S02 Salem Facility Wide Security Camera Upgrade Drawings1-10.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--Facility Wide Security Camera Upgrades Federal contract opportunity
- Solicitation number
- 36C24623B0019
About this file
This document package includes construction drawings and specifications for a facility wide security camera upgrade project at the Salem VA Medical Center. The project involves removing existing security cameras and installing approximately 116 new cameras throughout multiple buildings and exterior areas. New cabling, conduits, camera equipment, monitors, and related infrastructure will also be provided. The work will be performed in accordance with infection control, life safety, and construction phasing plans detailed in the documents. The project is funded through Department of Veterans Affairs contract number 36C24623B0019.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24623B0019 0004_1.docx | DOCX document | |
| S05 36C24623B0019 Facility Wide Security Camera Upgrade Questions 3-20-2023.pdf | ||
| S06 36C24623B0019 0004.pdf | ||
| S06_36C24623B0019 0003.pdf | ||
| 36C24623B0019 0003_1.docx | DOCX document | |
| S02_ 0002_36C24623B0019 0002.pdf | ||
| 36C24623B0019 0002_1.docx | DOCX document | |
| 36C24623B0019 0001_1.docx | DOCX document | |
| S06_36C24623B0019 0001.pdf | ||
| S02 Salem Facility Wide Security Camera Upgrade Drawings 21-30.pdf | ||
| S02 Salem Facility Wide Security Camera Upgrade Drawings 31-40.pdf | ||
| S02 Salem Facility Wide Security Camera Upgrade Specs.pdf | ||
| S02 36C24623B0019_1 Fac. Wide Cameras.pdf | ||
| S02 Salem Facility Wide Security Camera Upgrade Drawings11-20.pdf | ||
| 36C24623B0019_2.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALEM VA
MEDICAL
CENTER
A
M
G-001
COVER SHEET
FACILITY WIDE SECURITY CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153-6404
APOGEE PROJECT #: 20-210
PROJECT LOCATION MAPS
PROJECT SITE MAPS
VA PROJECT #: 658-20-105
SALEM VAMC
SALEM VAMC
DRAWING LIST
PROJECT
SITE
N
N
SCALE: NTS
SCALE: NTS
SALEM VA MEDICAL CENTER
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
Location
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
6Engineers Architects
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
DocuSign Envelope ID: 3ADC3376-EFA9-4753-9EE8-D15D0B94D50D
10/26/2022
2A
X
X
X
X
X
X
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
LOT
C
LOT
H
LOT
H
VP
LOT
F
LOT
B
LOT
K
LOT
N
LOT
X
LOT
Q
LOT
T
LOT
R
LOT
V
LO
T
E E
LO
T
Y
LO
T
W
LO
T
Z
LO
T
S
L O
T
P
L O
T
O
LO
T
M M
L O
T
L
LO
T
JJ
LO
T
J
LO
T
H H
LO
T
E
L O
T
A
LO
T
G
L O
T
D
L O
T
U
LO
T
F F
L O
T
M
VP
SITE KEY PLAN - SALEM VAMC
G-002
LEGEND
EXISTING BUILDING
EXISTING BUILDING - PART OF SCOPE
SITE KEY PLAN - SALEM VAMC
NORTH
Scale: No Scale
BUILDING ENTRANCE
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
6Engineers Architects U.S. Department of Veterans Affairs
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
OCTOBER 24, 2022
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
BUILDING LEGEND
1. DIRECTOR, POLICE
2. EXTENDED CARE, NUCLEAR MED, DENTAL, K.T., P.T., O.T.
2A. ADMISSIONS, EMER. RM., PATHOLOGY, RADIOLOGY
IMAGING
4. MAIN KITCHEN, CANTEEN, MEDICAL MEDIA
5. AUDITORIUM
7. LONG TERM EXTENDED PSYCHIATRIC, SOCIAL WORK
8. SUBSTANCE ABUSE, ACUTE PSYCHIATRIC
9. SUBSTANCE ABUSE, P.T.S.D.
10. CENTRALIZED FEE
11. METAL HYGIENE, DAY TREATMENT, PSYCHIATRY,
PSYCHOLOGY ADMIN.
12. HOPTEL, PROSTHETICS, AFGE, EMP. HEALTH, C&P
13. BOILER/CHILLED WATER PLANT
14. LAUNDRY
15. SOILED LINEN, VET. INDUST., ENG./MED.REC.STOR.
16. VISN 6 OFFICES, ADR, AC SHOP, LANDSCAPE
17. LEASED SPACE
18. OFFICES
19. OFFICES
23. SEWAGE PUMP HOUSE
25. DUPLEX HOUSE (LEASE)
26. 6-CAR GARAGE
27. 5-CAR GARAGE
28. 5-CAR GARAGE
29. SWIMMING POOL
72. STORAGE
74. FMS, LOGISTICS, SAFETY, HRM, IRS
75. WHEELCHAIR CLINIC, REGION OFFICES STO,
FISCAL, FITNESS CNTR
76. RESEARCH, NATIONAL AFGE, CARPENTRY & ELECTRIC
SHOPS, TRANSITIONAL LVG
77. CREDIT UNION, EDUCATION, ENVIRONMENTAL MGMT,
STUDENT QUARTERS
80. GREENHOUSE (WEST)
85. SHEET METAL SHOP
121. GREENHOUSE
130. GRANDSTAND
131. ELECTRICAL SUBSTATION
133. GOLF CLUBHOUSE
138. EMERGENCY GENERATOR BLDG
139. EMERGENCY GENERATOR BLDG
140. EMERGENCY GENERATOR BLDG
141. EMERGENCY GENERATOR BLDG
142. EMERGENCY GENERATOR BLDG
143. MAIN HOSPITAL, OUTPATIENT, INPATIENT,
CLINICAL NURSING UNIT.
