Amendment 0001 Attachment - Site Layout.jpg

JPG image 272 KB Posted

Attached to
Z1LZ--FY26: STATION (PROJ: N/A) BB Repaint all curbs crosswalks and roadway markings
Solicitation number
36C24826Q0393
Issued by

About this file

This is a site plan/master development plan document showing a phased construction and development layout for a campus or facility complex. The plan illustrates seven phases of development color-coded as follows: Phase 1 (Green), Phase 2 (Pink), Phase 3 (Purple), Phase 4 (Red), Phase 5 (Orange), Phase 6 (Blue), and Phase 7 (Brown). The layout displays various building structures, parking areas, landscaping features including water features and green spaces, pedestrian pathways, and vehicular circulation routes throughout the property.

The plan identifies specific locations for multiple facilities marked with numbered circles and lettered designations, including parking areas (labeled as parking lots with "P" designations and numbered references), buildings positioned around a central campus layout, and landscape elements such as retention ponds or water features shown in light blue. An orange circulation spine appears to connect the primary facilities and pathways throughout the site. The document includes a title block indicating it is a "Campus Map 2004" and references "Area of Construction" and "WEB Yard Complex & Map," with the architect/engineer of record noted in the documentation block. The plan provides a comprehensive overview of site organization, phasing strategy, and spatial relationships between functional areas of the development.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .