This is a certified Test, Adjust, and Balance (TAB) report dated September 4, 2024, for the Jesse Brown Animal Research Labs Veterinary Medical Unit Cage Wash System located on the 7th floor of Building 11 (Taylor) at 820 S Damen Ave, Chicago. The report, prepared by TL Services, Inc. (NEBB Contractor #2932), details the baseline performance testing of an unencumbered exhaust system prior to the installation of new Bottle Washer and Cage Wash equipment.
The report identifies system performance issues, with the fan running at 3.31 inwg and near maximum motor capacity (2 amps against 2.1 amp design). Key findings show the Bottle Washer connection (3" tube) pulling 57 CFM and Cage Wash flex (5" hose) drawing 780 CFM, for a total of 837 CFM inside the Cage Wash room. The report recommends increasing the Bottle Wash connection to 5" and the Cage Wash intake to 6-8" to reduce static pressure and motor load. Additional recommendations include relocating the duct connection box below the hard ceiling for easier maintenance access. The report includes detailed calibration certificates for testing equipment and is certified by John Sides Jr., P.E. CEM QCP NEBB_CP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE:
PROJECT:
ADDRESS:
Chicago, IL. 60612
ARCHITECT:
ENGINEER:
HVAC
CONTRACTOR
NEBB
TAB FIRM:
ADDRESS:
NA
NA
TL SERVICES, INC.
1101 1st SW
Ruskin, FL 33570
9/4/2024
CERTIFIED TEST, ADJUST, AND BALANCE REPORT
STAMP
Jesse Brown Animal Research Labs, Veterinary Medical Unit Cage Wash System
7th Floor Building 11, Taylor
820 S Damen Ave.
NA
TAB 1-91
NATIONAL ENVIRONMENTAL BALANCING BUREAU
Corporate Office
1101 1st SW ∙ Ruskin, FL 33570 ∙ (813)641-2730
September 4, 2024
TAB REPORT SUMMARY
7th Floor Animal Labs, Taylor (Building 11)
The data was taken to show how the system is operating at this point. Of course, the system load is not installed (the Bottle Washer and Cage Wash), so we should see an unencumbered system. At this point, the Bottle Washer connection is essentially a 3” tube (or hose). It is pulling 57 CFM. The Cage Wash flex is a 5” hose. The Cage Wash flex draws 780 CFM. The fan system is pulling 3.31 inwg at the fan. The total CFM inside the Cage Wash room is 837 CFM. We measured the air flow at the fan and determined it to be 869.2 CFM. The conclusion from this information is that the ductwork between the Cage Wash room and the exhaust fan on the roof has no major leaks or restriction losses. Total loss is 32 CFM.
The Fan running at 3.31 inwg, is concerning. Our opinion is that the 3” and 5” hoses are contributing to the high static value. To make the system run, it was sped up to its limit. The motor amp draw averages around 2 amps for the three phases. The Full Load Amp motor design is 2.1 amps. There is no more room on the motor.
In our opinion, the solution is to increase the sizes of the intake lines at the Bottle and Cage Wash machines. The square connection on the Bottle Wash machine is equivalent to a 5” line. The suggestion is to remake the connection at 5” instead of 3”.
This should reduce the static requirement on the fan and should bring down the overall amp draw of the motor. We also suggest that the Cage Wash intake be increased to at least 6” if not an 8” line. Upon these changes it should allow the fan speed to be reduced and still attain the current air flow draw. If the machines require more air than the old machines, this may also work in the system’s favor.
Jesse Brown VA Hospital TL Services, Inc.
P a g e | 2
A suggestion made on the walk through is that the current duct connection box, which is connected to the duct via a flange, be removed and a new connection box made and bring the line connections below the hard ceiling. This will make it much easier to work on in the future. We concur with this idea. There will still need to be a short piece of flex duct to make the final connection. This is to reduce vibration and noise.
John Sides, Jr. P.E. CEM QCP NEBB_CP TL Services, Inc
AIR APPARATUS
TEST REPORT
PROJECT Jesse Brown Exhaust Baseline TAB SERVICE VMU
LOCATION Taylor Building Roof SYSTEM/UNIT
UNIT DATA MOTOR DATA
Make/Model No. Make/Frame
Serial Number H.P./RPM (W)
Discharge Volts/Phase/Hertz
F.L. Amps/S.F.
Sheave Diam/Bore
Sheave Diam/Bore Sheave L Distance
No. Belts/make/size Sheave Oper. Diam.
TEST DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL
Fan RPM NA 1802 Suction S.P. 3.31
Motor Volts 460 467/466/466 Bottle Wash CFM 57.00
Motor Amps 2 1.93/2.02/2.00 Cart Wash CFM 780.00 Motor RPM 1725 1770 Total Space Exhaust CFM 837.00
Duct Traverse At Fan 869.20
REMARKS:
TEST DATE 9/4/2024 Sides/Bradley
5"
5" / 1"
11"
1 / 1760
460 / 3 / 60
2.1 / 1.15
Note 1
Note 1
Vertical
Cart Wash Exhaust Fan
STAMP
3" / 3/4"
1/Note 2/Note 2
TECHINCAN:
Note 1: There were no visible markings on the fan unit.
Note 2: Unable to stop unit to get belt data. No visible markings on the belt.
Fan sheave is sized to make the fan run faster. System currently is almost at full load amps. There isn't enough room to speed up the fan any more.
Marathon / 1451
RECTANGULAR DUCT
TRAVERSE REPORT
PROJECT SYSTEM/UNIT
LOCATION/ZONE SERVICE
Room
S.P. AIR TEMP F ( C ) SCFM (sl/s) SCFM (sl/s) SIZE 16''X16'' AREA SQFT 1.78 FPM (ms) CFM FPM (ms) CFM
Distance Position 1 2 3 4 5 6 7 8 9 10 11 12 13 From Bottom
2 1 972 621 692 386
6 2 460 570 519 319
10 3 430 514 360 310
14 4 416 547 399 298
2 6 10 14
2278 2252 1970 1313 0 0 0 0 0 0 0 0 0
REMARKS: STAMP
1) Total CFM = Avg Velocity
TECHNICIAN:
Jesse Brown Exhaust Baseline TAB Cart Wash Exhaust Fan
Taylor Building Roof VMU
ACTUALDESIGN
7,813.00
Distance From # of Readings
Sum of All Readings
Duct Edge
TEST DATE: 9/4/2024 SIDES/BRADLEY
CFM
SUB-TOTALS
869 488.31
VMU_CageWash_ExhaustFan_T&B_TRAVERSE
CERTIFICATION
PROJECT:
ADDRESS:
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM
PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD
PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB
TOLLERENCES ARE NOTED THROUGHOUT THIS REPORT.
THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL
STANDARDS FOR TESTING-ADJUSTING-BALANCE OF ENVIRONMENTAL SYSTEMS"
AND THE PROJECT SPECIFICATIONS.
NEBB CONTRACTOR:
REG. NO. 2932 CERTIFIED BY: DATE:
THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL
STANDARDS FOR TESTING-ADJUSTING-BALANCE OF ENVIRONMENTAL SYSTEMS"
AND THE PROJECT SPECIFICATIONS.
NEBB CONTRACTOR:
REG. NO. 2932 CERTIFIED BY: DATE:
SUBMITTED AND CERTIFIED BY:
NEBB CONTRACTOR:
TAB SUPERVISOR:
REG. NO. 2932 DATE:
TL SERVICES, INC.
JOHN SIDES JR. 9/4/2024
Jesse Brown Exhaust Baseline TAB for VMU Cage Wash syste
Chicago, IL. 60612
820 S Damen Ave.
STAMP
TL SERVICES, INC.
9/4/2024
JOHN SIDES JR.
TL SERVICES, INC.
JOHN SIDES JR. 9/4/2024
TAB 2-83
National Environmental Balancing Bureau
Report Not Valid Unless Stamped with Nebb Certification Seal
Table of Abbreviations Date: 9/4/2024
PROJECT:
L/S Liters Per Second kW Kilowatt GPM Gallons Per Minute W Watt Min Minimum MBH Thousand British Thermal Min Alt for Minute Units Per Hour Max Maximum BTU British Thermal Units CFM Cubic Feet Per Minute CAL Calibration PSI Pounds Per Square Inch PSF Pounds Per Square Foot Pa Pascales In Inch Ft Foot M Meter VFD/VSD Variable Frequency (Speed) Drive No. Number N/A / NA Not Applicible RPM Revolutions Per Minute S.P. Static Pressure H.P. Horse Power A Amps V Volts Damp / Dmp Damper OSA Outside Air RA Return Air RTN Return SA Supply Air MA Mixed Air VAV Variable Air Volume CORR Correction (Factor) Zn Zone S.F. Service Factor Ent Entering Lvg Leaving Temp Temperature Press Pressure Dischg Discharge Cond Condenser ChW Chilled Water Htr Heater L.P. Low Pressure H.P. High Pressure
Jesse Brown Exhaust Baseline TAB
INSTRUMENT
CALIBRATION
PROJECT: REPORT
INSTRUMENT/SERIAL NO. APPLICATION DATES OF USE DATE CALIBRAITED
REMARKS:
NEBB CONTRACTOR:
TAB SUPERVISOR:
REG. NO. 2932 DATE STAMP
8/27/2024 - 9/4/2024
8/27/2024 - 9/4/2024
8/27/2024 - 9/4/2024
Air Press / Air Velocity./ Temp. /
Humidity
Volts/Amps
Jesse Browm Quarterly TAB
JOHN SIDES JR.
TL SERVICES, INC.
9/4/2024
Nova Strobe
Velocicalc 9565P2130007
Fluke Clamp-on Multimeter
Rotation Speed
TAB 2-83
National Environmental Balancing Bureau
Report Not Valid Unless Stamped with
Nebb Certification Seal
| 0-Cover Sheet CageWash_TAB Report |
| REPORT COVER SHEET |
| 01-VMU_CageWash_ReportSummary |
| 1a-VMU_CageWash_ExFan-TAB Detail Sheet |
| 1b-VMU_CageWash_ExhaustFan_T&B_TRAVERSE |
| RECT DUCT TRAVERSE |
| 7d-Certification Report |
| CERTIFICATION REPORT |
| 8e-abbreviations tab |
| ABBREVIATIONS |
| 9a_Cali. report |
| 9b-trobe Cal Sheet |
| 9c-9565P_Velocicalc_CalSheet |
| 9565P_Velocicalc_CalSheet |
| 9565P_Velocicalc_CalSheet2 |
| 9565P_Velocicalc_CalSheet3 |
9d-Fluke 324 ClampMeter Cal sheet
File details come from the government source that posted it. Updated .