This package includes construction drawings and specifications for a steam and condensate replacement project at the Veterans Affairs Medical Center in Wilmington, Delaware. The project involves replacing aging steam and condensate piping across the medical center campus, including within mechanical rooms in various buildings. Drawings depict existing conditions, demolition plans, new piping layouts, manhole details, and mechanical, civil and electrical aspects. Specifications address post-construction stormwater management, erosion control, and general construction requirements.
The corresponding federal solicitation is for the steam and condensate replacement project at the Wilmington VAMC. The solicitation number is 36C24423R0062 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 4. The required work includes assessing piping conditions and replacing steam and condensate lines across the medical center to address deficiencies. The anticipated award date is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WL-SITE_PLAN-UTILITIES.pdf | ||
| 36C24423R0062 0004.docx | DOCX document | |
| 36C24423R0062 0003.docx | DOCX document | |
| 36C24423R0062 0002.docx | DOCX document | |
| 36C24423R0062 0001.docx | DOCX document | |
| Steam and Condensate Replacement_Site Walk-Thru Attendance_053123.pdf | ||
| S02 - Drawings Final Wilmington Steam and Condensate - Bid Docs CD Drawings --stamped_Part1.pdf | ||
| S02 - Drawings Final Wilmington Steam and Condensate - Bid Docs CD Drawings --stamped_Part2.pdf | ||
| 36C24423R0062_2.docx | DOCX document | |
| S02 - Specifications.pdf | ||
| S02 - 2023.05.22 36C24423R0062.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTANTS:
Drawing Title
Approved: Chief, Social Work
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECTS/ENGINEERS:
6"
6" 6" o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Approved: Chief, FacilityApproved: Associate Director of Patient Care Services
Approved: Chief of Staff
Approved: Associate Director of Operations
Approved: Director
65432
SEAL
209 Sandusky Street Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com
AE Works Project Number:
Revision# Date
460-15-201
CJC CJC
G001 02 / 20 / 2020
CONTRACT DOCUMENT SUBMISSION
VARIOUS
ASSESS AND REPLACE STEAM &
CONDENSATE PIPING
1601 KIRKWOOD HIGHWAY, WILMINGTON, DE 19805
02 / 20 / 2020 17011
COVER SHEET
WILMINGTON VAMC
ASSESS AND REPLACE STEAM
& CONDENSATE PIPING
VA PROJECT NUMBER: 460-15-201
VICINITY MAP
SITE
LOCATION MAP
SITE1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
G002 DUST CONTROL AND ICRA PLAN
CIVIL
C101 CIVIL CAMPUS SITE WORK
C102 SOIL TYPES MAP AND NOTES
C103 POST CONSTRUCTION STORMWATER MANAGEMENT PLAN
C104 CIVIL DETAILS
C105 EROSION AND SEDIMENT CONTROL DETAILS
C106 CIVIL SPECIFICATIONS
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
M101 EXISTING CAMPUS STEAM AND CONDENSATE PIPING PLAN
M102 NEW CAMPUS STEAM AND CONDENSATE PIPING PLAN
M103 ENLARGED PIPING PLANS
M110 PIPE PROFILE
M111 PIPE PROFILE
M201 STEAM MANHOLE PIPING - ST-1
M202 STEAM MANHOLE PIPING - ST-2
M202N STEAM MANHOLE PIPING - ST-2N
M203 STEAM MANHOLE PIPING - ST-3
M205 STEAM MANHOLE PIPING - ST-5
M206 STEAM MANHOLE PIPING - ST-6
M206A STEAM MANHOLE PIPING - ST-6A
M206B STEAM MANHOLE PIPING - ST-6B
M206C STEAM MANHOLE PIPING - ST-6C
M206N STEAM MANHOLE PIPING - ST-6N
M207 STEAM MANHOLE PIPING - ST-7
M208 STEAM MANHOLE PIPING - ST-8
M209 STEAM MANHOLE PIPING - ST-9
M210 STEAM MANHOLE PIPING - ST-10
M211 STEAM MANHOLE PIPING - ST-11
M212 STEAM MANHOLE PIPING - ST-12
M301 BUILDING 1 - EXISTING MECHANICAL ROOM 145
M302 BUILDING 1 - EXISTING MECHANICAL ROOM 245
M303 BUILDINGS 7 MECHANICAL ROOM - DEMO WORK
M304 BUILDINGS 7 MECHANICAL ROOM - NEW WORK
M305 BUILDING 10 MECHANICAL ROOM
M501 MECHANICAL DETAILS AND SCHEDULES
M502 MECHANICAL DETAILS - DIRECT BURIED PIPING
ELECTRICAL
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES
E101 ELECTRICAL SITE POWER PLAN
E501 ELECTRICAL DETAILS
Approved: Facility Planner
Approved: Energy Manager
Approved: Safety Officer
Approved: Chief Logistics
Approved: HBPC Program Manager
Approved: CCO Manager
Approved: CBO Manager
Approved: CPAC Manager
Approved: CWT Program Manager
Approved: EEO Program Manager
Approved: Contracting Representative
| Sheets |
| G001 - COVER SHEET |
| 2023-02-24T16:10:24-0500 | |
| EDWARD GANNON |
| 2023-02-27T14:55:42-0500 | |
| CATHY A. BURRIS 149080 |
| 2023-03-09T15:49:15-0500 | |
| Marshall J. Murdaugh 147305 |