144. CHAPEL
145. PLUMBING SHOP
146. CHAPEL OFFICES
148. MOTOR VEHICLE SHOP
150. SMOKING SHELTER
151. SMOKING SHELTER
152. SMOKING SHELTER
153. EMERGENCY GENERATOR BLDG
154. EMERGENCY GENERATOR BLDG
155. PUMP HOUSE
156. EMERGENCY GENERATOR BLDG
157. EMERGENCY GENERATOR BLDG
158. SMOKING SHELTER
159. SMOKING SHELTER
160. OPEN FRONT SMOKING SHELTER
161. SMOKING SHELTER
162. ROANOKE CITY WATER MAIN BLDG
164. GREENHOUSE
165. OPEN SMOKING SHELTER
168. CENTER FOR TRAUMATIC STRESS
170. ACUTE INPATIENT PSYCHIATRIC UNIT
171. POLICE SUB STATION
172. WVWA PUMP HOUSE
174. WATER TOWER
175. NEW BOILER PLANT
PARKING LOTS
LOT A PATIENT / VISITOR PARKING
LOT B PATIENT / VISITOR PARKING
LOT C PATIENT / VISITOR PARKING
LOT D PATIENT / VISITOR PARKING
LOT E EMPLOYEE PARKING
LOT EE EMPLOYEE PARKING
LOT F PATIENT / VISITOR PARKING
LOT FF PATIENT / VISITOR PARKING
LOT G PHYSICIAN PARKING
LOT H EMPLOYEE / STUDENT PARKING
LOT HH EMPLOYEE PARKING
LOT JJ EMPLOYEE PARKING
LOT K EMPLOYEE / PHYSICIAN PARKING
LOT L EMPLOYEE PARKING
LOT LL EMPLOYEE PARKING
LOT M PATIENT / VISITOR PARKING
LOT MM EMPLOYEE PARKING
LOT N EMPLOYEE / PHYSICIAN PARKING
LOT O EMPLOYEE PARKING
LOT P EMPLOYEE PARKING
LOT Q EMPLOYEE / PHYSICIAN PARKING
LOT R EMPLOYEE PARKING
LOT S EMPLOYEE PARKING
LOT T EMPLOYEE / STUDENT PARKING
LOT U PATIENT / VISITOR PARKING
LOT V EMPLOYEE PARKING
LOT W EMPLOYEE PARKING
LOT X PATIENT / VISITOR PARKING
LOT Y EMPLOYEE PARKING
LOT Z EMPLOYEE PARKING
VP VALET PARKING
EXISTING PARKING - PART OF SCOPE
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX
OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Class III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction
Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2
Medium Risk
- Therapy Areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
I
Patient Risk Group
TYPE
D
TYPE
C
TYPE
A
Group 4
Highest Risk
Group 3
High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD
- AMCU
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
o r control procedures are necessary.
C L
A S
S
I V
C L
A S
S
I I
During Construction Project
C L
A S
S
I I I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area.
Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III.
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers.
Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace walk-off mats per manufacturer's recommendations. Do not remove work area barriers until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering.
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Class IV
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Area Class Designation
II
I
LOW Risk Group 1
HIGH Risk Group 3
HIGHEST Risk Group 4
MEDIUM Risk Group 2
IV
IV
IV
III/IV
III/IV
III/IV
III/IV
III
III
III
Group 1
Low Risk
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
TYPE
B
I
C L
A S
S
I
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
FACILITY WIDE SECURITY CAMERAS UPGRADE
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
INFECTION CONTROL RISK
ASSESSMENT, INTERIM LIFE
SAFETY MEASURES, FIRE WATCH
AND MISCELLANEOUS FORMS
PAPER
CADDY
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS (CHANGED END OF
SHIFT OR MORE IF NECESSARY TO MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L
E X
D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
G-100
G-100
G-100
DUCT TO OUTSIDE
OF BUILDING
OUTSIDE OF
BUILDING
TEMPORARY DIGITAL MANOMETER FOR
NEGATIVE PRESSURE MONITORING OUTSIDE
OF ICRA BARRIER FOR VA'S INSPECTION.
INDICATOR SHALL BE AT -0.01 OR GREATER
(VERIFY DAILY). IF NOT, VERIFY ALL OPENINGS,
SUCH AS DOOR CLOSED, AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER.
ILSM SIGNAGE
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED. COVER WITH ROSIN PAPER /
FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V I F
V.I.F.
E X
I S
T I N
G
W
A L
L
V I F
E X
I S
T I N
G
W
A L
L
V I F
V I F
A P
P R
O X
A
F
F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
G-100
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING RUNNER
SUPPORT POLES, QUANTITY
PER MANUF.
RECOMMENDATIONS
AS
REQU.
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
I G
H T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
F.F.
A
M
G-100
TYPICAL ICRA DETAILS
A.
B.
C.
D.
TAPE ALL SERVICES TO PROTECT AGAINST
CONTAMINATION.
THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE CBOC.
USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER
AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ANY CEILING ACCESS PANELS OPENED FOR
INVESTIGATION BEYOND SEALED AREAS SHALL BE
SEALED IMMEDIATELY WHEN UNATTENDED.
AT COMPLETION, REMOVE CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND
CLEAN ALL SURFACES FREE OF DUST AFTER THE
REMOVAL.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
6Engineers Architects U.S. Department of Veterans Affairs
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
OCTOBER 24, 2022
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
Scale: No Scale
ILSM SIGNAGE
Scale: No Scale
ILSM BARRIER TAG
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
SECTION
Scale: 1/2" = 1'-0"
ROOM ELEVATION
NOTE:
TAG SHALL BE PLACED ON ALL ILSM
TEMPORARY BARRIERS. FINAL LOCATION BY G.C.
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
CBOC VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
THE ICRA MATRIX IS INCLUDED FOR REFERENCE
ONLY. ICRA SHALL BE DIRECTED BY THE SALEM
VAMC PERSONNEL.
F.
4 5 6
6'-0"
CLEAR
MIN.
C L
E A
R
M I N s s s s s s
BENCH
TO BLDNG 2
FP
DRESSING
RM
25F
MECH
25G
CANTEEN
STORAGE
25D
DISPLAY
WINDOW
25C
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
POST OFFICE
32C
MENS
TOILET
32B
WOMENS
TOILET
32A
BARBER SHOP
CANTEEN
OPTICAL
SHOP
25B
STORAGE
25A
CANTEEN RETAIL
OFFICE
25E
CANTEEN
OFFICE
11C
OFFICE
11D
CANTEEN
STORAGE
11B
CANTEEN
STORAGE
2A
2B
EVAPORATOR
REFRIGERATOR
DINING RM
GENERAL
STORAGE
MECH
6'-0"
CLEAR
MIN.
