About this file

This document package includes an invitation for bid (IFB) solicitation and project drawings for roof replacements at the West Haven VA Medical Center campus.

The IFB is seeking bids for a roof replacement project at Building 35A and the morgue building at the West Haven VAMC. The solicitation number is 36C24122B0011. Bids are due by July 15, 2022. The project will include removing the existing EPDM roofing system and installing a new roof. The drawings provide demolition notes, existing conditions, roof plans, construction details, and general notes for completing the work. Bidders must inspect the site and account for all conditions in their pricing. The selected contractor will be responsible for safety, debris control, and coordinating their work with other onsite trades. The Department of Veterans Affairs VISN 1 is the contracting agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN BY

CGS

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e

A1.0

R o o f

R e p l a c e m e n t s

Roof Work Plan

DRAWING NAME:

DRAWING NUMBER:

& General Notes

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

A1.0

C a m p b e l l

A v e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

29 MARCH 2021

29 MARCH 2021

V A

C

T

H

E A

L T

H C

A R

E

B

L D

G

A

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

- DECKING: WOOD DECK

AutoCAD SHX Text

- INSULATION:

AutoCAD SHX Text

- VAPOR BARRIER:

AutoCAD SHX Text

CORE "A"

AutoCAD SHX Text

- ROOF:

AutoCAD SHX Text

EXISTING ROOF CONSTRUCTION

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text

EPDM

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE LOCAL FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR. (HOT WORK PERMIT REQ.)

AutoCAD SHX Text

NOTE #7

AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES

AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.

AutoCAD SHX Text

NOTE #8

AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF

AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.

AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE

AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO

AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.

AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED

AutoCAD SHX Text

NOTE #9

AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.

AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING

AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL

AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE

AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.

AutoCAD SHX Text

NOTE #10

AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS

AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE

AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED

AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED

AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE

AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.

AutoCAD SHX Text

NOTE #11

AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD

AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN

AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES:

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)

AutoCAD SHX Text

ROOF PITCH

AutoCAD SHX Text

ROOF PITCH

AutoCAD SHX Text

ROOF PITCH

AutoCAD SHX Text

ROOF PITCH

AutoCAD SHX Text

EXPANSION JOINT SEE DETAIL 3/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 1/A2.1 (TYP)

AutoCAD SHX Text

EXPANSION JOINT SEE DETAIL 3/A2.1 (TYP)

AutoCAD SHX Text

EXISTING HATCH TO REMAIN AND INSTALL PERIMETER OSHA SAFETY RAIL

AutoCAD SHX Text

ROOF WORK PLAN

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 8/A2.1 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING & PLYWOOD REMOVAL & REPLACEMENT

AutoCAD SHX Text R&D EXISTING ADHERED EPDM ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - TO EXISTING WOOD STRUCTURAL DECK TO REMAIN.

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR (REWORK EXISTING).REFER TO DETAILS 1&3/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - REFER TO DETAIL 1/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR (REWORK EXISTING)

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 2/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED, RAISED (VERIFY IF LINES ARE ABLE TO BE RAISED TO PREVENT DAMAGE), AND PAINTED YELLOW AS WELL AS RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 7/A2.1 FOR PIPE SUPPORT & PIPE FLASHING DETAILS

AutoCAD SHX Text D14.1

AutoCAD SHX Text D14

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.2

AutoCAD SHX Text

ROOF IMAGE 1

AutoCAD SHX Text

ROOF IMAGE 2

AutoCAD SHX Text

ROOF IMAGE 3

AutoCAD SHX Text D15.5

AutoCAD SHX Text DURING CONSTRUCTION TEMPORARILY SAFETY RAILS ARE TO BE INSTALLED THAT COMPLY WITH OSHA 1910.29.

AutoCAD SHX Text D1.1

AutoCAD SHX Text D14.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.4

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D14.1

AutoCAD SHX Text D15.5

Sheets and Views
A1.0

File details come from the government source that posted it. Updated .