S02 EXHIBIT I 9766_Providence_Angio_Rev1_UPS-24-07-12.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24124R0065
About this file
This document is a Request for Proposal (RFP) for a construction project to renovate and upgrade the angiography operating room (Angio OR) suite at the Providence Veterans Affairs Medical Center (VAMC) in Providence, Rhode Island. The project involves general demolition, electrical, and imaging equipment work to update the existing Angio OR suite. Key requirements include providing a contractor-furnished and installed uninterruptible power supply (UPS) system for the angiography equipment, installing a surface or flush mounted warning light above the door to indicate when x-ray is on, and providing a 120V/5A door switch. The solicitation number is 36C24124R0065 and the contract is being administered by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Proposals are due by January 31, 2024.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DP1-EQ-CC
FR
ON
T
WORKING
CLEARANCE
(TYPICAL)
TV
S S S S S
S
S S
EMERG ELEC RM
201B
ELEC RM
201C
ANGIOPLASTY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Renovate and Upgrade Angio OR Suite at the Providence VAMC
Providence, Rhode Island
650-CSI-351
Building #1 Project Director
JANUARY 31, 2024Revisions: Date:
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
CO
MM
ON
WEA
LTH OF VIRGINIA
PROFESSIONAL EN
GI
NE
ER
SCOTT PARKER SCHWERIN
Lic. No. 37431
EXISTING PLANS
ED103
SPS BSP
GENERAL DEMOLITION NOTES
# KEY NOTES
SCALE:
FIRST FLOOR PLAN
ED103
16'1/8" = 1'-0" 4'0 8'
A. FIRST FLOOR IS TWO FLOORS BELOW ANGIO. MECHANICAL ROOM 105 IS
TWO FLOORS TALL.
SCALE:
EXISTING SECOND FLOOR PLAN
ED103
16'1/8" = 1'-0" 4'0 8'
07/10/24PRE-BID ADDENDUM NO. 11
1. APPROXIMATE LOCATION FOR CONTRACTOR FURNISHED, CONTRACTOR
INSTALLED UPS ANGIO. BASIS OF DESIGN IS SOCOMEC MODULYS GP UL
SERIES.
2. PROVIDE 3" HIGH MINIMUM CONCRETE MAINTENANCE PAD. CONCRETE
SHALL BE 3000 PSI MINIMUM.
AutoCAD SHX Text
ZB106
AutoCAD SHX Text
BLDG SVC
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
FM
AutoCAD SHX Text
AutoCAD SHX Text 7.32
AutoCAD SHX Text
ZB109
AutoCAD SHX Text
BLDG SVC
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
FM
AutoCAD SHX Text
AutoCAD SHX Text 0.35
AutoCAD SHX Text
ZB110
AutoCAD SHX Text
BLDG SVC
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
FM
AutoCAD SHX Text
AutoCAD SHX Text 0.58
AutoCAD SHX Text
AutoCAD SHX Text
BLDG SVC
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
FM
AutoCAD SHX Text
AutoCAD SHX Text 21.75
AutoCAD SHX Text 12E
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 28.23
AutoCAD SHX Text 12A
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 101.13
AutoCAD SHX Text 12B
AutoCAD SHX Text
BATH/SHOW.
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 39.36
AutoCAD SHX Text
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
THERAPY
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 396.11
AutoCAD SHX Text
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
THERAPY
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 285.03
AutoCAD SHX Text
AutoCAD SHX Text
COMMON
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
BATH/SHOW.
