S02 Exhibit A - JCI Controllers.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C24426Q0491
About this file
This file is an equipment exhibit listing JCI (Johnson Controls Inc.) controllers and related building automation system components required for the Metasys Building Automation System at the Erie VA Medical Center. The exhibit enumerates 114 distinct pieces of equipment organized by equipment number, object name, type, and remarks. Equipment types include SMARC Engine controllers (featuring NAE models ranging from NAE 25 to NAE 55), Site Director units, standard Controllers, and Field Devices. The controllers are distributed across multiple functional areas including HVAC management for various buildings and departments such as the chiller plant, pharmacy, radiology, chapel, laboratory, primary care, rehabilitation, dental, and ambulatory care facilities.
The equipment list represents the scope of building automation infrastructure that requires subscription, preventative maintenance, and repair services under solicitation 36C24426Q0491 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The contract opportunity addresses ongoing maintenance and support for the existing Metasys system managing HVAC operations across the medical center's complex. Questions regarding the solicitation were due by 4:00 PM EST on Monday, July 13, 2026. The exhibit serves as a baseline inventory of all JCI equipment components that prospective contractors must be capable of servicing and maintaining throughout the contract period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A - JCI Equipment
| # | OBJECT NAME: | TYPE: | REMARKS: |
| 1 | Base -1 | SMARC Engine NAE 55 | |
| 2 | Base-2 & CBOC | SMARC Engine NAE 55 | |
| 3 | Base -3 | SMARC Engine NAE 55 | |
| 4 | Base – 4 | Site Director N50 | |
| 5 | BH-SNE-1 | SMARC Engine NAE 45 | |
| 6 | BH-SNE-2 | SMARC Engine NAE 35 | |
| 7 | SNE-AMB-1 + dry cooler | SMARC Engine NAE 55 | |
| 8 | SNE-CLC-1 | SMARC Engine NAE 45 | |
| 9 | SNE-switch | SMARC Engine NAE 55 | |
| 10 | NCE-3FLR01 | SMARC Engine NAE 35 | |
| 11 | SNE-AMB-1 | SMARC Engine NAE 35 | |
| 12 | SNC-boiler plant | SMARC Engine NAE 25 | |
| 13 | NCE-Ashtabula | Site Director NCE | |
| 14 | SNC-E200 | SMARC Engine NAE 25 | |
| 15 | SNC-PARK-1 | SMARC Engine NAE 25 | |
| 16 | Chiller plant | SMARC Engine NAE 45 | |
| 17 | Fourth floor | SMARC Engine NAE 35 | |
| 18 | Building 6 | SMARC Engine NAE 35 | |
| 19 | SPS-SNE | SMARC Engine NAE 35 | |
| 20 | 3FL-HTX/oncology | Controller | |
| 21 | AHU-3 rd floor | Controller | |
| 22 | AHU-2 basement 58 | Controller | |
| 23 | 3rd floor octogon chiller | Controller | |
| 24 | SPD-HXS Pharm | Controller | |
| 25 | 6FL respiratory AHU | Controller | |
| 26 | UCC HVAC ACU-1 | Controller | |
| 27 | HTX-7East (exec suites) | Controller | |
| 28 | Lab - Heat Exchanger | Controller | |
| 29 | Wards HVAC (4,5,6) 7th flr roof | Controller | |
| 30 | Wards 4,5,6 HX and chiller cntls 8th fl | Controller | |
| 31 | Chapel - AHU (Main Point) | Controller | |
| 32 | Chapel - Heat Exchanger | Controller | |
| 33 | Chapel – Return Fan | Controller | |
| 34 | Chapel - Supply Fan | Controller | |
| 35 | Out patient HVAC (B01) | Controller | |
| 36 | OP/Rehab- Heat Exchanger | Controller | |
| 37 | Lab – AHU (Main Point) | Controller | |
| 38 | Lab-Return Fan VFD | Controller | |
| 39 | Lab-Supply Fan VFD | Controller | |
| 40 | Radi0logy - AHU (Main Pont) | Controller | |
| 41 | RAD-RET VFD | Controller | |
| 42 | RAD-SUP VFD | Controller | |
| 43 | RTU-1 Primary Care white team HVAC unit | Controller | |
| 44 | Primary care VFDs and filters | Controller | |
| 45 | 7east HWP cntls (penthouse) | Controller | |
| 46 | Rehab HVAC 2nd fl center rf | Controller | |
| 47 | Connect care | Controller | |
| 48 | IT server – RM-Liebert | Controller | |
| 49 | Education B13A Lieberts | Controller | |
| 50 | Phone – Liebert | Controller | |
| 51 | Room – WB42 HVAC (supply from WB-35) | Controller | |
| 52 | WB31 HVAC (package unit) | Controller | |
| 53 | Security HVAC (1st fl west roof) | Controller | |
| 54 | Canteen Store – HP | Controller | |
| 55 | Canteen AHU-1 | Controller | |
| 56 | Canteen AHU-1 SF VSD | Controller | |
| 57 | 7 east – RTU | Controller | |
| 58 | 7W heat exch | Controller | |
| 59 | 7W-AHU | Controller | |
| 60 | AHU-4B Pharmacy | Controller | |
| 61 | 7W-AHU-PMP-EP | Controller | |
| 62 | Base MAU-1 | Controller | |
| 63 | Dietetics AHU-1 | Controller | |
| 64 | Dietetics office AHU-2 | Controller | |
| 65 | Dietetics MAU-1 | Controller | |
| 66 | RTU-2 Front entrance | Controller | |
| 67 | White Clinic CHWS | Controller | |
| 68 | White Clinic/Atrium – HX | Controller | |
| 69 | Atrium – RTU-1 (waiting area) | Controller | |
| 70 | BH – Chiller | Controller | |
| 71 | BH – CHWS | Controller | |
| 72 | BH-HW HX | Controller | |
| 73 | BH-AHU | Controller | |
| 74 | Dry cooler | Controller | |
| 75 | Switch AHU-1 | Controller | |
| 76 | Switch – RTU | Controller | |
| 77 | Dental AHU-1 | Controller | |
| 78 | SF-1 VFD Ambulatory | Controller | |
| 79 | SF- 2 VFD Ambulatory | Controller | |
| 80 | RF-1 Ambulatory | Controller | |
| 81 | RF-2 Ambulatory | Controller | |
| 82 | HX-AMB -1 Ambulatory | Controller | |
| 83 | AMB-AHU | Controller | |
| 84 | RTU-1 Integration | Controller | |
| 85 | MAU-1 Integration | Controller | |
| 86 | MAU-2 Integration | Controller | |
| 87 | MAU-3 Integration | Controller | |
| 88 | MAU -1 | Controller | |
| 89 | MAU-2 | Controller | |
| 90 | MAU-3 | Controller | |
| 91 | B1 CHW Loop 1 chiller plant | Controller | |
| 92 | B1 CHW Loop 2 chiller plant | Controller | |
| 93 | B1 CHW Loop 3 chiller plant | Controller | |
| 94 | B7 – AHU-1 chiller plant | Controller | |
| 95 | B7 Chillers chiller plant | Controller | |
| 96 | B7 CHWP-1 VFD chiller plant | Controller | |
| 97 | B7 CHWP-2 VFD chiller plant | Controller | |
| 98 | B7 CHWS Pumps chiller plant | Controller | |
| 99 | B7 cooling tower chiller plant | Field Device | |
| 100 | B7 CT-1 VFD1 | Field Device | |
| 101 | B7 CT-1 VFD2 | Field Device | |
| 102 | B7 CT-2 VFD1 | Field Device | |
| 103 | B7 CT-2 VFD2 | Field Device | |
| 104 | B7 CWP-1 VFD | Field Device | |
| 105 | B7 CWP-2 VFD | Field Device | |
| 106 | Chiller -1 | Field Device | |
| 107 | Chiller – 2 | Field Device | |
| 108 | AHU-4A East | Field Device | |
| 109 | AHU-4B West | Field Device | |
| 110 | HWSYS | Field Device | |
| 111 | HRU-1 | Field Device | |
| 112 | HRU-1 Return Fan VFD | Field Device | |
| 113 | HRU-1 Supply Fan VFD | Field Device | |
| 114 | RTU-1VND E200 | Field Device |
EXHIBIT A: JCI Equipment Run Date: &D
&A &P
File details come from the government source that posted it. Updated .