S02 DRAWINGS .pdf

PDF 2 MB Posted

Attached to
7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC
Solicitation number
36C24225B0017
Issued by

About this file

These are architectural and construction drawings for renovating the D2 Swing Space at the Department of Veterans Affairs New York Harbor Healthcare System in Queens, New York (Project #630A4-24-411). The drawings include a cover sheet, general notes, scope of work details, and an architectural floor plan for Building 86's second floor.

The renovation project involves converting various staff offices and spaces into patient rooms to accommodate approximately 20 beds in the ward. Key work elements include: installation of a 40-button Wireless Nurse Call System, bathroom renovations, installation of patient privacy curtains and TV mounts, new LED lighting fixtures throughout, electrical upgrades including dedicated power for new AC units, plumbing modifications, and installation of scald protection in all showers. The scope also includes specific room-by-room renovations, such as converting Room D-206 from staff offices to three beds, Room D-221 to a nurses station, and Room D-210 to a nutrition kitchen. The drawings include detailed general notes covering contractor responsibilities, safety requirements, and VA compliance standards.

View the file

Other files

File Type Posted
SAMPLE BID SHEET WiFi UPGRADE.docx DOCX document
36C24225B0017 0001.docx DOCX document
C22 ALL POSTERS.pdf PDF
Attachment 5 FAR 52.225-2 BUY AMERICAN CERTIFICATE.pdf PDF
ADDITIONAL INSERTS.doc DOC document
Attachment 4 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION (1).pdf PDF
S02 SPECS .pdf PDF
36C24225B0017_1.docx DOCX document
C10 VA ID PACKAGE UPDATED 12-19-2023.pdf PDF
WAGE-RATES.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate D2 Swing SpaceCOVER SHEET

N

DEPARTMENT OF VETERANS AFFAIRS

NEW YORK HARBOR HEALTHCARE SYSTEM

QUEENS, NEW YORK

LOCATION MAP AREA OF WORK

EE

ES

S OF

M

R C

D

T

T T

IIN

U A

AA

V

RAP

M

N

T

T OF

E E

D

RS

I

FA

A

NT

SR

F

AEE

DRAWING LIST

Renovate D2 Swing Space

ISSUED FOR BID DOCUMENT

Project# 630A4-24-411 N

AutoCAD SHX Text

AutoCAD SHX Text Healthcare System

AutoCAD SHX Text New York Harbor

AutoCAD SHX Text Queens, New York 11425

AutoCAD SHX Text 179-00 Linden Blvd

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Project Title

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

QUEENS, NEW YORK

AutoCAD SHX Text Drawn By

AutoCAD SHX Text Location

AutoCAD SHX Text Designed By

AutoCAD SHX Text Checked By

AutoCAD SHX Text Scale:

AutoCAD SHX Text Sht. 1 Of

AutoCAD SHX Text Date

AutoCAD SHX Text

AW

AutoCAD SHX Text 11/24/23

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AW

AutoCAD SHX Text

GI-001

AutoCAD SHX Text Project No.

AutoCAD SHX Text Approved Division Chief:

AutoCAD SHX Text

GI-001

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AE-102

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

SCOPE OF WORK

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

SHEET# OUT OF TOTAL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCOPE OF WORK CONTINUED

AutoCAD SHX Text

GI-002

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AE-103

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL PLAN

Renovate D2 Swing SpaceGENERAL NOTES

GENERAL NOTES

1. ALL WORK AND MATERIALS FURNISHED SHALL COMPLY WITH THE NATIONAL FIRE PROTECTION ASSOCIATION REQUIREMENTS, AND ALL FEDERAL AUTHORITIES HAVING JURISDICTION OVER THE WORK. THE BUILDING PERMIT SHALL BE SECURED BY THE GENERAL CONTRACTOR, AND HE SHALL OBTAIN ALL OTHER PERMITS AND APPROVALS AS REQUIRED BY LAW FOR THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL OBTAIN THE CERTIFICATE OF OCCUPANCY.

2. CONTRACTOR SHALL PROVIDE CONTROLLED INSPECTIONS AS REQUIRED FOR APPROVAL. ALL CONTROLLED INSPECTIONS ARE TO BE PERFORMED BY LICENSED PROFESSIONALS AND THE

COST OF THESE SERVICES IS TO BE PAID BY THE CONTRACTOR.

3. THE SUBMISSION OF A PROPOSAL BY THE CONTRACTOR WILL BE CONSTRUCTED AS EVIDENCE THAT A CAREFUL AND THOROUGH EXAMINATION OF THE REMISES HAS BEEN MADE AND LATER CLAIMS FOR LABOR, MATERIALS OR EQUIPMENT REQUIRED OR FOR DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED. IT SHALL ALSO CONSTITUTE A REPRESENTATION THAT THE CONTRACTOR HAS CHECKED AND VERIFIED ALL QUANTITIES, WORK AND MATERIALS INVOLVED AND THAT HE

SHALL TAKE RESPONSIBILITY FOR ANY DEFICIENCIES THEREIN.

4. BEFORE ORDERING ANY MATERIAL OR DOING ANY WORK, EACH TRADE SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING AND SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF SAME.

NO EXTRA CHARGE OR COMPENSATION WILL BE ALLOWED ON ACCOUNT OF DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND THE MEASUREMENTS INDICATED ON THE DRAWINGS; ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE VA FOR CONSIDERATION AND CLARIFICATION BEFORE PROCEEDING

WITH THE WORK.

5. ALL OF THE VA's DRAWING AND CONSTRUCTION NOTES ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL; ANY WORK SHOWN OR REFERRED TO ON ONE DRAWING SHALL BE PROVIDED AS THOUGH SHOWN ON ALL DRAWINGS. WHENEVER AN ITEM IS SPECIFIED AND/OR SHOWN ON THE DRAWINGS BY DETAIL OR REFERENCE IT SHALL BE CONSIDERED TYPICAL FOR OTHER ITEMS WHICH ARE OBVIOUSLY INTENDED TO BE THE SAME, EVEN THOUGH NOT SO DESIGNATED OR SPECIFICALLY NAMED BUT

DO SERVE THE SAME FUNCTION.

6. THE WORK TO BE PERFORMED CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES, FEES, MATERIALS, AND SERVICES IN ACCORDANCE WITH THESE NOTES AND DRAWINGS AND PERFORMING ALL OPERATIONS NECESSARY TO CONSTRUCTION AND INSTALL COMPLETE AND IN SATISFACTORY CONDITION THE VARIOUS MATERIALS AND EQUIPMENT AT THE LOCATIONS SHOWN. IT IS INTENDED THAT THE DRAWINGS INCLUDE EVERYTHING REQUISITE AND NECESSARY TO FINISH THE ENTIRE WORK PROPERLY, NOTWITHSTANDING THE FACT THAT EVERY ITEM NECESSARILY INVOLVED MAY NOT BE SPECIFICALLY MENTIONED OR SHOWN. ANY ITEM WHICH MAY BE REASONABLY CONSTRUED AD INCIDENTAL TO THE PROPER AND SATISFACTORY COMPLETION OF THE WORK IN ACCORDANCE WITH THE INTENT OF THESE NOTES AND DRAWINGS IS HEREBY INCLUDED.

7. THE CONTRACTOR SHALL ABIDE BY AND COMPLY WITH THE TRUE INTENT AND MEANING OF THE DRAWINGS AND NOTES TAKEN AS A WHOLE AND SHALL NOT AVAIL HIMSELF OF ANY OBVIOUS ERRORS OR OMISSIONS, SHOULD ANY EXIST. SHOULD ANY ERROR OR DISCREPANCY APPEAR OR ANY DOUBT ARISE AS TO THE TRUE MEANING OR THE DRAWINGS OR NOTES, THE CONTRACTOR SHALL BRING SUCH ITEMS TO THE ATTENTION OF THE VA BEFORE SUBMISSION OF PROPOSAL FOR EXPLANATION OR CORRECTION OF SAME. AFTER THE SUBMISSION OF

PROPOSAL, THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL SUCH ITEMS.

8. THE CHARACTER AND SCOPE OF THE WORK ARE ILLUSTRATED BY THE DRAWINGS AND NOTES. TO INTERPRET AND EXPLAIN THE DRAWINGS OTHER INFORMATION DEEMED NECESSARY BY THE VA WILL BE FURNISHED TO THE CONTRACTOR WHEN AND AS REQUIRED BY THE WORK, AND IT IS UNDERSTOOD THAT SAID ADDITIONAL INFORMATION OR DRAWINGS ARE TO BE OF

EQUAL FORCE WITH THESE DRAWINGS.

9. DETAILS OR CONDITIONS INDICATED FOR A PORTION OF THE WORK BUT NOT CARRIED OUT FULLY FOR OTHER PORTIONS SHALL APPLY THROUGHOUT TO ALL SIMILAR PORTIONS EXCEPT AS OTHERWISE SPECIFICALLY NOTED. IN EVERY CASE A MORE EXPENSIVE ITEM OR METHOD SHALL BE ASSUMED OVER A LESS EXPENSIVE ONE AND DIMENSIONS SHALL BE FIGURED RATHER

THAN DETERMINED BY RULE OR SCALE.

10.THE PROJECT HAS BEEN DESIGNED AND DETAILED FOR THE SPECIFIC MATERIALS AND EQUIPMENT SPECIFIED. NO SUBSTITUTIONS SHALL BE MAKE WITHOUT THE EXPRESS WRITTEN CONSENT OF THE VA. IF THE SPECIFIED MATERIAL IS NOT AVAILABLE. THE CONTRACTOR SHALL PROPOSE AN ALTERNATE MATERIAL AND SHALL PROVIDE DRAWINGS, SAMPLES, SPECIFICATIONS, MANUFACTURER'S LITERATURE, PERFORMANCE DATA, ETC., IN ORDER THAT THE VA CAN EVALUATE THE PROPOSED SUBSTITUTION. IF THE SUBSTITUTION AFFECTS A CORRELATED FUNCTION, ADJACENT CONSTRUCTION, OR THE WORK OF ANY OTHER CONTRACTOR OR TRADE, THE NECESSARY CHANGES AND MODIFICATIONS TO THE AFFECTED WORK SHALL BE ACCOMPLISHED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. NO REQUESTS FOR SUBSTITUTES WILL BE ENTERTAINED BY THE VA DUE TO CONTRACTOR'S

FAILURE TO ORDER MATERIALS IN A TIMELY MANNER.

11.THE CONTRACTOR SHALL SUBMIT IN WRITING ALL PROPOSALS FOR ADDITIONAL WORK TO THE VA FOR REVIEW AND APPROVAL. NO ADDITIONAL WORK IS TO PROCEED UNTIL A SIGNED

AUTHORIZATION TO PROCEED IS RETURNED TO CONTRACTOR.

12.THE STANDARD SPECIFICATIONS OF THE MANUFACTURERS APPROVED FOR USE IN THE PROJECT ARE HEREBY MADE A PART OF THESE NOTES WITH THE SAME FORCE AND EFFECT AS THOUGH HEREIN WRITTEN OUT IN FULL, EXCEPT THAT WHEREVER THE DRAWINGS REQUIRE HEAVIER MEMBERS, BETTER QUALITY MATERIALS OR ARE OTHERWISE MORE STRINGENT, THOSE

MORE STRINGENT REQUIREMENTS SHALL GOVERN.

13.THE CONTRACTOR SHALL NOTIFY THE VA IMMEDIATELY IF HE CANNOT FOR ANY REASON COMPLY WITH ALL THE REQUIREMENTS OF THESE NOTES AND DRAWINGS.

14.THE CONTRACTOR SHALL COORDINATE AND SUPERVISE THE WORK OF ALL CONTRACTORS AND SUB-CONTRACTORS. HE SHALL BE RESPONSIBLE FOR GIVING ALL TRADES SUCH

INFORMATION, PLANS OR DETAILS AS MAY BE REQUIRED FOR THE PROPER INSTALLATION OF THEIR WORK. ALL MATERIALS SHALL BE ORDERED SUFFICIENTLY AHEAD OF TIME SO THAT WORK CAN PROCEED ON SCHEDULE. NO SUBSTITUTIONS WILL BE ACCEPTED BECAUSE OF FAILURE TO DO SO.

15.THE OWNER RESERVES THE RIGHT TO LET THE OTHER CONTRACTS IN CONNECTION WITH THE WORK OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF WORK WITH OTHER CONTRACTORS. THE CONTRACTOR SHALL AFFORD OTHER CONTRACTORS REASONABLE OPPORTUNITY FOR THE INTRODUCTION AND STORAGE OF THEIR MATERIALS

AND EQUIPMENT AND THE EXECUTION OF THEIR WORK.

16.ALL MATERIALS REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT SHALL BE NEW AND OF THE BEST QUALITY OF KINDS SPECIFIED, ALL SUBJECT TO THE APPROVAL OF THE VA. THE USE OF OLD OR SECOND-HAND MATERIALS IS STRICTLY FORBIDDEN. THE CONTRACTOR SHALL, IF REQUIRED, FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF MATERIALS AND WORKMANSHIP. MATERIALS SHALL BE USED IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. UPON REQUEST, THE MANUFACTURER'S REPRESENTATIVE SHALL GO TO THE SITE AND INSTRUCT THE MECHANICS IN THE USE OF THE MATERIALS OR SHALL SUPERVISE THEIR USE.

17.ANY MATERIALS DELIVERED OR WORK PERFORMED, CONTRARY TO THE DRAWINGS AND SPECIFICATIONS AND APPROVED SHOP DRAWINGS, SHALL BE REMOVED BY THE CONTRACTOR AT HIS OWN EXPENSE, AND THE SAME SHALL BE REPLACED WITH OTHER MATERIALS OR WORK SATISFACTORY TO THE VA. THE CONTRACTOR SHALL ALSO ASSUME THE COST OF REPLACING

THE WORK WHICH MAY BE DISTURBED.

18.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING WITH BUILDING MANAGEMENT FOR THE USE OF THE ELEVATOR OR OTHER HOISTING FACILITIES FOR HANDLING THE DELIVERY OF MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL SUB TRADES OF CONDITIONS REGARDING ELEVATOR CAB SIZE, DOOR OPENINGS, ETC.. ANY AND ALL FEES INVOLVED FOR THE USE OF THE HOISTING FACILITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY AND ACCURATELY LAYING OUT THE WORK AND FOR THE LINES AND MEASUREMENTS HEREIN. HE SHALL ESTABLISH NECESSARY REFERENCE LINES AND PERMANENT BENCH MARKS FROM WHICH BUILDING LINES AND ELEVATIONS SHALL BE TAKEN. HEIGHTS OF ALL WORK CALLED FOR "A.F.F." INCLUDING BUT NOT LIMITED TO SOFFITS, CEILINGS, DOORS, AND HOLLOW METAL SHALL BE TRUE AND LEVEL WITHIN A MAXIMUM TOLERANCE OF 1/8" OVERALL THROUGHOUT THE ENTIRE PROJECT.

20. THE CONTRACTOR SHALL KEEP THE VA INFORMED OF THE PROGRESS OF HIS WORK. NO WORK SHALL BE CLOSED OR COVERED UNTIL IT HAS BEEN DULY INSPECTED AND APPROVED.

SHOULD UNINSPECTED WORK BE COVERED THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, UNCOVER ALL SUCH WORK SO THAT IT CAN BE PROPERLY INSPECTED AND AFTER SUCH

INSPECTION, HE SHALL PROPERLY REPAIR AND REPLACE ALL WORK INTERRED WITH.

21. ALL WORK SHALL BE SUBJECT TO FINAL INSPECTION AND ACCEPTANCE BY THE VA.

22. PROTECT OWNER'S PROPERTY, EQUIPMENT, AND EMPLOYEES FROM INJURY OR DAMAGE AT THE PROJECT SITE.

23. ALL WORK ARE TO BE COORDINATED SO THAT NO CONFLICTS OCCUR. ANY CONFLICTS WHICH RESULT IN A RELOCATION OF A FINISHED SURFACE MUST BE BROUGHT TO THE ATTENTION

OF THE VA PRIOR TO INSTALLATION.

24. THE CONTRACTOR SHALL SUBMIT CERTIFICATES OF INSURANCE IN ACCORDANCE WITH BUILDING REQUIREMENTS AND SHALL INCLUDE A HOLD HARMLESS CLAUSE FOR THE OWNER, BUILDING MANAGEMENT, TENANT, AND VA.

25. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROVIDE A 20 YEAR WARRANTY COVERING ALL WORK PERFORMED AND EQUIPMENT INSTALLED.

26. THE CONTRACTOR SHALL SUBMIT ALL FABRICATION SHOP DRAWINGS, SAMPLES, AND FIXTURE CUTS FOR THE VA'S REVIEW AS REQUIRED AND/OR INDICATED ON THE DRAWINGS. THE VA'S

REVIEW SHALL NOT BE CONSTRUCTED AS AN INDICATION THAT THE SUBMITTAL IS CORRECT OR SUITABLE NOR THAT WORK REPRESENTED BY SUBMITTAL COMPLIES WITH THE DRAWINGS, EXCEPT AS TO MATTERS OF FINISH, COLOR, AND OTHER AESTHETIC MATTERS. ACTION NOTED ABOVE DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY TO COORDINATE ALL TRADES AND TO CHECK QUANTITIES AND DIMENSIONS AGAINST CONDITIONS IN THE FIELD. CONTRACTORS SHALL ASSUME RESPONSIBILITY FOR ALL ERRORS ON THEIR DRAWINGS.

27. THE CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS COMPLETE WITH MANUFACTURER'S EQUIPMENT CUTS, FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. SUBMITTAL SHALL BE IN THE FORM OF (A) REPRODUCIBLE SEPIA TRANSPARENCY (POSITIVE SIDE UP), AND (B) 3 BLACK AND WHITE PRINTS OF EACH DRAWING. SAMPLES SHALL BE SUBMITTED IN TRIPLICATE. THE CONTRACTOR WILL NOT COMMENCE FABRICATION BEFORE RECEIVING THE APPROVAL OF THE VA.

28. ITEMS TO BE SUBMITTED FOR REVIEW ARE NOTED IN THE VAURAL AND ENGINEERING SPECIFICATIONS.

29. THE PREMISES AND THE JOB SITE SHALL BE MAINTAINED IN A REASONABLY NEAT AND ORDERLY CONDITION AND KEPT FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH

DURING THE ENTIRE CONSTRUCTION PERIOD. REMOVE CRATES, CARTONS AND OTHER FLAMMABLE WASTE MATERIALS OR TRASH FROM THE WORK AREAS AT THE END OF EACH WORKING

DAY.

30. ELECTRICAL CLOSETS, PIPE AND DUCT SHAFTS CHASES, FURRED SPACES AND SIMILAR SPACES SHALL BE CLEANED AND LEFT FREE FROM RUBBISH LOOSE PLASTER, MORTAR DRIPPINGS, EXTRANEOUS CONSTRUCTION MATERIALS, DIRT AND DUST.

31. CARE SHALL BE TAKEN BY WORKMEN NOT TO MARK, SOIL, OR OTHERWISE DEFACE FINISHED SURFACES. IN THE EVENT THAT FINISHED SURFACES BECOME DEFACED, CLEAN AND

RESTORE SUCH SURFACES TO THEIR ORIGINAL CONDITION.

32. CLEAN UP IMMEDIATELY UPON COMPLETION OF EACH TRADE'S WORK.

33. CLEAN AREAS OF THE BUILDING IN WHICH PAINTING AND FINISHING WORK IS TO BE PERFORMED JUST PRIOR TO THE START OF THIS WORK, AND MAINTAIN THESE AREAS IN SATISFACTORY

CONDITION FOR PAINTING AND FINISHING.

34. THIS CLEANING INCLUDES THE REMOVAL OF TRASH AND RUBBISH FROM THESE AREAS, BROOM CLEANING OF FLOORS, THE REMOVAL OF ANY PLASTER MORTAR, DUST AND OTHER

EXTRANEOUS MATERIALS FROM FINISH SURFACES, INCLUDING BUT NOT LIMITED TO MISCELLANEOUS METAL, WOODWORK, PLASTER, GLASS, GYPSUM DRYWALL, MASONRY, CONCRETE, MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING DUCTWORK, CONDUIT, AND SURFACES VISIBLE AFTER PERMANENT FIXTURES, INDUCTION UNIT COVERS, GRILLES, REGISTERS, AND

OTHER SUCH FIXTURES OR DEVICES ARE IN PLACE.

35. IN ADDITION TO THE CLEANING SPECIFIED ABOVE AND THE MORE SPECIFIC CLEANING WHICH MAY BE REQUIRED IN VARIOUS SECTIONS OF THE SPECIFICATIONS THE PREMISES SHALL BE PREPARED FOR OCCUPANCY BY: (i) A THOROUGH CLEANING THROUGHOUT INCLUDING WASHING OR CLEANING BY OTHER APPROVED METHODS OF ALL FLOORS AND SURFACES ON WHICH DIRT OR DUST HAS COLLECTED AND BY WASHING GLASS, REMOVING ALL PAINT, FOREIGN MATERIAL, AND STAINS THEREON. (ii) PROVIDING AND MAINTAINING ADEQUATE RUNNER STRIPS OF NON-STAINING REINFORCED KRAFT BUILDING PAPER ON FINISHED FLOORS AS REQUIRED FOR PROTECTION. (iii) LEAVING ALL FIXTURES AND EQUIPMENT IN AN UNDAMAGED, BRIGHT, CLEAN POLISHED CONDITION. (iv) CLEAN AND POLISH ALL HARDWARE AND ALL OTHER METAL WORK. (v) DO ALL OTHER CLEANING AS REQUIRED TO TURN THE PREMISES OVER TO THE OWNER IN A

SPOTLESS AND ORDERLY CONDITION.

36. ALL EXITS AND MEANS OF EGRESS ROUTES SHALL BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL TIMES.

37. PRIOR TO SUBMITTING THE BID. EACH CONTRACTOR AND SUBCONTRACTOR SHALL THOROUGHLY EXAMINE EXISTING CONDITIONS AT THE PROJECT SITE TO ASSURE THAT THE SCOPE OF

WORK IS IN ACCORDANCE WITH THE CONTRACT DOCUMENT. CONDITION FOUND WHICH WILL ADVERSELY AFFECT THE WORK SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE/VA.

38. THE CONSTRUCTION MANAGER SHALL BE RESPONSIBLE FOR THE SAFETY AND PROTECTION/SECURITY OF THE PROPERTY AND THE SURROUNDING AREAS, INCLUDING SIDEWALKS, ROADS

AND ADJACENT STRUCTURES. ALL OPERATIONS SHALL BE CONDUCTED SO AS TO PREVENT DAMAGE TO EXISTING STRUCTURES, ADJACENT SPACES AND OTHER FACILITIES TO REMAIN.

ELEMENTS TO BE RETAINED SHALL BE SAFEGUARD AND PROTECTED FROM DAMAGE OF ANY KIND.

39. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE V.A. GUIDELINES, NFPA 101 LIFE SAFETY AND ELECTRIC CODES, O.S.H.A. SAFETY REGULATIONS.

40. THE CONTRACTOR SHALL ASSURE FREE AND SAFE PASSAGE FOR PEDESTRIAN AROUND THE SITE AREA. IN CONFORMANCE WITH GOVERNING AGENCIES AND THE OWNER. THE

CONTRACTOR SHALL OBTAIN ALL PERMITS AND PAY ALL RELATED FEES REQUIRED, ALL SITE CONSTRUCTION SIGNAGE AND ASSOCIATED TRAFFIC MEASURES.

41. PRIOR TO THE COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS, APPROVALS, ETC. FROM ALL RESPECTIVE DEPARTMENTS, AGENCIES, COMMISSIONS ETC. HAVING JURISDICTION AND SHALL SUBMIT ONE (1) COPY OF SUCH TO BOTH THE OWNER AND THE VA.

42. THE CONTRACTOR SHALL EMPLOY MEANS AND METHODS THAT MINIMIZE VIBRATION, NOISE, DUST, POLLUTANTS AND OTHER DISTURBANCES TO OPERATIONS OF EXISTING ADJACENT

TENANCIES.

43. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONSTRUCTION, CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ANY DEMOLITION OPERATIONS. NO WORK IS TO TAKE PLACE

WHICH ALTERS THE BUILDING STRUCTURE OR STRUCTURAL FIREPROOFING SYSTEMS. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE OWNER PRIOR TO THE START OF THE WORK. COMMENCEMENT OF THE WORK SHALL IMPLY ACCEPTANCE OF ALL EXISTING CONDITIONS.

44. THE OWNER, UNDER SEPARATE CONTRACT, SHALL ABATE THE CONSTRUCTION SITE OF ALL ASBESTOS CONTAINING MATERIALS. IF THE CONTRACTOR DISCOVERS ASBESTOS OR ANY OTHER HAZARDOUS MATERIALS THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND SHALL IMMEDIATELY STOP DISTURBING THE HAZARDOUS MATERIAL. THE OWNER SHALL NOTIFY THE CONTRACTOR WHEN IT IS PERMISSIBLE TO RESUME WORK IN THE AREA BASED ON REVIEW AND APPROVALS BY THE OWNER'S APPROPRIATE CONSULTANT. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE CODES, LAWS, REGULATIONS AND COMMON TRADE PRACTICE.

45. THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR SPACES AND ASSEMBLIES ADJACENT TO THE AREA OF OPERATION UNDER THIS CONTRACT. ANY DAMAGE OR DISTURBANCE RESULTING FROM WORK DONE UNDER THIS CONTRACT SHALL BE PROMPTLY RESTORED, REPLACED, OR REPAIRED AT NO EXTRA COST OF THE OWNER.

46. ALL DEBRIS AND ADDITIONAL MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF PROPERLY.

47. SEAL ALL OPENINGS UNCOVERED DURING THE DEMOLITION OF FURRED WALLS. RELOCATION OF DUCT SHAFTS OR PIPE CHASES, OR REMOVAL OF PARTITIONS OR FIXTURES.

48. CONTRACTOR RESPONSIBLE FOR VERIFYING THE EXISTING CONDITIONS.

AutoCAD SHX Text

AutoCAD SHX Text Healthcare System

AutoCAD SHX Text New York Harbor

AutoCAD SHX Text Queens, New York 11425

AutoCAD SHX Text 179-00 Linden Blvd

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Project Title

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

QUEENS, NEW YORK

AutoCAD SHX Text Drawn By

AutoCAD SHX Text Location

AutoCAD SHX Text Designed By

AutoCAD SHX Text Checked By

AutoCAD SHX Text Scale:

AutoCAD SHX Text Sht. 2 Of

AutoCAD SHX Text Date

AutoCAD SHX Text

AW

AutoCAD SHX Text 11/24/23

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AW

AutoCAD SHX Text

GI-002

AutoCAD SHX Text Project No.

Approved Division Chief:

Renovate D2 Swing SpaceSCOPE OF WORK

SCOPE OF WORK

Specific Requirements:

This project includes a general cosmetic renovation/upgrade of the entire second floor (D2 Ward) of Building 86 in order to accommodate approximately 20 beds at the ward.

· Hallway/Main Corridor:

· Purchase and install automatic door equipment for the ward's front doors to make them automatic

· Relocate if necessary existing electrical fixtures, LED lights, outlets, switches, cover plates, and possible wiring and conduits

· Repair of exhaust line (in conjunction with ongoing C3/D3 project)

· Seal/caulk existing VCT/terrazzo floor tiles with gray sealant at cracked locations only

· Installation of VCT floor tiles (whenever the tiles are missing or broken) to be spot patched

· Secure and tighten a loose wall-mounted handrail

· Cut, remove and replace only damaged portions of existing baseboard/molding

· Purchase and install new full height corner guards where missing or damaged (9 corner guards)

· Plaster/grout, spackle, and caulk all holes and defects throughout the hallway, as needed

· Purchase and installation of five (5) window mounted air conditioners and associated louvers. Install new dedicated power feed for new AC units

· Demolition and removal of existing rail support for ten (10) window curtains

· Purchase and installation of blinds and rail support for ten (10) window curtains

· Replace one damaged radiator cover

· Clean all area once all work is complete

· Purchase and installation of one (1) 2x4 LED lighting fixtures

· Hallway/Common Bathroom:

· Purchase and installation two (2) 2x4 LED lighting fixtures

· Room D-201 - Existing: Three Separate Staff Offices / Proposed: Three Beds

· Demolition and removal of existing walls for the three office spaces

· Relocate as necessary existing electrical fixtures, LED lights, outlets, switches, cover plates, and wiring/conduits

· Purchase and installation of new bathroom fixtures

· Purchase and installation of new sink in patient room

· Purchase and installation of rail support for patient privacy curtains

· Plaster, spackle, and caulk throughout the room, including the bathroom, as needed

· Purchase and installation of three flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for three beds

· Installation of cable tv service to three TVs

· Purchase and installation of two (2) 2x4 LED lighting fixtures

· Purchase and installation of three (3) overbed lighting fixtures

· Clean all area once all work is complete

· Room D-202 - Existing: Staff Offices / Proposed: Three Beds

· Purchase and installation of new bathroom fixtures

· Removal of existing bathtub (mud tub) and installation of shower

· Purchase and installation of new sink in patient room

· Purchase and installation of rail support for patient privacy curtains

· Plaster, spackle, and caulk throughout the room, including the bathroom, as needed

· Repair of damaged wall

· Purchase and installation of three flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for three beds

· Installation of cable tv service to three TVs

· Removal of existing lighting fixtures

· Purchase and installation of two (2) 2x4 LED lighting fixtures

· Purchase and installation of three (3) overbed lighting fixtures

· Clean all area once all work is complete

· Room D-203 - Existing: C2 Clean Utility Room / Proposed: SPS

Purchase and installation of one (1) 2x4 LED lighting fixture

· Room next to D-204 - Existing: Bathroom / Proposed: Staff Bathroom

· Purchase and installation of VCT floor tiles (at certain locations) to be spot patched

· Clean all area once all work is complete

· Room D-205 - Existing: Four Separate Staff Offices / Proposed: Three Beds

· Demolition and removal of existing walls for the four office spaces

· Reuse existing sink (check if plumbing is working) in patient room

· Create transition between two ceiling heights

· Relocate existing electrical fixtures, LED lights, outlets, switches, cover plates, and wiring/conduits as necessary

· Purchase and installation of two (2) 2x4 LED lighting fixtures

· Purchase and installation of three (3) overbed lighting fixtures

· Purchase and installation of rail support for patient privacy curtains

· Purchase and installation of four flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for four beds

· Installation of cable tv service to four TVs

· Clean all area once all work is complete

· Room D-206 - Existing: Staff Offices / Proposed: Three Beds

· Purchase and installation of new bathroom fixtures

· Removal of existing bathtub and installation of shower

· Purchase and installation of three (3) overbed lighting fixtures

· Demolition and removal of existing rail support for patient privacy curtains

· Purchase and installation of rail support for patient privacy curtains

· Purchase and installation of three flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for three beds

· Installation of cable tv service to three TVs

· Clean all area once all work is complete

· Purchase and installation of plumbing and water lines for new sink

· Room D-207 - Existing: Two Separate Staff Offices / Proposed: Three Beds

· Demolition and removal of existing walls for the two office spaces

· Cut out for new door opening by removing the drywall for bathroom

· Purchase and installation of new bathroom fixtures

· Installation of new non-rated HM door and frame with hardware and hinges

· Relocate existing electrical fixtures, LED lights, outlets, switches, cover plates, and wiring/conduits

· Purchase and installation of rail support for patient privacy curtains

· Purchase and installation of three flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for three beds

· Installation of cable tv service to three TVs

· Clean all area once all work is complete

· Room D-208 - Existing: EMS Training Room / Proposed: Three Beds

· Removal of existing bathtub and installation of shower; convert the tub drain and controls to new shower controls

· Purchase and installation of new bathroom fixtures

· Demolition and removal of existing rail support for patient privacy curtains

· Purchase and installation of rail support for patient privacy curtains

· Purchase and installation of new telephone and data conduits and outlets, as needed

· Purchase and installation of one (1) 2x4 LED lighting fixtures

· Purchase and installation of three (3) overbed lighting fixtures

· Purchase and installation of one (1) 2x2 LED lighting fixtures in the bathroom

· Purchase and installation of three flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for three beds

· Installation of cable tv service to three TVs

· Clean all area once all work is complete

· Room D-209 - Existing: Electrical Closet / Proposed: Electrical Closet

· Update electrical panel

· Update panel directory

· Room D-210 - Existing: Storage Room / Proposed: Nutrition Kitchen

· Purchase and installation of LVT floor tiles

· Purchase and installation of new baseboard

· Demolition and removal of existing carpet floor and preparation for installation of LVT floor tiles

· Demolition and removal of existing baseboard

· Clean all area once all work is complete

· Room D-211 - Existing: Bathroom / Proposed: Community Bathroom

· Purchase and installation of new bathroom fixtures

· Close the existing shower completely with drywall; spackle and paint

· Replace existing crooked door with a door removed from the demolished partitions

· Clean all area once all work is complete

AutoCAD SHX Text

AutoCAD SHX Text Healthcare System

AutoCAD SHX Text New York Harbor

AutoCAD SHX Text Queens, New York 11425

AutoCAD SHX Text 179-00 Linden Blvd

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Project Title

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

QUEENS, NEW YORK

AutoCAD SHX Text Drawn By

AutoCAD SHX Text Location

AutoCAD SHX Text Designed By

AutoCAD SHX Text Checked By

AutoCAD SHX Text Scale:

AutoCAD SHX Text Sht. 3 Of

AutoCAD SHX Text Date

AutoCAD SHX Text

AW

AutoCAD SHX Text 11/24/23

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AW

AutoCAD SHX Text

AE-101

AutoCAD SHX Text Project No.

Renovate D2 Swing SpaceSCOPE OF WORK

SCOPE OF WORK CONTINUED

· Room D-212 - Existing: Two Separate Staff Offices (EMS) / Proposed: Solarium

· Demolition and removal of existing walls for the two office spaces

· Relocate existing electrical fixtures, LED lights, outlets, switches, cover plates, and wiring/conduits if needed

· Demolition and removal of existing carpet flooring

· Purchase and installation of LVT floor tiles or if Terrazzo clean and polish

· Plaster, spackle, and caulk throughout the room

· Purchase and installation of one flat-screen/smart tv mount with full swivel/articulating motion feature (arm) for the space

· Installation of cable tv service to one (1) TV

· Relocate existing two (2) cameras cables, monitors and DVR from the room at the back to the Nurse Station - Purchase and installation two (2) new cameras with wiring

· Clean all area once all work is complete

· Room D-214 - Existing: Oxygen Storage Room / Proposed: Oxygen Storage Room

· Replace ceiling tiles

· Patch walls

· Replace door hardware

· Install door closer

· Seal all penetration from deck to deck

· Add one 2x4 LED light fixture

· Relocate existing electrical fixtures, LED lights, outlets, switches, cover plates, and wiring/conduits if needed

· Purchase and installation of LVT floor tiles or if Terrazzo clean and polish

· Plaster, spackle, and caulk throughout the room

· Clean all area once all work is complete

Room D-215 - Existing: Laundry Room / Proposed: Laundry room

· Purchase and installation of new wall and floor tiles

· Purchase and installation of exhaust pipe for the dryer machine; modifying washer and dryer pi

· Purchase and installation of new light fixture

· Purchase and installation of ACT to replace missing or damaged tiles

· Scrape peeling paint and repaint all existing radiator unit covers

· Paint the room fully and completely

· Plaster, spackle, and caulk throughout the room

· Installation of one (1) 2x4 LED lighting fixture

· Clean all area once all work is complete

· Room D-216 - Existing: Housekeeping Room / Proposed: Housekeeping room

· Purchase and installation of new wall and floor tiles (spot locations, as needed)

· Purchase and installation of new EMS sink

· Purchase and installation of ACT to replace missing or damaged tiles

· Scrape peeling paint and repainting radiator unit covers

· Paint the room fully and completely

· Installation of two (2) 2x4 LED lighting fixtures

· Plaster, spackle, and caulk throughout the room,

· Clean all area once all work is complete

· Room D-217 - Existing: Bathroom / Proposed: Bathroom

· Purchase and installation of new ADA lavatory, with new ADA faucet and wall carrier

· Purchase and installation of new toilets and urinals with new flash valves at existing roughing

· Purchase and installation of new wall and floor tiles

· Purchase and installation of new toilet stall partitions

· Purchase and installation of ACT to replace missing or damaged tiles

· Purchase and install new full height corner guards

· Paint the bathroom fully and completely

· Scrape peeling paint and repaint all existing radiator unit covers

· Plaster, spackle, and caulk throughout the room

· Purchase and installation toilet partitions

· Clean all area once all work is complete

· Purchase and installation of three (3) 2x4 LED lighting fixtures

· Purchase and installation of one (1) shower, three new grab bars and shower rod (photos)

· Installation of door for empty oxygen tanks space (photo). Storage room will be located behind shower wall

· Room D-218 - Existing: Communal Shower / Proposed: Communal Shower/Equipment Storage

· Purchase and installation of new fixtures

· Purchase and installation of new wall and floor tiles to replace damage/loose tiles

· Purchase and installation of ACT

· Purchase and install new full height corner guards

· Paint the bathroom fully and completely

· Scrape peeling paint and repaint all existing radiator unit covers

· Plaster, spackle, and caulk throughout the room

· Purchase and installation of two (2) 2x4 LED lighting fixtures

· Clean all area once all work is complete

· Connect exhaust ductwork and replace fan, belts, etc.

· Add trench drain if needed

· Soiled Room - Existing Linen Shute next to C2

· Repair damaged flooring, ceiling tiles

· Room D-221 - Existing: Staff Offices / Proposed: Nurses Station

· Remove wood panel from window and install tempered glass

· Purchase and installation of new telephone and data conduits and outlets

· Plaster, spackle, and caulk throughout the room,

· Purchase and installation one (1) lighting fixtures

· Clean all area once all work is complete

· Room D-222 - Existing: Staff Office / Proposed: Single Patient Room

· Installation of drywall to cover existing shower; spackle and paint

· Clean all area once all work is complete

· Room D-223 - Existing: Staff Office / Proposed: Clean Linen

· Touch paint and clean as needed

· Room D-224 (no number on door) - Existing: Staff Office / Proposed: Nurse Manger

· Touch paint and clean as needed

GENERAL:

· Incidental asbestos abatement of plumbing, as needed

· Relocate existing outlets, switches and IT from demolished partitions

· Purchase and Installation of 40 button Wireless Nurse Call System with console and programming

· Purchase and installation of coaxial cables, 2 amplifiers and connectors for all new TV units

· Existing fire alarm system shall be protected during construction work

· Purchase and installation of 2x4 LED lights to complement the existing one to make total of 4 lights per patient room

· Purchase and installation of LED spotlight/downlight for each patient

· Removal of all existing overhead lights in patient rooms

· Removal and disposal of existing DUKANE Nurse Call system

· Lighting fixture can be different types; keep same type of fixtures per location

· Adjust misc. existing doors and hardware as needed to close and latch properly

· Purchase and installation of two (2) new 46” x 80” HM door with new hardware and hinges

· Restore each headwall in each room

· Installation of one (1) sink for all patient rooms

· Replace all radiator traps and controls

· Contractor must follow all VA infection control, safety, security requirements

· Relocate sprinkler heads as needed

· Install window ACs in each room. BTU determined by the square foot of each of room

· Reuse AC split units in room D205 to feed the main corridor. Four ceiling cassettes to be spread equally throughout the corridor.

· Contractor responsible for connecting televisions to the existing VA cable network

· All showers to have scald protection installed

AutoCAD SHX Text

AutoCAD SHX Text Healthcare System

AutoCAD SHX Text New York Harbor

AutoCAD SHX Text Queens, New York 11425

AutoCAD SHX Text 179-00 Linden Blvd

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Project Title

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

QUEENS, NEW YORK

AutoCAD SHX Text Drawn By

AutoCAD SHX Text Location

AutoCAD SHX Text Designed By

AutoCAD SHX Text Checked By

AutoCAD SHX Text Scale:

AutoCAD SHX Text Sht. 4 Of

AutoCAD SHX Text Date

AutoCAD SHX Text

AW

AutoCAD SHX Text 11/24/23

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AW

AutoCAD SHX Text

AE-102

AutoCAD SHX Text Project No.

Renovate D2 Swing SpaceARCHITECTURAL PLAN

AutoCAD SHX Text Healthcare System

AutoCAD SHX Text New York Harbor

AutoCAD SHX Text Queens, New York 11425

AutoCAD SHX Text 179-00 Linden Blvd

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Project Title

AutoCAD SHX Text

VA MEDICAL CENTER

AutoCAD SHX Text

QUEENS, NEW YORK

AutoCAD SHX Text Drawn By

AutoCAD SHX Text Location

AutoCAD SHX Text Designed By

AutoCAD SHX Text Checked By

AutoCAD SHX Text Scale:

AutoCAD SHX Text Sht. 5 Of

AutoCAD SHX Text Date

AutoCAD SHX Text

AW

AutoCAD SHX Text 11/24/23

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text 1/8" = 1'

AutoCAD SHX Text

AW

AutoCAD SHX Text

AE-103

AutoCAD SHX Text Project No.

AutoCAD SHX Text Approved Division Chief:

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR

AutoCAD SHX Text D

AutoCAD SHX Text

STAIR

AutoCAD SHX Text E

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text D-212A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text D-212

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D-211

AutoCAD SHX Text D-210

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text D-208

AutoCAD SHX Text D-207B

AutoCAD SHX Text D-207A

AutoCAD SHX Text D-215

AutoCAD SHX Text D-216

AutoCAD SHX Text D-217

AutoCAD SHX Text D-218

AutoCAD SHX Text D-206

AutoCAD SHX Text D-205

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

CLEANING SUPPLY

AutoCAD SHX Text D-204

AutoCAD SHX Text

GROUP ROOM CLASS

AutoCAD SHX Text D-202

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text D-201

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text D-222

AutoCAD SHX Text

NURSE STATION

AutoCAD SHX Text D-221

AutoCAD SHX Text D-223

AutoCAD SHX Text

TELE CLOSET

AutoCAD SHX Text D-229

AutoCAD SHX Text D-224

AutoCAD SHX Text D-205a

AutoCAD SHX Text N

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

2 HR FIRE RATED SHAFT

AutoCAD SHX Text

SMOKE BARRIER

AutoCAD SHX Text

SECOND FLOOR PLAN

AutoCAD SHX Text

BUILDING NO. 86

AutoCAD SHX Text D-214

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text D-201

D-209

GI001
Sheets and Views
Model
GI002
Sheets and Views
Model
AE101
Sheets and Views
Model
AE102
Sheets and Views
Model
AE103
Sheets and Views
Model

File details come from the government source that posted it. Updated .