRID AND CEILING TILE, AS REQUIRED TO INSTALL NEW FIRE-RATED
PARTITION.
R2 NEW 2'x 2' ACOUSTICAL CEILING TILE. MATCH EXISTING CEILING HEIGHT.
R3 PATCH AND REPAIR GWB BULKEAD, AS REQUIRED, AT NEW WALL. PAINT ENTIRE BULKHEAD TO
MATCH EXISTING FINSH.
R4 EXISTING BULKHEAD TO REMAIN.
R5 PATCH AND REPAIR CEILING AS REQUIRED TO MEET PRE-DEMOLITION CONDITIONS. PAINT TO
MATCH EXISTING CEILING.
R6 NEW 2-HR FIRE RATED CEILING MEMBRANE CONSTRUCTION IN CORRIDOR 1. REFER TO DETAIL A / A102.
1/4" = 1'-0"
EXTERIOR ELEVATION
1 1/2" = 1'-0"
MASONRY WALL JAMB
3" = 1'-0"
LVT/ CONCRETE OR EXISTING
F
DOOR PANEL TYPES
N
1'
0" 2'
1"
4" 6"
F1
2" SEE SCHEDULE 2"
SE
E
SC
H
ED
U
LE
2"
DOOR FRAME TYPES
STD. HM DOUBLE RABBET MASONRY
DOOR BUTT TYPE HEAD w/ FRAMING
HOLLOW METAL FRAME
MASONRY ANCHOR, INSERT AT
MASONRY JOINTS, TYP.
SCHEDULED DOOR
6"x8" SOLID PRECAST
CONCRETE LINTEL W/ (1) #3
TOP AND BOTTOM
CONTINUOUS SEALANT
AT EACH SIDE.
CONTINUOUS
SEALANT
H1
STD. HM DOUBLE RABBET MASONRY
DOOR BUTT TYPE HEAD w/ FRAMING
HOLLOW METAL FRAME
EXISTING MASONRY WALL
ANCHOR FRAME TO EXISTING
MASONRY WALL
SCHEDULED DOOR
EXISTING MASONRY HEADER
CONTINUOUS SEALANT
AT EACH SIDE.
CONTINUOUS SEALANT
H2
PATCH EXISTING WALL
FINISH, RETURN FINISH
TO JAMB
EXISTING WALL FINISH
ON INTERIOR SIDE OF
DOOR. REPAIR AND
REPAINT ANY DAMAGE
DUE TO FRAME
INSTALLATION.
5 7/8" 5 7/8"
SHIM AS REQUIRED
EXTERIOR HM DOUBLE RABBET MASONRY
DOOR BUTT TYPE HEAD w/ FRAMING
H3
STONE VENEER INFILL -
MATCH EXISTING
STEEL LINTEL - REFER TO
STRUCTRUAL DRAWINGS
MASONRY INFILL - MATCH
EXISTING WALL CONSTRUCTION
BACKER ROD AND
SEALANT - BOTH SIDES
SHIM AS REQUIRED
THERMALLY BROKE FRAME
STD. HM DOUBLE RABBET MASONRY
DOOR, BUTT TYPE JAMB w/ FRAMING
HOLLOW METAL FRAME
MASONRY UNIT, SEE PARTITION
TYPE FOR DETAILS
MASONRY ANCHOR, INSERT AT
MASONRY JOINTS, TYP.
SCHEDULED DOOR
GROUT JAMB SOLID
CONTINUOUS SEALANT AT
EACH SIDE
CONTINUOUS
SEALANT
2"
EQ
2"
EQ
J1
STD. HM DOUBLE RABBET MASONRY
DOOR, BUTT TYPE JAMB w/ FRAMING
HOLLOW METAL FRAME
ANCHOR FRAME TO EXISTING
MASONRY WALL
SCHEDULED DOOR
GROUT JAMB SOLID
CONTINUOUS SEALANT AT
EACH SIDE
CONTINUOUS
SEALANT
2"
EQ
2"
EQ
J2
EXISTING MASONRY WALL WITH WALL
FINISH ON INTERIOR SIDE OF DOOR.
REPAIR AND REPAINT ANY DAMAGE
DUE TO FRAME INSTALLATION.
PATCH EXISTING
WALL FINISH,
RETURN FINISH TO
JAMB
EXTERIOR HM DOUBLE RABBET MASONRY
DOOR, BUTT TYPE JAMB w/ FRAMING
J3
THERMALLY BROKE
FRAME
MASONRY ANCHOR, INSERT
AT MASONRY JOINTS, TYP.
SCHEDULED DOOR
CONTINUOUS
SEALANT
BACKER ROD AND
SEALANT - BOTH
SIDES
MASONRY INFILL - MATCH
EXISTING WALL
CONSTRUCTION, GROUT SOLID
STONE VENEER INFILL -
MATCH EXISTING
1 5/8" METAL STUD
@ 16" O.C MAX
5/8" GYPSUM BOARD
BASE
PLAN
HEAD
SCHED CEILING, REF RCP
TYPE M - FULL HT. MASONRY PARTITION
UNDERSIDE OF
STRUCTURE
CMU - REFER TO FRAMING SIZE IN
SCHEDULE BELOW
2 x 2 x 3/16 ANGLE BRACE @ 4'-0" O.C. MAX.
BOLTED OR WELDED TO CONNECTION ANGLES
BOND BEAM W/
(1) #5 BAR CONT.
TOP OF WALL
+8-0" A.F.F.
2 HOUR FIRE-RATED CEILING MEMBRANE
EVALUATION # AER-09038 - SEE DETAIL 1
ON THIS SHEET.
3 X 3 X 3/16 ANGLE W/ (2) 1/2" DIAM.
HILTI KWIK HUS-EZ SCREW ANCHORS,
MIN. 2.5" EMBED. INTO EXIST. CONC. SLAB
3 X 3 X 3/16 ANGLE W/ (1) 1/2" DIAM. HILTI
HAS THREADED ROD ANCHOR, MIN. 2.5"
EMBED. INTO BOND BEAM
TYPE P - FULL HT. MASONRY PARTITION
BASE
PLAN
HEAD
CMU - REFER TO FRAMING SIZE IN
SCHEUDLE BELOW
UNDERSIDE OF STRUCTURE
2 1/2" MTL STUD FR - REF TO SPEC
FOR SPACING & WIDTH
(1) LAYER 5/8" TYPE "X" GYP BD
STEEL TRACK, FASTEN 2'-0" OC MAX
WALL BASE & FLOOR FIN - AS
SCHEDULED
SCHED CEILING, REF RCP
TOP OF WALL
+8'-0" A.F.F.
2 HOUR FIRE-RATED CEILING
MEMBRANE EVALUATION #
AER-09038 - SEE DETAIL 1 ON
THIS SHEET.
2 x 2 x 3/16 ANGLE BRACE @ 4'-0" O.C. MAX.
BOLTED OR WELDED TO CONNECTION ANGLES
BOND BEAM W/ (1) #5 BAR CONT.
3 X 3 X 3/16 ANGLE W/ (2) 1/2"
DIAM. HILTI KWIK HUS-EZ SCREW
ANCHORS, MIN. 2.5" EMBED. INTO
EXIST. CONC. SLAB
3 X 3 X 3/16 ANGLE W/ (1)
1/2" DIAM. HILTI HAS
THREADED ROD ANCHOR,
MI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .