S02 Project Drawing (A1.0) - Building 35A Roof.pdf
PDF 1009 KB Posted
- Solicitation number
- 36C24122B0011
About this file
This document package includes an invitation for bid (IFB) solicitation and project drawings for roof replacements at the West Haven VA Medical Center campus.
The IFB is seeking bids for a roof replacement project at Building 35A and the morgue building at the West Haven VAMC. The solicitation number is 36C24122B0011. Bids are due by July 15, 2022. The project will include removing the existing EPDM roofing system and installing a new roof. The drawings provide demolition notes, existing conditions, roof plans, construction details, and general notes for completing the work. Bidders must inspect the site and account for all conditions in their pricing. The selected contractor will be responsible for safety, debris control, and coordinating their work with other onsite trades. The Department of Veterans Affairs VISN 1 is the contracting agency.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN BY
CGS
APPROVED
A HALL
DATE
P R
O J E
C T
C a m p b e l l
A v e
A1.0
R o o f
R e p l a c e m e n t s
Roof Work Plan
DRAWING NAME:
DRAWING NUMBER:
& General Notes
P r o j e c t
O w n e r
L O
C A
T I O
N
DRAWING STATUS:
A1.0
C a m p b e l l
A v e
W e s t
H a v e n
C
T
DATE No. REVISIONS
Issued for Review:
29 MARCH 2021
29 MARCH 2021
V A
C
T
H
E A
L T
H C
A R
E
B
L D
G
A
AutoCAD SHX Text
SITE LOCUS PLAN
AutoCAD SHX Text
- DECKING: WOOD DECK
AutoCAD SHX Text
- INSULATION:
AutoCAD SHX Text
- VAPOR BARRIER:
AutoCAD SHX Text
CORE "A"
AutoCAD SHX Text
- ROOF:
AutoCAD SHX Text
EXISTING ROOF CONSTRUCTION
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
EPDM
AutoCAD SHX Text
NOTE #1
AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.
AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE
AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL
AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO
AutoCAD SHX Text
BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.
AutoCAD SHX Text
NOTE #2
AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A
AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON
AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE
AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR
AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.
AutoCAD SHX Text
NOTE #3
AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR
AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.
AutoCAD SHX Text
NOTE #4
AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL
AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY
AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND
AutoCAD SHX Text
WITHOUT ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
NOTE #5
AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL
AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.
AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.
AutoCAD SHX Text
NOTE #6
AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS
AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)
AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE LOCAL FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES
AutoCAD SHX Text
FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR. (HOT WORK PERMIT REQ.)
AutoCAD SHX Text
NOTE #7
AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE
AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES
AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.
AutoCAD SHX Text
NOTE #8
AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF
AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.
AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE
AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO
AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED
AutoCAD SHX Text
NOTE #9
AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.
AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING
AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL
AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE
AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.
AutoCAD SHX Text
NOTE #10
AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS
AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE
AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED
AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED
AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE
AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.
AutoCAD SHX Text
NOTE #11
AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD
AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN
AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES:
AutoCAD SHX Text
PV
AutoCAD SHX Text
PV
AutoCAD SHX Text
PV
AutoCAD SHX Text
PV
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST SCUPPERS PER 4/A2.1 (TYP)
AutoCAD SHX Text
ROOF PITCH
AutoCAD SHX Text
ROOF PITCH
AutoCAD SHX Text
ROOF PITCH
AutoCAD SHX Text
ROOF PITCH
AutoCAD SHX Text
EXPANSION JOINT SEE DETAIL 3/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
FLASH EXIST CURBS PER 1/A2.1 (TYP)
AutoCAD SHX Text
EXPANSION JOINT SEE DETAIL 3/A2.1 (TYP)
AutoCAD SHX Text
EXISTING HATCH TO REMAIN AND INSTALL PERIMETER OSHA SAFETY RAIL
AutoCAD SHX Text
ROOF WORK PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text D1.1
AutoCAD SHX Text
DEMOLITION GENERAL WORK NOTES::
AutoCAD SHX Text
XXX
AutoCAD SHX Text
NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA
AutoCAD SHX Text
XXX
AutoCAD SHX Text
NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS
AutoCAD SHX Text D1
AutoCAD SHX Text
ROOFING/FLASHING
AutoCAD SHX Text D1.2
AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 8/A2.1 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING & PLYWOOD REMOVAL & REPLACEMENT
AutoCAD SHX Text R&D EXISTING ADHERED EPDM ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - TO EXISTING WOOD STRUCTURAL DECK TO REMAIN.
AutoCAD SHX Text D15
AutoCAD SHX Text
PLUMBING AND HVAC PENETRATIONS
AutoCAD SHX Text D15.2
AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR (REWORK EXISTING).REFER TO DETAILS 1&3/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET WORK BOX DETAILS
AutoCAD SHX Text D15.3
AutoCAD SHX Text D15.1
AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - REFER TO DETAIL 1/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR (REWORK EXISTING)
AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 2/A2.1 FOR VENT FLASHING DETAIL
AutoCAD SHX Text D15.4
AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED, RAISED (VERIFY IF LINES ARE ABLE TO BE RAISED TO PREVENT DAMAGE), AND PAINTED YELLOW AS WELL AS RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 7/A2.1 FOR PIPE SUPPORT & PIPE FLASHING DETAILS
AutoCAD SHX Text D14.1
AutoCAD SHX Text D14
AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.
AutoCAD SHX Text
ELECTRICAL AND COMMUNICATIONS SYSTEMS
AutoCAD SHX Text D1.2
AutoCAD SHX Text D1.2
AutoCAD SHX Text D1.2
AutoCAD SHX Text D1.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text D15.2
AutoCAD SHX Text
ROOF IMAGE 1
AutoCAD SHX Text
ROOF IMAGE 2
AutoCAD SHX Text
ROOF IMAGE 3
AutoCAD SHX Text D15.5
AutoCAD SHX Text DURING CONSTRUCTION TEMPORARILY SAFETY RAILS ARE TO BE INSTALLED THAT COMPLY WITH OSHA 1910.29.
AutoCAD SHX Text D1.1
AutoCAD SHX Text D14.1
AutoCAD SHX Text D15.1
AutoCAD SHX Text D15.3
AutoCAD SHX Text D15.4
AutoCAD SHX Text D15.5
AutoCAD SHX Text D1.1
AutoCAD SHX Text D14.1
AutoCAD SHX Text D15.5
| Sheets and Views |
| A1.0 |