S02 Past Performance Questionnaire.pdf

PDF 152 KB Posted

Attached to
Z2DA--523A4-CSI-401 Cath Lab Site Prep Federal contract opportunity
Solicitation number
36C24125R0074
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a Past Performance Questionnaire template designed for federal contract performance evaluations. The form provides a structured format for capturing detailed contractor performance information across multiple evaluation factors, including quality of work, personnel, cost/budget control, customer satisfaction, timeliness of performance, business relations, and overall performance. The document includes comprehensive rating guidelines that allow evaluators to rate contractor performance on a scale from Unsatisfactory to Exceptional, with specific criteria defined for each rating level in different performance categories. The rating guidelines offer granular descriptions of what constitutes performance at each level, enabling a systematic and objective assessment of a contractor's past performance.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--523A4-CSI-401 Cath Lab Site Prep, newest first.
File Type Posted
WD MA20260001 01022026.pdf PDF
36C24125R0074 0008.docx DOCX document
S02 RFP SB Set Aside 36C24125R0074.pdf PDF
36C24125R0074 0007.docx DOCX document
S02 Existing drawings.zip ZIP file
S02 Clarifications Q and A.pdf PDF
36C24125R0074 0006.docx DOCX document
WD MA2025 07182025.pdf PDF
36C24125R0074 0003.pdf PDF
36C24125R0074 0002.docx DOCX document
36C24125R0074 0001.docx DOCX document
S02 WD MA20250001 04042025.pdf PDF
S02 SOW 523A4-CSI-401 Cath Lab Site Prep.pdf PDF
S02 Cores.pdf PDF
S02 Building 1 5th Floor Map.pdf PDF
S02 SHPO Notification Guide.pdf PDF
S02 Hirsch Velocity Data Sheet.pdf PDF
S02 Specification Sample 523A4-CSI-401 Cath Lab Site Prep.pdf PDF
S02 WRX PCRA Cathlab Site Prep 523A4-CSI-401-Final.pdf PDF
36C24125R0074 Solicitation.docx DOCX document
S02 SSJ 523A4-CSI-401 Cath Lab Site Prep.pdf PDF
S02 Strike.pdf PDF
S02 Levers.pdf PDF
S02 Hirsch Velocity Fast Facts.pdf PDF
S02 318_R4_West_Roxbury_MA_VA_WiFi_Fin.pdf PDF
S02 Azurion 7 C20 - R3 standard drawing.pdf PDF
S02 General Design Comments.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

PAST PERFORMANCE QUESTIONNAIRE

1. Contractor Name:

Role on Project:

2. Contract Number:

3. Contractor Address: 4. Contract Type:

□ Firm Fixed Price

□ T&M/LH

□ Cost Reimbursement

□ Other (Please Specify):

5. Procuring Agency/Company Name: 6. Agency/Company POC:

Phone:

Email:

7. Period of Performance: 8. Dollar Amount of Award: $

Annual Amount: $

Total Dollar Value w/ Mods:$

9. Title of Contract:

10. Description of Contract Service/Scope of Contract:

11. Complexity of Work:

FOR OFFICIAL USE ONLY 2

NOTE: Please use adjectival ratings from attached sheet.

12. Evaluation Factor 13. Comments (Mandatory, Attach additional sheets, if necessary.) 14. Rating

a. Quality of Work

b. Personnel

c. Cost/Budget Control

d. Customer Satisfaction

e. Timeliness of Performance/Deliverables

f. Business Relations

g. Overall Performance

15. Would you hire this contractor again?

Why or Why Not?

16. Name:

Date:

17. Title:

FOR OFFICIAL USE ONLY 3

PAST PERFORMANCE RATING GUIDELINES

Summarize Contractor Performance in each of the rating areas. Assign each area a rating of Unsatisfactory, Marginal, Satisfactory, Very Good, and Exceptional. Use the following instructions as guidance in making these evaluations. Please use the comments area on the preceding form to justify the rating given.

Ratings Quality of Work/ Cost/Budget Customer Timeliness of Business

Personnel/Service Control Satisfaction Services/Deliverable Relations

Customer -Effective Mgmt.

-Compliance w/contract Satisfaction is a -Met interim -Business like requirements -Within budget measure of how milestones correspondence -Accuracy of reports -Current, accurate, products and -Reliable -Responsive to -Appropriateness of personnel complete billings -Relationship of services supplied by a company

-Responsive to technical direction contract requirements -Prompt notification

-Technical excellence negotiated costs to meet or surpass -Completed on time of problems actual

-Cost efficiencies customer expectations.

-Reasonable/ cooperative

-Change orders -Flexible issued -Pro-active

Unsatisfactory Nonconformances are comprising the achievement of contract requirements

Cost issues are comprising performance

1 - Very Unsatisfied

Delays are compromising achievement of contract requirements

Response is not effective

Marginal Nonconformances Cost issues require major agency resources to ensure achievement of contract requirements

2 - Somewhat Delays require major agency resources to ensure achievement of contract requirements

Response is require major agency Dissatisfied marginally effective resources to ensure achievement of contract requirements

Satisfactory Nonconformances do not impact achievement of contract requirements

Cost issues do not impact achievement of contract requirements

3 - Neither Satisfied Nor Dissatisfied

Delays do not impact achievement of contract requirements

Response is usually effective

Very Good There are no quality problems/issues, and the

There are no cost management issues

4- Somewhat Satisfied

There are no delays Response to inquiries and/or contractor has and the Contractor technical, service, substantially exceeded the contract performance has exceeded the contract administrative issues are effective.

requirements without requirements, commensurate additional achieving cost costs to the Government savings to the Government.

Exceptional The contractor has The contractor has 5 - Very Satisfied The contractor has The contractor has demonstrated an demonstrated an demonstrated an demonstrated an exceptional performance level that was exceptional performance. It is exceptional performance level.

exceptional performance level.

significantly in excess of expected that this It is expected that It is expected that anticipated achievements rating will be used in this rating will be this rating will be and is commendable as those rare used in those rare used in those rare an example for others. It circumstances circumstances circumstances is expected that this where the contractor where contractor where contractor rating will be used in achieved cost performance clearly performance clearly those rare circumstances savings and exceeds the exceeds the where contractor performance clearly performance levels performance levels performance clearly exceeds the performance exceeds the performance levels described as "Exceptional".

described as "Exceptional".

levels described as described as "Exceptional". "Exceptional".

File details come from the government source that posted it. Updated .