S02 DRAWINGS.pdf
PDF 13 MB Posted
- Attached to
- Z1DA--630A4-26-102 GI RENOVATION PHASE III
- Solicitation number
- 36C24226R0018
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
GI-000
G-001 DRAWING LIST
Volume
Page
# SHEET # DRAWING TITLE
04 - INTERIORS FINISH
IN-101A FINISH PARTIAL PLAN - 4TH FLOOR
IN-102B FINISH PARTIAL PLAN - 4TH FLOOR
IN-601 INTERIOR FINISH SCHEDULE
12 - MECHANICAL
34 MD101 HVAC - DEMOLITION PLAN - DUCTWORK & PIPING - LEVEL 5
35 MH101 HVAC - DUCTWORK NEW WORK PLAN - LEVEL 4
36 MH102 HVAC - MECHANICAL EQUIPMENT ROOM PLANS - LEVEL 5
MP101 HVAC - PIPING NEW WORK PLAN - LEVEL 4
MP102 HVAC - PIPING NEW WORK PLAN - LEVEL 5
MX101 HVAC - SCHEDULES
MX102 HVAC - SCHEDULES
MX201 HVAC - DETAILS
MX202 HVAC - DETAILS
MX203 MECHANICAL DETAILS
MX301 HVAC ATC DIAGRAMS
15 - ELECTRICAL
EL101 ELECTRIC - LIGHTING NEW WORK PLAN - LEVEL 4
EP101 ELECTRIC - POWER NEW WORK PLAN - LEVEL 4
EP102 BUILDING 1 MECHANICAL POWER NEW WORK PLAN - PARTIAL
FIFTH FLOOR
EX101 ELECTRIC - DETAILS AND SYMBOLS
EX102 BUILDING 1ELECTRICALPANEL SCHEDULES - FOURTH FLOOR
EAST
16 - PLUMBING
PP101 PLUMBING - NEW DOMESTIC WATER PIPING - LEVEL 4
PP102 PLUMBING - NEW WASTE AND VENT PIPING - LEVEL 4
PP103 PLUMBING - NEW MEDICAL GAS PIPING - LEVEL 4
PX101 PLUMBING - SCHEDULES, NOTES, AND DETAILS
17 - FIRE PROTECTION
FX101 SPRINKLER - DEMOLITION & NEW WORK PLAN - LEVEL 4
FX201 SPRINKLER - NOTES, DETAILS AND SCHEDULES
G-001 DRAWING LIST
Volume
Page
# SHEET # DRAWING TITLE
01 - GENERAL
Volume 1
1 GI-000 COVER SHEET
2 GI-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS
3 GI-002 TYPICAL MOUNTING HEIGHTS & ACCESSIBILITY STANDARDS
4 GI-101 LIFE SAFETY PLAN AND CODE ANAYLSIS
AS-101A CONSTRUCTION PARTIAL PLAN - 4TH FLOOR
AS-102B CONSTRUCTION PARTIAL PLAN - 4TH FLOOR
AS-111A REFLECTED CEILING PARTIAL PLAN - 4TH FLOOR
AS-112B REFLECTED CEILING PARTIAL PLAN - 4TH FLOOR
AS-121A EQUIPMENT/ POWER PARTIAL PLAN - 4TH FLOOR
AS-122B EQUIPMENT/ POWER PARTIAL PLAN - 4TH FLOOR
AS-201 INTERIOR ELEVATIONS
AS-202 INTERIOR ELEVATIONS
AS-203 INTERIOR ELEVATIONS
AS-400 ENLARGED PLANS & ELEV - NURSE STATION
AS-410 ENLARGED TOILET PLANS & ELEV
AS-501 PARTITION TYPES AND DETAILS
AS-502 CEILING DETAILS
AS-503 MILLWORK DETAILS
AS-504 MILLWORK DETAILS - NURSE STATION
AS-505 NURSE STATION MILLWORK DETAILS
AS-506 MISCELLANEOUS INTERIOR DETAILS
AS-507 MISCELLANEOUS INTERIOR DETAILS
AS-601 DOOR, FRAME, TYPE AND SCHEDULE
AS-602 EQUIPMENT AND ACCESSORY SCHEUDLES
VA BROOKLYN CAMPUS
G.I. RENOVATIONS PHASE III
PROJECT # 630A4-26-102 (BRIDGING DOCUMENTS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
0.
dw g
A ug
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
03 - ARCHITECTURAL
AS-412 ENLARGED TOILET PLANS & ELEV
5 GI-102 SCOPE OF WORK MATRIX
AS-411 ENLARGED TOILET PLANS & ELEV
6 GI-103 PHASE PLAN
AS-402 ENLARGED PLANS & ELEV - FLUOROSCOPE / LASER
7 GI-104 INFECTION CONTROL PLAN & NOTES
NYH Engineering Chief
ALUMINUM
CONCRETE
GLASS
RIGID INSULATION
BRICK IN SECTION
CONCRETE MASONRY UNIT
EARTH
GYPSUM / PLASTER
STEEL
PEA GRAVEL
STONE
BATT INSULATION
PRECAST
GRAVEL
SAND
WOOD - SOLID
PLYWOOD
BRICK
CULTURED STONE
EXTERIOR COMPOSITE PANEL
WOOD BLOCKING
WOOD SHIM
2'
- 9
1' - 0"
2'
- 9
1' - 6"
1'
- 1
0"
TOILET PAPER
DISPENSER
3'
- 6
" T O
TO
P
OF
B
UB
BL
ER
ELECTRIC
WATER COOLER
ELECTRIC
WATER COOLER
(ACCESSIBLE)
3'
- 0
" A
DA
T O
TO
P
OF
B
UB
BL
ER
4'
- 0
PAPER TOWEL
DISPENSER W/
WASTE RECEPTACLE
GRAB BAR
TOILET PAPER
DISPENSER
8"
3'
- 8
" A
FF
A
DA
URINAL FLUSH
VALVE
3'
- 0
MOP SINK
BASIN
6'
- 0
" T
OP
O F
SH
EL
F
MOP AND BROOM
HOLDER
4'
- 0
" T
OP
O F
SH
EL
F
UTILITY SHELF
1'
- 1
0"
SANITARY NAPKIN
RECEPTACLE
3'
- 9
COMBINATION PAPER
TOWEL DISPENSER W/
WASTE RECEPTACLE
4'
- 0
TOILET SEAT
COVER DISPENSER
4'
- 0
PAPER TOWEL
DISPENSER
(RECESSED)
3' - 6" MIN.
3' - 4"
1'
- 6
" M
IN
VERTICAL GRAB BAR
3'
- 4
1'
- 3
" M
IN
3' - 0" MIN.
1' - 0" MIN.
TYPICAL MOUNTING HEIGHTS (ANSI)
1 1 /2"
1'
- 5
" M
IN
. T O
SE
AT
4'
- 0
SANITARY NAPKIN
DISPENSER
4'
- 0
BABY CHANGING
STATION-
RECESSED
FIRE EXTINGUISHER
CABINET
5'
- 6
" A
FF
T
OP
O F
SH
EL
F
4'
- 0
" A
FF
A
DA
T
OP
O F
SH
EL
F
CLOSET ROD
AND SHELF
ADA CLOSET
ROD AND SHELF
LO
W
ES
T
OF
6'
8"
M
IN
. O R
6" B
EL
OW
C
LG
4'
- 0
ELEVATOR
CALL BUTTON
1'
- 3
OUTLET
4'
- 0
WALL SWITCH THERMOSTAT
4'
- 0
" M
AX
LO
W
ES
T
OF
6'
8"
M
IN
. O R
6" B
EL
OW
C
LG
VISUAL SIGNAL STROBE
FE
H
AN
DL
E
NO
T
TO
E
XC
EE
D
4'
- 0
" A
FF
5'
- 6
" A
FF
T
OP
O F
SH
EL
F
LINEN CLOSET
SHELVING
4'
- 0
FIRE ALARM
PULL BOX
4'
- 6
" A
CC
ES
SI
BL
E
5'
- 1
0"
ROBE HOOK
4'
- 0
4'
- 8
" A T
TU
B/
T
OI
LE
T
TOWEL BAR (TYP.) PERSONAL
EMERGENCY
PULL SWITCH
3'
- 8
4'
- 0
" A
FF
C
EN
TE
R
OF
V
AL
VE
SOAP DISPENSER
SYMBOLS LEGEND
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
Sheet No. Sequence Sheet Type Discipline
A 101
1t
A02
Room Name 0-0000
NET SF
0 GRID LINE
ROOM No.
DOOR No.
WINDOW TYPE
WALL TYPE
NORTH ARROW
N
EQUIPMENT /
FURNITURE TAG
SCOPE NOTE
CENTER LINE
FLOW ARROW
INTERIOR
ELEVATION
DETAIL
SPOT
ELEVATION
MARKERS
REVISION No.
REVISION
CLOUD
EXTERIOR
ELEVATION
SECTION
SHEET No.
A301
A201
A211
A501
4 2
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
SECTION
MARKERS
AFF
X-XXX
1'-0" CEILING TAG
SD CD
CL
LEVEL
ELEVATION
NOTES, ABBREVIATIONS,
LEGENDS
GI - 001
ABBREVIATIONS MATERIALS
STRUCT STRUCTURE / STRUCTURAL
SUH SUSPENDED UNIT HEATER
SURF SURFACE
SUSP SUSPENDED
SVP VINYL SOLID PANEL (ACROVYN)
SW SWITCH
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/S TUB / SHOWER
TB TOWEL BAR
TC TERRA COTTA
TCZ CEMENTITIOUS TERRAZZO
TEL TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
TK BD TACK BOARD
TKP TACKABLE PANELING
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TR ACCENT RAIL
TRTD TREATED
TRZ INTERIOR POURED EPOXY RESIN
TERRAZO
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UGND UNDERGROUND
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VOLT
VAC VACUUM
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VOL VOLUME
VP VACUUM PUMP
VP VANISHING POINT
VP VAPOR PRESSURE
VP VENEER PLASTER
VPC VENEER PLASTIC CEILING/SOFFIT
VR VAPOR RETARDER
VRR VINYL (ACROVYN) RAIL
VS VENT STACK
VS VOLUMETRIC SWITCH
VS SHEET VINYL
VT SOLID VINYL TILE
VTR VENT THRU ROOF
VTS VINYL TRANSITION STRIP
VWC VINYL WALLCOVERING
W WIDE
W WEST
W / W WALL TO WALL
W/ WITH
W/D WASHER / DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WC WALLCOVERING
WD WOOD
WDH WOOD HAND RAIL
WDM WOOD WALL MOULDINGS
WDP WOOD PANELING
WDR WOOD CHAIR, CRASH, OR HAND RAIL
WDS ATHLETIC/ACOUSTIC ISOLATED WOOD
FLOORING
WDSHV WOOD SHELVING
WDT WOOD TILE OR PARQUET FLOORING
WDV WOOD VENEER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WI WROUGHT IRON
WP WATERPROOF
WP WORKING POINT
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WR WIRE ROPE
WRP WATER REPELLENT
WT WEIGHT
WWF WELDED WIRE FABRIC
XPS EXTRUDED POLYSTYRENE
YD YARD
PAT PATTERN
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
PREFIN PRE-FINISHED
PRF POLYURETHANE SPORTS FLOORING
PROP PROPERTY
PRST PRESSURE TREATED
PS POURED SEALANT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT(ED)
PT/E EPOXY PAINT
PT/F FLAT PAINT
PT/HG HIGH GLOSS PAINT
PT/SG SEMIGLOSS PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
Q HEAT TRANSFER
Q RATE OF FLOW
QT QUARRY TILE
QTY QUANTITY
QZF QUARTZ FLOORING
QZR QUARTZ RESIN
QZT QUARTZ TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE(D)
REQ REQUIRED
RESIL RESILIENT
REST RESTROOM
RET RETURN
REV REVISE / REVISION
RF RESILIENT FLOORING
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RAILROAD
RR ROLL ROOFING
RS RAPID START
RS ROUGH SAWN
RS RUBBER SHEET
RSF RUBBER SHEET FLOORING
RST REINFORCING STEEL
RT RIGHT
RTF RUBBER TILE FLOORING
RTS RUBBER TRANSITION STRIP
RWD REDWOOD
RWL RAIN WATER LEADER
S SOUTH
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD SOAP DISPENSER
SECT SECTION
SF SQUARE FEET
SGL SINGLE
SH SINGLE HUNG
SHR SHOWER
SHR HD SHOWER HEAD
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SL SEA LEVEL
SL SPOT LIGHT
SLDG SLIDING
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SUSPENDED PLASTER CEILING
SPEC SPECIFY / SPECIFICATION
SPH SOLID PHENOLIC POLYMER (TRESPA)
SPKR SPEAKER
SPR SOLID POLYMER RESIN (3FORM)
SQ SQUARE
SQIN SQUARE INCH(ES)
SSP SOLID SURFACE POLYMER (CORIAN)
SSPR SOLID POLYMER (CORIAN) RUB RAIL
SST STAINLESS STEEL
SSTR STAINLESS STEEL RUB RAIL
ST SINGLE THROW
ST STAIRS
ST STREET
ST STAIN
STA STATION
STD STANDARD
STIF STIFFENER
STON STONE
STOR STORAGE
GYP BD GYPSUM BOARD
H HIGH
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAVY DUTY
HD HAND DRYER
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HDWL HEADWALL
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HEAT PUMP
HP HIGH PRESSURE
HP HORSEPOWER
HR HAND RAIL
HS HAND SINK
HT HEIGHT
HVAC HEATING / VENTILATION / AIR
CONDITIONING
HW HOT WATER
HWP HOT WATER PUMP
HYD HYDRANT
IC IRONING CABINET
ID INSIDE DIAMETER
IN INCH / INCHES
INCL INCLUDE(D) / INCLUDING
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
ITS INTERTEK TESTING SERVICES
J-BOX JUNCTION BOX
JAN CLO JANITOR'S CLOSET
JS JANITOR'S SINK
KIT KITCHEN
L ANGLE
L LITER
LAB LABORATORY
LAM LAMINATE(D)
LAV LAVATORY
LB(S) POUND(S)
LC LINEN CLOSET
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIB LIBRARY
LINO LINOLEUM
LKR LOCKER
LNO LINOLEUM
LPT LOW POINT
LT LIGHT
LTF LINOLEUM TILE FLOORING
LTWT LIGHT WEIGHT
LVR LOUVER
m METER
MACH MACHINE
MAT WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MB MAIL BOX
MB MIXING BOX
MBH MOP/BROOM HOLDER
MC MEDICINE CABINET
MCP ACOUSTIC LAY-IN METAL CEILING PADS
ME MECHANICAL ENGINEER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MKR BD MARKER BOARD
MLDG MOULDING
mm MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS MOP SINK
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
MTS METAL TRANSITION STRIP
MULL MULLION
MVBL MOVABLE
MW MICROWAVE
N NORTH
NA NOT AVAILABLE / APPLICABLE
NAT NATURAL
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF / CI OWNER FURNISHED / CONTRACTOR
INSTALLED
OFF OFFICE
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
PAR PARALLEL
PAR PARAPET
PART PARTIAL
D DEEP
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DMPF DAMPPROOFING
DR DOOR / DRAIN
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EACH FACE
EG VERTICAL END GUARDS
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EM ELECTROMAGNETIC
EM EXPANDED METAL
EMER EMERGENCY
ENCL ENCLOSED / ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPB ELECTRIC PANEL BOARD
EQ EQUAL(LY)
EQUIP EQUIPMENT
ER POURED EPOXY
ERF POURED EPOXY FLOORING
ESCAL ESCALATOR
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXF EXTERIOR FINISH
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAB FABRIC
FAI FRESH AIR INTAKE
FBRK FIREBRICK
FCP PREFABRICATED FABRIC CEILING PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FGL FIBERGLASS
FH FIRE HOSE
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIN FLR FINISHED FLOOR
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLASH FLASH(ING)
FLR FLOOR
FLRSK FLOOR SINK
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOW FACE OF WALL
FP FIREPROOF
FPL FIREPLACE
FR FRAME
FRG FIBER REINFORCED GYPSUM
FRP FIBERGLASS REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FSP FIRE STAND PIPE
FSTNR FASTENER
FTG FOOTING
FURG FURRING
FUT FUTURE
FWC FABRIC WALL COVER
FWP NON-ACOUSTIC STRETCHED FABRIC
PANEL WALL INSTALATION
G GROUND
GA GAGE
GALV GALVANIZE(D)
GB GRAB BAR
GC GENERAL CONTRACTOR
GDISP GARBAGE DISPOSAL
GEN GENERAL
GFP GFRP OR GFRG FREESTANDING PANEL
GFRG GLASS FIBER REINFORCED GYPSUM
GFRP GLASS FIBER REINFORCED POLYMER
GL GLASS / GLAZING
GL BLK GLASS BLOCK
GLT GLASS MOSIAC TILE
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNIT
GPM GALLONS PER MINUTE
GR GROSS
GR LN GRADE LINE
GRAN GRANITE
GT GREASE TRAP
GT GROSS TON
GT GROUT
GYP GYPSUM
@ AT
A/C AIR CONDITIONER / CONDITIONING
ACC ACCESSIBLE
ACCSY ACCESSORY
ACOUS INSUL ACOUSTICAL INSULATION
ACOUS PNL ACOUSTICAL PANELS
ACP LAY-IN ACOUSTIC PANEL CEILING PADS
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADDM ADDENDUM
ADJ ADJUSTABLE / ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHR ANCHOR
AHU AIR HANDLING UNIT
ALNMT ALIGNMENT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
APPVD APPROVED
APT APARTMENT
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR TESTING
MATERIALS
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWP WALL-MOUNTED SOUND ABSORPTION
PANEL
AWT ACOUSTIC WALL TREATMENT
BD BOARD
BITUM BITUMINOUS
BL BASELINE
BL BLACK
BLDG BUILDING
BM BEAM
BO BLOWOFF
BOT BOTTOM
BR BEDROOM
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
BW BOTH WAYS
C CELSIUS
C CHANNEL
C TO C CENTER TO CENTER
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CEM PLAS CEMENT PLASTER (STUCCO)
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CH COAT HOOK
CHBD CHALKBOARD
CHFR CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CL D CLOTHES DRYER
CLG CEILING
CLG HT CEILING HEIGHT
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CARBON MONOXIDE
CO CASED OPENING
CO CERTIFICATE OF OCCUPANCY
CO CLEANOUT
CO COMPANY
CO CUTOUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONC FLR SEALED CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
CONT CONTROLLER
CONV CONVERT
CORR CORRIDOR / CORRUGATED
CPT CARPET
CR CLOSET ROD
CR CONTROL RELAY
CR CONTROL ROOM
CR CRASH RAIL
CS CAST STONE
CS CONTROL SWITCH
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU COPPER
CU FT CUBIC FOOT
CU YD CUBIC YARD
CUB CUBICLE CURTAIN
CURT CURTAIN
CW CASEMENT WINDOW
CW CHEMICAL WASTE LINE
CW CLOCKWISE
CW COLD WATER PIPING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
1.
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
1/ 4"
M
AX
.FINISH FLOOR
1/ 4"
M
AX
.FINISH FLOOR
1/ 4"
1/ 2"
M
AX
. 1
1/ 4"
1/
2"
FINISH FLOOR
1/ 2"
M
AX
. 1
GENERAL NOTE:
LEVEL CHANGES IN EXCESS OF 1/2" SHALL MEET SLOPE REQUIREMENTS FOR A RAMP
MIN.
M
IN
*2 4"
F O
R C
H
IL
D R
EN
M
IN
MIN.
MAX
FINISH FLOOR
ELEVATION
PLAN
17" - 25"
25" MAX.
TOE CLEARANCE
KNEE CLEARANCE
M
IN
" M
IN
" M
IN
4" MAX
FINISH FLOOR
LIMITS OF PROTRUDING
OBJECTS
REDUCED VERTICAL CLEARANCE
" M
AX
X
FINISH FLOOR
24MAX. 48MIN. 24MAX.
M
IN
M
IN
M
IN
M
IN
CLEAR WIDTH OF AN ACCESSIBLE ROUTE
SEGMENT LENGTH MINIMUM SEGMENT WIDTH
< 24 INCHES
> 24 INCHES
32" INCHES
36" INCHES
60MIN.
X
36MIN.
X
6"
T O
F
IN
SU
RF
AC
E GRAB BAR
ASSEMBLY
GROUNDS & BACKER BLOCKS SHALL BE
DESIGNED TO MEET MIN. SUPPORT LOADING AS
INDICATED.
FINISH AS SHOWN ON SCHEDULE
1 1/4" -2" 1 1/2"
NOTE:
GRAB BARS TO BE
DESIGNED TO
SUPPORT A MINIMUM
CONCENTRATED LOAD
OF 250 LBS AND MUST
NOT ROTATE IN THEIR
FITTINGS.
GRAB BAR
M
AX
. A
.F .F
M
EA
SU
RE
D
TO
TH
E
HI
G
HE
R O
F
TH
E
SI
NK
R
IM
O
R
CO
UN
TE
R
SU
RF
AC
E
FINISH FLOOR 27
M
IN
REFER TO TOE /KNEE CLEARANCES
PIPE PROTECTION
(TYP.) AS PER ICC/ANSI
A117.1-2003 606.6 -
THERE SHALL BE NO
SHARP OR ABRASIVE
SURFACES UNDER LAV.
& SINKS. PROVIDE
UNDERSINK
PROTECTIVE PIPE
COVERS.
ELEVATIONS
VARIES
M
AX
TO
B
O
TT
O M
O F
RE
FL
EC
TI
VE
S
UR
FA
CE
W
HE
RE
M O
UN
TE
D
AB
O
VE
S
IN
K O
R
CO
UN
TE
R
SINK & MIRROR
PLAN30
17" -25"
CLEAR
FLOOR
SPACE
" M
IN
61" MIN.
16" - 18"
CLEAR
FLOOR
SPACE
ACCESSIBLE
WATER CLOSET
NOTE:
REFER TO TOILET
ELEVATIONS FOR
ADDITIONAL INFORMATION.
" M
AX
TO
O
U
TL
ET
O
F D
IS
P.
M
IN
AB
O
VE
G
RA
B
BA
R
FINISH
FLOOR
TOILET
TISSUE
DISPENSER
TO OUTLET OF
DISPENSER
M
IN
1/
M
IN
7" MIN.
9" MAX.
MAX.
42MIN.
1"
M
IN
6"
39" - 41"
54MIN.
TOILET
TISSUE
DISPENSER
1 1/2" MIN.
1"
M
IN
9"33
6"
FINISH
FLOOR
TOILET
TISSUE
DISPEN.
TOILET
TISSUE
DISPEN.
36" MIN.
24MIN. 12
MIN.
CLEAR
FLOOR
SPACE
SIGN CENTERED IN
CLEAR FLOOR
SPACE
FR
O
M F
IN
IS
HE
D
FL
O
O R
TO
BA
SE
LI
NE
O
F
CH
AR
AC
TE
RS
FROM LATCH SIDE
" M
IN
" M
AX
FROM FRONT
FROM FRONT
FROM HINGE SIDE
FROM HINGE SIDE
FROM HINGE SIDE
FROM LATCH SIDE
FROM LATCH SIDE
PULL
PULL
PULL
PULL
PUSH
PUSH
PUSH
60 INCHES
60 INCHES
48 INCHES
54 INCHES
42 INCHES (NOTE 1)
48 INCHES (NOTE 2)
42 INCHES (NOTE 2)
18 INCHES
0 INCHES (NOTE 3)
36 INCHES
42 INCHES
22 INCHES (NOTE 3 & 4)
24 INCHES
24 INCHES
APPROACH DIRECTION DOOR SIDE PERPENDICULAR TO
DOORWAY
PERPENDICULAR TO DOORWAY
(BEYOND LATCH UNLESS NOTED)
TYPE OF USE MINIMUM MANEUVERING CLEARANCES
MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS
HINGE/PUS
H
LATCH/PUS
H
FRONT/PUS
H
FRONT/PUL
L
LATCH/PULLHINGE/PULL
NOTES:
1. ADD 6" IF CLOSER AND LATCH PROVIDED.
2. ADD 6" IF CLOSER PROVIDED.
3. ADD 12" BEYOND LATCH IF CLOSER AND LATCH PROVIDED.
4. BEYOND HINGE SIDE.
10" MAX.
" M
AX
" M
AX
" M
AX
" M
AX
> 10" - 24"
FINISH FLOOR
FINISH
FLOOR
ELECTRICAL
DEVICE
COUNTERPAPER TOWEL
DISPENSER/RECEPTACLE
F.E.
CABINET
OPERABLE
DEVICE
" M
AX
" M
IN
" M
AX
GENERAL NOTE:
ALL OPERABLE PORTIONS OF DEVICES MUST FALL WITH IN THE SHADED AREA.
C L
ACCESSORY ELEVATIONS AND FIXTURE MOUNTING HEIGHTS
36" GRAB BAR /
42" BRAB BAR
W/ 18" VERT.
GRAB BAR
DOUBLE ROLL
DISPENSER
TOILET PAPER
NOTES:
ALL ACCESSORIES ARE TO BE MOUNTED BETWEEN 15" AND 44" ABOVE
FINISHED FLOOR UNLESS OTHERWISE NOTED TO COMPLY WITH ADA
REQUIREMENTS.
VARIES 12
MAX.
7" - 9"
A2 C3
1.
" M
AX
IM
U M
T O
BO
TT
O M
O F
R
EF
LE
C
TI
VE
SU
R
FA
C
E
SMALL
MIRROR
G2
CL
SOAP DISPENSER
WALL MOUNTED
(BY SLCH)
H1
SINGLE HOOK
J1
ALL GRAB BARS SHALL HAVE SERIES 256 ANCHOR PLATES (CONCEALED
ANCHORS) INTO SOLID BLOCKING
INSTALLATION OF ACCESSORIES IN HANDICAPPED ACCESSIBLE TOILETS
SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, CITY, STATE AND
FEDERAL AUTHORITIES WITH JURSDICTION.
2.
ALL GRAB BARS SHALL HAVE PEENED FINISH.
3.
5.
ALL ACCESSORIES ARE TO HAVE SATIN ST. STL. FINISH UNLESS OTHERWISE NOTED.
4.
CHANGING TABLE
WALL MOUNTED
N
TO
P O
F U
N
IT
5"
M1
SEAT-COVER
DISPENSER
WALL MOUNTED
" M
AX
. T
O C
TR
O
F
TO
W
EL
D
IS
PE
N
SE
R
S
LO
T
E7
PAPER TOWEL
DISPENSER AND DISPOSAL UNIT
SEMI-RECESSED MOUNTED
L1
HAND DRYER
AUTOMATIC
WALL MOUNTED
TO
T O
P O
F D
IS
PE
N
SE
R U
.O .N
SHELF UNIT WITH
MOP HOLDER
K1
SEMI-RECESSED
" T
O T
O P
O F
BR
AB
B
AR
" M
IN
" M
IN
SCALE: 1/2" = 1'-0"7 LEVEL CHANGES - (UP TO 1/2")
SCALE: 1/2" = 1'-0"9 CLEARANCES
TOE / KNEE
SCALE: 1/2" = 1'-0"8 PROTRUDING OBJECTS
SCALE: 1/2" = 1'-0"6 ACCESSIBLE ROUTE
SCALE: 1/2" = 1'-0"10 CLEAR FLOOR OR GROUND SPACE
SCALE: 1/2" = 1'-0"4 GRAB BARS & HANDRAILS
SCALE: 1/2" = 1'-0"
LAVATORIES AND SINKS
SCALE: 1/2" = 1'-0"1 WATER CLOSETS
SCALE: 1/2" = 1'-0"2 WATER CLOSET ELEVATIONS
SCALE: 1/2" = 1'-0"11 TACTILE INTERIOR SIGN
SCALE: 1/2" = 1'-0"
5 Maneuvering Clearances1
SCALE: 1/2" = 1'-0"12 REACH / MOUNTING HEIGHTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
2.
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
TYPICAL MOUNTING HEIGHTS
& ACCESSIBILTY STANDARDS
GI-002
MG MG MG MG
MG
MG
MG
MG
NR
NR
NR
NRNR
CAMERA
CAMERA
CAMERA
180 SQ.FT.
1,475 SQ.FT.
52 SQ.FT.
84 SQ.FT.
250 SQ.FT.
160 SQ.FT.
100 SQ.FT.
135 SQ.FT.
82 SQ.FT.
470 SQ.FT.
417 SQ.FT.
180 SQ.FT. 180 SQ.FT.
274 SQ.FT.
175 SQ.FT.
665 SQ.FT.
200 SQ.FT.
160 SQ.FT. 625 SQ.FT.
510 SQ.FT.
200 SQ.FT.
480 SQ.FT.475 SQ.FT.200 SQ.FT.480 SQ.FT.
80 SQ.FT.
450 SQ.FT.
50 SQ.FT.50 SQ.FT.
30 SQ.FT.
605 SQ.FT.
135 SQ.FT.
155 SQ.FT.
160 SQ.FT.
305 SQ.FT.
48 SQ.FT.
73 SQ.FT.
73 SQ.FT.73 SQ.FT.
537 SQ.FT.
146 SQ.FT.
160 SQ.FT.
130 SQ.FT.
130 SQ.FT.
120 SQ.FT.
157 SQ.FT.
140 SQ.FT.
80 SQFT.
70 SQFT.
1,610 SQ.FT.
173 SQ.FT.
85 SQ.FT.
50 SQ.FT.
15 SQ.FT.
340 SQ.FT.
62 SQ.FT.
156 SQ.FT.
39 SQFT.
1,095 SQ.FT.
100 SQ.FT.
70 SQFT.87 SQFT.41 SQFT.
473 SQ.FT.
FEC
FECFECFEC
FEC
FEC
FEHC
FEC
FEC
PPE
PPE
FEC
FEC
FEC
STAIR #3
EXIST.
CLINIC
UROLOGY
PREP RM
PACU
CLEAN HOLD
SOILED
UTILITY
STAFF
LOUNGE
NEW ELECTRICAL
CLOSET
EMS HOLD
NEW OFFICE
(POLANCO)
NEW OFFICE
(KUYUMJIAN)
OFFICE
NEW OFFICE
(VO)PRESCREEN
TOILET
NEW OFFICE
(KELLY)
NEW OFFICE
(ADELE)NEW
CONFERENCE
NEW OFFICE
(NURSE ANTHES.)
INTERIM
LOCKER ROOM
SHOWERSHOWER
CHIEF
SURGEON
NEW OFFICE
(ROSEMARY)
NEW
ADMIN
NEW OFFICE
(BOWNE)
NEW OFFICE
(WEBB)
LOGISTICS
W/ LIBRARY
EQUIPMENT
STORAGE
STERILE
STORAGE
BULK
STORAGE
ANESTHESIA
STORAGE
RECORDS
MANIFOLD
EXIST.
BATH
EXIST.
OD ROOM
EXIST.
OFFICE
EXIST.
BATH
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
BATH
EXIST.
OFFICE
EXIST.
BATH
EXIST.
BATH
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
BATH
EXIST.
BATH
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
VISITOR LOUNGE
EXIST.
TOILET
CLINIC
EXIST.
SHAFT
EXIST.
ELEC. CLO.
EXIST.
GAS CYL. STOR.
EXIST.
WAITING ROOM
EXIST.
TOILET
EXIST.
TOILET EXIST.
RECEPTION
EXIST.
DATA ROOM
EXIST.
TOILET
EXIST.
TOILET
TOILET
TOILET
TOILET SHOWER
MALE
LOCKER (74)
FEMALE
LOCKER (61)
TOILET/
SHOWER
TOILET/
SHOWER
EQUIP HOLD
SOIL
UTILITY CLEAN
CART SUPPLY
ANESTHESIA
WORK ROOM
SUB
STERILE
STAIR #5
OR #1
(ORTHO/GENERAL)
OR #2
(VASCULAR/GENERAL)
SUB
STERILEOR #3
(ENT/GENERAL)
OR #4
(OPHTHALMOLOGY)
SUB
STERILE
OR #5
(UROLOGY)
MED ROOM
STORAGE
CLEAN
HOLDSOIL
UTILITYPATIENT
TOILET
HOLDING
SCHEDULER
NURSE
OFFICE
CHARTING
SUTURE
SUPPLY
TOILET
CLEAN
LINEN
CORRIDOR
EXIST.
TOILET
STAIR #6
CORRIDOR
ORTHOPEDIC
STORE ROOM
CORRIDOR N/W
SHOWER
CORRIDOR N/W
DECONTAMINATION
LOGISTIC
OFFICE
STAIR #4
CORRIDOR N/E
ISOLATION
ISOLATION
EQUIPMENT
HOLD
LOCKER
LOCKER
OFFICEEMS
HOLDING
DISPATCH AREA
MANUAL
CART WASH
AUTO
CART WASH
PATIENT
TOILET
EMS
HOLD
WAREHOUSE
EMS
HOLD
BREAK
DOWN ROOM
SUPPLY
PREPARATION &
PACKAGING ROOM
TERMINAL
STERILIZATION
EtO
SERVICE
EtO
STERILIZATION
EtO
SERVICE
ANESTHESIA
CONFERENCE
STAIR #1
CORRIDOR CORRIDOR
CORRIDOR EC CORRIDOR WC
SERVICE
LOBBY
CORRIDOR
ELEVATOR
LOBBY
SERVICE
CORRIDOR
4-203
4-414
4-500
4-502
4-504
4-103B
4-105A
4-423
4-1114-230
4-201
4-2264-225
4-225A
4-2244-2234-2214-2194-217
4-219A4-217A
4-214
4-2134-212 4-211 4-210
4-208 4-208A 4-207 4-205
4-204
4-105B 4-105
4-227A
4-227 4-228
4-229A
4-229 4-229A 4-112
4-112A
4-113
4-113A 4-114A
4-114 4-115
4-115A 4-116A
4-116 4-117 4-118
4-203A
4-202
4-109
4-108
4-107
4-106B
4-106C
4-106B 4-106
4-128
4-43
4-44
4-223A 4-214A
4-213A 4-210A
4-125
4-127
4-128 4-126
4-424
4-401 4-402
4-404 4-405 4-406
4-407
4-409 4-4104-4114-4124-413
4-415
4-416
4-4184-419 4-420
4-417
4-421
4-422
4-400
4-129
4-416A
4-402A
SE
4-208B
4-127
N/C
4-403
4-001
4-217A
4-001A
4-506
4-511
4-003
4-501
4-503
4-500A
4-508
4-505
4-507A 4-507B
4-507
4-506A
4-506C
4-500B
4-506B
4-513
4-512
4-514
4-509E
4-509
4-509A
4-509B4-509C4-509D
4-102
SE 1A SE
SC
SC
14 15
10987
D
C
B
A
114321
M
L
K
J
16 2017 18 19 21 2212 13 14 15
15.713.7
E
F
G
H
E
I I
N
O
11.2
10987 11
D
C
B
A
17 18 19 21 22
19A
E
9875 6
9875 6
N
O
U P
DN
U P
DN
DNU
P
DNU
P
4-209 J.C.
82.83
DUCT
DUCT
DUCT
DUCT
P-6
ELEV.
S-5
ELEV.
S-11
ELEV
S-10
ELEV
S-9
ELEV
DUCT
DUCT
DUCT
PLUMB
SHAFT
S-4
ELEV.
P-5
ELEV.
S-3
ELEV.
S-2
ELEV.
S-1
ELEV.
P-4
ELEV.
P-3
ELEV.
P-2
ELEV.
P-1
ELEV.
10 11
15 16 17 18 19 20 21 22 23 24 25
M
L
J
I
SOUTH WEST AREA - ENDOSCOPY
SMOKE COMPARTMENT
7,083 SF
NORTH EAST AREA - OR
SMOKE COMPARTMENT
9,215 SF
SOUTH EAST AREA - SURGERY
OFFICE
SMOKE COMPARTMENT
8,375SF
CENTER AREA
SMOKE COMPARTMENT
18,352 SF
STAIR #5
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
STAIR #2
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
STAIR #3
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
STAIR #3
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
STAIR #3
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
STAIR #4
DOOR
STAIR
WIDTH EXIT
CAPACITY
36" 46"
NORTH WEST AREA - OR
SMOKE COMPARTMENT
7,508SF
ACCUMULATION SPACE
440 SF
TD:135' 3"
CP
: 6
9' 9"
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
CP: 34'-9"
TD: 75'-6"TD: 139'-6"
TD: 56'-2"
TD
: 9
8'- 3"
DE: 38'-6" TD: 25'-6"
U
TD: 59' 4"TD: 136' 6"
FEFE FE
2. OCCUPANCY:
NFPA 101, 18.1.1.1.1 - CHAPTER 18 NEW HEALTHCARE
3. CONSTRUCTION TYPE :
NFPA 101, TABLE A.8.2.1.2 - TYPE II-222 NON-COMBUSTIBLE
4. FIRE SEPARATIONS :
NOT REQUIRED
5. MEANS OF EGRESS :
NFPA 101, TABLE 7.3.1.2. OCCUPANT LOAD FACTOR
AMBULATORY HEALTHCARE 100 GSF
6. EXIT CAPACITY FACTOR :
NFPA 101, TABLE 7.3.3.1
STAIRWAY
.3"/PERSON
DOOR, RAMP, CORRIDOR, HORIZONTAL EXIT LEVEL COMPONENTS
.2"/PERSON
7. MAXIMUM TRAVEL DISTANCE :
NFPA 101, 18.2.6.2.2. 200' SPRINKLERED
8. MAXIMUM DEAD END CORRIDOR :
NFPA 101, 18.2.5.10 30'
(EXISTING DEAD-END CORRIDORS EXCEEDING 30' SHALL BE PERMITTED TO
CONTINUE IN USE IF IT IS IMPRACTICAL AND UNFEASIBLE TO ALTER THEM)9. MINIMUM CORRIDOR WIDTH:
NFPA 101, 18.2.3.4 8'-0" PATIENT AREAS, 3'-8" STAFF AREAS
10. MAXIMUM COMMON PATH:
NFPA 101, 18.2.5.3 100' MAXIMUM
11. RATINGS - CORRIDOR :
NFPA 101, 18.3.6.2 NO RATING REQUIRED. LIMIT THE TRANSFER OF SMOKE
12. RATINGS - STAIRS:
NFPA 101, 7.1.3.2.1a 2 HOUR FOR FOUR OR MORE STORY BUILDING
13. RATINGS - SHAFTS:
NFPA 101, 8.2.5.4 2 HOUR
14. MAXIMUM SMOKE COMPARTMENT AREA:
NFPA 101, 18.3.7.1(1) 22,500 GSF
15. MAXIMUM SMOKE COMPARTMENT TRAVEL DISTANCE:
NFPA 101, 18.3.7.1(2) 200'
17. EXIT & EGRESS CALCULATION :
THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION.
1. APPLICABLE CODES:
1.1 VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY.
1.2 NFPA 101 LIFE SAFETY CODE 2012.
1.3 NFPA NATIONAL FIRE CODES WITH EXCEPTION OF NFPA 5000 & NFPA 900
1.4 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARD
1.5 VA SEISMIC DESIGN REQUIRMENTS, H-18-8
1.6 NATIONAL ELECTRICAL CODE (NEC)
1.7 NATIONAL STANDARD PLUMBING CODE (NSPC)
1.8 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
1. DOORS AT FIRE RATED PARTITION SHALL BE FIRE PROOF, SELF CLOSING AND
RATED ACCORDINGLY PER RATED PARTITION.
2. AREA OF PROJECT ARE FULLY SPRINKLERED.
3. ALL CORRIDOR WALLS SHALL BE CONSTRUCTED FROM SLAB TO SLAB ABOVE TO
RESIST THE PASSAGE OF SMOKE.
EXIT SIGN (SINGLE
SIDED, DOUBLE SIDED,
W/ DIRECTIONAL
ARROW, WALL
MOUNTED)
LIFE SAFETY LEGEND
SYMBOL DESCRIPTION REMARKS
NEW SMOKE COMPARTMENT
BOUNDARY
EGRESS PATH
TD - TRAVEL DISTANCE
CP - COMMON PATH
DE - DEAD END CORRIDOR
DIRECTION OF TRAVEL MAXIMUM TRAVEL DIST:
200'
TD: 0'-0"
AREA NOT IN
CONTRACT
N.I.C
ACCUMULATION SPACE AREA
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
1HR RATED PARTITIONNEW SMOKE BARRIER
1HR RATED PARTITION
FE FIRE EXTINGUISHER
1/16" = 1'-0"1 LIFE SAFETY PLAN - 4th FLOOR
OCCUPANT CALCULATION:
SMOKE
COMPARTMENT AREA OCCUPANCY OCCUPANCY
LOAD
EXIT CAPACITY
A
B
C
D
E
8,375SF TREATMENT* 8,375F/240SF = 35P
10,819SF
14,396SF
9,215SF
7,508SF
TREATMENT*
TREATMENT*
TREATMENT*
TREATMENT*
10,420SF/240SF = 46P
14,396SF/240SF = 60P
9,215F/240SF = 39P
7,508SF/240SF = 32P
STAIR 1 =153P
STAIR 2 =153P
STAIR 3 =153P
STAIR 4 =153P
STAIR 5 =153P
TOTAL #OCCUPANTS = 285 <918 TOTAL
EXIT CAPACITY
ACCUMULATION* 440SF/6NSF = 73P STAIR 6 =153P
*PER NFPA 101 TABLE 7.3.1.2 OCCUPANT LOAD FACTOR - INPATIENT TREATMENT DEPARTMENTS
UNDER HEALTHCARE USE SHALL BE PROVIDE WITH 240 S.F. PER PERSON.
**PER NFPA 101 SECTION 19.2.2.5.1.2 ACCUMULATION SPACE OF NOT LESS THAN 6 NET SQUARE
FEET PER OCCUPANT SHALL BE PROVIDED FOR ADJOINING COMPARTMENT ON STORIES NOT
HOUSING BED OR LITTERBORNE PATIENTS.
LIFE SAFETY NOTES
CODE ANALYSIS:
LIFE SAFETY PLAN AND
CODE ANAYLSIS
GI-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
1.
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
WALLS FLOORING CEILINGS WINDOWS & DOORS MILLWORK PLUMBING ELECTRICAL
PR
IM
E
AN
D P
AI
N
T
EN
TI
R
E
SP
AC
E
TO
U
C H
U P
PA
IN
T
PA
R
TI
AL
C O
M
PO
U N
D A
N D
S
AN
D
IN
ST
AL
L
SC
H
ED
U
LE
D
W
AL
L
TI
LE
IN
ST
AL
L
M
IS
SI
N
G C
O R
N
ER
G U
AR
D
S
IN
ST
AL
L
M
IS
SI
N
G H
O R
IZ
O
N
TA
L C
R
AS
H R
AI
L
C
LO
SE
O
PE
N
IN
G
IN
E
XI
ST
IN
G
PA
R
TI
TI
O N
. T
AP
E, S
PA
C
KL
E
PA
IN
T
IN
ST
AL
L
1" F
U R
R
IN
G
/8
" G
YP
. B D
O
N E
XI
ST
IN
G
P
AR
TI
TI
O N
PR
EP
S
LA
B
AN
D
IN
ST
AL
L
SC
H
ED
U
LE
D
FL
O O
R
IN
G
B
AS
E
C
LE
AN
S
TA
IN
ED
F
LO
O
R
IN
G
R
EP
LA
C
E
FL
O O
R
IN
G
SE
E
SC
H
ED
IN
ST
AL
L
VI
N
YL
B
AS
E
IN
ST
AL
L
N
EW
S C
H
ED
U
LE
D C
EI
LI
N G
SY
ST
EM
R
EP
LA
C
E
ST
AI
N
ED
C
EI
LI
N G
T
IL
E( S)
IN
ST
AL
L
M
IS
SI
N
G C
EI
LI
N G
T
IL
E
IN
ST
AL
L
N
EW
H M
F R
AM
E, D O
O R
H
AR
D
W
AR
E
IN
ST
AL
L
N
EW
D O
O R
H
D W
R
IN
EX
IS
TI
N
G F
R
AM
E
PR
IM
E
PA
IN
T
EX
IS
TI
N G
D O
O R
FR
AM
E O
R V
IS
IO
N P
AN
EL
F R
AM
E
IN
ST
AL
L
H
AR
D W
AR
E
IN
E
XI
ST
IN
G
D O
O R
R
EM
O
VE
E
XI
ST
IN
G A
LU
M
W
IN
D O
W
SA
SH
ES
, C
LE
AN
T
R
AC
KS
, R
E-
IN
ST
AL
L
AN
D R
EA
LI
G N
S
AS
H
ES
IN
ST
AL
L
N
EW
S
EM
I-T R
AN
SL
U C
EN
T
W
IN
D O
W F
IL
M
IN
ST
AL
L
SP
EC
IF
IE
D O
PE
R
AB
LE
PA
R
TI
TI
O N
R
EP
LA
C
E
SM
O
KE
S
EA
L
IN
ST
AL
L
SC
H
ED
U
LE
D
M
IL
LW
O
R K
R
EM
O
VE
R
EL
AC
E
EX
IS
TI
N G
W
AL
L C
O
VE
R
IN
G B
AC
KS
PL
AS
C
AR
EF
U
LL
Y
R
EM
O
VE
E
XI
ST
IN
G B
AS
E
W
AL
L
C
AB
S
FO
R R
EU
SE
IN
ST
AL
L
R
EL
O C
AT
ED
B
AS
E
W
AL
L C
AB
S
IN
ST
AL
L
N
EW
M
ET
AL
L
O C
KE
R
S
IN
ST
AL
L
SC
H
ED
U
LE
D
T O
IL
ET
AC
C
ES
SO
R
IE
S
PR
O
VI
D
E N
EW
S
AN
S U
PP
LY
R O
U G
H
-IN
A N
D
IN
ST
AL
L N
EW
W
C
PR
O
VI
D
E N
EW
S
AN
S U
PP
LY
R O
U G
H
-IN
A N
D
IN
ST
AL
L N
EW
W
AL
L
H U
N G
L
AV
T
R
IM
C U
T H
O
LE
IN
ST
AL
L
SI
N K
/ T R
IM
IN
EX
IS
TI
N
G C
O U
N
TE
R
C O
N N
EC
T
TO
EX
IS
TI
N G
R O
U G
H
IN
G
IN
ST
AL
L
N
EW
W C
C
O N
N
EC
T
TO
EX
IS
TI
N
G R
O U
G H
IN
G
R
EM
O
VE
E
XI
ST
IN
G L
AV
C
AP
P
IP
IN
G
C
AR
EF
U
LL
Y
R
EM
O
VE
E
XI
ST
IN
G S
IN
KS
PR
O
VI
D
E N
EW
S
AN
S U
PP
LY
R O
U G
H
-IN
R
EI
N
ST
AL
L R
EL
O
C
AT
ED
SI
N
KS
IN
ST
AL
L
SU
R
G
IC
AL
L
IG
H
T
ST
R
U C
TU
R
AL
S
U
PP
O R
T
C O
M
PL
ET
E
N U
R
SE
C
AL
L
SY
ST
EM
C O
N
FI
R M
P O
W
ER
S
W
IT
C H
W
IR
IN
G
TO
E
XI
ST
IN
G
N O
N -F
U N
C
TI
O N
IN
G
LI
G
H T
FI
XT
U R
ES
C O
R R
EC
T
SW
IT
C H
L O
C
AT
IO
N
4-100 ENDO RECEPTION
4-101 AMB SURG PRE-OP
4-102 AMB SURG PRE-OP
4-103 PATIENT TOILET
4-104 AMB SURG PRE-OP
4-105 PATIENT TOILET
4-106 AMB SURG PRE-OP
4-107 AMB SURG PRE-OP
4-108 PATIENT TOILET
4-109 AMB SURG SOILED UTILITY
4-110 ENDO / AMB SURG PACU
4-111 PATIENT TOILET
4-112 PATIENT TOILET
4-113 ENDO NURSE STATION
4-114 PANTRY
4-115 WORKROOM
4-116 ENDOSCOPY
4-117 NOT USED
4-118 G.I. / ENDO STORAGE
4-119 ENDOSCOPY
4-120 NOT USED
4-121 EVS CLOSET
4-122 ENDOSCOPY
4-123 MOTILITY
4-124 PATIENT TOILET
4-125 CLEAN SCOPE STORAGE
4-126 ENDO CLEAN SUPPLY
4-126A PATIENT TOILET
4-127 ENDO PRE-OP
4-128 PATIENT TOILET
4-129 ENDO PRE-OP
4-130 ENDO PRE-OP
4130A PATIENT TOILET
4-131 PATIENT LOCKERS
4-132 FLUOROSCOPE / LASER
4-133 NOT USED
4-134 CLEAN LINEN
4-135 PATIENT TOILET
4-136 PCT OFFICE
4-137 AMB SURG DOCTORS
4-138 MED ROOM
4-139 EXIST LINEN CHUTE
4-140 AMB SURG NURSE STATION
4-141 STRETCHER STORAGE
4-142 AMB SURG SUPPLIES
4-143 STAFF OFFICE
4-144 TOILET
4-145 AMB SURG LOUNGE
4-146 FEMALE LOCKERS
4-147 TOILET / SHOWER
4-148 MALE LOCKERS
4-149 TOILET / SHOWER
4-150 NOT USED
4-151 NOT USED
4-152 EXIST ELEC CLOSET
SW-1C CORRIDOR
SW-1B CORRIDOR
SW-1C CORRIDOR
SW-1D PASSAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
2.
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
SCOPE OF WORK MATRIX
GI-102
160 SQ.FT.
82 SQ.FT.
470 SQ.FT.
417 SQ.FT.
180 SQ.FT. 180 SQ.FT.
E
N N
DNU
P
S-11
ELEV
S-10
ELEV
S-9
ELEV
DUCT
DUCT
DUCT
PLUMB
SHAFT
S-4
ELEV.
P-5
ELEV.
S-3
ELEV.
S-2
ELEV.
S-1
ELEV.
P-4
ELEV.
P-3
ELEV.
P-2
ELEV.
P-1
ELEV.
CORRIDOR WC
SERVICE
LOBBY
CORRIDOR
SC
PHASE 1
PHASE 2
NOTES:
PHASE 1 IS SUBSTANTIALLY
COMPLETE. ITEMS REMAINING TO BE
COMPLETED ARE DESCRIBED IN THESE
DOCUMENTS.
PHASE 1 IS TO BE COMPLETED FIRST
AND MADE READY FOR OWNER TO
TAKE OCCPANCY WHILE PHASE 2
WORK IS BEING COMPLETED.
PHASE 2 IS PARTIALLY COMPETE. ALL
ITEMS TO BE COMPLETED IN THIS
PHASE ARE DESCRIBED IN THESE
DOCUMENTS
THIS PHASING PLAN APPLIES TO ALL
TRADES, GENERAL CONSTRUCTION
AND MECHANICAL, ELECTRICAL,
PLUMBING, FIRE ALARM AND
SPRINKLER TRADES
TEMP PART'NTEMP PART'N
TEMP PART'N
1/8" = 1'-0"1 PHASE PLAN - 4th FLOOR
PHASE PLAN
GI-103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
3.
5,
- 1 :0
4p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
AutoCAD SHX Text K-12867
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_SINKS
AutoCAD SHX Text
CAMERTON
470 SQ.FT.
417 SQ.FT.
180 SQ.FT. 180 SQ.FT.
E
N
DUCT
DUCT
CORRIDOR WC
SERVICE
LOBBY
CORRIDOR
SC
TO BE IN PLACE DURING
BOOM WORK
TO BE IN PLACE DURING
BOOM WORK
TO BE IN PLACE DURING
BOOM WORK
1/8" = 1'-0"1 INFECTION CONTROL PLAN - 4th FLOOR
INFECTION CONTROL
PLAN & NOTES
GI-104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
630A4-26-102
Project Director
08/05/2025 G.W.C.Revisions: Date:
PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
439 Route 46 East, Rockaway, New Jersey 07866
WWW.PEGMEP.COM PEG# YYNNN
O: 973-586-3004 I F: 973-586-3009
P:
\2
5\
.X
X X
B ro ok ly n V
A R en ov at io ns B rid gi ng D oc um en ts
\D R
A W
IN
G
S\ C
O N
D O
C S\
G I-
4.
5,
- 1 :0
5p m b ob r
Brooklyn Campus New York, NY
G.I. Renovation Phase III
NY Harbor Healthcare Systems
DESIGN BUILD RFP 08-05-2025
15 Bethany Street ▪ New Brunswick, NJ 08901 ▪ T:732.249.6242 2450 W Hunting Park Ave., Bldg 9 ▪ Philadelphia, PA 19129-1302 ▪
T: 215.634.3400 Richard D. Alderiso , AIA
NY RA 027416
TEMPORARY PARTITIONS SHALL CONSIST OF 6 MIL, FIRE RETARDANT
POLYSTYRENE DUST BARRIER WITH ZIPPERED ACCESS
PROVIDE MINIMUM 24" X 36" ADHESIVE (TACK)Y WALK-OFF MAT'S AT ALL
ENTRANCES TO CONSTRUCTION AREA.
PROVIDE H.E.P.A. FILTERING OF ALL AIR LEAVING THE ROOM.
MAINTAIN NEGATIVE PRESSURE WITHIN THE CONSTRUCTION AREA AT
ALL TIMES. INSTALL NEGATIVE PRESSURE MACHINES AS REQUIRED.
REFER TO I.C.R.A. MATRIX AND FOLLOW ALL REQUIREMENTS SET
FORTH WITHIN THE MATRIX AND AS DIRECTED BY HOSPITAL INFECTION
CONTROL STAFF.
FLOOR TO CEILING TEMPORARY
DUST CONTROL PARTITION EQUAL
TO EDGEGUARD
(www.EDGEGUARD.COM) WITH
SLIDING ACCESS DOOR
WALK OFF MAT
Infection Control Notes
Infection Control Legend IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA
CLASS DESIGNATION
MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
C
LA
SS
I
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL
INSPECTION.
1. WIPE SURFACES TO REMOVE DUST.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AND EXIT OF
WORK AREA. REPLACE USED MATS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
1. WIPE WORK SURFACES WITH DISINFECTANT
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WORK AREA WITH H.E.P.A.
FILTERED VACUUM BEFORE LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
C
LA
SS
II
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY
OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND
ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS.
3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION
BEGINS OR IMPLEMENT CONTROL CUBE METHOD.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
H.E.P.A.-EQUIPPED AIR FILTRATION UNITS.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.
8. WET MOP AND/OR VACUUM WITH H.E.P.A. FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
C
LA
SS
II
I
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT IS NOT LIMITED TO:
· REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE TO 50 SQUARE FEET
· PAINTING (BUT NOT SANDING), WALL COVERING
· ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVATES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING
OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE B
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
· INSTALLATION OF TELEPHONE AND COMPUTER CABLING
· ACCESS TO CHASE SPACES
· CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES, BUT IS NOT LIMITED TO:
· SANDING OF WALLS FOR PAINTING OR WALL COVERING
· REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
· NEW WALL CONSTRUCTION
· MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
· MAJOR CABLING ACTIVITIES
· ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
· ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
· REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM
· NEW CONSTRUCTION
GROUP 1
LOW RISK
· OFFICE AREAS
(NON-CLINICAL)
GROUP 2
MEDIUM RISK
· CARDIOLOGY
· ECHOCARDIOLOGY
· ENDOSCOPY - GI
· PHYSICAL THERAPY
· RADIOLOGY/MRI
· NUCLEAR MEDICINE
· RESPIRATORY CARE (EXCEPT
BRONCHOSCOPY AREA)
· CAFETERIA
· OUTPATIENT AREAS- CLINICS AND
OFFICES (EXCEPTION: TRANSPLANT
AND ONCOLOGY)
· EMERGENCY ROOM
· POST ANESTHESIA CARE UNITS
· LABOR AND DELIVERY
· PEDIATRICS
· ADMISSION/DISCHARGE AREA
· LABORATORIES
· PHARMACY
· INPATIENT UNITS (NOT
OTHERWISE SPECIFIED) AT ALL
A.E.H.N. LOCATIONS
GROUP 3
HIGH RISK
GROUP 4
HIGHEST RISK
· ALL OPERATING ROOMS INCLUDING LABOR
AND DELIVERY
· ANESTHESIA AND PUMP AREAS
· CENTRAL EQUIPMENT/STERILE SUPPLY
· CARDIAC CATHERTERIZATION AND
ANGIOGRAPHY AREAS
· INTERVENTIONAL RADIOLOGY
· RADIATION ONCOLOGY
· ALL INTENSIVE CARE UNITS
· NEWBORN NURSERIES, INCLUDING N.I.C.U.
· DIALYSIS UNIT
· ONCOLOGY- INPATIENT & OUTPATIENT
· TRANSPLANT- INPATIENT & OUTPATIENT
· PHARMACY ADMIXTURE
· NEGATIVE PRESSURE ISOLATION
ROOMS/AREAS (INCLUDING
BRONCHOSCOPY AREA)
PATIENT RISK GROUP TYPE A TYPE B TYPE C
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
VERY HIGH RISK GROUP 4
I
I
I
III
II II
II
TYPE D
III/1V
IV
IV
IVIII/1V
III/1V
III/1V
III
III
CONSTRUCTION PROJECT TYPE
PATIENT RISK GROUP TABLE
INFECTION CONTROL RISK ASSESSMENT
TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR
CLASS IV CONTROL PROCEDURES ARE NECESSARY.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY
OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND
ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS.
3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE
TO PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL
CUBE METHOD BEFORE CONSTRUCTION BEGINS.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
H.E.P.A. EQUIPPED AIR FILTRATION UNITS.
6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
7. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A
H.E.P.A. VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
8. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME
THE WORKER EXITS THE WORK AREA.
9. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA
WITHIN ANTEROOM. REPLACE PER MANUFACTURER'S
RECOMMENDATIONS.
10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS INSPECTED EACH BY THE HOSPITAL
SAFETY OFFICER, FACILITIES MANAGEMENT MAINTENANCE AND
ENGINEERING DEPARTMENT AND THOROUGHLY CLEANED BY
THE HOSPITAL ENVIRONMENTAL SERVICES DEPARTMENT OR
THEIR CONTRACTED ENVIRONMENTAL SERVICES COMPANY.
11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
12. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
13. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. WET
MOP WITH DISINFECTANT AFTER BARRIERS ARE REMOVED.
14. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
4. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT AFTER BARRIERS ARE
REMOVED
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
WAS BEING PERFORMED.
ICRA GENERAL NOTES
1. PROVIDE CONTAINMENT AS REQUIRED BY V.A. INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA
C
LA
SS
IV
AutoCAD SHX Text K-12867
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_SINKS
D01 A1-3
F1-3
G0-3
G0-3
G0-3
G08
G08
F03
H0-3
G08
H03
G03
G03 F03
G10
F03
G10
G10L1-0
L1-0
G03
G03
G09 H03
CORRIDOR WC
SERVICE
LOBBY
CORRIDOR
SC
16 17 18 19 20
M
L
K
J
HH
GG
FF
U
AS-2024
AS-202
AS-202 34
AS-202
40 38
AS-202 2628
AS-202
AS-202
AS-203 26AS-202
AS-201 2
AS-2028
AS-507
Sim
AS-412
B
AS-400
AS-410
B
AS-412
A
AS-410
A
D02
A03A03
G09
D01
D01
A08
A1-3
L1-0
L01
L1-0
L1-0
L1-0
L1-0
L1-0
L1-0
L1-0
A08
A0-3
15'-9 5/8"
1'- 6"
1'- 0 7
/8" 7'-
1/
2" 5'-
2 7 /8"
2'- 5"
1'-1 1/2" 6'-4 3/4"
4'-4 1/2"
1'- 8 3
/8" 4'-
6 3 /4"
2'- 4 7
/8"
6'- 1 7
/8" 7'-
7 1 /4"
2'-
7/ 8"
4'- 0 3
/4" 6'-
7 1 /2"
5'- 5"
6 3 /4"
1'-6 3/8" 6'-0" 6'-4 1/4" 2'-7 1/2"
3'-10 1/2" 2'-5"
3'- 5 7
/8" 2'-
5 7 /8"
2'- 7 3
/4" 3'-
6 1 /8"
± 1'-0"
6'- 6 3
/4" 4-144
4-143
4-142
4-140
4-141B
4-147
4-149
4-148
4-138
4-001
4-
4-146
4-141A
REF.G
REF.G
EXISTING 2 HR RATED WALL
CONSTRUCTION BARRIER
MA
TC
HL
IN
E
MA
TC
HL
IN
E
RELOCATED
CABINETS & SINKS
FROM FORMER
SCOPE / HIGH LEVEL
DISINFECT 4-126
EXISTING DOOR,
FRAME AND HDWR
TO BE RELOCATED
NEW TRANSLUCENT
FILM TO BE ADDED
TO EXISTING GLASS
IMPACT
PROTECTION RAIL
TO BE ADDED
INSTALL SCHEDULED BASEINSTALL CRASHRAIL
AS-410
C
INDICATES MISSING DOOR
HARDWARE TO BE INSTALLED (TYP)AS-201
AS-412
C
L1-0
F10
G10
H03
H03
H03
G03
F10
L1-0
F0-3
H0-3
H0-3
H0-3
G0-3
H03
F0-3
STORAGE ROOM WALLS TO
BE 1-HR RATED (AS SPECIFIED
ON LIFE SAFETY PLAN)
EXISTING WALLS TO BE
EXTENDED TO EXISTING DECK
AND SEALED. ALL
PENETRATIONS TO BE
SEALED IN ACCORDANCE
WITH PENETRATION DETAILS,
DWG. AS-501
7'- 2 3
/8" 2'-
5" 2'-
7/
8" 2'-
7/
8" 2'-
5 3 /4"
6'- 2 5
/8"
53 SF
TOILET/SHOWER
4-149
35 SF
EXIST. LINEN
CHUTE
4-139
113 SF
EXISTING MED
ROOM
4-138
433 SF
AMB SURG
LOUNGE
4-145
122 SF
STAFF OFFICE
4-143
93 SF
AMG SURG
SUPPLIES
4-142
140 SF
EXISTING AMB
SURG DRS
4-137
225 SF
EXISTING PCTC
OFFICE
4-136
61 SF
AMB SURG
SOILED UTILITY
4-109
389 SF
EXISTING
FLUOROSCOPE/LASER
4-132
129 SF
EXISTING ENDO
PRE-OP
4-130
165 SF
EXISTING
ENDO
RECEPTION
4-100
141 SF
EXISTING
AMB SURG
PRE-OP
4-101
42 SF
EXISTING
PATIENT TOILET
4-103
142 SF
EXISTING
AMB SURG
PRE-OP
4-102
142 SF
EXISTING
AMB SURG
PRE-OP
4-104
42 SF
EXISTING
PATIENT TOILET
4-105
38 SF
PATIENT TOILET
4-108
141 SF
EXISTING
AMB SURG
PRE-OP
4-106
140 SF
AMB SURG
PRE-OP
4-107
59 SF
EXISTING
CLEAN LINEN
4-134
61 SF
TOILET/SHOWER
4-147
47 SF
EXISTING
TOILET
4-135
54 SF
4-111
144 SF
FEMALE
LOCKERS
4-146
135 SF
MALE LOCKERS
4-148
43 SF
EXISTING PATIENT
TOILET
4-130A
161 SF
STRETCHER
STORAGE
4-141
41 SF
TOILET
4-144
25 SF
EXISTING
ELECTRICAL
CLOSET
4-152
193 SF
AMB. SURG.
NURSE STATION
4-140
584 SF
EXISTING
CORRIDOR
SW-1A
256 SF
CORRIDOR
SW-1C
33 SF
EXISTING
PATIENTS
LOCKERS
4-131
140 SF
EXISTING ENDO
PRE-OP
4-129
1345 SF
4-110
PATIENT TOILET
PASSAGECORRIDOR
SW-1D
EXISTING ENDO /
AMB SURG PACU
4-100 4-101
4-103A 4-103B
4-102 4-104
4-105A
4-105B
4-106 4-107
4-108
4-109 4-110
4-130
4-130A
4-1324-1344-1354-136
4-137
4-1394-152
ALL LOOSE
FURNITURE TO BE
PROVIDED AND
INSTALLED BY
OWNER
1'-8"
3'-
0"20" X 36" COUNTER
& UPPER CABS
PROVIDED AND
INSTALLED BY
CONTRACTOR
CONSTRUCTION GENERAL NOTES:
1. REFER TO SHEET GI-001 FOR ADDITIONAL NOTES.
2. UNLESS OTHERWISE NOTED, ALL HORIZONTAL BUMPER GUARD, CRASH RAIL AND HAND RAIL SHALL BE TERMINATED 2" CLEAR FROM ANY CORNER GUARD, DOOR FRAME OR INTERCEPTING WALL PARTITION.
3. PROVIDE WALL REINFORCEMENT FOR ALL WALL MOUNTED ITEMS (RAILS, COUNTERS, CABINET WORK, ETC.) AS FOLLOWS; 16 GAUGE STEEL 8"W. MIN. TO RUN CONTINUOUSLY BEHIND DRYWALL OR BACKER BOARD FOR A MINIMUM OF 3 STUDS OR MORE FOR LENGTH AS REQUIRED FOR MOUNTING. SECURE TO
EVERY STUD. SEE MILLWORK DETAILS FOR MILLWORK REINFORCEMENT HEIGHTS AND LENGTHS.
4. ALL DRYWALL PARTITION WITH "FH" MUST EXTEND FULL HEIGHT TO UNDERSIDE OF SLAB ABOVE PER
D.O.H. REQUIREMENTS.
5. EXISTING TILE WALL TO REMAINED SHALL BE LAMINATED WITH ONE LAYER OF GYPSUM WALL BOARD, TYPICAL UNLESS OTHERWISE NOTED.
6. REFER TO SHEET #AD-101A & AD-101B FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 3RD FLOOR AS REQUIRED TO PERFORM THE NEW WORK ON THE 4TH FLOOR. REFER TO SHEET
#AD-103 FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 5TH FLOOR.
7. ALL EXISTING TO REMAIN PERIMETER WINDOW SILL & CONVECTOR ENCLOSURE SHALL BE PREPPED TO
RECEIVE NEW FINISH. ALL METAL CONVECTOR ENCLOSURE SHALL RECEIVE ELECTROSTATIC
REFINISHING.
8. ALL AREAS WHERE EXISTING MEETS NEW WORK SHALL BE PATCHED TO MATCH THE NEW FINISH. ALL
NEW WORK SHALL ALIGN WITH THE EXISTING ADJACENT SURFACES UNLESS OTHERWISE NOTED.
9. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF ANY EXISTING UTILITIES WHICH CONFLICT WITH
ANY NEW WORK.
10. ALL EXISTING WALL MOUNTED DEVICES SHALL BE REMOVED AND RECESSED INTO EXISTING WALL
PARTITION, TYPICAL, UON.
11. SEE LIFE SAFETY PLANS FOR ALL SMOKE BARRIER, 1 HR, AND 2 HR RATED WALL,DOOR, AND ROOM
LOCATIONS.
12. WHERE EXISTING WALLS ARE BEING USED FOR CONSTRUCTION BARRIERS, THE WALL ABOVE THE
CEILING MUST BE EXTENDED TO THE SLAB ABOVE WITH FIRE RATED CONSTRUCTION.
CONSTRUCTION GENERAL NOTES:
1. REFER TO SHEET GI-001 FOR ADDITIONAL NOTES.
2. UNLESS OTHERWISE NOTED, ALL HORIZONTAL BUMPER GUARD, CRASH RAIL AND HAND RAIL SHALL BE TERMINATED 2" CLEAR FROM ANY CORNER GUARD, DOOR FRAME OR INTERCEPTING WALL PARTITION.
3. PROVIDE WALL REINFORCEMENT FOR ALL WALL MOUNTED ITEMS (RAILS, COUNTERS, CABINET WORK, ETC.) AS FOLLOWS; 16 GAUGE STEEL 8"W. MIN. TO RUN CONTINUOUSLY BEHIND DRYWALL OR BACKER BOARD FOR A MINIMUM OF 3 STUDS OR MORE FOR LENGTH AS REQUIRED FOR MOUNTING. SECURE TO
EVERY STUD. SEE MILLWORK DETAILS FOR MILLWORK REINFORCEMENT HEIGHTS AND LENGTHS.
4. ALL DRYWALL PARTITION WITH "FH" MUST EXTEND FULL HEIGHT TO UNDERSIDE OF SLAB ABOVE PER
D.O.H. REQUIREMENTS.
5. EXISTING TILE WALL TO REMAINED SHALL BE LAMINATED WITH ONE LAYER OF GYPSUM WALL BOARD, TYPICAL UNLESS OTHERWISE NOTED.
6. REFER TO SHEET #AD-101A & AD-101B FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 3RD FLOOR AS REQUIRED TO PERFORM THE NEW WORK ON THE 4TH FLOOR. REFER TO SHEET
#AD-103 FOR CEILING, WALL & FLOOR ASSEMBLY REPAIR & PATCH WORK ON THE 5TH FLOOR.
7. ALL EXISTING TO REMAIN PERIMETER WINDOW SILL & CONVECTOR ENCLOSURE SHALL BE PREPPED TO
RECEIVE NEW FINISH. ALL METAL CONVECTOR ENCLOSURE SHALL RECEIVE ELECTROSTATIC
REFINISHING.
8. ALL AREAS WHERE EXISTING MEETS NEW WORK SHALL BE PATCHED TO MATCH THE NEW FINISH. ALL
NEW WORK SHALL ALIGN WITH THE EXISTING ADJACENT SURFACES UNLESS OTHERWISE NOTED.
9. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF ANY EXISTING UTILITIES WHICH CONFLICT WITH
ANY NEW WORK.
10. ALL EXISTING WALL MOUNTED DEVICES SHALL BE REMOVED AND RECESSED INTO EXISTING WALL
PARTITION, TYPICAL, UON.
11. SEE LIFE SAFETY PLANS FOR ALL SMOKE BARRIER, 1 HR, AND 2 HR RATED WALL,DOOR, AND ROOM
LOCATIONS.
12. WHERE EXISTING WALLS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .