This document contains an amendment to a solicitation for a steam and condensate replacement project at the Wilmington Veterans Affairs Medical Center. The Department of Veterans Affairs seeks to replace approximately 1,854 linear feet of asbestos-containing insulation on steam lines between multiple buildings on site. Questions and answers are provided to clarify details including the conformance wage rate for asbestos abatement laborers, laydown area location, construction signage requirements, and handling of existing storm piping and handrails. Offerors must acknowledge receipt of the amendment by June 26, 2023 at 3:00PM local time, though the proposal due date remains unchanged. A loaded construction schedule and unit pricing per linear foot of asbestos containment insulation is requested to account for potential variances in the total quantity.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 460-15-201 00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24423R0062 06-20-2023

X X X

THE PURPOSE OF AMENDMENT 0003 IS HEREBY ISSUED TO POST THE REQUEST FOR INFORMATION (RFIs).

THE REQUEST FOR PROPOSAL (RFP) DUE DATE REMAINS JUNE 26, 2023 AT 3:00PM LOCAL TIME.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR PROPOSAL.

MAUREEN JACKSON

CONTRACT SPECIALIST

Amendment 0003 36C24423R0062

QUESTIONS & ANSWERS

1. Please provide the conformance wage rate for “Asbestos Abatement Laborer” for this project. This classification is not included in the supplied wage rates. Davis Bacon Wage Rates Number- DE20230008 05/05/2023

1. Will a lay-down area be provided to the GC for the duration of this project? If so, where will it be located? Onsite, south of the clinical addition in the grass.

1. Will a construction sign be required? No.

1. Cost loaded construction schedule required? Yes.

1. Solicitation states that there is approx. 625 linear feet of asbestos containing insulation that will need to be abated on this project. However, spec section 02 82 13.13 – 1, 1.1.2 Extent of Work states that there is 1,854 linear feet. Which one is correct? Include the 1,854 linear feet in your proposal. Provide a cost per foot value in the event that more or less ACM is found.

1. Spec. Section 01 00 00 - General Requirements; page 1; Paragraph 1.2 General Intention; item D. “Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.” Please confirm who owns retaining the services of the testing laboratory.VA, it is expected that a large majority of steam piping will be shop fabricated and X-ray work will be conducted in the shop.

1. Spec. Section 01 45 00 – Quality Control. 1.1 Description – This section references Design-Bid-Build (DBB) or Design-Build (DB) construction projects. This project is neither. Disregard

1. Spec. Section 01 45 00 – Quality Control. 3.4 Quality Control Organization. The requirements for the CQC organization are a Safety and Health Manager, CQC System Manager, a Design Quality Manager (if applicable), and sufficient number of additional qualified personnel to ensure safety and Contract compliance. Please confirm this requirement. Yes, this requirement is correct.

1. Parking spaces outside of Building 6 are not shown on the drawings. Will this affect path of new steam and condensate lines between ST-6A and ST-6B? NO, steam lines are to be run as closely to contract design as physically possible unless there is a direct conflict with non-pressurized piping systems.

1. Drawing M102, Mechanical Work Keynote #17: Please provide elevations of existing storm piping and details of existing storm manhole called out to be removed and reconstructed (between ST-6A & ST-6B). Also, please indicate where the lines are to be intercepted for re-route. See As-Builts for GES project 460-09-108 FCA Repair Replace Sewer Systems where we replaced that line.

1. What is the extent of work expected for the handrails encountered throughout the project? For example, along sidewalk/ramp between ST-2 and ST-2N, outside of Building 6, between ST-6A & ST-6B, and at ramp leading to Building 7 loading dock. Remove existing rails. Store during construction. Return to normal use once construction is complete. Provide safety railing as necessary once removed until such time as it is replaced in kind.

*REQUEST FOR PROPOSAL DUE DATE IS JUNE 26, 2023 AT 3:00PM LOCAL TIME*

Replace Steam and Condensate at Wilmington VAMC, Project No. 460-15-201

File details come from the government source that posted it. Updated .