S02 RFQ Attachment - Project Price Breakdown.docx

DOCX document 21 KB Posted

Attached to
Z1LZ--FY26: STATION (PROJ: N/A) BB Repaint all curbs crosswalks and roadway markings
Solicitation number
36C24826Q0393
Issued by

About this file

This is a Request for Quote (RFQ) pricing template for construction project cost breakdown submission. The form requires offerors to provide detailed labor costs, material costs, and total costs organized by MasterFormat divisions, which is the standard classification system for construction specifications. The template includes 34 construction divisions ranging from General Requirements through Transportation, with line items for concrete, masonry, metals, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities.

Offerors must complete the form with their project number, project title, project location, and company information, then calculate subtotals for each division and provide aggregate division subtotals. The form requires separate columns for labor cost, material cost, and total cost for each line item, followed by calculations for overhead percentage, profit percentage, and bond percentage to arrive at a total base offer cost. The pricing template does not specify response dates, award dates, or set-asides but is associated with solicitation 36C24826Q0393 from the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 8, for a project titled "Z1LZ--FY26: STATION BB Repaint all curbs crosswalks and roadway markings" at an unspecified West Palm Beach VAMC location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Cost Breakdown

Project Number:

Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City

State

Zip

Item
Description
Labor Cost
Material Cost
Total Cost
Division 1
General Requirements
$-
$-
$-
Division 2
Existing Conditions
-
-
-
Division 3
Concrete
-
-
-
Division 4
Masonry
-
-
-
Division 5
Metals
-
-
-
Division 6
Wood and Plastic
-
-
-
Division 7
Thermal & Moisture Protect
-
-
-
Division 8
Doors and Windows
-
-
-
Division 9
Finishes
-
-
-
Division 10
Specialties
-
-
-
Division 11
Equipment
-
-
-
Division 12
Furnishings
-
-
-
Division 13
Special Construction
-
-
-
Division 14
Conveying Equipment
-
-
-
Division 21
Fire Suppression
-
-
-
Division 22
Plumbing
-
-
-
Division 23
HVAC
-
-
-
Division 26
Electrical
-
-
-
Division 27
Communications
-
-
-
Division 28
Electronic Safety & Security
-
-
-
Division 31
Earthwork
-
-
-
Division 32
Exterior Improvements
-
-
-
Division 33
Utilities
-
-
-
Division 34
Transportation Subtotal
-
-
-
Division Subtotals :
$-
$-
$-
Overhead %
0.00%
-
Profit %
0.00%
-
Bond %
0.00%
-

Overhead/Profit Subtotals :

Total Base Offer Cost
$-
$-
$-