S02 EXHIBIT G ITEMIZED COST BREAKDOWN SHEET 650-CSI-351.pdf
PDF 34 KB Posted
- Solicitation number
- 36C24124R0065
About this file
This document is an Itemized Schedule of Values Cost Breakdown for the project to Renovate and Upgrade the Angio OR Suite at the VAMC Providence, RI. The document provides a detailed cost breakdown by construction division, including labor and material costs for each item. The total base offer cost is provided, as well as the overhead, profit, and bond percentages.
The related federal contract opportunity is Solicitation Number 36C24124R0065 issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1, to renovate and upgrade the Angio OR Suite. The solicitation seeks proposals for this construction project, but no additional details are provided in the given materials.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEMIZED SCHEDULE OF VALUES COST BREAKDOWN
Base Item Letter A - Cost Breakdown
Project No.: 650-CSI-351
Date:
Project Title: Renovate and Upgrade Angio OR Suite
Project Location: VAMC Providence, RI
Offerors Company Name and Address:
Item Description
Labor Cost
Material Cost
Total Cost
Division 1 - General Requirements
Division 2 - Existing Conditions
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood and Plastic
Division 7 - Thermal and Moisture Protection
Division 8 - Doors and Windows
Division 9 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Subtotal
Overhead (xx %)
Profit (xx %)
Bond (xx %)
Total Base Offer Cost
File details come from the government source that posted it. Updated .