AutoCAD SHX Text
FMS
AutoCAD SHX Text
AutoCAD SHX Text 118.50
AutoCAD SHX Text 12D
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 131.12
AutoCAD SHX Text
AutoCAD SHX Text
OUTPAT
AutoCAD SHX Text
THERAPY
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
HMS
AutoCAD SHX Text
AutoCAD SHX Text 2,212.37
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
STAIR
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
TEL/DATA
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
EXIST. GRADE
AutoCAD SHX Text
APPROX. EL 81'-0"
AutoCAD SHX Text
TT
AutoCAD SHX Text
TTTTTTTTT
AutoCAD SHX Text
EXIST. GRADE
AutoCAD SHX Text
EL 82'-0"
AutoCAD SHX Text
TT
AutoCAD SHX Text
TTTTTTT
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
EL 79'-7"
AutoCAD SHX Text
TTT
AutoCAD SHX Text
TTTTTTTT
AutoCAD SHX Text 4.3
AutoCAD SHX Text 4.3
AutoCAD SHX Text 4.5
AutoCAD SHX Text 4.5
AutoCAD SHX Text G3
AutoCAD SHX Text 4.7
AutoCAD SHX Text 4.7
AutoCAD SHX Text A.6
AutoCAD SHX Text A.6
AutoCAD SHX Text E
AutoCAD SHX Text A.2
AutoCAD SHX Text 4.8
AutoCAD SHX Text A.5
AutoCAD SHX Text A.2
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text A.2
AutoCAD SHX Text 4.8
AutoCAD SHX Text A.5
AutoCAD SHX Text A.2
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
EL 79'-9"
AutoCAD SHX Text
TTT
AutoCAD SHX Text
TTTTTTTT
AutoCAD SHX Text
EXTERIOR GRADE
AutoCAD SHX Text
EL 79'-7"
AutoCAD SHX Text
TTT
AutoCAD SHX Text
TTTTTTTT
AutoCAD SHX Text
BASEMENT LEVEL
AutoCAD SHX Text
EL 78'-0"
AutoCAD SHX Text
TTT
AutoCAD SHX Text
TTTTTTTT
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
EL 78'-0"
AutoCAD SHX Text
TTT
AutoCAD SHX Text
TTTTTT
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
CLOCK
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
MED GAS ZONE VALVE
AutoCAD SHX Text
NITROGEN CTR PANEL
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text
AutoCAD SHX Text 255B
AutoCAD SHX Text 255A
AutoCAD SHX Text 209A
AutoCAD SHX Text 209B
" [1
5m m]
TV
S S S S S S S S S S S
S S
S
S S S S
ANGIOPLASTY
OR ACCESS VESTIBUILE
SCRUB
210A
SEMI-RESTRICTED CORRIDOR
A B C D
IPU-E-ANGIO
IPU-N-ANGIOCY-MA-PG
CY
CY-MA-SCY-MR-S
MAME MRMB
CB
E BOOM
ATY
RIC
VB2
FW VB1
MSA
TV
SP
ERB
WR2
WR1
WM IC WR3
PHY
ST
E
IPU-E-ANGIO-13
IPU-E-ANGIO-14
IPU-N-ANGIO-12
IPU-N-ANGIO-13
E
IPU-E-ANGIO-12
E
IPU-E-ANGIO-10
IPU-N-ANGIO-10
IPU-N-ANGIO-8
IPU-E-ANGIO-8
IPU-N-ANGIO-6
IPU-N-ANGIO-4
E,C
E,C
IPU-E-ANGIO-6
IPU-N-ANGIO-2
E E E E
E
DP-CB-OR-2-57
DP-CB-OR-2-53
DP-CB-OR-2-59
7ANGIO UPS
DP-CB-OR-2-58
CRAC-1
C
DOOR
OPERATORWP
WP
E,96"
ST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Renovate and Upgrade Angio OR Suite at the Providence VAMC
Providence, Rhode Island
650-CSI-351
Building #1 Project Director
JANUARY 31, 2024Revisions: Date:
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
CO
MM
ON
WEA
LTH OF VIRGINIA
PROFESSIONAL EN
GI
NE
ER
SCOTT PARKER SCHWERIN
Lic. No. 37431
NEW WORK PLAN
EP101
GENERAL NOTES
A. EXACT LOCATION FOR VB3,VB4,VB5,VB6,VB7, AND VB8 WILL
BE COORDINATED BY CUSTOMER AND LOCAL PHILIPS
SERVICE.
B. CONTRACTOR TO PROVIDE A SURFACE OR FLUSH MOUNTED
WARNING LIGHT ABOVE DOOR TO INDICATE WHEN X-RAY IS
ON.
C. CONTRACTOR TO PROVIDE 120V/5A DOOR SWITCH.
MOUNTED IN THE UPPER CORNER ON STRIKE SIDE OF MAIN
ENTRY DOORS
# KEY NOTES
1 NEW LOCATION FOR ISOLATED POWER PANEL.
2 WR2 TO CONNECT THROUGH WALL TO WR1 VIA RACEWAY.
3 FIREWALL MUST BE INSTALLED MAXIMUM OF 6'-6 34" FROM
THE CY.
4 SURFACE MOUNT TO THE BOTTOM OF WR2.
5 SHUNT TRIP (EMERGENCY OFF) BUTTON TO BE ON REMOTE
CONTROL STATION WITH 2 #12, 1 #12G, 3/4"C TO CB.
6 PROVIDE ENCLOSED CIRCUIT BREAKER WITH DOUBLE LUG
ON LINESIDE.
7 PROVIDE 5#3/0, 2-1/2"C TO THE LOAD SIDE OF THE UPS
ANGIO. SEE SHEET ED103 FOR LOCATION.
8 PROVIDE 3/4"C WITH PULL STRING FROM WAVE PLATE TO
DOOR OPERATOR.
SCALE:
NEW WORK POWER PLAN
EP101
8'1/4" = 1'-0" 2'0 4'
IMAGING EQUIPMENT SCHEDULE
ITEM
DESIGNATION DESCRIPTION
CB MLO PANELBOARD WITH LUGS AS REQUIRED FOR INCOMING
FEEDER AND 480V, 3 PHASE, TYPE D 80 A CIRCUIT BREAKER WITH
LONG-TIME DELAY AND SHUNT TRIP (E.G. SQUARE D HDL36080
OR EQUIVALENT). RUN POWER FROM BREAKER TO "MA", LEAVING
AN 8' (2440MM) TAIL AT "MA".
ST SHUNT TRIP (EMERGENCY OFF) - LARGE MUSHROOM-HEAD
BUTTON ON REMOTE CONTROL STATION WITH CONTACTS TO
OPERATE FEATURE OF "CB" (IF REQUIRED BY LOCAL CODE OR
OWNER, AND MANDATORY FOR VA AND D.O.D INSTALLATIONS).
GE LOCAL BUILDING STEEL (I.E. STRUCTURAL STEEL, GROUND ROD).
ERB EQUI-POTENTIAL REFERENCE BAR MOUNTED IN A 12" (305MM) W
X 12" (305MM) H X 4" (105MM) D PULL BOX WITH HINGED COVER,
SURFACE MOUNTED TO THE BOTTOM OF "WR2" WHEN POSSIBLE.
ME 19 1/4" (490MM) W X 67" (1705MM) H X 4" (105MM INCLUDING
RUBBER ISOLATION STRIPS) D FLANGED-EDGE TERMINAL BACK
BOX, SURFACE MOUNTED 82" (2085MM) A.F.F. TO TOP OF BOX.
MR
MA
MB
CY GROMMET OPENING ON "WR3". APPROXIMATE LOCATION SHOWN
IS RECOMMENDED AND MAY BE CHANGED - VERIFY RELOCATION
WITH LOCAL PHILIPS SERVICE.
WM
VB1
VB2
VB3 4" (105MM) W X 4" (105MM) H X 4" (105MM) D PULL BOX WITH
REMOVABLE SCREW-TYPE COVER PLATE, FLUSH MOUNTED.
EXACT HEIGHT TO BE DETERMINED. VERIFY LOCATION WITH
LOCAL PHILIPS SERVICE.
VB4
VB5
VB6
VB7
VB8
WR1 10" (255MM) W X 4" (105MM) D WALL RACEWAY, SURFACE
MOUNTED WITH REMOVABLE SCREW-TYPE COVER PLATE. "WR1"
IS AT 5" (130MM) A.F.F. TO BOTTOM OF RACEWAY. "WR2" IS AT 82"
(2085MM) A.F.F. TO BOTTOM OF RACEWAY.
WR2
WR3 10" (255MM) W X 4" (105MM) D WALL RACEWAY, SURFACE
MOUNTED WITH REMOVABLE SCREW-TYPE COVER PLATE. "WR3"
IS AT FINISHED FLOOR. "WR3" MAY NEED TO BE CUT AT THE
LOCATION OF THE "CY" CONNECTION BOX.
PHY STUB UP POINT FOR PHYSIOLOGICAL MONITORING CABLES. RUN
RACEWAY (CONDUIT) TO CUSTOMER'S PHYSIOLOGICAL CONSOLE
LOCATION. CONTACT MANUFACTURER FOR POWER
REQUIREMENTS, ETC.
ATY AUXILIARY BOX - 6" (155MM) W X 6" (155MM) H X 4" (105MM) D
WALL BOX, FLUSH MOUNTED WITH REMOVABLE SCREW-TYPE
COVER PLATE. LOCATION SHOWN IS RECOMMENDED AND MAY
BE CHANGED - VERIFY HEIGHT AND RELOCATION WITH LOCAL
PHILIPS SERVICE.
DS DOOR SWITCH - 120V/5A SWITCH LIMITED TO OPEN WHEN DOOR
IS OPEN. MOUNT IN UPPER CORNER ON STRIKE SIDE OF MAIN
ENTRY DOOR(S) (COOPER NO. 1665 OR EQUIVALENT), IF
REQUIRED BY LOCAL CODE OR PHYSICIST OF RECORD. SEE
SHEET "ED3" DIAGRAM FOR CONNECTION DETAILS.
WL WARNING LIGHT - PROVIDE A SURFACE OR FLUSH MOUNTED
LIGHT FIXTURE ABOVE DOOR TO INDICATE WHEN X-RAY IS ON, IF
REQUIRED BY LOCAL CODE OR PHYSICIST OF RECORD.
FW APPROXIMATE LOCATION SHOWN FOR FIREWALL IS
RECOMMENDED AND MAY BE CHANGED - VERIFY RELOCATION
WITH LOCAL PHILIPS SERVICE. FIREWALL MUST BE INSTALLED
MAXIMUM OF 6'-6 3/4" FROM THE CY.
MSA
10" (255MM) W X 10" (255MM) L X 6" (155MM) D FLOOR BOX, FLUSH
MOUNTED WITH UNDERSIDE OF AD7 UNIVERSAL FLOOR PLATE.
SP 18" (460MM) W X 18" (460MM) L X 6" (155MM) D CEILING BOX, FLUSH
MOUNTED WITH REMOVABLE SCREW-TYPE COVER PLATE.
PROVIDE ONE 4" (105MM) SQUARE KNOCKOUT.
TV 18" (460MM) W X 18" (460MM) L X 6" (155MM) D CEILING BOX, FLUSH
MOUNTED WITH REMOVABLE SCREW-TYPE COVER
PLATE. PROVIDE A 2 1
2" (65MM) ROUND CUTOUT (TWO 2 1 2" (65MM) ROUND CUTOUTS
ARE REQUIRED FOR SYSTEMS WITH TWO MONITOR CARRIAGES -
VERIFY WITH LOCAL PHILIPS SERVICE).
07/10/24PRE-BID ADDENDUM NO. 11
IMAGING EQUIPMENT RACEWAY SCHEDULE
RUN
NUMBER DESIGNATION FROM TO
RACEWAY
QUANTITY
CABLE
TYPE
MINIMUM
RACEWAY/
CONDUIT
SIZE
MAXIMUM
RACEWAY/
CONDUIT
LENGTH IN
FEET
1 UPS-CB UPS CB 1 P
2 CB-MA CB MA 1 P 2 1/2" 50
3 CB-ST CB ST 1 P 3/4" 50
4 ERB-GE ERB GE 1 G 3/4" 6
5 ERB-RO ERB
ROOM
OUTLETS 1 G 3/4" -
6 MA-WL MA WL 1 P 3/4" 55
7 ATY-DS ATY DS 1 S 3/4" 55
8 ATY-MA ATY MA 1 S 2 1/2" 41
9 ATY-TV ATY TV 1 S 3/4" 65
10 SP-MA SP MA 1 S 2" 41
11 SP-ME-C SP ME 1 C 2 1/2" 41
12 SP-ME-PG SP ME 1 PG 1" 41
13 SP-ME-S SP ME 1 S 1 1/2" 41
14 SP-ME-S SP ME 1 H 2 1/2" 41
15 SP-MR-PG SP MR 1 PG 2" 41
16 SP-MR-S SP MR 1 S 1" 41
17 MSA-MA-P MSA MA 1 P 1 1/2" 39
18 MSA-MA-S MSA MA 1 S 3" 39
19 MSA-MR-PG MSA MR 1 PG 2" 39
20 MSA-MR-S MSA MR 1 S 2" 39
21 TV-MA-P TV MA 1 P 1 1/2" 55
22 TV-MA-S TV MA 1 S 2 1/2" 55
23 TV-MR TV MR 1 P 2" 55
24 TV-MB-S TV MB 1 S 1 1/2" 55
25 TV-MB-PG TV MB 1 PG 1 1/2" 55
26 TV-WM TV WM 1 S 3/4" 65
27 CY-MR CY MR 1 S 2" 55
28 CY-MA-PG CY MA 1 PG 1 1/2" 55
29 CY-MA-S CY MA 1 S 2 1/2" 55
30 MA-WM MA WM 1 S 1 1/2" 82
31 MR-WM MR WM 1 S 1" 82
32 TV-WR3 TV WR3 2 S 1 1/2" -
33 MSA-WR3 MSA WR3 2 S 1 1/2" -
34 MSA-PHY MSA PHY 1 S 2 1/2" -
35 PYS-PM PHY
PHYSIO
MONITOR 1 S 2" 33
THIRD
PARTY
THIRD
PARTY - - - -
37 TP-ERB
THIRD
PARTY ERB - G - -
38 VB1-MB VB1 MB 1 S 1" 82
39 VB2-MB VB2 MB 1 S 1" 82
40 VB3-MB VB3 MB 1 S 1" 82
41 VB4-MB VB4 MB 1 S 1" 82
42 VB5-MB VB5 MB 1 S 1" 82
43 VB6-MB VB6 MB 1 S 1" 82
44 VB7-MB VB7 MB 1 S 1" 82
45 VB8-MB VB8 MB 1 S 1" 82
46 VB3-CY VB3 CY 1 S 1" 91
47 VB4-CY VB4 CY 1 S 1" 91
48 VB5-CY VB5 CY 1 S 1" 91
49 VB6-CY VB6 CY 1 S 1" 91
50 VB7-CY VB7 CY 1 S 1" 91
51 VB8-CY VB8 CY 1 S 1" 91
52 IS-MSA
INTRA
SIGHT MSA 1 S 3" 75
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text
MED GAS
AutoCAD SHX Text 900mm ARM
AutoCAD SHX Text 900mm ARM
AutoCAD SHX Text
AP
AutoCAD SHX Text 10'-1"
AutoCAD SHX Text E
AutoCAD SHX Text E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Renovate and Upgrade Angio OR Suite at the Providence VAMC
Providence, Rhode Island
650-CSI-351
Building #1 Project Director
JANUARY 31, 2024Revisions: Date:
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
CO
MM
ON
WEA
LTH OF VIRGINIA
PROFESSIONAL EN
GI
NE
ER
SCOTT PARKER SCHWERIN
Lic. No. 37431
PANEL SCHEDULES
E501
SCALE:
ANGIOPLASTY 209
NO SCALE
PARTIAL POWER RISER DIAGRAM
E501
EXISTING
PANEL
IPU-N
60A
120V 1Ø, 2W
10 KAIC
RELOCATE
NORMAL
EXISTING
PANEL
IPU-E
60A
120V 1Ø, 2W
10 KAIC
RELOCATE
CRITICAL
BRANCH
EXISTING
PANEL
DP-CB-OR-2
400A MLO
208/120V 3Ø, 4W
10 KAIC
TO REMAIN
CRITICAL
BRANCH
EXISTING
PANEL
DP1-EQ-CC
800A MCB
480/277V 3Ø, 4W
42 KAIC
TO REMAIN
EQUIPMENT
BRANCH
EXISTING
PANEL
DP-N-OR
225A MLO
208/120V 3Ø, 4W
10 KAIC
TO REMAIN
NORMAL
ELEC RM 201CEMERG ELEC
RM 201B
MECHANICAL 105
EXISTING 400A
(380A AMPACITY)
FEEDER FROM
MDP-CR
EXISTING 400A
(380A AMPACITY)
FEEDER FROM
SWITCHBOARD #2
EXISTING 800A
(840A AMPACITY)
FEEDER FROM
SWITCHBOARD #4
VIA 800A ATS-EQ
EXTEND WITH 2 #8, 1 #8G IN 3/4"C
TO NEW LOCATION
UPS
ANGIO
75 KW/KVA
480/277V 3Ø, 4W
4 #3/0, 1 #6G IN 2 1/2"C
07/10/24PRE-BID ADDENDUM NO. 11
EXISTING PANEL DP-N-OR SCHEDULE
225 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED
CKT. WIRE BKR BKR WIRE CKT.
NO. LOAD DESCRIPTION SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE LOAD DESCRIPTION NO.
1 PANEL IPU-N-ANGIO 50 14.3 1.7 A 50 IPU-N-OR3 2
14.3 1.7 B 4
5 IPU-N-ORI 50 C 50 SPARE (OFF) 6
7 A 8
9 IPU-N=OR2 50 B 50 SPARE (OFF) 10
11 C 12
13 IPU-N-CYSTO 50 A 100 N-2-CC 14
15 B 16
17 ICI POWER SUPPLIES 20 C 18
19 BUSSED SPACE A BUSSED SPACE 20
21 BUSSED SPACE B BUSSED SPACE 22
23 BUSSED SPACE C BUSSED SPACE 24
25 BUSSED SPACE A BUSSED SPACE 26
27 BUSSED SPACE B BUSSED SPACE 28
29 BUSSED SPACE C BUSSED SPACE 30
31 BUSSED SPACE A BUSSED SPACE 32
33 BUSSED SPACE B BUSSED SPACE 34
35 BUSSED SPACE C BUSSED SPACE 36
37 BUSSED SPACE A BUSSED SPACE 38
39 BUSSED SPACE B BUSSED SPACE 40
41 BUSSED SPACE C BUSSED SPACE 42
TOTAL AMPS (CONN. LOAD) A: 14.3 B: 14.3 C:
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 14.3 B: 14.3 C:
PANELBOARD OPTIONS: PANELBOARD NOTES:
1. LOCATION: RM. 201C
2. ALL BREAKERS IN THIS PANEL ARE EXISITNG TO REMAIN.
EXISTING PANEL IPU-N-ANGIO SCHEDULE
45 AMP MCB 120/208 VOLTS 1PH, 3W, 60 HZ MIN. 10 KAIC FLUSH MOUNTED
CKT. WIRE BKR BKR WIRE CKT.
NO. LOAD DESCRIPTION SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE LOAD DESCRIPTION NO.
1 SPARE 20 A 0.3 3.0 20 12 REC CONTROL DESK 2
B 0.3 3.0
3 SPARE 20 A 0.3 3.0 20 12 REC SOUTH WALL 4
B 0.3 3.0
5 SPARE 20 A 0.3 3.0 20 12 REC WEST WALL 1 6
B 0.3 3.0
7 SPARE 20 A 0.3 3.0 20 12 REC WEST WALL 2 8
B 0.3 3.0
9 SPARE 20 A 0.2 1.5 20 12 REC NORTH WALL 10
B 0.2 1.5
11 SPARE 20 A 0.2 1.5 20 12 REC BOOM 1 12
B 0.2 1.5
13 REC BOOM 2 12 20 1.5 0.2 A 20 12 SPARE 14
1.5 0.2 B
15 SPARE 20 A 20 12 SPARE 16
B
TOTAL AMPS (CONN. LOAD) A: 14.3 B: 14.3 C:
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 14.3 B: 14.3 C:
PANELBOARD OPTIONS: PANELBOARD NOTES:
1. LOCATION: ANGIO 209
2. ALL BREAKERS IN THIS PANEL ARE EXISITNG TO REMAIN.
EXISTING PANEL IPU-E-ANGIO SCHEDULE
45 AMP MCB 120/208 VOLTS 1PH, 3W, 60 HZ MIN. 10 KAIC FLUSH MOUNTED
CKT. WIRE BKR BKR WIRE CKT.
NO. LOAD DESCRIPTION SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE LOAD DESCRIPTION NO.
1 SPARE 20 A 20 SPARE 2
B
3 SPARE 20 A 20 SPARE 4
B
5 SPARE 20 A 0.5 4.5 20 12 REC CONTROL DESK 6
B 0.5 4.5
7 SPARE 20 A 0.3 3.0 20 12 REC WEST WALL 1 8
B 0.3 3.0
9 SPARE 20 A 0.3 3.0 20 12 REC WEST WALL 2 10
B 0.3 3.0
11 SPARE 20 A 0.2 1.5 20 12 REC BOOM 2 12
B 0.2 1.5
13 REC BOOM 1 12 20 1.5 0.2 A 20 SPARE 14
1.5 0.2 B
15 SPARE 20 A 20 SPARE 16
B
TOTAL AMPS (CONN. LOAD) A: 11.8 B: 11.8 C:
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 11.8 B: 11.8 C:
PANELBOARD OPTIONS: PANELBOARD NOTES:
1. LOCATION: ANGIO 209
2. ALL BREAKERS IN THIS PANEL ARE EXISITNG TO REMAIN.
EXISTING PANEL DP-CB-OR-2 SCHEDULE
225 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ SURFACE MOUNTED
CKT. WIRE BKR BKR WIRE CKT.
NO. LOAD DESCRIPTION SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE LOAD DESCRIPTION NO.
1 PANEL IPU-E-ANGIO 50 11.8 1.4 A 3.1 30.0 50 IPU-E-OR3 32
11.8 1.4 B 3.1 30.0
35 IPU-E-ORI 50 30.0 3.1 C 3.1 30.0 50 IPU-E-CYSTO 36
30.0 3.1 A 3.1 30.0
39 IPU-E-OR2 50 30.0 3.1 B 50 SPARE 40
30.0 3.1 C
43 SPARE 50 A 20 LIGHTING - ELECTRIC ROOM 44
B 50 SPARE 46
47 LTS ANGIO (NOTE 3) 10 20 12.5 1.5 C
49 LTS ANGIO (NOTE 3) 10 20 12.5 1.5 A 1.4 12.0 20 12 DOOR OPERATOR (NOTE 3) 50
51 LTS ANGIO SURG (NOTE 3) 10 20 5.0 0.6 B 0.2 1.5 20 12 REC ROOF (NOTE 3) 52
53 LTS ANGIO SURG (NOTE 3) 10 20 5.0 0.6 C 0.8 7.3 15 12 CRAC-1 (NOTE 3) 54
55 REC CONTROL ROOM 1 (NOTE 3) 10 20 3.0 0.4 A 0.8 7.3
57 REC CONTROL ROOM 2 (NOTE 3) 10 20 4.5 0.5 B 0.7 7.0 15 12 ACC-1 (NOTE 3) 58
59 SHUNT TRIP (NOTE 3) 12 15 1.0 0.1 C 0.7 7.0
TOTAL AMPS (CONN. LOAD) A: 123.6 B: 80.8 C: 108.9
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 123.6 B: 80.8 C: 108.9
PANELBOARD OPTIONS: PANELBOARD NOTES:
1. LOCATION: RM 209
2. ALL BREAKERS IN THIS PANEL ARE EXISITNG TO REMAIN UNLESS
THE "LOAD DESCRIPTION" CONTAINS "(NOTE 3)".
3. PROVIDE BREAKER TO MATCH EXISTING SQUARE-D NQ SERIES
PANEL.
EXISTING PANEL DP1-EQ-CC SCHEDULE
800 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 42 KAIC FLOOR MOUNTED
CKT. WIRE BKR BKR WIRE CKT.
NO. LOAD DESCRIPTION SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE LOAD DESCRIPTION NO.
1 BUSSED SPACE A 50 SPARE 2
3 BUSSED SPACE B 4
5 BUSSED SPACE C 6
7 BUSSED SPACE A 3.8 13.7 15 AHU-1 8
9 BUSSED SPACE B 3.8 13.7 10
11 ANGIO RM 209 VIA UPS ANGIO (NOTE 3) 3/0 200 63.0 17.5 C 3.8 13.7 12
13 63.0 17.5 A 50 SPARE 14
15 63.0 17.5 B 16
17 CC AHU-2 25 19.9 5.5 C 18
19 19.9 5.5 A 1.7 6.1 45 PANEL B-EQ-CC 20
21 19.9 5.5 B 1.7 6.1 VIA 20KVA XFMR 22
23 HWP-1 CC 15 6.1 1.7 C 1.7 6.1 24
25 6.1 1.7 A 50 SPARE 26
27 6.1 1.7 B 28
29 HWP-2 CC 15 6.1 1.7 C 30
31 6.1 1.7 A 50 SPARE 32
33 6.1 1.7 B 34
35 SPARE 50 C 36
37 A 60 SPARE 38
39 B 40
41 SPARE 50 C 42
43 A 8.9 32.0 50 6 SHUNT TRIP CYSTO 44
45 B 8.9 32.0 46
47 OR CHILLER #2 600 346.9 96.1 C 8.9 32.0 48
49 346.9 96.1 A 60 SPD 50
51 346.9 96.1 B 52 53 C 54
TOTAL AMPS (CONN. LOAD) A: 493.9 B: 493.9 C: 493.9
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 493.9 B: 493.9 C: 493.9
PANELBOARD OPTIONS: PANELBOARD NOTES:
1. LOCATION: RM. 105
2. ALL BREAKERS IN THIS PANEL ARE EXISITNG TO REMAIN UNLESS
THE "LOAD DESCRIPTION" CONTAINS "(NOTE 3)".
3. PROVIDE BREAKER TO MATCH EXISTING SQUARE-D HCP SERIES I-LINE
PANEL. BREAKER SIZE SHALL BE CONFIRMED BY THE UPS MANUFACTURER.
PANEL SUBFEED FEEDTHRU TOTAL D.F. TOTAL KVA
LOAD DESCRIPTION CONN LOAD CONN LOAD CONN LOAD LOAD MULT. DEMAND
LIGHTING KVA KVA KVA KVA 1.25 KVA
RECEPTACLES KVA KVA KVA KVA NEC KVA
MECH EQUIP 315.0 KVA KVA KVA 315.0 KVA 1.00 315.0 KVA
ELECTRIC HEAT KVA KVA KVA KVA 1.25 KVA
MISCELLANEOUS 84.0 KVA KVA KVA 84.0 KVA 1.00 84.0 KVA
ELEVATOR KVA KVA KVA KVA 1.00 KVA
KITCHEN EQUIP. KVA KVA KVA KVA 0.65 KVA
KVA KVA KVA KVA KVA
KVA KVA KVA KVA KVA
KVA KVA KVA KVA KVA
KVA KVA KVA KVA KVA
KVA KVA KVA KVA KVA
TOTALS (CONN. KVA) 399.0 KVA KVA KVA 399.0 KVA 399.0 KVA
TOTALS (CONN. KVA + 20%) 478.8 KVA KVA KVA 478.8 KVA 478.8 KVA
TOTALS (CONN. AMPS) 480.0 AMPS AMPS AMPS 480.0 AMPS 480.0 AMPS
TOTALS (CONN. AMPS + 20%) 576.0 AMPS AMPS AMPS 576.0 AMPS 576.0 AMPS
| Sheets and Views |
| ED103 EXISTING PLANS |
| EP101 NEW WORK PLAN |
| E501 PANEL SCHEDULES |
| 2024-07-14T12:11:23-0400 | |
| Scott P Schwerin |
| 2024-07-14T12:11:49-0400 | |
| Scott P Schwerin |
| 2024-07-14T12:12:17-0400 | |
| Scott P Schwerin |
File details come from the government source that posted it. Updated .