36C25225B0010 0001.docx

DOCX document 29 KB Posted

Attached to
Y1DA--537-23-102 VMU Equipment Tie-in
Solicitation number
36C25225B0010
Issued by

About this file

This is Amendment 0001 to solicitation 36C25225B0010 for VMU Equipment Tie-in at Jesse Brown VA Medical Center in Chicago, IL, issued by the Department of Veterans Affairs Great Lakes Acquisition Center. The amendment removes bid guarantee and bond requirements, changes the project magnitude to between $25,000-$100,000, and provides responses to bidder questions about using existing disconnects for condensate pump tie-ins, installing outlets, abandoning existing ductwork, and establishing Construction Infection Control Risk Assessment as Type C Medium Risk Group - Class III.

The amendment includes clarifications about electrical requirements, noting that contractors can use existing abandoned electrical disconnects with 480V supply available in the 8th floor mechanical room. It maintains the original public bid opening date and requires the inclusion of VAAR 852.219-75 VA Notice of Limitations on Subcontracting certification with bid submissions. A pre-bid site visit sign-in sheet from February 12, 2025, is attached to the amendment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 537-25-2-6985-0007 537-23-102 Department of Veterans Affairs

GLAC (69D)

115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs

GLAC-MILWAUKEE (69D)

Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25225B0010

X X X

SEE ATTACHED SUMMARY OF DETAILS.

CONTINUE TO MONITOR CONTRACT OPPORTUNITIES FOR ANY AND ALL CHANGES TO THIS SOLICITATION.

Kristine Sutton Contracting Officer 36C25225B0010 A0001 Page 2 of 2

CONTINUATION PAGE

537-23-102 VMU EQUIPMENT TIE IN

JESSE BROWN VA MEDICAL CENTER, CHICAGO, IL

I. THE FOLLOWING CHANGES ARE TO BE MADE TO THE SOLICITATION:

A. Provide Pre-Bid Site Visit Sign-In Sheet conducted on 2/12/2025.

B. Remove Bid Guarantee Requirement, FAR 52.228-1 BID GUARANTEE

(SEPT 1996)

C. Remove Bid Bond and Performance Bond Requirement, D. Remove FAR 52.228-17 Individual Surety – Pledge of Assets (BID GUARANTEE) (FEB 2021) E. Remove VAAR 852.228-70 BOND PREMIUM ADJUSTMENT F. Remove FAR 52.228-2 Additional Bond Security and FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS G. Project Magnitude is changed to $25,000 and $100,000.

H. Provide VA responses to bidders Request for Information (RFI’s) received to date.

II. THE FOLLOWING CHANGES ARE MADE ON PROJECT SPECIFICATIONS:

N/A

III. THE FOLLOWING CHANGES ARE MADE ON PROJECT DRAWINGS:

N/A IV. THE FOLLOWING QUESTIONS AND ANSWERS / CLARIFICATIONS ARE THE RESULT OF BIDDERS REQUEST(S) FOR INFORMATION:

1. Q1 Can the Contractor use the existing abandoned disconnect to tie in the condensate pump?

A1 Yes, the contractor can use the existing abandoned electrical disconnect to tie in the condensate pump. The breaker panel is on the opposite side of the wall in the hallway. 480V supply panel available in 8th floor mechanical room.

1. Q2 Would the VA prefer an outlet installed next to the condensate pump location in Cage Wash?

A2 Yes, the VA would like a local outlet installed near the condensate pump, either next to or on the Cage Wash machine.

1. Q3 Will the VA approve abandoning the existing duct once it is cut above the ceiling and patched? If not, this will significantly increase the workload for both the carpenters and the mechanical team.

A3 Yes, the VA approves abandoning the existing duct once it is cut above the ceiling and patched.

1. Q4 What is the Construction Infection Control Risk Assessment for this project (i.e., Type C Low Risk Group - Class II, Type C Medium /High Risk Group - Class III, etc., etc.)?

A4 Construction Infection Control Risk Assessment for this project is Type C Medium Risk Group – Class III.

V. GENERAL INFORMATION:

A. NOTE: VAAR 852.219-75 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction (NOV 2022) is included in this solicitation (see SF1442 pages 53-54); signed certification must accompany bid to be considered for award.

B. NO CHANGE TO THE PUBLIC BID OPENING.

NOTE: ENSURE TO INCLUDE SOLICITATION NUMBER ON THE BID ENVELOPE AND ALL CORRESPONDENCE IS MAILED OR HAND-CARRIED TO THE FOLLOWING ADDRESS:

DEPARTMENT OF VETERANS AFFAIRS

GREAT LAKES ACQUISITION CENTER

ATTN: KRISTINE SUTTON AND RYAN MCMILLIN

115 S. 84TH ST., SUITE 101

MILWAUKEE, WI 53214-1476

C. SEE ATTACHMENT FOR SITE VISIT SIGN IN SHEET

See attached document: S04 - Site Visit Sign-in Sheet.FE.

End of Amendment 0001 .