FP
STAIR
STAIR
12A
STORAGE
CANTEEN
11A
14B
40B
CAFETERIA
FREEZER
26A
FREEZER
GENERAL
STORAGE
40A
FREEZER
OFFICE FOOD
GENERAL
STORAGE
LOCKER
ROOM
GENERAL
STORAGE
KITCHEN
DISH
WASHING
RM
LOADING
DOCK
FREEZER
GENERAL
STORAGE
DINING RM
HAC
7A
VESTIBULE
A
M
G-101
ENLARGED ICRA PLANS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
6Engineers Architects U.S. Department of Veterans Affairs
SHEET KEY NOTES:
X
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
WALL RATINGS LEGEND:
SMOKE WALLS S S S
1 HOUR FIRE WALL
S
2 HOUR FIRE WALL
3 HOUR FIRE WALL
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
OCTOBER 24, 2022
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
1. PROVIDE TEMPORARY PLASTIC BARRIER
PARTITION TO THE UNDERSIDE OF CEILING WITH
ZIPPER ENTRY. PARTITION SHALL BE INSPECTED
BY VA ICRA STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE CONSTRUCTION
SPACE.
2. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
3. WORK TO BE PERFORMED AT THE MASTER AND
SLAVE CONTROL PANEL LOCATIONS SHALL BE
PERFORMED AT ONE LOCATION AT A TIME.
4. USE A PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
5. CONTRACTOR SHALL COVER ALL FURNITURE
WITHIN ROOM WITH PLASTIC, PRIOR TO
COMMENCING WORK IN A SPACE AND REMOVE
PRIOR TO POST-CONSTRUCTION TERMINAL
CLEANING.
6. THE AIR WITHIN THE CONSTRUCTION AREA SHALL
BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE
NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE, PORTABLE
HEPA FILTER CAPABLE OF FILTRATION RATES OF
300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST INTO A ROOM,
A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST.
A. FOLLOW ICRA REQUIREMENTS.
B. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
C. PATCH ALL PENETRATIONS AND OPENINGS IN
SMOKE AND FIRE WALLS WITH APPROVED UL
LISTED MATERIALS. COR TO APPROVE PRIOR TO
INSTALLATION.
D. DEMOLISH ALL DEVICES MARKED TO BE
DEMOLISHED ON TECHNOLOGY SHEETS UNLESS
NOTED OTHERWISE.
E. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. VERIFY ALL FIELD
CONDITIONS.
F. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
G. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
H. EXISTING WINDOWS THAT NEED TO BE
TEMPORARILY REMOVED TO ACCOMMODATE
DISCHARGED AIR EXHAUST DUCT, SHALL BE
RE-INSTALLED AFTER CONSTRUCTION.
I. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
SALEM VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
J. TYPICAL ICRA PLANS ARE INCLUDED FOR
REFERENCE ONLY. ICRA SHALL BE PROVIDED BY
THE SALEM VAMC PERSONNEL
1 TYPICAL PHARMACY (CLASS III INFECTION CONTROL)
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
CLASS III
2 TYPICAL CAFETERIA
SCALE: 1/8" = 1' 0"
3 TYPICAL CANTEEN
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
CLASS II
CLASS II
HOUSE KEEPING
STORAGE
101B
102A
C L
E A
R
M I N
6'-0"
CLEAR
MIN.
4 56
STAIR
TOILET
OFFICE
139A
OFFICE
139B
IRM
BENCH
DRESSING
RM
25F
CORRIDOR
OFFICE
25E
11C
MECH
19A
EVAPORATOR
FREEZER
REFRIGERATOR
C L
E A
R
M I N
FP
FEMALE
TLT
MALE
TOILET
ENTR LOBBY
CORRIDOR
CB-4
STORAGE
STAIR
CORRIDOR
CB-1A
STORAGE
SOILED LINEN
HOUSEKEEPING
TEL
ELECTRICAL
RM
OFFICE
C L
E A
R
M I N
11B
11A
11C
CHASE
13B
9A
STAIR
TOILET
TOILET
6'-0"
CLEAR
MIN.
C L E
A R
M I N
RAMP
SERVER
RM
227E
COMPUTER
SPECIALIST
227D
227C
4 5 6
INFO RESOURCE
MGMT
OFFICE
STORAGE
FEMALE
TOILET
219A
CHASE
KITCHEN
ELEVATOR
LOBBY
ELEVATOR
2 1
4 5 6
C L
E A
R
M I N
4 5 6
C L E
A R
M I N s s s s s s s s
UNISEX
TOILET
VEST
101A
CORR
VISITOR
ROOM
CORR
WAITING
NURSE
INTERVIEW
s s s s s s s s s s s s s s
ELEC
117A
STAFF
TOILET
STAFF
TOILET
STAFF
SECL
TOILET
SECL
CORR
CORR
4 5 6
6'-0"
CLEAR
MIN.
4 5 6 ss s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s
GROUP
TOILET
157A
EMER
EXIT
CORR
WORK
156A
C
L
E
A
R
M
I
N
4 5 6 s s s s s s s s s s s s s s s s
4 5 6
C L
E A
R
M I N
FP
ELEVATOR
CORRIDOR
STAIR
CANTEEN
STORAGE
A
M
G-102
ENLARGED ICRA PLANS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
6Engineers Architects U.S. Department of Veterans Affairs
SHEET KEY NOTES:
X
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
WALL RATINGS LEGEND:
SMOKE WALLS S S S
1 HOUR FIRE WALL
S
2 HOUR FIRE WALL
3 HOUR FIRE WALL
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
OCTOBER 24, 2022
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
1. PROVIDE TEMPORARY PLASTIC BARRIER
PARTITION TO THE UNDERSIDE OF CEILING WITH
ZIPPER ENTRY. PARTITION SHALL BE INSPECTED
BY VA ICRA STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE CONSTRUCTION
SPACE.
2. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
3. WORK TO BE PERFORMED AT THE MASTER AND
SLAVE CONTROL PANEL LOCATIONS SHALL BE
PERFORMED AT ONE LOCATION AT A TIME.
4. USE A PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
5. CONTRACTOR SHALL COVER ALL FURNITURE
WITHIN ROOM WITH PLASTIC, PRIOR TO
COMMENCING WORK IN A SPACE AND REMOVE
PRIOR TO POST-CONSTRUCTION TERMINAL
CLEANING.
6. THE AIR WITHIN THE CONSTRUCTION AREA SHALL
BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE
NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE, PORTABLE
HEPA FILTER CAPABLE OF FILTRATION RATES OF
300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST INTO A ROOM,
A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST.
7. ICRA MOBILE CONTAINMENT CART. TYPICAL
WHERE TEMPORARY CONTAINMENT IS REQUIRED
IN AREA OF WORK.
8. WORKSTATION BY VA.
1 TYPICAL GROUP ROOM
SCALE: 1/8" = 1' 0"
2 TYPICAL ARMORY
SCALE: 1/8" = 1' 0"
3 DISPATCHES
SCALE: 1/8" = 1' 0"
4 TYPICAL IRM
SCALE: 1/8" = 1' 0"
5 TYPICAL MECHANICAL ROOM
SCALE: 1/8" = 1' 0"
6 TYPICAL TEL/COM ROOM
SCALE: 1/8" = 1' 0"
7 TYPICAL STORAGE ROOM
SCALE: 1/8" = 1' 0"
8 TYPICAL ELECTRICAL ROOM
SCALE: 1/8" = 1' 0"
9 TYPICAL SERVER ROOM
SCALE: 1/8" = 1' 0"
10 TYPICAL INFO RESOURCE MGMT
SCALE: 1/8" = 1' 0"
11 TYPICAL TELE/SIGNAL ROOM
SCALE: 1/8" = 1' 0"
12 TYPICAL VESTIBULE
SCALE: 1/8" = 1' 0"
13 TYPICAL SECL ROOM
SCALE: 1/8" = 1' 0"
14 TYPICAL IT CLOSET
SCALE: 1/8" = 1' 0"
15 TYPICAL CAMERA ISOLATION
SCALE: 1/8" = 1' 0"
16 TYPICAL CANTEEN STORAGE
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16 0
NORTH
PLAN
0 4 8 16 0
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 160
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16 0
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16 0
NORTH
PLAN
0 4 8 16
TYPICAL POLICE
CLASS III
CLASS II CLASS II
CLASS IICLASS II
CLASS II
CLASS IICLASS IICLASS II
CLASS IICLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
A. FOLLOW ICRA REQUIREMENTS.
B. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
C. PATCH ALL PENETRATIONS AND OPENINGS IN
SMOKE AND FIRE WALLS WITH APPROVED UL
LISTED MATERIALS. COR TO APPROVE PRIOR TO
INSTALLATION.
D. DEMOLISH ALL DEVICES MARKED TO BE
DEMOLISHED ON TECHNOLOGY SHEETS UNLESS
NOTED OTHERWISE.
E. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. VERIFY ALL FIELD
CONDITIONS.
F. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
G. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
H. EXISTING WINDOWS THAT NEED TO BE
TEMPORARILY REMOVED TO ACCOMMODATE
DISCHARGED AIR EXHAUST DUCT, SHALL BE
RE-INSTALLED AFTER CONSTRUCTION.
I. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
SALEM VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
J. TYPICAL ICRA PLANS ARE INCLUDED FOR
REFERENCE ONLY. ICRA SHALL BE PROVIDED BY
THE SALEM VAMC PERSONNEL
BENCH
DRESSING
RM
25F
MECH
25G
CANTEEN
STORAGE
25D
DISPLAY
WINDOW
CORRIDOR
CORRIDOR
CORRIDOR
POST OFFICE
32C
MENS
TOILET
32B
WOMENS
TOILET
BARBER SHOP
CANTEEN
OPTICAL
SHOP
25B
STORAGE
25A
CANTEEN RETAIL
OFFICE
25E
CANTEEN
OFFICE
11C
OFFICE
11D
CANTEEN
STORAGE
11B
CANTEEN
STORAGE
EVAPORATOR
REFRIGERATOR
C L
E A
R
M I N
6'-0"
CLEAR
MIN.
FP
STAIR
STAIR
12A
40B
CAFETERIA
FREEZER
26A
FREEZER
GENERAL
STORAGE
FREEZER
GENERAL
STORAGE
LOCKER
ROOM
GENERAL
STORAGE
KITCHEN
DISH
WASHING
RM
GENERAL
STORAGE
HAC
7A
VESTIBULE
EQ. EQ.
WOMEN'S
TLT
DIRTY
UTILITY
CLEAN
UTILITY
IT
OFFICE
IT
CLOSET
TLT
CORR.
C-6
CLOSET
26-A
20-A
C L
E A
R
M I N
MEN'S
TLT
STAFF
OFFICE
BREAK
ROOM
STAFF
OFFICE
STAFF
OFFICE
GROUP/
CONFERENCE
CORR.
C-5
C L
E A
R
M I N
A
M
G-103
ENLARGED ICRA PLANS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
RR
658-20-105
20-210
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
6Engineers Architects U.S. Department of Veterans Affairs
SHEET KEY NOTES:
X
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
WALL RATINGS LEGEND:
SMOKE WALLS S S S
1 HOUR FIRE WALL
S
2 HOUR FIRE WALL
3 HOUR FIRE WALL
1, 2A, 2, 4, 5, 7, 8, 9, 10, 11, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
OCTOBER 24, 2022
CA
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
D
1. PROVIDE TEMPORARY PLASTIC BARRIER
PARTITION TO THE UNDERSIDE OF CEILING WITH
ZIPPER ENTRY. PARTITION SHALL BE INSPECTED
BY VA ICRA STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE CONSTRUCTION
SPACE.
2. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
3. WORK TO BE PERFORMED AT THE MASTER AND
SLAVE CONTROL PANEL LOCATIONS SHALL BE
PERFORMED AT ONE LOCATION AT A TIME.
4. USE A PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
5. CONTRACTOR SHALL COVER ALL FURNITURE
WITHIN ROOM WITH PLASTIC, PRIOR TO
COMMENCING WORK IN A SPACE AND REMOVE
PRIOR TO POST-CONSTRUCTION TERMINAL
CLEANING.
6. THE AIR WITHIN THE CONSTRUCTION AREA SHALL
BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE
NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE, PORTABLE
HEPA FILTER CAPABLE OF FILTRATION RATES OF
300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST INTO A ROOM,
A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST.
1 TYPICAL CAFETERIA
SCALE: 1/8" = 1' 0"
2 TYPICAL CANTEEN
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
CLASS II
CLASS II
3 SOUTH ELEVATION @ POLICE DISPATCHES - ROOM 3K
SCALE: 1/4" = 1' 0"
A. FOLLOW ICRA REQUIREMENTS.
B. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
C. PATCH ALL PENETRATIONS AND OPENINGS IN
SMOKE AND FIRE WALLS WITH APPROVED UL
LISTED MATERIALS. COR TO APPROVE PRIOR TO
INSTALLATION.
D. DEMOLISH ALL DEVICES MARKED TO BE
DEMOLISHED ON TECHNOLOGY SHEETS UNLESS
NOTED OTHERWISE.
E. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. VERIFY ALL FIELD
CONDITIONS.
F. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
G. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
H. EXISTING WINDOWS THAT NEED TO BE
TEMPORARILY REMOVED TO ACCOMMODATE
DISCHARGED AIR EXHAUST DUCT, SHALL BE
RE-INSTALLED AFTER CONSTRUCTION.
I. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
SALEM VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
J. TYPICAL ICRA PLANS ARE INCLUDED FOR
REFERENCE ONLY. ICRA SHALL BE PROVIDED BY
THE SALEM VAMC PERSONNEL.
K. CONTRACTOR TO MOUNT IT ROOM AND NURSE
MANAGER ROOM MONITORS ON METAL STUDS @
48" A.F.F. BRACED STUD-TO-STUD IF NECESSARY.
PATCH AND REPAIR AREA OF WALL REMOVED FOR
BLOCKING. PAINT FROM CORNER TO CORNER.
NOTIFY COR PRIOR TO SAW-CUTTING OF DRYWALL.
FOLLOW ICRA GUIDELINES FOR ANY DRILLING/
CUTTING OF DRYWALL TO CONTAIN DUST. SEE
TYPICAL ICRA DETAILS, SHEET G-100.
4 TYPICAL IT OFFICE
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
CLASS II
5 TYPICAL NURSE MANAGER ROOM
SCALE: 1/8" = 1' 0"
NORTH
PLAN
0 4 8 16
CLASS II
GENERAL TECHNOLOGY NOTES
1. PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA
STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT
SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL
LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.
4. PROVIDE CABLING THAT COMPLIES WITH LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION
METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.
5. COMPLY WITH ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS FOR
TELECOMMUNICATIONS IN COMMERCIAL BUILDING.
6. COMPLY WITH ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING STANDARD.
7. COMPLY WITH ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS
PATHWAYS AND SPACES.
8. COMPLY WITH NFPA 70 NATIONAL ELECTRICAL CODE.
9. COMPLY WITH NFPA 99 HEALTHCARE FACILITIES CODE.
10. COMPLY WITH NFPA 101 LIFE SAFETY CODE.
11. COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.
12. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY
AMERICAN ACT".
13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS
NOTED OTHERWISE.
14. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.
15. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY
TESTING AGENCY.
16. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE
MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.
17.
18.
PROVIDE TIA/EIA CAT 6A COPPER OUTLETS AND CONNECTORS.
19.
ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6A KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED
BY THE VA COR.
20.
LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS
SET FORTH BY THE VA HOSPITAL OIT.
21.
ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
TECHNOLOGY SYMBOL LEGEND
DATA OUTLET - 2-4 PR UTP
DATA OUTLET - 1-4 PR UTP
TELECOMMUNICATIONS OUTLET - 1-4 PR UTP
SYMBOL HEIGHT DESCRIPTION
18"
18"
48"
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.
SEE DRAWINGS FOR MORE INFORMATION.
NOTE: NOT ALL SYMBOLS ARE USED.
WIRELESS ACCESS POINT - 2-4 PR UTP
WALL PHONEW
DATA OUTLET - 4-4 PR UTP18"
TV OUTLET WALL MOUNTED
48"
FOUR POST OIT EQUIPMENT RACK
OIT EQUIPMENT CABINET
CCTV EQUIPMENT CABINETCCTV
AS NOTED
GROUND BUS
CEILING
FLOOR
FLOOR
FLOOR
18"
DATA OUTLET - 6-4 PR UTP18"6
FLOOR TWO POST OIT EQUIPMENT RACK
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
OCTOBER 24, 2022 ADRKTK
658-20-10520-210
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A. 34Engineers Architects
U.S. Department of Veterans Affairs
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
1, 2, 2A, 4, 5, 7, 8, 9, 10, 11, 12, 14,17, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
T-001
TECHNOLOGY GENERAL NOTES,
LEGEND, AND ABBREVIATIONS
ELECTRICAL AND TECHNOLOGY ABBREVIATIONS LIST
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SYS SYSTEM
TELEPHONE/DATA
TP TWISTED PAIR
TR TELECOM ROOM
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL CABINET
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
V VOLT
VA VETERANS ADMINISTRATION
W WATT
W/ WITH
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
FEET"
INCHES
# NUMBER
MTR MOTOR, MOTORIZED
MTS MANUAL TRANSFER SWITCH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT
SWITCH
NIC NOT IN CONTRACT
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OIT OFFICE OF INFORMATION TECHNOLOGY
PACS PHYSICAL ACCESS CONTROL SYSTEM
PCB POLYCHLORINATED BYPHENYL
PC PERSONAL COMPUTER
PDU RACK POWER DISTRIBUTION UNITS
PoE POWER OVER ETHERNET
PH PHASE
PNL PANEL
PR PAIR
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RGS RIGID GALVANIZED STEEL
RM
RP REPLACE
RV REMOVE
SC SURFACE CONDUIT
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SM SINGLE MODE FIBER
SPEC SPECIFICATION
SP SPACE
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AC ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACC ACCESSIBLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AMP AMPERE
ARCH ARCHITECT, ARCHITECTURAL
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAT CATALOG
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
CO CONTRACTING OFFICER
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER'S REPRESENTATIVE
CTR CENTER
CU COPPER
dB DECIBEL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DN DOWN
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
EM EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
ETR EXISTING TO REMAIN
EX EXISTING
FLR FLOOR
FMC FLEXIBLE METAL CONDUIT
FU FUSE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYPSUM BOARD
HP HORSEPOWER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IT INTERCOMMUNICATION ROOM
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LMFC LIQUIDTIGHT FLEXIBLE METAL CONDUIT
LV LOW VOLTAGE
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
'LPN'
SYMBOL NOTES
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5 EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
GENERAL ELECTRICAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE AND VA STANDARDS.
PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.
VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING
HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
ALL 120 VOLT, 20 AMP BRANCH CIRCUIT CONDUCTORS SHALL BE 2-12 AWG, 1-12 AWG EG IN 3/4" CONDUIT, UNLESS NOTED OTHERWISE.
a. RUNS LESS THAN 150' SHALL BE MINIMUM 2-12 AWG, 1-12 AWG EG IN 3/4" CONDUIT.
b. RUNS 150' TO 250' SHALL BE MINIMUM 2-10 AWG, 1-10 AWG EG IN 3/4" CONDUIT.
c. RUNS GREATER THAN 250' SHALL BE MINIMUM 2-8 AWG, 1-8 AWG EG IN 3/4" CONDUIT.
COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT
DURING CONSTRUCTION.
ALL PANELS SHALL HAVE TYPED, COMPLETED UP-DATED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR
SPACE.
MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST
COMPLY WITH "BUY AMERICAN ACT".
ALL CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT
MANUFACTURER'S SPECIFICATIONS.
CIRCUITRY TO, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S
SCREW TERMINALS.
MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEG C.
ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED
(MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED
THIRD PARTY TESTING AGENCY.
IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
MINIMUM CONDUIT SIZE TO BE USED IS 3/4".
ELECTRICAL SYMBOL LEGEND
120V DUPLEX RECEPTACLE
RECEPTACLE MODIFIERS:
AC: 3" ABOVE COUNTERTOP/BACKSPLASH
GFI: GROUND FAULT CURRENT INTERRUPTER
WP: WEATHERPROOF ENCLOSURE
DED: DEDICATED CIRCUIT
120V DUPLEX RECEPTACLE EMERGENCY OUTLET
AND COVER PLATE SHALL BE RED IN COLOR
120V QUADRUPLEX RECEPTACLE
120V QUADRUPLEX RECEPTACLE EMERGENCY
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
SYMBOL HEIGHT DESCRIPTION
18"
18"
18"
18"
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
TOP: HEIGHT TO TOP OF DEVICE
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.
SPECIAL RECEPTACLE18"
NOTE CONCERNING NEW SECURITY
SURVEILLANCE CAMERAS:
NONE OF THE NEW SECURITY SURVEILLANCE CAMERAS SUPPLIED BY CONTRACTOR WILL BE
SOURCED FROM CHINESE MANUFACTURERS IN ACCORDANCE WITH THE NATIONAL DEFENSE
AUTHORIZATION ACT. CONTRACTOR TO ENSURE NO NEW CAMERAS ARE REFURBISHED CAMERAS
FROM CHINA.
22.
BASIS OF DESIGN FOR CCTV EQUIPMENT IS BASED ON AVIGILON.
PROPOSED PHASING SCHEME:
ALL NEW MONITORS TO BE SURVEILLANCE SECURITY CAMERA TYPES AND NOT TV MONITORS.
23.
19. ALL NETWORK CONNECTIONS TO LAN/WAN ARE PROVIDED BY OTHERS.
FE
EF
FIBER TO ETHERNET CONVERTER
ETHERNET TO FIBER CONVERTER
AS
INDICATED
AS
INDICATED
UNO UNLESS NOTED OTHERWISE
'BLD 1' - 1 EXAMPLE: HOME RUN TO BUILDING NUMBER 1 (BLD 1); Room 1.
THE VA TO PROVIDE ALL PoE SWITCHES AND UPS(ES) IN EACH BUILDING OIT ROOM INTENDED TO SERVE
THE NEW CAMERAS.
DVR DIGITAL VIDEO RECORDER
FO FIBER OPTIC
MM MULTI MODE FIBER
N NEW
NAC NETWORK APPLIANCES CONTROL PANEL
NVR NETWORK VIDEO RECORDER
OL OVERLOAD
WM WIRE MANAGEMENT
TEL/DATA
TGB
TMGB TELECOM MAIN GROUND BUS BAR
TELECOM GROUND BUS BAR
LAN LOCAL AREA NETWORK
ROOM
WAN WIDE AREA NETWORK
GYP BD
VOLT-AMPERES
TV TELEVISION
TIA TELECOMMUNICATIONS INDUSTRY
ASSOCIATION
EIA ELECTRONIC INDUSTRIES ASSOCIATION
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
BICSI BUILDING INDUSTRY CONSULTING SERVICES,
INTERNATIONAL
CATEGORY
24. MINIMUM CONDUIT SIZE TO BE USED IS 1-1/4"
25. COORDINATE DEACTIVATION OF EXISTING CAMERAS WITH COR OR DESIGNATED VA REPRESENTATIVE TO
ENSURE CAMPUS POLICE AND CAMERA SYSTEM OWNERS ARE PREPARED FOR LOSS OF CAMERAS.
26. COORDINATE FIXED CAMERA FACING AFTER INITIAL ACTIVATION WITH COR OR DESIGNATED VA
REPRESENTATIVE.
1. INSTALL FIBER BACKBONE CABLING FROM NEW SECURITY CAMERA
HEADEND EQUIPMENT TO NEW PoE CISCO SWITCH TO BE INSTALLED IN
SERVER ROOM 277E, BUILDING 74, TO FACILITATE CONNECTION TO
CAMPUS SECURED FIBER OPTIC NETWORK.
2. RUN NEW CAT 6A COPPER CABLES (OR FIBER CABLES FOR DISTANCES
OVER 90 METERS) FROM EXISTING IT ROOMS TO CAMERA LOCATIONS.
3. INSTALL SECURITY CAMERA HEADEND EQUIPMENT, CONDUIT ALONG
WITH EQUIPMENT RACKS IN SERVER ROOM 277E AND REQUIRED
POWER OUTLETS.
4. INSTALL MONITORS IN POLICE DISPATCH ROOM.
5. INSTALL WALL MOUNTED AND CEILING MOUNTED SECURITY CAMERAS.
NEW CAMERAS TO BE CONNECTED PRIOR TO REMOVAL OF THOSE
BEING REPLACED TO AVOID BLIND SPOTS.
6. MAKE CONNECTIONS TO CAMERAS.
7. PROVIDE TESTING/CERTIFICATION.
8. REMOVE ALL REMAINING EXISTING CAMERAS, EQUIPMENT AND
CABLING.
9. REMOVE REPLACED EXISTING CAMERAS AND UNUSED POWER AND
DATA CABLES.
27. REMOVED CAMERAS ARE REQUIRED TO BE RETURNED TO POLICE SERVICES DEPARTMENT.
JUNCTION BOX, CEILING MOUNTED, PURPOSE AS NOTEDJ
CLNG
HOME RUN TO EXISTING PATCH PANEL: THE BUILDING NUMBER AND IT ROOM
NUMBER DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
TERMINATE CABLING ON PATCH PANEL IN DESIGNATED BUILDING AND ROOM
NUMBER.
FE 12 MP CCTV FISH EYE (H4F-D01-IR)9'-0"
NA
D6
RV
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
WP - WEATHER PROOF
6 MP CCTV FIXED DOME (H5A)9'-0"
5 MP CCTV FIXED DOME (H5A)9'-0"
24 MP CCTV MULTISENSOR (24C-H4A-3MH)9'-0"
9'-0"
9'-0"
9'-0"
3 MP CCTV LICENSE PLATE (H4 LPC)9'-0"
EXISTING CAMERA TO BE REMOVED
24 MP CCTV MULTISENSOR (24C-H4A-3MH)
24 MP CCTV MULTISENSOR (24C-H4A-3MH)
32 MP CCTV MULTISENSOR (24C-H4A-3MH)
AFG ABOVE FINISHED GRADE
360L
D5
28. ALL NEW PoE MID-SPAN DEVICES AND CAMERA EQUIPMENT TO BE LABELED. COORDINATE LABELING
SCHEME WITH COR AND OIT.
TELECOMMUNICATIONSTELECOM
VSS VIDEO SECURITY SURVEILLANCE
REMOTE MONITORING WORKSTATION
BASIS OF DESIGN SPECIFICATION:
FOUR MONITOR PROFESSIONAL HIGH-PERFORMANCE REMOTE MONITORING WORKSTATION:
1. BASIS OF DESIGN: MODEL RM5-WKS-4MN, BY AVIGILON.
2. PERFORMANCE:
2.a. PERFORMANCE AT HIGH QUALITY IN THE ACC CLIENT SOFTWARE AT 200 PERCENT DPI
SCALING USING FOUR (4) 4K DISPLAYS:
2.a.a. THIRTY-FIVE (35) 2MP VIDEO STREAMS AT 15 fps.
2.a.b. TWENTY-FIVE (25) 4MP VIDEO STREAMS AT 15 fps.
2.a.c. FOURTEEN (14) 8 MP VIDEO STREAMS AT 15 fps.
2.a.d. FOURTEEN (14) 2 MP VIDEO STREAMS AT 30 fps.
2.a.e. FOURTEEN (14) 4 MP VIDEO STREAMS AT 30 fps.
2.a.f. FIVE (5) 8 MP VIDEO STREAMS AT 30 fps.
2.b. PERFORMANCE AT HIGH QUALITY IN THE ACC CLIENT SOFTWARE USING FOUR (4) 1080 PIXEL
DISPLAYS:
2.b.a. THIRTY-FIVE (35) 2MP VIDEO STREAMS AT 15 fps.
2.b.b. TWENTY-FIVE (25) 4MP VIDEO STREAMS AT 15 fps.
2.b.c. FOURTEEN (14) 8 MP VIDEO STREAMS AT 15 fps.
2.b.d. TWENTY (20) 2 MP VIDEO STREAMS AT 30 fps.
2.b.e. SIXTEEN (16) 4 MP VIDEO STREAMS AT 30 fps.
2.b.f. FIVE (5) 8 MP VIDEO STREAMS AT 30 fps.
2.c. OPERATING SYSTEM: MICROSOFT WINDOWS 10 IoT ENTERPRISE LTSB 2.d. PROCESSOR: INTEL CORE i5.
2.e. MEMORY: 16 GB DDR4 RAM.
2.f. STORAGE: 256 GB SOLID STATE DRIVE (SSD) SYSTEM DRIVE.
2.g. NETWORK INTERFACE: 2 GIGABIT ETHERNET RJ-45 PORTS (1000BASE-T).
2.h. VIDEO OUTPUTS: 4 ACTIVE (4 x mDP).
2.i. OPTICAL DRIVE: DVD-RW.
ACCESSORIES:
1. HUMAN INTERFACE DEVICES (HID):
1.a. USB KEYBOARD 1.b. USB MOUSE
2. CABLING:
2.a. POWER CORD; ONE (1) PER WORKSTATION.
2.b. ADAPTER; TWO (2) mDP TO DISPLAY PORT.
2.c. ADAPTER; TWO (2) mDP TO HIGH DEFINITION MULTIMEDIA INTERFACE.
2.d. ADAPTER; FOUR (4) mDP TO DISPLAY PORT.
2.e. ADAPTER; FOUR (4) mDP TO HIGH DEFINITION MULTIMEDIA INTERFACE.
fps FRAMES PER SECOND
DPI DOTS PER INCH
MP MEGA-PIXEL
mDP MINI-DISPLAY PORT
DocuSign Envelope ID: 3ADC3376-EFA9-4753-9EE8-D15D0B94D50D
2A
X
X
X
X
X
X
27 28
CC
LOT
DD
LOT
T
LOT
S
LOT
P
LOT
O
LOT
Q
LOT
N
LOT
W
LOT
Y
LOT
V
LOT
L
LOT
K
LOT
A
LOT
B
LOT
C
LOT
J
LOT
I
LOT
H
LOT
G
LOT
D
LOT
E
LOT
'BLD 14' -
104A
IT RM
IT RM
IT RM
4A
IT RM
IT RM
104A
IT RM
2B
IT RM 136
IT RM 9
2 2
'BLD 77'
- 4A
'BLD 143' -
BC-114
'BLD 143' -
BE-100
'BLD 7'
- 11
'BLD 11'
- 8A
'BLD 11' -
8A
'BLD 12'
- 5
'BLD 170'
- 117
'BLD 170' -
'BLD 8' -
16i
'BLD 9'
- 12
'BLD 9' -
2A
'BLD 9' -
LAKE AREA
RV
RV
RV
RV
'BLD 1' - 2B
'BLD 1' - 2B
RP
WP
+12' #3
'BLD 143' -
BG-138
'BLD 4'
- 19A
RV
RV
RP
WP
+12' #24
RP
WP
+12' #22
RV
'BLD 74'
- 209
'BLD 75'
- 14
'BLD 76'
- 21
'BLD 17' -
'BLD 75'
- 14 'BLD 75' - 14
'BLD 76'
- 21
'BLD 77'
- 4A
'BLD 17' -
RV
IT RM
19A
360L N
WP
+8' #40
N
WP
+12' #39
RP
WP
+12' #38
RV
RP
WP
+12' #15
N
WP
+12' #16
RP
WP
#14
N
WP
+12' #17
RV
D6 N
WP
+12' #4
1 2
'BLD 2' -
RP
WP
+12' #5
N
WP
+12' #37
'BLD 4'
- 19A
'BLD 4'
- 19A
N
WP
+12' #26D5
N
WP
#27
'BLD 4'
- 19A
RP
WP
12' #12
RP
WP
+9' #13
'BLD 7'
- 11
N
WP
+12' #34
N
WP
+12' #35
N
WP
+12' #32
N
WP
+12' #31
N
WP
+12' #33
N
WP
+12' #36
RP
WP
+9' #30
RP
WP
+12' #1
RP
WP
+12' #2
RP
WP
#7
FE
RP
WP
+12' #6
N
WP
+12'
#8 180
RP
WP
+12' #9
1 2
'BLD 5' -
3B1
RP
WP
+12' #23
RP
WP
+12' #28
D6
RP
WP
+12' #29
N
WP
+12' #10
360L
RP
WP
#11
N
WP
+12' #18
N
WP
+12' #19
RP
WP
+12' #20
RP
WP
+12' #21
N
WP
+12' #25
RV
IT RM
IT RM
16i
IT RM
3B1
IT RM
IT RM
8A
IT RM
IT RM
2A
IT RM
IT RM
BG-138
IT RM
BC-114
IT RM
BE-100
IT
RM
IT RM 125A
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
OCTOBER 24, 2022 ADRKTK
658-20-10520-210
CONSTRUCTION DOCUMENTS - FOR CONSTRUCTION
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A. 34Engineers Architects
U.S. Department of Veterans Affairs
FACILITY WIDE SECURITY
CAMERAS UPGRADE
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
CAMERA SYMBOL LEGENDCAMERA SYMBOL LEGEND
SYMBOL HEIGHT DESCRIPTION
CCTV FISH EYE
(WP-WEATHER PROOF)
12'-0" AFG
UNO
TYPE
12 MP
H4F-DO1-IR
5 MP H5A
24 MP
24C-H4A-3MH
CCTV FIXED DOME
(WP-WEATHER PROOF)
6 MP H5A
360 32 MP
32C-H4A-4MH
3 MP
H4 LPC
FE
MANUFACTURER
AVIGILON
TOTAL
DEVICES
AVIGILON
AVIGILON
AVIGILON
AVIGILON
AVIGILON
AVIGILON
CCTV FIXED DOME
(WP-WEATHER PROOF)
CCTV MULTISENSOR
(WP-WEATHER PROOF)
CCTV MULTISENSOR
(WP-WEATHER PROOF)
CCTV MULTISENSOR
(WP-WEATHER PROOF)
CCTV MULTISENSOR
(WP-WEATHER PROOF)
CCTV LICENSE PLATE
(WP-WEATHER PROOF)
24 MP
24C-H4A-3MH
24 MP
24C-H4A-3MH
D6
360L
CAMERA ABBREVIATIONS
N
RP
RV
WP
PROVIDE AND INSTALL NEW CAMERA
REPLACE EXISTING CAMERA WITH NEW CAMERA
REMOVE EXISTING CAMERA
WEATHER PROOF
SPECIAL NOTE
ALL CAMERAS LOCATED ON THE EXTERIOR OF THE
BUILDING ARE SHOWN ON SHEET TS101 UNLESS
NOTED OTHERWISE.
1, 2, 2A, 4, 5, 7, 8, 9, 10, 11, 12, 14,17, 74, 75, 76, 77, 143, 170, PARKING LOTS B, C, F, H, K, N, Q, R, T, V, X, AND VP
12'-0" AFG
UNO
12'-0" AFG
UNO
12'-0" AFG
UNO
12'-0" AFG
UNO
12'-0" AFG
UNO
12'-0" AFG
UNO
12'-0" AFG
UNO
D5
AVIGILON
TS101
OVERALL SITE PLAN - SALEM VA
MEDICAL CENTER
1 OVERALL SITE PLAN - SALEM VA MEDICAL CENTER
1" = 100'
0 50 100 2000
NORTH
SHEET NOTES:
SHEET KEY NOTES:X
SHEET NOTES:
A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA
ABBREVIATIONS). REMOVE CABLING AND
CONDUIT BACK TO SOURCE. PATCH/REPAIR AND
PAINT SURFACES AFFECTED BY DEMOLITION TO
MATCH SURROUNDING AREA. REPLACE ANY
CEILING TILES DAMAGED OR BROKEN DURING
DEMOLITION AT NO ADDITIONAL COST TO THE
VA.
B. PROVIDE AND INSTALL NEW CAMERAS AS NOTED
(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR
UTP TO CCTV EQUIPMENT IN DESIGNATED IT
ROOM.
C. REMOVE AND REPLACE CAMERAS AS NOTED
(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR
UTP TO CCTV EQUIPMENT IN DESIGNATED IT
ROOM.
D. CCTV SERVICES ARE TO REMAIN ACTIVE
OUTSIDE AREAS UNDER ACTIVE CONSTRUCTION
AT ALL TIMES. FIELD VERIFY CIRCUITS SHOWN
AND RETAIN SERVICES TO ALL DEVICES AND/OR
SYSTEMS DURING DEMOLITION AND REMODEL
OF THE RESPECTIVE AREAS.
E. ALL EXISTING CONDITIONS AND DEVICES ARE
BASED ON THE BEST AVAILABLE INFORMATION
AT THE TIME OF SURVEY AND VISUAL
INSPECTION. VERIFY EXISTING CONDITIONS IN
FIELD.
F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
G. ALL CONDUIT SECURITY JUNCTION BOXES AND
RACEWAY PROVIDED BY ELECTRICAL
CONTRACTOR UNO. ALL CONDUIT SHALL BE 3/4"
MINIMUM. ELECTRICAL CONTRACTOR TO SIZE
CONDUIT PER THE MOST CURRENT EDITION OF
THE NEC.
H. ALL EXPOSED BOXES AND PANELS MOUNTED ON
OR IN THE EXTERIOR WALLS SHALL BE
WEATHERPROOF AND RAIN-TIGHT.
I. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEED 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
J. ALL CAMERAS AND EQUIPMENT THAT IS
REMOVED SHALL BE TURNED OVER TO THE
POLICE DEPARTMENT. COORDINATE WITH COR.
K. ALL EXTERIOR CAMERAS TO BE
WEATHERPR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .