S02 DRAWINGS.pdf

PDF 13 MB Posted

Attached to
Z1DA--630A4-26-102 GI RENOVATION PHASE III
Solicitation number
36C24226R0018
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET

GI-000

G-001 DRAWING LIST

Volume

Page

# SHEET # DRAWING TITLE

04 - INTERIORS FINISH

IN-101A FINISH PARTIAL PLAN - 4TH FLOOR

IN-102B FINISH PARTIAL PLAN - 4TH FLOOR

IN-601 INTERIOR FINISH SCHEDULE

12 - MECHANICAL

34 MD101 HVAC - DEMOLITION PLAN - DUCTWORK & PIPING - LEVEL 5

35 MH101 HVAC - DUCTWORK NEW WORK PLAN - LEVEL 4

36 MH102 HVAC - MECHANICAL EQUIPMENT ROOM PLANS - LEVEL 5

MP101 HVAC - PIPING NEW WORK PLAN - LEVEL 4

MP102 HVAC - PIPING NEW WORK PLAN - LEVEL 5

MX101 HVAC - SCHEDULES

MX102 HVAC - SCHEDULES

MX201 HVAC - DETAILS

MX202 HVAC - DETAILS

MX203 MECHANICAL DETAILS

MX301 HVAC ATC DIAGRAMS

15 - ELECTRICAL

EL101 ELECTRIC - LIGHTING NEW WORK PLAN - LEVEL 4

EP101 ELECTRIC - POWER NEW WORK PLAN - LEVEL 4

EP102 BUILDING 1 MECHANICAL POWER NEW WORK PLAN - PARTIAL

FIFTH FLOOR

EX101 ELECTRIC - DETAILS AND SYMBOLS

EX102 BUILDING 1ELECTRICALPANEL SCHEDULES - FOURTH FLOOR

EAST

16 - PLUMBING

PP101 PLUMBING - NEW DOMESTIC WATER PIPING - LEVEL 4

PP102 PLUMBING - NEW WASTE AND VENT PIPING - LEVEL 4

PP103 PLUMBING - NEW MEDICAL GAS PIPING - LEVEL 4

PX101 PLUMBING - SCHEDULES, NOTES, AND DETAILS

17 - FIRE PROTECTION

FX101 SPRINKLER - DEMOLITION & NEW WORK PLAN - LEVEL 4

FX201 SPRINKLER - NOTES, DETAILS AND SCHEDULES

G-001 DRAWING LIST

Volume

Page

# SHEET # DRAWING TITLE

01 - GENERAL

Volume 1

1 GI-000 COVER SHEET

2 GI-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS

3 GI-002 TYPICAL MOUNTING HEIGHTS & ACCESSIBILITY STANDARDS

4 GI-101 LIFE SAFETY PLAN AND CODE ANAYLSIS

AS-101A CONSTRUCTION PARTIAL PLAN - 4TH FLOOR

AS-102B CONSTRUCTION PARTIAL PLAN - 4TH FLOOR

AS-111A REFLECTED CEILING PARTIAL PLAN - 4TH FLOOR

AS-112B REFLECTED CEILING PARTIAL PLAN - 4TH FLOOR

AS-121A EQUIPMENT/ POWER PARTIAL PLAN - 4TH FLOOR

AS-122B EQUIPMENT/ POWER PARTIAL PLAN - 4TH FLOOR

AS-201 INTERIOR ELEVATIONS

AS-202 INTERIOR ELEVATIONS

AS-203 INTERIOR ELEVATIONS

AS-400 ENLARGED PLANS & ELEV - NURSE STATION

AS-410 ENLARGED TOILET PLANS & ELEV

AS-501 PARTITION TYPES AND DETAILS

AS-502 CEILING DETAILS

AS-503 MILLWORK DETAILS

AS-504 MILLWORK DETAILS - NURSE STATION

AS-505 NURSE STATION MILLWORK DETAILS

AS-506 MISCELLANEOUS INTERIOR DETAILS

AS-507 MISCELLANEOUS INTERIOR DETAILS

AS-601 DOOR, FRAME, TYPE AND SCHEDULE

AS-602 EQUIPMENT AND ACCESSORY SCHEUDLES

VA BROOKLYN CAMPUS

G.I. RENOVATIONS PHASE III

PROJECT # 630A4-26-102 (BRIDGING DOCUMENTS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

0.

dw g

A ug

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

03 - ARCHITECTURAL

AS-412 ENLARGED TOILET PLANS & ELEV

5 GI-102 SCOPE OF WORK MATRIX

AS-411 ENLARGED TOILET PLANS & ELEV

6 GI-103 PHASE PLAN

AS-402 ENLARGED PLANS & ELEV - FLUOROSCOPE / LASER

7 GI-104 INFECTION CONTROL PLAN & NOTES

NYH Engineering Chief

ALUMINUM

CONCRETE

GLASS

RIGID INSULATION

BRICK IN SECTION

CONCRETE MASONRY UNIT

EARTH

GYPSUM / PLASTER

STEEL

PEA GRAVEL

STONE

BATT INSULATION

PRECAST

GRAVEL

SAND

WOOD - SOLID

PLYWOOD

BRICK

CULTURED STONE

EXTERIOR COMPOSITE PANEL

WOOD BLOCKING

WOOD SHIM

2'

- 9

1' - 0"

2'

- 9

1' - 6"

1'

- 1

0"

TOILET PAPER

DISPENSER

3'

- 6

" T O

TO

P

OF

B

UB

BL

ER

ELECTRIC

WATER COOLER

ELECTRIC

WATER COOLER

(ACCESSIBLE)

3'

- 0

" A

DA

T O

TO

P

OF

B

UB

BL

ER

4'

- 0

PAPER TOWEL

DISPENSER W/

WASTE RECEPTACLE

GRAB BAR

TOILET PAPER

DISPENSER

8"

3'

- 8

" A

FF

A

DA

URINAL FLUSH

VALVE

3'

- 0

MOP SINK

BASIN

6'

- 0

" T

OP

O F

SH

EL

F

MOP AND BROOM

HOLDER

4'

- 0

" T

OP

O F

SH

EL

F

UTILITY SHELF

1'

- 1

0"

SANITARY NAPKIN

RECEPTACLE

3'

- 9

COMBINATION PAPER

TOWEL DISPENSER W/

WASTE RECEPTACLE

4'

- 0

TOILET SEAT

COVER DISPENSER

4'

- 0

PAPER TOWEL

DISPENSER

(RECESSED)

3' - 6" MIN.

3' - 4"

1'

- 6

" M

IN

VERTICAL GRAB BAR

3'

- 4

1'

- 3

" M

IN

3' - 0" MIN.

1' - 0" MIN.

TYPICAL MOUNTING HEIGHTS (ANSI)

1 1 /2"

1'

- 5

" M

IN

. T O

SE

AT

4'

- 0

SANITARY NAPKIN

DISPENSER

4'

- 0

BABY CHANGING

STATION-

RECESSED

FIRE EXTINGUISHER

CABINET

5'

- 6

" A

FF

T

OP

O F

SH

EL

F

4'

- 0

" A

FF

A

DA

T

OP

O F

SH

EL

F

CLOSET ROD

AND SHELF

ADA CLOSET

ROD AND SHELF

LO

W

ES

T

OF

6'

8"

M

IN

. O R

6" B

EL

OW

C

LG

4'

- 0

ELEVATOR

CALL BUTTON

1'

- 3

OUTLET

4'

- 0

WALL SWITCH THERMOSTAT

4'

- 0

" M

AX

LO

W

ES

T

OF

6'

8"

M

IN

. O R

6" B

EL

OW

C

LG

VISUAL SIGNAL STROBE

FE

H

AN

DL

E

NO

T

TO

E

XC

EE

D

4'

- 0

" A

FF

5'

- 6

" A

FF

T

OP

O F

SH

EL

F

LINEN CLOSET

SHELVING

4'

- 0

FIRE ALARM

PULL BOX

4'

- 6

" A

CC

ES

SI

BL

E

5'

- 1

0"

ROBE HOOK

4'

- 0

4'

- 8

" A T

TU

B/

T

OI

LE

T

TOWEL BAR (TYP.) PERSONAL

EMERGENCY

PULL SWITCH

3'

- 8

4'

- 0

" A

FF

C

EN

TE

R

OF

V

AL

VE

SOAP DISPENSER

SYMBOLS LEGEND

SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS

Sheet No. Sequence Sheet Type Discipline

A 101

1t

A02

Room Name 0-0000

NET SF

0 GRID LINE

ROOM No.

DOOR No.

WINDOW TYPE

WALL TYPE

NORTH ARROW

N

EQUIPMENT /

FURNITURE TAG

SCOPE NOTE

CENTER LINE

FLOW ARROW

INTERIOR

ELEVATION

DETAIL

SPOT

ELEVATION

MARKERS

REVISION No.

REVISION

CLOUD

EXTERIOR

ELEVATION

SECTION

SHEET No.

A301

A201

A211

A501

4 2

DETAIL

SHEET

DETAIL

SHEET

DETAIL

SHEET

DETAIL

SHEET

SECTION

MARKERS

AFF

X-XXX

1'-0" CEILING TAG

SD CD

CL

LEVEL

ELEVATION

NOTES, ABBREVIATIONS,

LEGENDS

GI - 001

ABBREVIATIONS MATERIALS

STRUCT STRUCTURE / STRUCTURAL

SUH SUSPENDED UNIT HEATER

SURF SURFACE

SUSP SUSPENDED

SVP VINYL SOLID PANEL (ACROVYN)

SW SWITCH

SYMM SYMMETRICAL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

T/S TUB / SHOWER

TB TOWEL BAR

TC TERRA COTTA

TCZ CEMENTITIOUS TERRAZZO

TEL TELEPHONE

TEMP TEMPERATURE

TEMP TEMPORARY

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

TK BD TACK BOARD

TKP TACKABLE PANELING

TOC TOP OF CONCRETE

TOS TOP OF SLAB

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TR ACCENT RAIL

TRTD TREATED

TRZ INTERIOR POURED EPOXY RESIN

TERRAZO

TV TELEVISION

TYP TYPICAL

UC UNDERCUT

UGND UNDERGROUND

UL UNDERWRITER'S LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VOLT

VAC VACUUM

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VNR VENEER

VOL VOLUME

VP VACUUM PUMP

VP VANISHING POINT

VP VAPOR PRESSURE

VP VENEER PLASTER

VPC VENEER PLASTIC CEILING/SOFFIT

VR VAPOR RETARDER

VRR VINYL (ACROVYN) RAIL

VS VENT STACK

VS VOLUMETRIC SWITCH

VS SHEET VINYL

VT SOLID VINYL TILE

VTR VENT THRU ROOF

VTS VINYL TRANSITION STRIP

VWC VINYL WALLCOVERING

W WIDE

W WEST

W / W WALL TO WALL

W/ WITH

W/D WASHER / DRYER

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WC WALLCOVERING

WD WOOD

WDH WOOD HAND RAIL

WDM WOOD WALL MOULDINGS

WDP WOOD PANELING

WDR WOOD CHAIR, CRASH, OR HAND RAIL

WDS ATHLETIC/ACOUSTIC ISOLATED WOOD

FLOORING

WDSHV WOOD SHELVING

WDT WOOD TILE OR PARQUET FLOORING

WDV WOOD VENEER

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WALL HUNG

WI WROUGHT IRON

WP WATERPROOF

WP WORKING POINT

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WR WIRE ROPE

WRP WATER REPELLENT

WT WEIGHT

WWF WELDED WIRE FABRIC

XPS EXTRUDED POLYSTYRENE

YD YARD

PAT PATTERN

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PED PEDESTAL

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTIC

PLAS PLASTER

PLYWD PLYWOOD

PR PAIR

PREFAB PREFABRICATED

PREFIN PRE-FINISHED

PRF POLYURETHANE SPORTS FLOORING

PROP PROPERTY

PRST PRESSURE TREATED

PS POURED SEALANT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT(ED)

PT/E EPOXY PAINT

PT/F FLAT PAINT

PT/HG HIGH GLOSS PAINT

PT/SG SEMIGLOSS PAINT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PV PAVED

PVC POLYVINYL CHLORIDE

PVG PAVING

Q HEAT TRANSFER

Q RATE OF FLOW

QT QUARRY TILE

QTY QUANTITY

QZF QUARTZ FLOORING

QZR QUARTZ RESIN

QZT QUARTZ TILE

R RISER

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

RECPT RECEPTACLE

REF REFERENCE

REF REFRIGERATOR

REFL REFLECTED

REG REGISTER

REINF REINFORCE(D)

REQ REQUIRED

RESIL RESILIENT

REST RESTROOM

RET RETURN

REV REVISE / REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RAILROAD

RR ROLL ROOFING

RS RAPID START

RS ROUGH SAWN

RS RUBBER SHEET

RSF RUBBER SHEET FLOORING

RST REINFORCING STEEL

RT RIGHT

RTF RUBBER TILE FLOORING

RTS RUBBER TRANSITION STRIP

RWD REDWOOD

RWL RAIN WATER LEADER

S SOUTH

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SD SOAP DISPENSER

SECT SECTION

SF SQUARE FEET

SGL SINGLE

SH SINGLE HUNG

SHR SHOWER

SHR HD SHOWER HEAD

SHT SHEET

SHTHG SHEATHING

SIM SIMILAR

SL SEA LEVEL

SL SPOT LIGHT

SLDG SLIDING

SND SANITARY NAPKIN DISPENSER

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPC SUSPENDED PLASTER CEILING

SPEC SPECIFY / SPECIFICATION

SPH SOLID PHENOLIC POLYMER (TRESPA)

SPKR SPEAKER

SPR SOLID POLYMER RESIN (3FORM)

SQ SQUARE

SQIN SQUARE INCH(ES)

SSP SOLID SURFACE POLYMER (CORIAN)

SSPR SOLID POLYMER (CORIAN) RUB RAIL

SST STAINLESS STEEL

SSTR STAINLESS STEEL RUB RAIL

ST SINGLE THROW

ST STAIRS

ST STREET

ST STAIN

STA STATION

STD STANDARD

STIF STIFFENER

STON STONE

STOR STORAGE

GYP BD GYPSUM BOARD

H HIGH

HC HOLLOW CORE

HCP HANDICAPPED

HD HEAVY DUTY

HD HAND DRYER

HDBD HARDBOARD

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HDWL HEADWALL

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HP HEAT PUMP

HP HIGH PRESSURE

HP HORSEPOWER

HR HAND RAIL

HS HAND SINK

HT HEIGHT

HVAC HEATING / VENTILATION / AIR

CONDITIONING

HW HOT WATER

HWP HOT WATER PUMP

HYD HYDRANT

IC IRONING CABINET

ID INSIDE DIAMETER

IN INCH / INCHES

INCL INCLUDE(D) / INCLUDING

INSUL INSULATE / INSULATION

INT INTERIOR

INV INVERT

ITS INTERTEK TESTING SERVICES

J-BOX JUNCTION BOX

JAN CLO JANITOR'S CLOSET

JS JANITOR'S SINK

KIT KITCHEN

L ANGLE

L LITER

LAB LABORATORY

LAM LAMINATE(D)

LAV LAVATORY

LB(S) POUND(S)

LC LINEN CLOSET

LF LINEAR FOOT (FEET)

LH LEFT HAND

LIB LIBRARY

LINO LINOLEUM

LKR LOCKER

LNO LINOLEUM

LPT LOW POINT

LT LIGHT

LTF LINOLEUM TILE FLOORING

LTWT LIGHT WEIGHT

LVR LOUVER

m METER

MACH MACHINE

MAT WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MB MAIL BOX

MB MIXING BOX

MBH MOP/BROOM HOLDER

MC MEDICINE CABINET

MCP ACOUSTIC LAY-IN METAL CEILING PADS

ME MECHANICAL ENGINEER

MECH MECHANICAL

MED MEDIUM

MEZZ MEZZANINE

MFR MANUFACTURE(R)

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MKR BD MARKER BOARD

MLDG MOULDING

mm MILLIMETER

MO MASONRY OPENING

MR MOISTURE RESISTANT

MS MOP SINK

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

MTS METAL TRANSITION STRIP

MULL MULLION

MVBL MOVABLE

MW MICROWAVE

N NORTH

NA NOT AVAILABLE / APPLICABLE

NAT NATURAL

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OF / CI OWNER FURNISHED / CONTRACTOR

INSTALLED

OFF OFFICE

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OZ OUNCE

PAR PARALLEL

PAR PARAPET

PART PARTIAL

D DEEP

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DMPF DAMPPROOFING

DR DOOR / DRAIN

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWR DRAWER

E EAST

EA EACH

EF EACH FACE

EG VERTICAL END GUARDS

EHD ELECTRIC HAND DRYER

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EM ELECTROMAGNETIC

EM EXPANDED METAL

EMER EMERGENCY

ENCL ENCLOSED / ENCLOSURE

ENGR ENGINEER

ENTR ENTRANCE

EOS EDGE OF SLAB

EPB ELECTRIC PANEL BOARD

EQ EQUAL(LY)

EQUIP EQUIPMENT

ER POURED EPOXY

ERF POURED EPOXY FLOORING

ESCAL ESCALATOR

EST ESTIMATE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXF EXTERIOR FINISH

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAB FABRIC

FAI FRESH AIR INTAKE

FBRK FIREBRICK

FCP PREFABRICATED FABRIC CEILING PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF EL FINISH FLOOR ELEVATION

FGL FIBERGLASS

FH FIRE HOSE

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIN FLR FINISHED FLOOR

FIN FLR FINISH FLOOR

FIXT FIXTURE

FLASH FLASH(ING)

FLR FLOOR

FLRSK FLOOR SINK

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUDS

FOW FACE OF WALL

FP FIREPROOF

FPL FIREPLACE

FR FRAME

FRG FIBER REINFORCED GYPSUM

FRP FIBERGLASS REINFORCED PLASTIC

FRT FIRE RETARDANT TREATED

FSP FIRE STAND PIPE

FSTNR FASTENER

FTG FOOTING

FURG FURRING

FUT FUTURE

FWC FABRIC WALL COVER

FWP NON-ACOUSTIC STRETCHED FABRIC

PANEL WALL INSTALATION

G GROUND

GA GAGE

GALV GALVANIZE(D)

GB GRAB BAR

GC GENERAL CONTRACTOR

GDISP GARBAGE DISPOSAL

GEN GENERAL

GFP GFRP OR GFRG FREESTANDING PANEL

GFRG GLASS FIBER REINFORCED GYPSUM

GFRP GLASS FIBER REINFORCED POLYMER

GL GLASS / GLAZING

GL BLK GLASS BLOCK

GLT GLASS MOSIAC TILE

GLZ GLAZING

GLZ CMU GLAZED CONCRETE MASONRY UNIT

GPM GALLONS PER MINUTE

GR GROSS

GR LN GRADE LINE

GRAN GRANITE

GT GREASE TRAP

GT GROSS TON

GT GROUT

GYP GYPSUM

@ AT

A/C AIR CONDITIONER / CONDITIONING

ACC ACCESSIBLE

ACCSY ACCESSORY

ACOUS INSUL ACOUSTICAL INSULATION

ACOUS PNL ACOUSTICAL PANELS

ACP LAY-IN ACOUSTIC PANEL CEILING PADS

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADDL ADDITIONAL

ADDM ADDENDUM

ADJ ADJUSTABLE / ADJACENT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AHR ANCHOR

AHU AIR HANDLING UNIT

ALNMT ALIGNMENT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATELY

APPVD APPROVED

APT APARTMENT

ARCH ARCHITECT(URAL)

ASPH ASPHALT

ASTM AMERICAN SOCIETY FOR TESTING

MATERIALS

ATC ACOUSTICAL TILE CEILING

AUTO AUTOMATIC

AVG AVERAGE

AWP WALL-MOUNTED SOUND ABSORPTION

PANEL

AWT ACOUSTIC WALL TREATMENT

BD BOARD

BITUM BITUMINOUS

BL BASELINE

BL BLACK

BLDG BUILDING

BM BEAM

BO BLOWOFF

BOT BOTTOM

BR BEDROOM

BRG BEARING

BS BOTH SIDES

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

BW BOTH WAYS

C CELSIUS

C CHANNEL

C TO C CENTER TO CENTER

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CEM PLAS CEMENT PLASTER (STUCCO)

CER CERAMIC

CG CORNER GUARD

CH CHILLER

CH COAT HOOK

CHBD CHALKBOARD

CHFR CHAMFER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CL D CLOTHES DRYER

CLG CEILING

CLG HT CEILING HEIGHT

CLL CONTRACT LIMIT LINE

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CARBON MONOXIDE

CO CASED OPENING

CO CERTIFICATE OF OCCUPANCY

CO CLEANOUT

CO COMPANY

CO CUTOUT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CONC FLR SEALED CONCRETE FLOOR

CONSTR CONSTRUCTION

CONT CONTINUE

CONT CONTROLLER

CONV CONVERT

CORR CORRIDOR / CORRUGATED

CPT CARPET

CR CLOSET ROD

CR CONTROL RELAY

CR CONTROL ROOM

CR CRASH RAIL

CS CAST STONE

CS CONTROL SWITCH

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU COPPER

CU FT CUBIC FOOT

CU YD CUBIC YARD

CUB CUBICLE CURTAIN

CURT CURTAIN

CW CASEMENT WINDOW

CW CHEMICAL WASTE LINE

CW CLOCKWISE

CW COLD WATER PIPING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

1.

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

1/ 4"

M

AX

.FINISH FLOOR

1/ 4"

M

AX

.FINISH FLOOR

1/ 4"

1/ 2"

M

AX

. 1

1/ 4"

1/

2"

FINISH FLOOR

1/ 2"

M

AX

. 1

GENERAL NOTE:

LEVEL CHANGES IN EXCESS OF 1/2" SHALL MEET SLOPE REQUIREMENTS FOR A RAMP

MIN.

M

IN

*2 4"

F O

R C

H

IL

D R

EN

M

IN

MIN.

MAX

FINISH FLOOR

ELEVATION

PLAN

17" - 25"

25" MAX.

TOE CLEARANCE

KNEE CLEARANCE

M

IN

" M

IN

" M

IN

4" MAX

FINISH FLOOR

LIMITS OF PROTRUDING

OBJECTS

REDUCED VERTICAL CLEARANCE

" M

AX

X

FINISH FLOOR

24MAX. 48MIN. 24MAX.

M

IN

M

IN

M

IN

M

IN

CLEAR WIDTH OF AN ACCESSIBLE ROUTE

SEGMENT LENGTH MINIMUM SEGMENT WIDTH

< 24 INCHES

> 24 INCHES

32" INCHES

36" INCHES

60MIN.

X

36MIN.

X

6"

T O

F

IN

SU

RF

AC

E GRAB BAR

ASSEMBLY

GROUNDS & BACKER BLOCKS SHALL BE

DESIGNED TO MEET MIN. SUPPORT LOADING AS

INDICATED.

FINISH AS SHOWN ON SCHEDULE

1 1/4" -2" 1 1/2"

NOTE:

GRAB BARS TO BE

DESIGNED TO

SUPPORT A MINIMUM

CONCENTRATED LOAD

OF 250 LBS AND MUST

NOT ROTATE IN THEIR

FITTINGS.

GRAB BAR

M

AX

. A

.F .F

M

EA

SU

RE

D

TO

TH

E

HI

G

HE

R O

F

TH

E

SI

NK

R

IM

O

R

CO

UN

TE

R

SU

RF

AC

E

FINISH FLOOR 27

M

IN

REFER TO TOE /KNEE CLEARANCES

PIPE PROTECTION

(TYP.) AS PER ICC/ANSI

A117.1-2003 606.6 -

THERE SHALL BE NO

SHARP OR ABRASIVE

SURFACES UNDER LAV.

& SINKS. PROVIDE

UNDERSINK

PROTECTIVE PIPE

COVERS.

ELEVATIONS

VARIES

M

AX

TO

B

O

TT

O M

O F

RE

FL

EC

TI

VE

S

UR

FA

CE

W

HE

RE

M O

UN

TE

D

AB

O

VE

S

IN

K O

R

CO

UN

TE

R

SINK & MIRROR

PLAN30

17" -25"

CLEAR

FLOOR

SPACE

" M

IN

61" MIN.

16" - 18"

CLEAR

FLOOR

SPACE

ACCESSIBLE

WATER CLOSET

NOTE:

REFER TO TOILET

ELEVATIONS FOR

ADDITIONAL INFORMATION.

" M

AX

TO

O

U

TL

ET

O

F D

IS

P.

M

IN

AB

O

VE

G

RA

B

BA

R

FINISH

FLOOR

TOILET

TISSUE

DISPENSER

TO OUTLET OF

DISPENSER

M

IN

1/

M

IN

7" MIN.

9" MAX.

MAX.

42MIN.

1"

M

IN

6"

39" - 41"

54MIN.

TOILET

TISSUE

DISPENSER

1 1/2" MIN.

1"

M

IN

9"33

6"

FINISH

FLOOR

TOILET

TISSUE

DISPEN.

TOILET

TISSUE

DISPEN.

36" MIN.

24MIN. 12

MIN.

CLEAR

FLOOR

SPACE

SIGN CENTERED IN

CLEAR FLOOR

SPACE

FR

O

M F

IN

IS

HE

D

FL

O

O R

TO

BA

SE

LI

NE

O

F

CH

AR

AC

TE

RS

FROM LATCH SIDE

" M

IN

" M

AX

FROM FRONT

FROM FRONT

FROM HINGE SIDE

FROM HINGE SIDE

FROM HINGE SIDE

FROM LATCH SIDE

FROM LATCH SIDE

PULL

PULL

PULL

PULL

PUSH

PUSH

PUSH

60 INCHES

60 INCHES

48 INCHES

54 INCHES

42 INCHES (NOTE 1)

48 INCHES (NOTE 2)

42 INCHES (NOTE 2)

18 INCHES

0 INCHES (NOTE 3)

36 INCHES

42 INCHES

22 INCHES (NOTE 3 & 4)

24 INCHES

24 INCHES

APPROACH DIRECTION DOOR SIDE PERPENDICULAR TO

DOORWAY

PERPENDICULAR TO DOORWAY

(BEYOND LATCH UNLESS NOTED)

TYPE OF USE MINIMUM MANEUVERING CLEARANCES

MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS

HINGE/PUS

H

LATCH/PUS

H

FRONT/PUS

H

FRONT/PUL

L

LATCH/PULLHINGE/PULL

NOTES:

1. ADD 6" IF CLOSER AND LATCH PROVIDED.

2. ADD 6" IF CLOSER PROVIDED.

3. ADD 12" BEYOND LATCH IF CLOSER AND LATCH PROVIDED.

4. BEYOND HINGE SIDE.

10" MAX.

" M

AX

" M

AX

" M

AX

" M

AX

> 10" - 24"

FINISH FLOOR

FINISH

FLOOR

ELECTRICAL

DEVICE

COUNTERPAPER TOWEL

DISPENSER/RECEPTACLE

F.E.

CABINET

OPERABLE

DEVICE

" M

AX

" M

IN

" M

AX

GENERAL NOTE:

ALL OPERABLE PORTIONS OF DEVICES MUST FALL WITH IN THE SHADED AREA.

C L

ACCESSORY ELEVATIONS AND FIXTURE MOUNTING HEIGHTS

36" GRAB BAR /

42" BRAB BAR

W/ 18" VERT.

GRAB BAR

DOUBLE ROLL

DISPENSER

TOILET PAPER

NOTES:

ALL ACCESSORIES ARE TO BE MOUNTED BETWEEN 15" AND 44" ABOVE

FINISHED FLOOR UNLESS OTHERWISE NOTED TO COMPLY WITH ADA

REQUIREMENTS.

VARIES 12

MAX.

7" - 9"

A2 C3

1.

" M

AX

IM

U M

T O

BO

TT

O M

O F

R

EF

LE

C

TI

VE

SU

R

FA

C

E

SMALL

MIRROR

G2

CL

SOAP DISPENSER

WALL MOUNTED

(BY SLCH)

H1

SINGLE HOOK

J1

ALL GRAB BARS SHALL HAVE SERIES 256 ANCHOR PLATES (CONCEALED

ANCHORS) INTO SOLID BLOCKING

INSTALLATION OF ACCESSORIES IN HANDICAPPED ACCESSIBLE TOILETS

SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, CITY, STATE AND

FEDERAL AUTHORITIES WITH JURSDICTION.

2.

ALL GRAB BARS SHALL HAVE PEENED FINISH.

3.

5.

ALL ACCESSORIES ARE TO HAVE SATIN ST. STL. FINISH UNLESS OTHERWISE NOTED.

4.

CHANGING TABLE

WALL MOUNTED

N

TO

P O

F U

N

IT

5"

M1

SEAT-COVER

DISPENSER

WALL MOUNTED

" M

AX

. T

O C

TR

O

F

TO

W

EL

D

IS

PE

N

SE

R

S

LO

T

E7

PAPER TOWEL

DISPENSER AND DISPOSAL UNIT

SEMI-RECESSED MOUNTED

L1

HAND DRYER

AUTOMATIC

WALL MOUNTED

TO

T O

P O

F D

IS

PE

N

SE

R U

.O .N

SHELF UNIT WITH

MOP HOLDER

K1

SEMI-RECESSED

" T

O T

O P

O F

BR

AB

B

AR

" M

IN

" M

IN

SCALE: 1/2" = 1'-0"7 LEVEL CHANGES - (UP TO 1/2")

SCALE: 1/2" = 1'-0"9 CLEARANCES

TOE / KNEE

SCALE: 1/2" = 1'-0"8 PROTRUDING OBJECTS

SCALE: 1/2" = 1'-0"6 ACCESSIBLE ROUTE

SCALE: 1/2" = 1'-0"10 CLEAR FLOOR OR GROUND SPACE

SCALE: 1/2" = 1'-0"4 GRAB BARS & HANDRAILS

SCALE: 1/2" = 1'-0"

LAVATORIES AND SINKS

SCALE: 1/2" = 1'-0"1 WATER CLOSETS

SCALE: 1/2" = 1'-0"2 WATER CLOSET ELEVATIONS

SCALE: 1/2" = 1'-0"11 TACTILE INTERIOR SIGN

SCALE: 1/2" = 1'-0"

5 Maneuvering Clearances1

SCALE: 1/2" = 1'-0"12 REACH / MOUNTING HEIGHTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

2.

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

TYPICAL MOUNTING HEIGHTS

& ACCESSIBILTY STANDARDS

GI-002

MG MG MG MG

MG

MG

MG

MG

NR

NR

NR

NRNR

CAMERA

CAMERA

CAMERA

180 SQ.FT.

1,475 SQ.FT.

52 SQ.FT.

84 SQ.FT.

250 SQ.FT.

160 SQ.FT.

100 SQ.FT.

135 SQ.FT.

82 SQ.FT.

470 SQ.FT.

417 SQ.FT.

180 SQ.FT. 180 SQ.FT.

274 SQ.FT.

175 SQ.FT.

665 SQ.FT.

200 SQ.FT.

160 SQ.FT. 625 SQ.FT.

510 SQ.FT.

200 SQ.FT.

480 SQ.FT.475 SQ.FT.200 SQ.FT.480 SQ.FT.

80 SQ.FT.

450 SQ.FT.

50 SQ.FT.50 SQ.FT.

30 SQ.FT.

605 SQ.FT.

135 SQ.FT.

155 SQ.FT.

160 SQ.FT.

305 SQ.FT.

48 SQ.FT.

73 SQ.FT.

73 SQ.FT.73 SQ.FT.

537 SQ.FT.

146 SQ.FT.

160 SQ.FT.

130 SQ.FT.

130 SQ.FT.

120 SQ.FT.

157 SQ.FT.

140 SQ.FT.

80 SQFT.

70 SQFT.

1,610 SQ.FT.

173 SQ.FT.

85 SQ.FT.

50 SQ.FT.

15 SQ.FT.

340 SQ.FT.

62 SQ.FT.

156 SQ.FT.

39 SQFT.

1,095 SQ.FT.

100 SQ.FT.

70 SQFT.87 SQFT.41 SQFT.

473 SQ.FT.

FEC

FECFECFEC

FEC

FEC

FEHC

FEC

FEC

PPE

PPE

FEC

FEC

FEC

STAIR #3

EXIST.

CLINIC

UROLOGY

PREP RM

PACU

CLEAN HOLD

SOILED

UTILITY

STAFF

LOUNGE

NEW ELECTRICAL

CLOSET

EMS HOLD

NEW OFFICE

(POLANCO)

NEW OFFICE

(KUYUMJIAN)

OFFICE

NEW OFFICE

(VO)PRESCREEN

TOILET

NEW OFFICE

(KELLY)

NEW OFFICE

(ADELE)NEW

CONFERENCE

NEW OFFICE

(NURSE ANTHES.)

INTERIM

LOCKER ROOM

SHOWERSHOWER

CHIEF

SURGEON

NEW OFFICE

(ROSEMARY)

NEW

ADMIN

NEW OFFICE

(BOWNE)

NEW OFFICE

(WEBB)

LOGISTICS

W/ LIBRARY

EQUIPMENT

STORAGE

STERILE

STORAGE

BULK

STORAGE

ANESTHESIA

STORAGE

RECORDS

MANIFOLD

EXIST.

BATH

EXIST.

OD ROOM

EXIST.

OFFICE

EXIST.

BATH

EXIST.

OFFICE

EXIST.

OFFICE

EXIST.

OFFICE

EXIST.

BATH

EXIST.

OFFICE

EXIST.

BATH

EXIST.

BATH

EXIST.

OFFICE

EXIST.

OFFICE

EXIST.

BATH

EXIST.

BATH

EXIST.

OFFICE

EXIST.

OFFICE

EXIST.

VISITOR LOUNGE

EXIST.

TOILET

CLINIC

EXIST.

SHAFT

EXIST.

ELEC. CLO.

EXIST.

GAS CYL. STOR.

EXIST.

WAITING ROOM

EXIST.

TOILET

EXIST.

TOILET EXIST.

RECEPTION

EXIST.

DATA ROOM

EXIST.

TOILET

EXIST.

TOILET

TOILET

TOILET

TOILET SHOWER

MALE

LOCKER (74)

FEMALE

LOCKER (61)

TOILET/

SHOWER

TOILET/

SHOWER

EQUIP HOLD

SOIL

UTILITY CLEAN

CART SUPPLY

ANESTHESIA

WORK ROOM

SUB

STERILE

STAIR #5

OR #1

(ORTHO/GENERAL)

OR #2

(VASCULAR/GENERAL)

SUB

STERILEOR #3

(ENT/GENERAL)

OR #4

(OPHTHALMOLOGY)

SUB

STERILE

OR #5

(UROLOGY)

MED ROOM

STORAGE

CLEAN

HOLDSOIL

UTILITYPATIENT

TOILET

HOLDING

SCHEDULER

NURSE

OFFICE

CHARTING

SUTURE

SUPPLY

TOILET

CLEAN

LINEN

CORRIDOR

MAIL

EXIST.

TOILET

STAIR #6

CORRIDOR

ORTHOPEDIC

STORE ROOM

CORRIDOR N/W

SHOWER

CORRIDOR N/W

DECONTAMINATION

LOGISTIC

OFFICE

STAIR #4

CORRIDOR N/E

ISOLATION

ISOLATION

EQUIPMENT

HOLD

LOCKER

LOCKER

OFFICEEMS

HOLDING

DISPATCH AREA

MANUAL

CART WASH

AUTO

CART WASH

PATIENT

TOILET

EMS

HOLD

WAREHOUSE

EMS

HOLD

BREAK

DOWN ROOM

SUPPLY

PREPARATION &

PACKAGING ROOM

TERMINAL

STERILIZATION

EtO

SERVICE

EtO

STERILIZATION

EtO

SERVICE

ANESTHESIA

CONFERENCE

STAIR #1

CORRIDOR CORRIDOR

CORRIDOR EC CORRIDOR WC

SERVICE

LOBBY

CORRIDOR

ELEVATOR

LOBBY

SERVICE

CORRIDOR

4-203

4-414

4-500

4-502

4-504

4-103B

4-105A

4-423

4-1114-230

4-201

4-2264-225

4-225A

4-2244-2234-2214-2194-217

4-219A4-217A

4-214

4-2134-212 4-211 4-210

4-208 4-208A 4-207 4-205

4-204

4-105B 4-105

4-227A

4-227 4-228

4-229A

4-229 4-229A 4-112

4-112A

4-113

4-113A 4-114A

4-114 4-115

4-115A 4-116A

4-116 4-117 4-118

4-203A

4-202

4-109

4-108

4-107

4-106B

4-106C

4-106B 4-106

4-128

4-43

4-44

4-223A 4-214A

4-213A 4-210A

4-125

4-127

4-128 4-126

4-424

4-401 4-402

4-404 4-405 4-406

4-407

4-409 4-4104-4114-4124-413

4-415

4-416

4-4184-419 4-420

4-417

4-421

4-422

4-400

4-129

4-416A

4-402A

SE

4-208B

4-127

N/C

4-403

4-001

4-217A

4-001A

4-506

4-511

4-003

4-501

4-503

4-500A

4-508

4-505

4-507A 4-507B

4-507

4-506A

4-506C

4-500B

4-506B

4-513

4-512

4-514

4-509E

4-509

4-509A

4-509B4-509C4-509D

4-102

SE 1A SE

SC

SC

14 15

10987

D

C

B

A

114321

M

L

K

J

16 2017 18 19 21 2212 13 14 15

15.713.7

E

F

G

H

E

I I

N

O

11.2

10987 11

D

C

B

A

17 18 19 21 22

19A

E

9875 6

9875 6

N

O

U P

DN

U P

DN

DNU

P

DNU

P

4-209 J.C.

82.83

DUCT

DUCT

DUCT

DUCT

P-6

ELEV.

S-5

ELEV.

S-11

ELEV

S-10

ELEV

S-9

ELEV

DUCT

DUCT

DUCT

PLUMB

SHAFT

S-4

ELEV.

P-5

ELEV.

S-3

ELEV.

S-2

ELEV.

S-1

ELEV.

P-4

ELEV.

P-3

ELEV.

P-2

ELEV.

P-1

ELEV.

10 11

15 16 17 18 19 20 21 22 23 24 25

M

L

J

I

SOUTH WEST AREA - ENDOSCOPY

SMOKE COMPARTMENT

7,083 SF

NORTH EAST AREA - OR

SMOKE COMPARTMENT

9,215 SF

SOUTH EAST AREA - SURGERY

OFFICE

SMOKE COMPARTMENT

8,375SF

CENTER AREA

SMOKE COMPARTMENT

18,352 SF

STAIR #5

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

STAIR #2

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

STAIR #3

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

STAIR #3

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

STAIR #3

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

STAIR #4

DOOR

STAIR

WIDTH EXIT

CAPACITY

36" 46"

NORTH WEST AREA - OR

SMOKE COMPARTMENT

7,508SF

ACCUMULATION SPACE

440 SF

TD:135' 3"

CP

: 6

9' 9"

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

CP: 34'-9"

TD: 75'-6"TD: 139'-6"

TD: 56'-2"

TD

: 9

8'- 3"

DE: 38'-6" TD: 25'-6"

U

TD: 59' 4"TD: 136' 6"

FEFE FE

2. OCCUPANCY:

NFPA 101, 18.1.1.1.1 - CHAPTER 18 NEW HEALTHCARE

3. CONSTRUCTION TYPE :

NFPA 101, TABLE A.8.2.1.2 - TYPE II-222 NON-COMBUSTIBLE

4. FIRE SEPARATIONS :

NOT REQUIRED

5. MEANS OF EGRESS :

NFPA 101, TABLE 7.3.1.2. OCCUPANT LOAD FACTOR

AMBULATORY HEALTHCARE 100 GSF

6. EXIT CAPACITY FACTOR :

NFPA 101, TABLE 7.3.3.1

STAIRWAY

.3"/PERSON

DOOR, RAMP, CORRIDOR, HORIZONTAL EXIT LEVEL COMPONENTS

.2"/PERSON

7. MAXIMUM TRAVEL DISTANCE :

NFPA 101, 18.2.6.2.2. 200' SPRINKLERED

8. MAXIMUM DEAD END CORRIDOR :

NFPA 101, 18.2.5.10 30'

(EXISTING DEAD-END CORRIDORS EXCEEDING 30' SHALL BE PERMITTED TO

CONTINUE IN USE IF IT IS IMPRACTICAL AND UNFEASIBLE TO ALTER THEM)9. MINIMUM CORRIDOR WIDTH:

NFPA 101, 18.2.3.4 8'-0" PATIENT AREAS, 3'-8" STAFF AREAS

10. MAXIMUM COMMON PATH:

NFPA 101, 18.2.5.3 100' MAXIMUM

11. RATINGS - CORRIDOR :

NFPA 101, 18.3.6.2 NO RATING REQUIRED. LIMIT THE TRANSFER OF SMOKE

12. RATINGS - STAIRS:

NFPA 101, 7.1.3.2.1a 2 HOUR FOR FOUR OR MORE STORY BUILDING

13. RATINGS - SHAFTS:

NFPA 101, 8.2.5.4 2 HOUR

14. MAXIMUM SMOKE COMPARTMENT AREA:

NFPA 101, 18.3.7.1(1) 22,500 GSF

15. MAXIMUM SMOKE COMPARTMENT TRAVEL DISTANCE:

NFPA 101, 18.3.7.1(2) 200'

17. EXIT & EGRESS CALCULATION :

THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION.

1. APPLICABLE CODES:

1.1 VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE

TECHNICAL INFORMATION LIBRARY.

1.2 NFPA 101 LIFE SAFETY CODE 2012.

1.3 NFPA NATIONAL FIRE CODES WITH EXCEPTION OF NFPA 5000 & NFPA 900

1.4 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARD

1.5 VA SEISMIC DESIGN REQUIRMENTS, H-18-8

1.6 NATIONAL ELECTRICAL CODE (NEC)

1.7 NATIONAL STANDARD PLUMBING CODE (NSPC)

1.8 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

1. DOORS AT FIRE RATED PARTITION SHALL BE FIRE PROOF, SELF CLOSING AND

RATED ACCORDINGLY PER RATED PARTITION.

2. AREA OF PROJECT ARE FULLY SPRINKLERED.

3. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED FROM SLAB TO SLAB ABOVE TO

RESIST THE PASSAGE OF SMOKE.

EXIT SIGN (SINGLE

SIDED, DOUBLE SIDED,

W/ DIRECTIONAL

ARROW, WALL

MOUNTED)

LIFE SAFETY LEGEND

SYMBOL DESCRIPTION REMARKS

NEW SMOKE COMPARTMENT

BOUNDARY

EGRESS PATH

TD - TRAVEL DISTANCE

CP - COMMON PATH

DE - DEAD END CORRIDOR

DIRECTION OF TRAVEL MAXIMUM TRAVEL DIST:

200'

TD: 0'-0"

AREA NOT IN

CONTRACT

N.I.C

ACCUMULATION SPACE AREA

1 HOUR RATED PARTITION

2 HOUR RATED PARTITION

1HR RATED PARTITIONNEW SMOKE BARRIER

1HR RATED PARTITION

FE FIRE EXTINGUISHER

1/16" = 1'-0"1 LIFE SAFETY PLAN - 4th FLOOR

OCCUPANT CALCULATION:

SMOKE

COMPARTMENT AREA OCCUPANCY OCCUPANCY

LOAD

EXIT CAPACITY

A

B

C

D

E

8,375SF TREATMENT* 8,375F/240SF = 35P

10,819SF

14,396SF

9,215SF

7,508SF

TREATMENT*

TREATMENT*

TREATMENT*

TREATMENT*

10,420SF/240SF = 46P

14,396SF/240SF = 60P

9,215F/240SF = 39P

7,508SF/240SF = 32P

STAIR 1 =153P

STAIR 2 =153P

STAIR 3 =153P

STAIR 4 =153P

STAIR 5 =153P

TOTAL #OCCUPANTS = 285 <918 TOTAL

EXIT CAPACITY

ACCUMULATION* 440SF/6NSF = 73P STAIR 6 =153P

*PER NFPA 101 TABLE 7.3.1.2 OCCUPANT LOAD FACTOR - INPATIENT TREATMENT DEPARTMENTS

UNDER HEALTHCARE USE SHALL BE PROVIDE WITH 240 S.F. PER PERSON.

**PER NFPA 101 SECTION 19.2.2.5.1.2 ACCUMULATION SPACE OF NOT LESS THAN 6 NET SQUARE

FEET PER OCCUPANT SHALL BE PROVIDED FOR ADJOINING COMPARTMENT ON STORIES NOT

HOUSING BED OR LITTERBORNE PATIENTS.

LIFE SAFETY NOTES

CODE ANALYSIS:

LIFE SAFETY PLAN AND

CODE ANAYLSIS

GI-101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

1.

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

WALLS FLOORING CEILINGS WINDOWS & DOORS MILLWORK PLUMBING ELECTRICAL

PR

IM

E

AN

D P

AI

N

T

EN

TI

R

E

SP

AC

E

TO

U

C H

U P

PA

IN

T

PA

R

TI

AL

C O

M

PO

U N

D A

N D

S

AN

D

IN

ST

AL

L

SC

H

ED

U

LE

D

W

AL

L

TI

LE

IN

ST

AL

L

M

IS

SI

N

G C

O R

N

ER

G U

AR

D

S

IN

ST

AL

L

M

IS

SI

N

G H

O R

IZ

O

N

TA

L C

R

AS

H R

AI

L

C

LO

SE

O

PE

N

IN

G

IN

E

XI

ST

IN

G

PA

R

TI

TI

O N

. T

AP

E, S

PA

C

KL

E

PA

IN

T

IN

ST

AL

L

1" F

U R

R

IN

G

/8

" G

YP

. B D

O

N E

XI

ST

IN

G

P

AR

TI

TI

O N

PR

EP

S

LA

B

AN

D

IN

ST

AL

L

SC

H

ED

U

LE

D

FL

O O

R

IN

G

B

AS

E

C

LE

AN

S

TA

IN

ED

F

LO

O

R

IN

G

R

EP

LA

C

E

FL

O O

R

IN

G

SE

E

SC

H

ED

IN

ST

AL

L

VI

N

YL

B

AS

E

IN

ST

AL

L

N

EW

S C

H

ED

U

LE

D C

EI

LI

N G

SY

ST

EM

R

EP

LA

C

E

ST

AI

N

ED

C

EI

LI

N G

T

IL

E( S)

IN

ST

AL

L

M

IS

SI

N

G C

EI

LI

N G

T

IL

E

IN

ST

AL

L

N

EW

H M

F R

AM

E, D O

O R

H

AR

D

W

AR

E

IN

ST

AL

L

N

EW

D O

O R

H

D W

R

IN

EX

IS

TI

N

G F

R

AM

E

PR

IM

E

PA

IN

T

EX

IS

TI

N G

D O

O R

FR

AM

E O

R V

IS

IO

N P

AN

EL

F R

AM

E

IN

ST

AL

L

H

AR

D W

AR

E

IN

E

XI

ST

IN

G

D O

O R

R

EM

O

VE

E

XI

ST

IN

G A

LU

M

W

IN

D O

W

SA

SH

ES

, C

LE

AN

T

R

AC

KS

, R

E-

IN

ST

AL

L

AN

D R

EA

LI

G N

S

AS

H

ES

IN

ST

AL

L

N

EW

S

EM

I-T R

AN

SL

U C

EN

T

W

IN

D O

W F

IL

M

IN

ST

AL

L

SP

EC

IF

IE

D O

PE

R

AB

LE

PA

R

TI

TI

O N

R

EP

LA

C

E

SM

O

KE

S

EA

L

IN

ST

AL

L

SC

H

ED

U

LE

D

M

IL

LW

O

R K

R

EM

O

VE

R

EL

AC

E

EX

IS

TI

N G

W

AL

L C

O

VE

R

IN

G B

AC

KS

PL

AS

C

AR

EF

U

LL

Y

R

EM

O

VE

E

XI

ST

IN

G B

AS

E

W

AL

L

C

AB

S

FO

R R

EU

SE

IN

ST

AL

L

R

EL

O C

AT

ED

B

AS

E

W

AL

L C

AB

S

IN

ST

AL

L

N

EW

M

ET

AL

L

O C

KE

R

S

IN

ST

AL

L

SC

H

ED

U

LE

D

T O

IL

ET

AC

C

ES

SO

R

IE

S

PR

O

VI

D

E N

EW

S

AN

S U

PP

LY

R O

U G

H

-IN

A N

D

IN

ST

AL

L N

EW

W

C

PR

O

VI

D

E N

EW

S

AN

S U

PP

LY

R O

U G

H

-IN

A N

D

IN

ST

AL

L N

EW

W

AL

L

H U

N G

L

AV

T

R

IM

C U

T H

O

LE

IN

ST

AL

L

SI

N K

/ T R

IM

IN

EX

IS

TI

N

G C

O U

N

TE

R

C O

N N

EC

T

TO

EX

IS

TI

N G

R O

U G

H

IN

G

IN

ST

AL

L

N

EW

W C

C

O N

N

EC

T

TO

EX

IS

TI

N

G R

O U

G H

IN

G

R

EM

O

VE

E

XI

ST

IN

G L

AV

C

AP

P

IP

IN

G

C

AR

EF

U

LL

Y

R

EM

O

VE

E

XI

ST

IN

G S

IN

KS

PR

O

VI

D

E N

EW

S

AN

S U

PP

LY

R O

U G

H

-IN

R

EI

N

ST

AL

L R

EL

O

C

AT

ED

SI

N

KS

IN

ST

AL

L

SU

R

G

IC

AL

L

IG

H

T

ST

R

U C

TU

R

AL

S

U

PP

O R

T

C O

M

PL

ET

E

N U

R

SE

C

AL

L

SY

ST

EM

C O

N

FI

R M

P O

W

ER

S

W

IT

C H

W

IR

IN

G

TO

E

XI

ST

IN

G

N O

N -F

U N

C

TI

O N

IN

G

LI

G

H T

FI

XT

U R

ES

C O

R R

EC

T

SW

IT

C H

L O

C

AT

IO

N

4-100 ENDO RECEPTION

4-101 AMB SURG PRE-OP

4-102 AMB SURG PRE-OP

4-103 PATIENT TOILET

4-104 AMB SURG PRE-OP

4-105 PATIENT TOILET

4-106 AMB SURG PRE-OP

4-107 AMB SURG PRE-OP

4-108 PATIENT TOILET

4-109 AMB SURG SOILED UTILITY

4-110 ENDO / AMB SURG PACU

4-111 PATIENT TOILET

4-112 PATIENT TOILET

4-113 ENDO NURSE STATION

4-114 PANTRY

4-115 WORKROOM

4-116 ENDOSCOPY

4-117 NOT USED

4-118 G.I. / ENDO STORAGE

4-119 ENDOSCOPY

4-120 NOT USED

4-121 EVS CLOSET

4-122 ENDOSCOPY

4-123 MOTILITY

4-124 PATIENT TOILET

4-125 CLEAN SCOPE STORAGE

4-126 ENDO CLEAN SUPPLY

4-126A PATIENT TOILET

4-127 ENDO PRE-OP

4-128 PATIENT TOILET

4-129 ENDO PRE-OP

4-130 ENDO PRE-OP

4130A PATIENT TOILET

4-131 PATIENT LOCKERS

4-132 FLUOROSCOPE / LASER

4-133 NOT USED

4-134 CLEAN LINEN

4-135 PATIENT TOILET

4-136 PCT OFFICE

4-137 AMB SURG DOCTORS

4-138 MED ROOM

4-139 EXIST LINEN CHUTE

4-140 AMB SURG NURSE STATION

4-141 STRETCHER STORAGE

4-142 AMB SURG SUPPLIES

4-143 STAFF OFFICE

4-144 TOILET

4-145 AMB SURG LOUNGE

4-146 FEMALE LOCKERS

4-147 TOILET / SHOWER

4-148 MALE LOCKERS

4-149 TOILET / SHOWER

4-150 NOT USED

4-151 NOT USED

4-152 EXIST ELEC CLOSET

SW-1C CORRIDOR

SW-1B CORRIDOR

SW-1C CORRIDOR

SW-1D PASSAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

2.

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

SCOPE OF WORK MATRIX

GI-102

160 SQ.FT.

82 SQ.FT.

470 SQ.FT.

417 SQ.FT.

180 SQ.FT. 180 SQ.FT.

E

N N

DNU

P

S-11

ELEV

S-10

ELEV

S-9

ELEV

DUCT

DUCT

DUCT

PLUMB

SHAFT

S-4

ELEV.

P-5

ELEV.

S-3

ELEV.

S-2

ELEV.

S-1

ELEV.

P-4

ELEV.

P-3

ELEV.

P-2

ELEV.

P-1

ELEV.

CORRIDOR WC

SERVICE

LOBBY

CORRIDOR

SC

PHASE 1

PHASE 2

NOTES:

PHASE 1 IS SUBSTANTIALLY

COMPLETE. ITEMS REMAINING TO BE

COMPLETED ARE DESCRIBED IN THESE

DOCUMENTS.

PHASE 1 IS TO BE COMPLETED FIRST

AND MADE READY FOR OWNER TO

TAKE OCCPANCY WHILE PHASE 2

WORK IS BEING COMPLETED.

PHASE 2 IS PARTIALLY COMPETE. ALL

ITEMS TO BE COMPLETED IN THIS

PHASE ARE DESCRIBED IN THESE

DOCUMENTS

THIS PHASING PLAN APPLIES TO ALL

TRADES, GENERAL CONSTRUCTION

AND MECHANICAL, ELECTRICAL,

PLUMBING, FIRE ALARM AND

SPRINKLER TRADES

TEMP PART'NTEMP PART'N

TEMP PART'N

1/8" = 1'-0"1 PHASE PLAN - 4th FLOOR

PHASE PLAN

GI-103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

3.

5,

- 1 :0

4p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

AutoCAD SHX Text K-12867

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_SINKS

AutoCAD SHX Text

CAMERTON

470 SQ.FT.

417 SQ.FT.

180 SQ.FT. 180 SQ.FT.

E

N

DUCT

DUCT

CORRIDOR WC

SERVICE

LOBBY

CORRIDOR

SC

TO BE IN PLACE DURING

BOOM WORK

TO BE IN PLACE DURING

BOOM WORK

TO BE IN PLACE DURING

BOOM WORK

1/8" = 1'-0"1 INFECTION CONTROL PLAN - 4th FLOOR

INFECTION CONTROL

PLAN & NOTES

GI-104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities

Management U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

630A4-26-102

Project Director

08/05/2025 G.W.C.Revisions: Date:

PREMIER

ENGINEERING

GROUP, INC.

MECHANICAL | ELECTRICAL | PLUMBING

439 Route 46 East, Rockaway, New Jersey 07866

WWW.PEGMEP.COM PEG# YYNNN

O: 973-586-3004 I F: 973-586-3009

P:

\2

5\

.X

X X

B ro ok ly n V

A R en ov at io ns B rid gi ng D oc um en ts

\D R

A W

IN

G

S\ C

O N

D O

C S\

G I-

4.

5,

- 1 :0

5p m b ob r

Brooklyn Campus New York, NY

G.I. Renovation Phase III

NY Harbor Healthcare Systems

DESIGN BUILD RFP 08-05-2025

15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪

T: 215.634.3400 Richard D. Alderiso , AIA

NY RA 027416

TEMPORARY PARTITIONS SHALL CONSIST OF 6 MIL, FIRE RETARDANT

POLYSTYRENE DUST BARRIER WITH ZIPPERED ACCESS

PROVIDE MINIMUM 24" X 36" ADHESIVE (TACK)Y WALK-OFF MAT'S AT ALL

ENTRANCES TO CONSTRUCTION AREA.

PROVIDE H.E.P.A. FILTERING OF ALL AIR LEAVING THE ROOM.

MAINTAIN NEGATIVE PRESSURE WITHIN THE CONSTRUCTION AREA AT

ALL TIMES. INSTALL NEGATIVE PRESSURE MACHINES AS REQUIRED.

REFER TO I.C.R.A. MATRIX AND FOLLOW ALL REQUIREMENTS SET

FORTH WITHIN THE MATRIX AND AS DIRECTED BY HOSPITAL INFECTION

CONTROL STAFF.

FLOOR TO CEILING TEMPORARY

DUST CONTROL PARTITION EQUAL

TO EDGEGUARD

(www.EDGEGUARD.COM) WITH

SLIDING ACCESS DOOR

WALK OFF MAT

Infection Control Notes

Infection Control Legend IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA

CLASS DESIGNATION

MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

C

LA

SS

I

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM

CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL

INSPECTION.

1. WIPE SURFACES TO REMOVE DUST.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AND EXIT OF

WORK AREA. REPLACE USED MATS IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

1. WIPE WORK SURFACES WITH DISINFECTANT

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WORK AREA WITH H.E.P.A.

FILTERED VACUUM BEFORE LEAVING WORK AREAS.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK

IS BEING PERFORMED.

C

LA

SS

II

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY

OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND

ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS.

3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION

BEGINS OR IMPLEMENT CONTROL CUBE METHOD.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING

H.E.P.A.-EQUIPPED AIR FILTRATION UNITS.

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.

8. WET MOP AND/OR VACUUM WITH H.E.P.A. FILTERED VACUUM

BEFORE LEAVING WORK AREAS.

9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING.

4. VACUUM WORK WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK

IS BEING PERFORMED.

C

LA

SS

II

I

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT IS NOT LIMITED TO:

· REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE TO 50 SQUARE FEET

· PAINTING (BUT NOT SANDING), WALL COVERING

· ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVATES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING

OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE B

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

· INSTALLATION OF TELEPHONE AND COMPUTER CABLING

· ACCESS TO CHASE SPACES

· CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

INCLUDES, BUT IS NOT LIMITED TO:

· SANDING OF WALLS FOR PAINTING OR WALL COVERING

· REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

· NEW WALL CONSTRUCTION

· MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

· MAJOR CABLING ACTIVITIES

· ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

· ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS

· REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM

· NEW CONSTRUCTION

GROUP 1

LOW RISK

· OFFICE AREAS

(NON-CLINICAL)

GROUP 2

MEDIUM RISK

· CARDIOLOGY

· ECHOCARDIOLOGY

· ENDOSCOPY - GI

· PHYSICAL THERAPY

· RADIOLOGY/MRI

· NUCLEAR MEDICINE

· RESPIRATORY CARE (EXCEPT

BRONCHOSCOPY AREA)

· CAFETERIA

· OUTPATIENT AREAS- CLINICS AND

OFFICES (EXCEPTION: TRANSPLANT

AND ONCOLOGY)

· EMERGENCY ROOM

· POST ANESTHESIA CARE UNITS

· LABOR AND DELIVERY

· PEDIATRICS

· ADMISSION/DISCHARGE AREA

· LABORATORIES

· PHARMACY

· INPATIENT UNITS (NOT

OTHERWISE SPECIFIED) AT ALL

A.E.H.N. LOCATIONS

GROUP 3

HIGH RISK

GROUP 4

HIGHEST RISK

· ALL OPERATING ROOMS INCLUDING LABOR

AND DELIVERY

· ANESTHESIA AND PUMP AREAS

· CENTRAL EQUIPMENT/STERILE SUPPLY

· CARDIAC CATHERTERIZATION AND

ANGIOGRAPHY AREAS

· INTERVENTIONAL RADIOLOGY

· RADIATION ONCOLOGY

· ALL INTENSIVE CARE UNITS

· NEWBORN NURSERIES, INCLUDING N.I.C.U.

· DIALYSIS UNIT

· ONCOLOGY- INPATIENT & OUTPATIENT

· TRANSPLANT- INPATIENT & OUTPATIENT

· PHARMACY ADMIXTURE

· NEGATIVE PRESSURE ISOLATION

ROOMS/AREAS (INCLUDING

BRONCHOSCOPY AREA)

PATIENT RISK GROUP TYPE A TYPE B TYPE C

LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

VERY HIGH RISK GROUP 4

I

I

I

III

II II

II

TYPE D

III/1V

IV

IV

IVIII/1V

III/1V

III/1V

III

III

CONSTRUCTION PROJECT TYPE

PATIENT RISK GROUP TABLE

INFECTION CONTROL RISK ASSESSMENT

TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR

CLASS IV CONTROL PROCEDURES ARE NECESSARY.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY

OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND

ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS.

3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE

TO PREVENT CONTAMINATION OF DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL

CUBE METHOD BEFORE CONSTRUCTION BEGINS.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING

H.E.P.A. EQUIPPED AIR FILTRATION UNITS.

6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES

APPROPRIATELY.

7. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A

H.E.P.A. VACUUM CLEANER BEFORE LEAVING WORK SITE OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

8. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR

SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME

THE WORKER EXITS THE WORK AREA.

9. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA

WITHIN ANTEROOM. REPLACE PER MANUFACTURER'S

RECOMMENDATIONS.

10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED EACH BY THE HOSPITAL

SAFETY OFFICER, FACILITIES MANAGEMENT MAINTENANCE AND

ENGINEERING DEPARTMENT AND THOROUGHLY CLEANED BY

THE HOSPITAL ENVIRONMENTAL SERVICES DEPARTMENT OR

THEIR CONTRACTED ENVIRONMENTAL SERVICES COMPANY.

11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

12. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

13. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. WET

MOP WITH DISINFECTANT AFTER BARRIERS ARE REMOVED.

14. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

4. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT AFTER BARRIERS ARE

REMOVED

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK

WAS BEING PERFORMED.

ICRA GENERAL NOTES

1. PROVIDE CONTAINMENT AS REQUIRED BY V.A. INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA

C

LA

SS

IV

AutoCAD SHX Text K-12867

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_SINKS

D01 A1-3

F1-3

G0-3

G0-3

G0-3

G08

G08

F03

H0-3

G08

H03

G03

G03 F03

G10

F03

G10

G10L1-0

L1-0

G03

G03

G09 H03

CORRIDOR WC

SERVICE

LOBBY

CORRIDOR

SC

16 17 18 19 20

M

L

K

J

HH

GG

FF

U

AS-2024

AS-202

AS-202 34

AS-202

40 38

AS-202 2628

AS-202

AS-202

AS-203 26AS-202

AS-201 2

AS-2028

AS-507

Sim

AS-412

B

AS-400

AS-410

B

AS-412

A

AS-410

A

D02

A03A03

G09

D01

D01

A08

A1-3

L1-0

L01

L1-0

L1-0

L1-0

L1-0

L1-0

L1-0

L1-0

A08

A0-3

15'-9 5/8"

1'- 6"

1'- 0 7

/8" 7'-

1/

2" 5'-

2 7 /8"

2'- 5"

1'-1 1/2" 6'-4 3/4"

4'-4 1/2"

1'- 8 3

/8" 4'-

6 3 /4"

2'- 4 7

/8"

6'- 1 7

/8" 7'-

7 1 /4"

2'-

7/ 8"

4'- 0 3

/4" 6'-

7 1 /2"

5'- 5"

6 3 /4"

1'-6 3/8" 6'-0" 6'-4 1/4" 2'-7 1/2"

3'-10 1/2" 2'-5"

3'- 5 7

/8" 2'-

5 7 /8"

2'- 7 3

/4" 3'-

6 1 /8"

± 1'-0"

6'- 6 3

/4" 4-144

4-143

4-142

4-140

4-141B

4-147

4-149

4-148

4-138

4-001

4-

4-146

4-141A

REF.G

REF.G

EXISTING 2 HR RATED WALL

CONSTRUCTION BARRIER

MA

TC

HL

IN

E

MA

TC

HL

IN

E

RELOCATED

CABINETS & SINKS

FROM FORMER

SCOPE / HIGH LEVEL

DISINFECT 4-126

EXISTING DOOR,

FRAME AND HDWR

TO BE RELOCATED

NEW TRANSLUCENT

FILM TO BE ADDED

TO EXISTING GLASS

IMPACT

PROTECTION RAIL

TO BE ADDED

INSTALL SCHEDULED BASEINSTALL CRASHRAIL

AS-410

C

INDICATES MISSING DOOR

HARDWARE TO BE INSTALLED (TYP)AS-201

AS-412

C

L1-0

F10

G10

H03

H03

H03

G03

F10

L1-0

F0-3

H0-3

H0-3

H0-3

G0-3

H03

F0-3

STORAGE ROOM WALLS TO

BE 1-HR RATED (AS SPECIFIED

ON LIFE SAFETY PLAN)

EXISTING WALLS TO BE

EXTENDED TO EXISTING DECK

AND SEALED. ALL

PENETRATIONS TO BE

SEALED IN ACCORDANCE

WITH PENETRATION DETAILS,

DWG. AS-501

7'- 2 3

/8" 2'-

5" 2'-

7/

8" 2'-

7/

8" 2'-

5 3 /4"

6'- 2 5

/8"

53 SF

TOILET/SHOWER

4-149

35 SF

EXIST. LINEN

CHUTE

4-139

113 SF

EXISTING MED

ROOM

4-138

433 SF

AMB SURG

LOUNGE

4-145

122 SF

STAFF OFFICE

4-143

93 SF

AMG SURG

SUPPLIES

4-142

140 SF

EXISTING AMB

SURG DRS

4-137

225 SF

EXISTING PCTC

OFFICE

4-136

61 SF

AMB SURG

SOILED UTILITY

4-109

389 SF

EXISTING

FLUOROSCOPE/LASER

4-132

129 SF

EXISTING ENDO

PRE-OP

4-130

165 SF

EXISTING

ENDO

RECEPTION

4-100

141 SF

EXISTING

AMB SURG

PRE-OP

4-101

42 SF

EXISTING

PATIENT TOILET

4-103

142 SF

EXISTING

AMB SURG

PRE-OP

4-102

142 SF

EXISTING

AMB SURG

PRE-OP

4-104

42 SF

EXISTING

PATIENT TOILET

4-105

38 SF

PATIENT TOILET

4-108

141 SF

EXISTING

AMB SURG

PRE-OP

4-106

140 SF

AMB SURG

PRE-OP

4-107

59 SF

EXISTING

CLEAN LINEN

4-134

61 SF

TOILET/SHOWER

4-147

47 SF

EXISTING

TOILET

4-135

54 SF

4-111

144 SF

FEMALE

LOCKERS

4-146

135 SF

MALE LOCKERS

4-148

43 SF

EXISTING PATIENT

TOILET

4-130A

161 SF

STRETCHER

STORAGE

4-141

41 SF

TOILET

4-144

25 SF

EXISTING

ELECTRICAL

CLOSET

4-152

193 SF

AMB. SURG.

NURSE STATION

4-140

584 SF

EXISTING

CORRIDOR

SW-1A

256 SF

CORRIDOR

SW-1C

33 SF

EXISTING

PATIENTS

LOCKERS

4-131

140 SF

EXISTING ENDO

PRE-OP

4-129

1345 SF

4-110

PATIENT TOILET

PASSAGECORRIDOR

SW-1D

EXISTING ENDO /

AMB SURG PACU

4-100 4-101

4-103A 4-103B

4-102 4-104

4-105A

4-105B

4-106 4-107

4-108

4-109 4-110

4-130

4-130A

4-1324-1344-1354-136

4-137

4-1394-152

ALL LOOSE

FURNITURE TO BE

PROVIDED AND

INSTALLED BY

OWNER

1'-8"

3'-

0"20" X 36" COUNTER

& UPPER CABS

PROVIDED AND

INSTALLED BY

CONTRACTOR

CONSTRUCTION GENERAL NOTES:

1. REFER TO SHEET GI-001 FOR ADDITIONAL NOTES.

2. UNLESS OTHERWISE NOTED, ALL HORIZONTAL BUMPER GUARD, CRASH RAIL AND HAND RAIL SHALL BE TERMINATED 2" CLEAR FROM ANY CORNER GUARD, DOOR FRAME OR INTERCEPTING WALL PARTITION.

3. PROVIDE WALL REINFORCEMENT FOR ALL WALL MOUNTED ITEMS (RAILS, COUNTERS, CABINET WORK, ETC.) AS FOLLOWS; 16 GAUGE STEEL 8"W. MIN. TO RUN CONTINUOUSLY BEHIND DRYWALL OR BACKER BOARD FOR A MINIMUM OF 3 STUDS OR MORE FOR LENGTH AS REQUIRED FOR MOUNTING. SECURE TO

EVERY STUD. SEE MILLWORK DETAILS FOR MILLWORK REINFORCEMENT HEIGHTS AND LENGTHS.

4. ALL DRYWALL PARTITION WITH "FH" MUST EXTEND FULL HEIGHT TO UNDERSIDE OF SLAB ABOVE PER

D.O.H. REQUIREMENTS.

5. EXISTING TILE WALL TO REMAINED SHALL BE LAMINATED WITH ONE LAYER OF GYPSUM WALL BOARD, TYPICAL UNLESS OTHERWISE NOTED.

6. REFER TO SHEET #AD-101A & AD-101B FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 3RD FLOOR AS REQUIRED TO PERFORM THE NEW WORK ON THE 4TH FLOOR. REFER TO SHEET

#AD-103 FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 5TH FLOOR.

7. ALL EXISTING TO REMAIN PERIMETER WINDOW SILL & CONVECTOR ENCLOSURE SHALL BE PREPPED TO

RECEIVE NEW FINISH. ALL METAL CONVECTOR ENCLOSURE SHALL RECEIVE ELECTROSTATIC

REFINISHING.

8. ALL AREAS WHERE EXISTING MEETS NEW WORK SHALL BE PATCHED TO MATCH THE NEW FINISH. ALL

NEW WORK SHALL ALIGN WITH THE EXISTING ADJACENT SURFACES UNLESS OTHERWISE NOTED.

9. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF ANY EXISTING UTILITIES WHICH CONFLICT WITH

ANY NEW WORK.

10. ALL EXISTING WALL MOUNTED DEVICES SHALL BE REMOVED AND RECESSED INTO EXISTING WALL

PARTITION, TYPICAL, UON.

11. SEE LIFE SAFETY PLANS FOR ALL SMOKE BARRIER, 1 HR, AND 2 HR RATED WALL,DOOR, AND ROOM

LOCATIONS.

12. WHERE EXISTING WALLS ARE BEING USED FOR CONSTRUCTION BARRIERS, THE WALL ABOVE THE

CEILING MUST BE EXTENDED TO THE SLAB ABOVE WITH FIRE RATED CONSTRUCTION.

CONSTRUCTION GENERAL NOTES:

1. REFER TO SHEET GI-001 FOR ADDITIONAL NOTES.

2. UNLESS OTHERWISE NOTED, ALL HORIZONTAL BUMPER GUARD, CRASH RAIL AND HAND RAIL SHALL BE TERMINATED 2" CLEAR FROM ANY CORNER GUARD, DOOR FRAME OR INTERCEPTING WALL PARTITION.

3. PROVIDE WALL REINFORCEMENT FOR ALL WALL MOUNTED ITEMS (RAILS, COUNTERS, CABINET WORK, ETC.) AS FOLLOWS; 16 GAUGE STEEL 8"W. MIN. TO RUN CONTINUOUSLY BEHIND DRYWALL OR BACKER BOARD FOR A MINIMUM OF 3 STUDS OR MORE FOR LENGTH AS REQUIRED FOR MOUNTING. SECURE TO

EVERY STUD. SEE MILLWORK DETAILS FOR MILLWORK REINFORCEMENT HEIGHTS AND LENGTHS.

4. ALL DRYWALL PARTITION WITH "FH" MUST EXTEND FULL HEIGHT TO UNDERSIDE OF SLAB ABOVE PER

D.O.H. REQUIREMENTS.

5. EXISTING TILE WALL TO REMAINED SHALL BE LAMINATED WITH ONE LAYER OF GYPSUM WALL BOARD, TYPICAL UNLESS OTHERWISE NOTED.

6. REFER TO SHEET #AD-101A & AD-101B FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 3RD FLOOR AS REQUIRED TO PERFORM THE NEW WORK ON THE 4TH FLOOR. REFER TO SHEET

#AD-103 FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 5TH FLOOR.

7. ALL EXISTING TO REMAIN PERIMETER WINDOW SILL & CONVECTOR ENCLOSURE SHALL BE PREPPED TO

RECEIVE NEW FINISH. ALL METAL CONVECTOR ENCLOSURE SHALL RECEIVE ELECTROSTATIC

REFINISHING.

8. ALL AREAS WHERE EXISTING MEETS NEW WORK SHALL BE PATCHED TO MATCH THE NEW FINISH. ALL

NEW WORK SHALL ALIGN WITH THE EXISTING ADJACENT SURFACES UNLESS OTHERWISE NOTED.

9. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF ANY EXISTING UTILITIES WHICH CONFLICT WITH

ANY NEW WORK.

10. ALL EXISTING WALL MOUNTED DEVICES SHALL BE REMOVED AND RECESSED INTO EXISTING WALL

PARTITION, TYPICAL, UON.

11. SEE LIFE SAFETY PLANS FOR ALL SMOKE BARRIER, 1 HR, AND 2 HR RATED WALL,DOOR, AND ROOM

LOCATIONS.

12. WHERE EXISTING WALLS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .