S02 - Drawings_Combined_612A4_21_011_FULL_SIZE_FINAL_230804.pdf
PDF 26 MB Posted
- Attached to
- Z2LZ--VISN 21 MACC Group 2 Project # 612A4-21-011 Correct Sacramento Entrance Access and Parking (VA Mather)
- Solicitation number
- 36C26124R0007
About this file
This file summary describes a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is soliciting proposals under solicitation number 36C26124R0007 to provide corrective access and parking construction services at the Sacramento VA Medical Center campus in Mather, California. The scope of work involves entrance access and parking improvements at the facility. The 26MB PDF file attached appears to include detailed construction drawings related to the project. Proposals are due by the date listed on FedBizOpps for this opportunity under the Miller Act and Service-Disabled Veteran-Owned Small Business set aside provisions. The award is a fixed-price construction contract with an anticipated period of performance through 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26124R0007 0004.docx | DOCX document | |
| 36C26124R0007 0003.docx | DOCX document | |
| 210416_AGI Geotech_MatherB650.pdf | ||
| 36C26124R0007 0002.docx | DOCX document | |
| 36C26124R0007 0001.docx | DOCX document | |
| S04 - Completed Site Visit Log Form - 612A4-21-011.pdf | ||
| 852.219-75 - VA Notice of Limitations on Subcontracting--Certificate of Compliance for SErvices and Construction - JAN 2023 Deviation.docx | DOCX document | |
| S02 - Specifications - 000000 to 024100.pdf | ||
| 36C26124R0007.docx | DOCX document | |
| S02 - Specifications - 033000 to 347113.pdf | ||
| S02 Attachment B_Contractor Certification RE Safety and EMR.docx | DOCX document | |
| S02 - RFI Form - 36C26124R0007.docx | DOCX document | |
| S02 - VA Mather Site Map 2023- parking options for guests.pdf | ||
| S02 Attachment A_Price Breakdown.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
U.S. DEPARTMENT OF VETERANS AFFAIRS
CONSTRUCTION DOCUMENTS (100%) SUBMISSION
SITE MAPDESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
STRUCTURAL ENGINEER
U.S. Department of Veterans Affairs VA Northern California Health Care System
Contact: Andy Malone
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, Virginia 22192 Contact: Matt Shuba, AIA mshuba@awensolutions.com
AHJ Engineers, PC 9751 W Chinden Blvd #200 Garden City ID 83714 Contact: Dave Haugland, PE dhaugland@ahjengineers.com
LANDSCAPE ARCHITECT
Smith + Smith 1501 N Point Street San Francisco, CA 94123 Contact: Jason Milam jason@smith2.com
DRAWING INDEX
ELECTRICAL ENGINEER
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, Virginia 22192 Contact: Michael Risbridger, P.E.
mrisbridger@awensolutions.com
CIVIL ENGINEER
BKF ENGINEERS
980 9th Street, Suite 2300, Sacramento, CA 95814 Contact: Jonathan Shattuck jshattuck@bkf.com
PROJECT NUMBER 612A4-21-011
10535 Hospital Way, Mather, CA 95655
B
IM
/M a th e r
E n tr a n c e s
S id e w a lk s /M a th e r_
E n tr a n c e s
S id e w a lk s .r v t
/3
/2
:2
:4
P M
G-001
COVER SHEET
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023
Correct Mather Entrance Access and Parking
08/04/2023
10535 Hospital Way, Mather, CA 95655
7 - ARCHITECTURE
A-101 ARCHITECTURAL SITE PLAN
A-102 PHASING PLAN 1
A-103 PHASING PLAN 2
A-111 ARCHITECTURAL SITE PLAN WEST
A-401 ENLARGED PLANS
8 - ELECTRICAL
E-111 SITE LIGHTING PLAN WEST
E-112 SITE LIGHTING PLAN EAST
1 - GENERAL
G-001 COVER SHEET
2 - CIVIL
C-001 GENERAL NOTES, ABBREVIATION, SHEET INDEX
C-101 EXISTING CONDITIONS
C-102 EXISTING CONDITIONS
C-201 DEMOLITION PLAN
C-202 DEMOLITION PLAN
C-301 SURFACE IMPROVEMENTS
C-302 SURFACE IMPROVEMENTS - LOT 3
C-303 SURFACE IMPROVEMENTS ENLARGEMENTS
C-304 SURFACE PAVEMENT
C-305 SURFACE PAVEMENT, LOT 3
C-401 GRADING PLAN
C-402 GRADING PLAN
C-501 UTILITY PLAN
C-502 UTILITY PLAN
C-503 LOT 8 GRADING AND UTILITY ENLARGEMENTS
C-601 FIRE ACCESS
C-701 EROSION CONTROL
C-702 EROSION CONTROL
C-703 EROSION CONTROL DETAILS
C-801 STRIPING AND SIGNAGE PLAN
C-802 STRIPING AND SIGNAGE PLAN
C-901 DETAILS
C-902 DETAILS
C-903 DETAILS
C-904 CROSS SECTIONS
3 - LANDSCAPE
L-101 LANDSCAPE PLAN - WEST
L-102 LANDSCAPE PLAN - EAST
Revisions: Date:
Schematic Design (35%) 06/24/2022
Design Development (65%) 10/21/2022
Design Development (95%) 03/17/2023
Construction Documents (100%) 05/09/2023
Construction Documents (100%) 06/23/2023
DOMESTIC WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
FIRE HYDRANT
CLEANOUT
STORM DRAIN CURB INLET
STORM DRAIN AREA DRAIN
FIRE DEPARTMENT CONNECTION
BACKFLOW PREVENTER
GAS LINE
ELECTRICAL CONDUIT / DUCT BANK
TELECOMMUNICATIONS CONDUIT / DUCT BANK
FENCE
SIGN
LIMIT OF WORK
DETAIL REFERENCE - DETAIL # / SHEET#
POST INDICATOR VALVE
WATER LINE STOP VALVE
LIGHTING CONDUIT
SITE RETAINING WALL
SITE ENCLOSURE WALL
LIGHT POLE
LIMIT OF DEMOLITION
WATER VALVE
DOUBLE DETECTOR CHECK BACKFLOW PREVENTER
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER
FIRE WATER LINE
POTABLE WATER LINE
BUILDING LIMITS
LEGEND NEW EXISTING
AB AGGREGATE BASE
AC ASPHALTIC CONCRETE
AD AREA DRAIN
BFP BACKFLOW PREVENTER
BLDG BUILDING
BS BOTTOM OF SWALE
C CONCRETE
CB CATCH BASIN
CO CLEANOUT
CONC CONCRETE
DDC DOUBLE DETECTOR CHECK VALVE
DIP DUCTILE IRON PIPE
DI DRAINAGE INLET
DIA DIAMETER
DW DOMESTIC WATER
E EASTING OR EAST OR ELECTRICAL
EX/(E) EXISTING
EL/ELEV ELEVATION
ELL ELBOW
EG EXISTING GRADE/GROUND
EP EXISTING PAVEMENT
FDC FIRE DEPARTMENT CONNECTION
FG FINISHED GRADE/GROUND
FF FINISHED FLOOR
FL FLOW LINE
FH FIRE HYDRANT
FT FOOT/FEET
GALV GALVANIZED
GB GRADE BREAK
GR GRADE OR GRATE
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
LF LINEAR FEET
LG LIP OF GUTTER
MAX MAXIMUM
MIN MINIMUM
N NORTHING OR NORTH
NE NORTHEAST
NO. NUMBER
O.C. ON CENTER
P PAVEMENT
PCC PORTLAND CEMENT CONCRETE
PIV POST INDICATOR VALVE
POC POINT OF CONNECTION
PR PROPOSED
PVC POLYVINYL CHLORIDE
RAD RADIUS
RIM UTILITY STRUCTURE RIM
RCP REINFORCED CONCRETE PIPE
RPP REDUCED PRESSURE PRINCIPLE
S SOUTH OR SLOPE
SD STORM DRAIN
SDCI STORM DRAIN CURB INLET
SDCO STORM DRAIN CLEAN OUT
SDDI STORM DRAIN DROP INLET
SDMH STORM DRAIN MANHOLE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN OUT
SSMH SANITARY SEWER MANHOLE
SW SIDEWALK
RCP REINFORCED CONCRETE PIPE
T TELECOM OR TELEPHONE
TC TOP OF CURB
TH BUILDING THRESHOLD
THRU THROUGH
TS TOP OF SWALE
TYP TYPICAL
W WEST OR WATER
W/ WITH
WD WATER DOMESTIC
WF WATER FIRE
WV WATER VALVE
ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-001
GENERAL NOTES,
ABBREVIATIONS, SHEET INDEX
THE BACKGROUND SURVEY INFORMATION SHOWN ON THIS PLAN IS COMPILED FROM DRAWINGS SUPPLIED BY THE OWNER.
1. THE TYPES, LOCATIONS, EXTENTS, SIZES AND DEPTHS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND WERE OBTAINED FROM VARIOUS SOURCES, INCLUDING TOPOGRAPHIC FIELD SURVEYS, RECORD DRAWINGS, AND VA FACILITY MAPS.
CONTRACTOR IS CAUTIONED THAT THE TYPES, LOCATIONS, EXTENTS, SIZES AND DEPTHS OF EXISTING UNDERGROUND UTILITIES INDICATED ON THE PLANS MAY NOT BE THE TYPES, LOCATIONS, EXTENTS, SIZES AND DEPTHS ENCOUNTERED IN THE FIELD.
2. ONLY EXCAVATION AND PHYSICAL EXPOSURE WILL REVEAL THE ACTUAL TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF EXISTING UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR POTHOLING EXISTING UNDERGROUND UTILITIES WITHIN THE AREA OF WORK. CONTRACTOR SHALL RETAIN A PRIVATE UTILITY LOCATOR TO IDENTIFY EXISTING UTILITIES. THE CONTRACTOR SHALL POTHOLE AS NECESSARY AT CONNECTION LOCATIONS AND PROPOSED UTILITY CROSSINGS TO FULLY LOCATE AND IDENTIFY EXISTING UTILITIES. UTILITY LOCATING AND POTHOLING SHALL BE COMPLETED PRIOR TO THE START OF WORK. A COPY OF THE UTILITY SURVEY SHALL BE PROVIDED TO
THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND SEQUENCING HIS WORK TO AVOID CONFLICTS BETWEEN SEWER LATERALS, STORM DRAINS, WATER MAINS, AND ALL OTHER UNDERGROUND UTILITIES.
4. PRIOR TO CONSTRUCTION, CONTRACTOR TO UTILITY LOCATE AND VERIFY LOCATIONS OF EXISTING UTILITIES WITHIN THE PROJECT SCOPE.
CONTRACTOR TO FIELD VERIFY LOCATIONS AND INVERTS AT PROPOSED UTILITY CONNECTIONS. CONTRACTOR SHALL LOCATE ALL SHUT-OFF DEVICES ASSOCIATED WITH THE UNDERGROUND UTILITIES WITHIN THE PROJECT BOUNDARY. CONTRACTOR TO COORDINATE LOCATIONS WITH
OPERATIONS AND MAINTENANCE FACULTY.
UTILITY NOTES
CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, AND THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INCLUDE ALL MATERIAL AND LABOR REQUIRED WITHIN THE BID PRICE, FOR EARTHWORK CONSTRUCTION, TO CARRY OUT THE CUT/FILL AND/OR IMPORT/EXPORT AS NECESSARY TO MEET THE DESIGN GRADES SHOWN ON THE PLANS.
CONTRACTOR IS TO DELIVER TO OWNER THE PROJECT IN A COMPLETE AND OPERATIONAL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR ANY INVESTIGATION OR STUDIES THAT ARE REQUIRED BY THE CONTRACTOR TO SATISFY THIS REQUIREMENT. NO ADDITIONAL COMPENSATION
SHALL BE PAID FOR SAID CUT/FILL AND/OR IMPORT/EXPORT.
IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN DRAWINGS AND EXISTING CONDITIONS WHICH WILL AFFECT THE WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE FOR ADJUSTMENT BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING OF ALL WORK AND FOR THE COORDINATION OF ALL TRADES, SUBCONTRACTORS, AND PERSONS ENGAGED UPON THIS CONTRACT.
1. ALL SITE WORK SHALL BE IN CONFORMANCE WITH THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS EXCEPT AS MODIFIED BY
THE DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE (PG-18-13).
2. CURB RAMPS SHALL BE A MINIMUM OF 4 FEET WIDE AND NOT EXCEED A SLOPE OF 1:20 (5%).
3. WALKS SHALL NOT EXCEED A SLOPE OF 1:50 (2%). PEDESTRIAN RAMPS SHALL NOT EXCEED 1:20 (5%).
4. A 2% MAXIMUM SLOPE LANDING SHALL BE PROVIDED AT PRIMARY ENTRANCES TO BUILDINGS, THE LANDINGS SHALL HAVE A MINIMUM WIDTH OF 72" WHEN THE DOOR OPENS INTO THE BUILDING. WHEN THE DOOR OPENS ONTO THE LANDING THE DEPTH SHALL BE 42" PLUS THE WIDTH
OF THE DOOR MINIMUM.
5. RAMPS ARE DEFINED AS ANY WALKWAY WITH SLOPES BETWEEN 1:33 (3%) AND 1:20 (5%), AND SHALL HAVE A MAXIMUM CROSS SLOPE OF 2%.
RAMPS SHALL HAVE INTERMEDIATE (2% MAXIMUM SLOPE) LANDINGS A MINIMUM OF 60" BY 60" IN SIZE. LANDINGS SHALL BE EVERY 40 FEET FOR RAMPS BETWEEN 1:33 AND 1:25, AND EVERY 35 FEET FOR RAMPS BETWEEN 1:25 AND 1:20. ALL RAMPS SHALL HAVE HANDRAILS, AND EDGE
PROTECTION OR GUIDE RAILS.
6. MAXIMUM CROSS SLOPE ON ANY WALK OR RAMP SHALL BE 2% MAXIMUM. SLOPE WITHIN PARKING STALLS DESIGNATED AS ACCESSIBLE
PARKING SHALL BE 2% MAXIMUM IN ANY DIRECTION.
1. ALL SERVICES TO EXISTING BUILDINGS TO REMAIN SHALL REMAIN OPERATIONAL AT ALL TIMES DURING THE PROJECT.
2. UNLESS OTHERWISE INDICATED ON THE PLANS, SEPARATION OF SANITARY SEWER AND WATER PIPES SHALL BE 10' HORIZONTAL AND 2' VERTICAL. SEPARATION OF SANITARY SEWER AND STORM DRAIN PIPES SHALL BE 4' HORIZONTAL AND 1' VERTICAL. SEPARATION OF ALL
OTHER UTILITIES SHALL BE 5' HORIZONTAL AND 1' VERTICAL WHENEVER POSSIBLE.
3. PROPOSED STORM DRAIN SHALL BE CONSTRUCTED STARTING AT THE DOWNSTREAM END. CONTRACTOR SHALL VERIFY INVERTS OF
EXISTING GRAVITY PIPES PRIOR TO STARTING EXCAVATION WORK.
4. CONTRACTOR SHALL PROVIDE TEMPORARY CONVEYANCE OF STORM DRAINAGE IN AREAS WHERE PORTIONS OF THE EXISTING DRAINAGE
SYSTEM ARE DEMOLISHED AND REROUTED.
1. CONTRACTOR SHALL POST EMERGENCY PHONE NUMBERS AT THE JOB SITE FOR POLICE AND FIRE DEPARTMENTS, AMBULANCE, PUBLIC WORKS, VA POLICE, AND THE CONTRACTING OFFICER'S REPRESENTATIVE.
2. ALL UNDERGROUND UTILITIES SHALL BE COMPLETE BEFORE PLACING OF BASE ROCK UNLESS OTHERWISE NOTED.
3. ALL MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AMPLE COVER FOR THE PROTECTION OF ALL INSTALLED UTILITIES DURING THE
CONSTRUCTION OF THIS PROJECT.
5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL NECESSARY UTILITY RELOCATIONS, IF REQUIRED, WITH THE APPROPRIATE UTILITY
COMPANIES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL APPLICABLE PERMITS AND FURNISHING THE OWNER WITH A COPY OF ALL PERMITS AND FINAL ACCEPTANCES GRANTED BY THE UTILITY COMPANY AND/OR AGENCIES INVOLVED PRIOR TO COMMENCEMENT OF WORK. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, A STREET WORK/IMPROVEMENTS PERMIT FOR WORK WITHIN THE CITY RIGHT-OF-WAY/UTILITY EASEMENTS, DISCHARGE PERMITS FOR WATER DURING CONSTRUCTION (DEWATERING OPERATIONS, HYDROSTATIC TESTING, ETC.) AND HAULING OF MATERIALS
OFF-SITE.
7. THE CONTRACTOR SHALL COORDINATE WITH VA CONTRACTING OFFICER'S REPRESENTATIVE AND SUBMIT A TRAFFIC / PHASING CONTROL PLAN, A CONSTRUCTION LOGISTICS PLAN, AND A CONSTRUCTION SEQUENCING PLAN.
8. THE CONTRACTOR MUST MAINTAIN THE STREETS, SIDEWALKS, AND ANY OTHER RIGHTS-OF-WAY IN A CLEAN, SAFE, AND USABLE CONDITION.
ANY SPILLS OF SOIL, ROCK OR CONSTRUCTION DEBRIS MUST BE REMOVED FROM THE PROPERTY DURING CONSTRUCTION AND UPON COMPLETION
OF THE PROJECT.
9. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY EXISTING IMPROVEMENTS OR UNDERGROUND FACILITIES DAMAGED BY HIM, HIS SUBCONTRACTORS OR HIS MATERIAL SUPPLIERS.
10. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
11. THE CONTRACTOR SHALL MAINTAIN SITES OF WORK DURING CONSTRUCTION SO AS TO KEEP THEM REASONABLY NEAT AND FREE OF TRASH, RUBBISH, AND OTHER DEBRIS. IN CLEAN-UP OPERATIONS, CONTRACTOR SHALL REMOVE ALL TEMPORARY STRUCTURES, RUBBISH AND WASTE
MATERIALS FROM SITES OF WORK AND FROM PUBLIC AND PRIVATE PROPERTY.
12. THE CONTRACTOR WILL CONDUCT WORK ALONG ANY SECTION OF THIS PROJECT WHICH IS CROSSED BY, OR ADJACENT TO, A PUBLIC UTILITY SUCH AS GAS LINES, OVERHEAD POWER LINES, SEWER LINES, ETC. IN A MANNER SO THAT NO DAMAGES RESULT TO THESE UTILITIES. ALL POLES, WIRES, CABLES, CONDUITS, PIPELINES, OR OTHER STRUCTURES WITHIN THE WORK AREA, BELONGING TO MUNICIPALITIES OR PUBLIC UTILITY CORPORATIONS, SHALL BE PROTECTED BY THE CONTRACTOR. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR DAMAGES TO SUCH
UTILITIES AS A RESULT OF CARELESS OR NEGLIGENT OPERATIONS.
13. THE CONTRACTOR SHALL NOT DESTROY ANY PERMANENT SURVEY POINTS WITHOUT THE CONSENT OF THE CONTRACTING OFFICER'S REPRESENTATIVE. ANY PERMANENT MONUMENTS OR POINTS DESTROYED SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE BY A
CALIFORNIA LICENSED SURVEYOR.
14. THE CONTRACTOR SHALL PROPERLY COORDINATE HIS WORK WITH THE WORK OF OTHER CONTRACTS THAT MAY BE UNDER WAY
CONCURRENTLY WITH THIS PROJECT.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AIRBORNE DUST NUISANCE FROM THE CONSTRUCTION SITE BY WATERING AND/OR TREATING THE SITE IN SUCH A MANNER TO CONFINE DUST PARTICLES TO THE IMMEDIATE SURFACE OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE SITE OR SURROUNDING AREA DUE TO DUST OR EROSION, RESULTING FROM WORK DONE BY THE CONTRACTOR. EROSION CONTROL MEASURES SHALL BE IN PLACE CONTINUOUSLY DURING CONSTRUCTION.
16. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO THE CALIFORNIA STORM WATER CONSTRUCTION BMP HANDBOOK, DATED DECEMBER 2019.
17. EXISTING CURB AND GUTTER THAT ARE DAMAGED OR DISPLACED BY THE CONTRACTOR'S OPERATION SHALL BE REPAIRED OR REPLACED BY
THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE.
18. CONTRACTOR SHALL CONDUCT HIS WORK IN SUCH A MANNER AS TO NOT INTERFERE OR BLOCK EXISTING DRAINAGE. MANNER OF MAINTAINING DRAINAGE SHALL BE SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE. BASED ON THE CONTRACTOR'S SEQUENCING OF THE WORK, IF TEMPORARY DRAINAGE FACILITIES ARE REQUIRED, CONTRACTOR SHALL SUBMIT A PLAN FOR THE TEMPORARY IMPROVEMENTS TO
THE CONTRACTING OFFICER'S REPRESENTATIVE FOR APPROVAL.
19. THE MANIPULATION OF EXISTING WATER VALVES SHALL BE DONE BY STATION ENGINEERING STAFF ONLY.
20. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY PERTAINING TO "CONFINED SPACES." ANY MANHOLE, CULVERT, DROP INLET OR TRENCH WHICH COULD CONTAIN AIR WHICH IS NOT READILY VENTILATED MAY BE CONSIDERED
A "CONFINED SPACE."
21. IF ANY CULTURAL FEATURES OR ARCHEOLOGICAL MATERIALS ARE UNCOVERED DURING GRADING, TRENCHING, OR OTHER EXCAVATION WORK, ALL WORK WITHIN 100 FEET OF THESE MATERIALS SHALL BE STOPPED UNTIL A PROFESSIONAL ARCHEOLOGIST (SOPA) AND/OR THE SOCIETY OF CALIFORNIA ARCHEOLOGY (SCA) HAS HAD AN OPPORTUNITY TO EVALUATE THE SIGNIFICANCE OF THE FIND AND APPROPRIATE MITIGATION MEASURES ARE DETERMINED AND IMPLEMENTED. CONTRACTOR SHALL ALSO NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE.
22. ALL REVISIONS TO THIS PLAN MUST BE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO CONSTRUCTION AND SHALL BE ACCURATELY SHOWN ON REVISED PLANS PRIOR TO ACCEPTANCE OF THE WORK AS COMPLETE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION FROM THE CONTRACTING OFFICER'S REPRESENTATIVE.
SURVEY NOTE
CONTRACTOR RESPONSIBILITY
DISCREPANCIES
EARTHWORK NOTE
ABAAS NOTES
EXISTING UTILITY NOTES
GENERAL NOTES
HOSPITAL
57 ROS 25
HOSPITAL
57 ROS 25
649651
701 703
PARKING
GARAGE
T8
T9
LOT 8
LOT 9
LOT 11
CANTEEN
LOT
LOT 6
SDMH
RIM 92.75
12" PVC INV(N)= UNK
15" PVC INV(E)= UNK
15" PVC INV(W)= UNK
EXISTING CONDITION NOTES
1. A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE
KNOWN UNDERGROUND UTILITIES. THE TYPES, LOCATIONS, EXTENTS, SIZES
AND DEPTHS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS
ARE APPROXIMATE AND WERE OBTAINED FROM VARIOUS SOURCES,
INCLUDING TOPOGRAPHIC FIELD SURVEYS, AND AS-BUILT DRAWINGS
PROVIDED BY THE PROPERTY OWNER. ABANDONED UNDERGROUND
UTILITIES MAY EXIST, THE LOCATION OF WHICH ARE NOT KNOWN.
CONTRACTOR IS CAUTIONED THAT THE TYPES, LOCATIONS, EXTENTS, SIZES
AND DEPTHS OF EXISTING UNDERGROUND UTILITIES INDICATED ON THE
PLANS MAY NOT BE THE TYPES, LOCATIONS, EXTENTS, SIZES AND DEPTHS
ENCOUNTERED IN THE FIELD.
2. ONLY EXCAVATION AND PHYSICAL EXPOSURE WILL REVEAL THE ACTUAL
TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF EXISTING
UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR
POTHOLING EXISTING UNDERGROUND UTILITIES WITHIN THE AREA OF
WORK. CONTRACTOR SHALL RETAIN A PRIVATE UTILITY LOCATOR TO
IDENTIFY EXISTING UTILITIES. THE CONTRACTOR SHALL POTHOLE AS
NECESSARY AT CONNECTION LOCATIONS AND PROPOSED UTILITY
CROSSINGS TO FULLY LOCATE AND IDENTIFY EXISTING UTILITIES.
POTHOLING SHALL BE DONE AND THE RESULTS, INCLUDING ANY CONFLICTS
IDENTIFIED, REPORTED TO THE ENGINEER PRIOR TO THE START OF WORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK TO
AVOID CONFLICTS BETWEEN SEWER LATERALS, STORM DRAINS, WATER
MAINS, AND ALL OTHER UNDERGROUND UTILITIES.
4. A PORTION OF THE EXISTING CONDITIONS HAS BEEN DRAFTED BASED ON
FIELD OBSERVATION AND AS-BUILT CONDITIONS. CONTRACTOR TO FIELD
VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER IF THERE ARE ANY
DISCREPANCIES SHOWN ON THIS PLAN.
5. UTILITY INFORMATION IS OBTAINED BY AS-BUILT INFORMATION AS WELL AS
SURVEY OBSERVATION. ALL EXISTING UTILITY INFORMATION IN THIS PLAN
SET IS IDENTIFIED PER THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
STANDARD FOR LEVEL OF QUALITY. BELOW IS A LIST OF THE LEVEL OF
QUALITY CATEGORIES WITH THE ASSOCIATED DEFINITION PER ASCE
STANDARDS.
(A) - PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES
OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF
PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND
SUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES,
USUALLY AT A SPECIFIC POINT. MINIMALLY INTRUSIVE
EXCAVATION EQUIPMENT IS TYPICALLY USED TO MINIMIZE THE
POTENTIAL FOR UTILITY DAMAGE. A PRECISE HORIZONTAL AND
VERTICAL LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS
SHOWN ON PLAN DOCUMENTS. ACCURACY IS TYPICALLY SET TO
15-MM VERTICAL AND TO APPLICABLE HORIZONTAL SURVEY AND
MAPPING ACCURACY AS DEFINED OR EXPECTED BY THE PROJECT
OWNER.
(B) - INFORMATION OBTAINED THROUGH THE APPLICATION OF
APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE
THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF
SUBSURFACE UTILITIES. QUALITY LEVEL B DATA SHOULD BE
REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF
THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO
APPLICABLE TOLERANCES DEFINED BY THE PROJECT AND
REDUCED ONTO PLAN DOCUMENTS.
(C) - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE
ABOVE-GROUND UTILITY FEATURES AND BY USING
PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION
TO QUALITY LEVEL D INFORMATION.
(D) - UTILITY LOCATION INFORMATION DERIVED FROM EXISTING
RECORDS OR ORAL RECOLLECTIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-101
EXISTING CONDITIONS
NORTH
M
ATHER
HOSPITAL
57 ROS 25
M
ATHER
HOSPITAL
57 ROS 25
727 728726
722 A
LOT 3
EXISTING CONDITION NOTES
1. A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE
KNOWN UNDERGROUND UTILITIES. THE TYPES, LOCATIONS, EXTENTS, SIZES
AND DEPTHS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS
ARE APPROXIMATE AND WERE OBTAINED FROM VARIOUS SOURCES,
INCLUDING TOPOGRAPHIC FIELD SURVEYS, AND AS-BUILT DRAWINGS
PROVIDED BY THE PROPERTY OWNER. ABANDONED UNDERGROUND
UTILITIES MAY EXIST, THE LOCATION OF WHICH ARE NOT KNOWN.
CONTRACTOR IS CAUTIONED THAT THE TYPES, LOCATIONS, EXTENTS, SIZES
AND DEPTHS OF EXISTING UNDERGROUND UTILITIES INDICATED ON THE
PLANS MAY NOT BE THE TYPES, LOCATIONS, EXTENTS, SIZES AND DEPTHS
ENCOUNTERED IN THE FIELD.
2. ONLY EXCAVATION AND PHYSICAL EXPOSURE WILL REVEAL THE ACTUAL
TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF EXISTING
UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR
POTHOLING EXISTING UNDERGROUND UTILITIES WITHIN THE AREA OF
WORK. CONTRACTOR SHALL RETAIN A PRIVATE UTILITY LOCATOR TO
IDENTIFY EXISTING UTILITIES. THE CONTRACTOR SHALL POTHOLE AS
NECESSARY AT CONNECTION LOCATIONS AND PROPOSED UTILITY
CROSSINGS TO FULLY LOCATE AND IDENTIFY EXISTING UTILITIES.
POTHOLING SHALL BE DONE AND THE RESULTS, INCLUDING ANY CONFLICTS
IDENTIFIED, REPORTED TO THE ENGINEER PRIOR TO THE START OF WORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK TO
AVOID CONFLICTS BETWEEN SEWER LATERALS, STORM DRAINS, WATER
MAINS, AND ALL OTHER UNDERGROUND UTILITIES.
4. A PORTION OF THE EXISTING CONDITIONS HAS BEEN DRAFTED BASED ON
FIELD OBSERVATION AND AS-BUILT CONDITIONS. CONTRACTOR TO FIELD
VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER IF THERE ARE ANY
DISCREPANCIES SHOWN ON THIS PLAN.
5. UTILITY INFORMATION IS OBTAINED BY AS-BUILT INFORMATION AS WELL AS
SURVEY OBSERVATION. ALL EXISTING UTILITY INFORMATION IN THIS PLAN
SET IS IDENTIFIED PER THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
STANDARD FOR LEVEL OF QUALITY. BELOW IS A LIST OF THE LEVEL OF
QUALITY CATEGORIES WITH THE ASSOCIATED DEFINITION PER ASCE
STANDARDS.
(A) - PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES
OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF
PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND
SUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES,
USUALLY AT A SPECIFIC POINT. MINIMALLY INTRUSIVE
EXCAVATION EQUIPMENT IS TYPICALLY USED TO MINIMIZE THE
POTENTIAL FOR UTILITY DAMAGE. A PRECISE HORIZONTAL AND
VERTICAL LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS
SHOWN ON PLAN DOCUMENTS. ACCURACY IS TYPICALLY SET TO
15-MM VERTICAL AND TO APPLICABLE HORIZONTAL SURVEY AND
MAPPING ACCURACY AS DEFINED OR EXPECTED BY THE PROJECT
OWNER.
(B) - INFORMATION OBTAINED THROUGH THE APPLICATION OF
APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE
THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF
SUBSURFACE UTILITIES. QUALITY LEVEL B DATA SHOULD BE
REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF
THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO
APPLICABLE TOLERANCES DEFINED BY THE PROJECT AND
REDUCED ONTO PLAN DOCUMENTS.
(C) - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE
ABOVE-GROUND UTILITY FEATURES AND BY USING
PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION
TO QUALITY LEVEL D INFORMATION.
(D) - UTILITY LOCATION INFORMATION DERIVED FROM EXISTING
RECORDS OR ORAL RECOLLECTIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-102
EXISTING CONDITIONS
SDMH
RIM 92.75
12" PVC INV(N)= UNK
15" PVC INV(E)= UNK
15" PVC INV(W)= UNK
HOSPITAL
57 ROS 25
HOSPITAL
57 ROS 25
DEMOLITION NOTES
1. CONTRACTOR TO USE CAUTION WHEN WORKING ADJACENT TO EXISTING
BUILDING.
2. CONTRACTOR TO CLEAR AND GRUB WITHIN THE LIMITS OF PROPOSED WORK,
UNLESS OTHERWISE NOTED ON PLANS.
3. RIM ELEVATIONS FOR EXISTING UTILITY STRUCTURES SHALL BE RAISED TO
PROPOSED SURFACE ELEVATIONS.
4. THE UTILITY LINES AND STRUCTURES SHOWN ON THESE PLANS ARE DERIVED
FROM RECORD DATA AND/OR SURFACE OBSERVATION AND ARE APPROXIMATE
ONLY. ACTUAL LOCATION AND SIZE, TOGETHER WITH THE PRESENCE OF ANY
ADDITIONAL UTILITY LINES AND STRUCTURES NOT SHOWN ON THIS PLAN,
SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR DURING
CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY
UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS IN
THE FIELD AND INFORMATION SHOWN ON THESE PLANS.
5. THE CONTRACTOR IS REQUIRED BY STATE LAW TO ACTIVELY RESEARCH THE
WORK AREA PRIOR TO COMMENCEMENT OF CONSTRUCTION, REFERENCE ANY
MONUMENTS, AND REPLACE THOSE DAMAGED OR REMOVED DURING
CONSTRUCTION.
6. THE LIMITS OF DEMOLITION SHOWN ARE APPROXIMATE ONLY. CONTRACTOR IS
RESPONSIBLE FOR MATCHING EXISTING SURROUNDINGS, LANDSCAPE AND
OTHER IMPROVEMENTS WITH A SMOOTH TRANSITION IN PAVING, CURBS,
GUTTERS, AND SIDEWALKS AND AVOIDING ANY ABRUPT OR APPARENT
CHANGES IN GRADES OR CROSS SLOPES OR HAZARDOUS CONDITIONS.
7. EXISTING CURB AND SIDEWALK AND LANDSCAPE/IRRIGATION WITHIN THE
PROJECT LIMITS THAT ARE DAMAGED OR DISPLACED, EVEN THOUGH THEY
WERE NOT TO BE REMOVED, SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST.
8. PROTECT ALL EXISTING UTILITIES AND SITE FEATURES FROM BEING DAMAGED,
UNLESS OTHERWISE NOTED. ALL UTILITIES AND IMPROVEMENTS THAT BECOME
DAMAGED DURING CONSTRUCTION SHALL BE COMPLETELY RESTORED AT NO
ADDITIONAL COST TO THE OWNER AND TO THE SATISFACTION OF THE
ENGINEER.
DEMOLITION ITEMS
REMOVE EX ASPHALT
REMOVE EX CONCRETE
CLEAR AND GRUB
REMOVE EX PARKING STALLS AND
RETURN SIGNS TO VA COR
REMOVE EX CURB
REMOVE EX STORM DRAIN PIPE
REMOVE EX STORM DRAIN STRUCTURE
REMOVE EX BOLLARD
REMOVE EX TREE
REMOVE EX RAMP
PROTECT EXISTING ASPHALT
PROTECT EX CONCRETE
PROTECT EX CURB
RELOCATE EX SIGN
PROTECT EX FIRE HYDRANT
PROTECT EX SIGNAGE
PROTECT EX TREE
REMOVE AND RELOCATE EX LIGHT
PROTECT EX WATER STRUCTURE
PROTECT EX ELECTRICAL STRUCTURE
PROTECT EX TREE
PROTECT EX LIGHT
PROTECT EX GAS STRUCTURE
PROTECT EX STORM DRAIN LINE
CUT THROUGH TURF
PROTECT EX TURF
REMOVE EX HANDRAIL
REMOVE EX PLANTER
REMOVE EXISTING CONCRETE STEPS
PROTECT EX STORM DRAIN STRUCTURE
PROTECT EX GAS LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-201
DEMOLITION PLAN
HOSPITAL
57 ROS 25
M
ATHER
HOSPITAL
57 ROS 25
DEMOLITION NOTES
1. CONTRACTOR TO USE CAUTION WHEN WORKING ADJACENT TO EXISTING
BUILDING.
2. CONTRACTOR TO CLEAR AND GRUB WITHIN THE LIMITS OF PROPOSED WORK,
UNLESS OTHERWISE NOTED ON PLANS.
3. RIM ELEVATIONS FOR EXISTING UTILITY STRUCTURES SHALL BE RAISED TO
PROPOSED SURFACE ELEVATIONS.
4. THE UTILITY LINES AND STRUCTURES SHOWN ON THESE PLANS ARE DERIVED
FROM RECORD DATA AND/OR SURFACE OBSERVATION AND ARE APPROXIMATE
ONLY. ACTUAL LOCATION AND SIZE, TOGETHER WITH THE PRESENCE OF ANY
ADDITIONAL UTILITY LINES AND STRUCTURES NOT SHOWN ON THIS PLAN,
SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR DURING
CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY
UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS IN
THE FIELD AND INFORMATION SHOWN ON THESE PLANS.
5. THE CONTRACTOR IS REQUIRED BY STATE LAW TO ACTIVELY RESEARCH THE
WORK AREA PRIOR TO COMMENCEMENT OF CONSTRUCTION, REFERENCE ANY
MONUMENTS, AND REPLACE THOSE DAMAGED OR REMOVED DURING
CONSTRUCTION.
6. THE LIMITS OF DEMOLITION SHOWN ARE APPROXIMATE ONLY. CONTRACTOR IS
RESPONSIBLE FOR MATCHING EXISTING SURROUNDINGS, LANDSCAPE AND
OTHER IMPROVEMENTS WITH A SMOOTH TRANSITION IN PAVING, CURBS,
GUTTERS, AND SIDEWALKS AND AVOIDING ANY ABRUPT OR APPARENT
CHANGES IN GRADES OR CROSS SLOPES OR HAZARDOUS CONDITIONS.
7. EXISTING CURB AND SIDEWALK AND LANDSCAPE/IRRIGATION WITHIN THE
PROJECT LIMITS THAT ARE DAMAGED OR DISPLACED, EVEN THOUGH THEY
WERE NOT TO BE REMOVED, SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST.
8. PROTECT ALL EXISTING UTILITIES AND SITE FEATURES FROM BEING DAMAGED,
UNLESS OTHERWISE NOTED. ALL UTILITIES AND IMPROVEMENTS THAT BECOME
DAMAGED DURING CONSTRUCTION SHALL BE COMPLETELY RESTORED AT NO
ADDITIONAL COST TO THE OWNER AND TO THE SATISFACTION OF THE
ENGINEER.
DEMOLITION ITEMS
REMOVE EX ASPHALT
REMOVE EX CONCRETE
CLEAR AND GRUB
REMOVE EX PARKING STALLS AND
RETURN SIGNS TO VA COR
REMOVE EX CURB
REMOVE EX STORM DRAIN PIPE
REMOVE EX STORM DRAIN STRUCTURE
REMOVE EX BOLLARD
REMOVE EX TREE
REMOVE EX RAMP
PROTECT EXISTING ASPHALT
PROTECT EX CONCRETE
PROTECT EX CURB
RELOCATE EX SIGN
PROTECT EX FIRE HYDRANT
PROTECT EX SIGNAGE
PROTECT EX TREE
REMOVE AND RELOCATE EX LIGHT
PROTECT EX WATER STRUCTURE
PROTECT EX ELECTRICAL STRUCTURE
PROTECT EX TREE
PROTECT EX LIGHT
PROTECT EX GAS STRUCTURE
PROTECT EX STORM DRAIN LINE
CUT THROUGH TURF
PROTECT EX TURF
REMOVE EX HANDRAIL
REMOVE EX PLANTER
REMOVE EXISTING CONCRETE STEPS
PROTECT EX STORM DRAIN STRUCTURE
PROTECT EX GAS LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-202
DEMOLITION PLAN
HOSPITAL
57 ROS 25
SURFACE IMPROVEMENTS NOTES
1. THE LIMITS OF WORK ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR
MATCHING EXISTING SURROUNDINGS, LANDSCAPE, AND OTHER IMPROVEMENTS WITH
A SMOOTH TRANSITION, AVOIDING ANY ABRUPT OR APPARENT CHANGES IN GRADES
OR CROSS-SLOPES OR HAZARDOUS CONDITIONS.
2. EXISTING CONCRETE SHALL BE REMOVED AT THE NEAREST EXPANSION JOINTS.
3. NEW WORK SHALL MATCH EXISTING AS CLOSELY AS POSSIBLE IN FINISH, SCORING,
AND COLOR.
4. EXISTING SITE FEATURES (CURBS, CONCRETE WALKS, LANDSCAPE, IRRIGATION, ETC.)
DEMOLISHED DURING CONSTRUCTION SHALL BE REPLACED IN KIND.
5. THE CONTRACTOR TO FIELD VERIFY PROPOSED SURFACE IMPROVEMENTS WITH
EXISTING CONDITIONS AS SHOWN ON PLANS.
6. CONTRACTOR TO COORDINATE TIMING OF PAVING WITH VA STAFF.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-301
SURFACE
IMPROVEMENTS
HOSPITAL
57 ROS 25
M
ATHER
HOSPITAL
57 ROS 25
SURFACE IMPROVEMENTS NOTES
1. THE LIMITS OF WORK ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR
MATCHING EXISTING SURROUNDINGS, LANDSCAPE, AND OTHER IMPROVEMENTS WITH
A SMOOTH TRANSITION, AVOIDING ANY ABRUPT OR APPARENT CHANGES IN GRADES
OR CROSS-SLOPES OR HAZARDOUS CONDITIONS.
2. EXISTING CONCRETE SHALL BE REMOVED AT THE NEAREST EXPANSION JOINTS.
3. NEW WORK SHALL MATCH EXISTING AS CLOSELY AS POSSIBLE IN FINISH, SCORING,
AND COLOR.
4. EXISTING SITE FEATURES (CURBS, CONCRETE WALKS, LANDSCAPE, IRRIGATION, ETC.)
DEMOLISHED DURING CONSTRUCTION SHALL BE REPLACED IN KIND.
5. THE CONTRACTOR TO FIELD VERIFY PROPOSED SURFACE IMPROVEMENTS WITH
EXISTING CONDITIONS AS SHOWN ON PLANS.
6. CONTRACTOR TO COORDINATE TIMING OF PAVING WITH VA STAFF.
SURFACE IMPROVEMENTS LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-302
SURFACE
IMPROVEMENTS-LOT 3
1" = 20'1" = 20'
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-303
SURFACE IMPROVEMENTS
ENLARGEMENTS
1" = 20'1" = 20'
1" = 20'
1" = 20'
HOSPITAL
57 ROS 25
SDMH
RIM 92.75
12" PVC INV(N)= UNK
15" PVC INV(E)= UNK
15" PVC INV(W)= UNK
SURFACE IMPROVEMENTS NOTES
1. THE LIMITS OF WORK ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR
MATCHING EXISTING SURROUNDINGS, LANDSCAPE, AND OTHER IMPROVEMENTS WITH
A SMOOTH TRANSITION, AVOIDING ANY ABRUPT OR APPARENT CHANGES IN GRADES
OR CROSS-SLOPES OR HAZARDOUS CONDITIONS.
2. EXISTING CONCRETE SHALL BE REMOVED AT THE NEAREST EXPANSION JOINTS.
3. NEW WORK SHALL MATCH EXISTING AS CLOSELY AS POSSIBLE IN FINISH, SCORING,
AND COLOR.
4. EXISTING SITE FEATURES (CURBS, CONCRETE WALKS, LANDSCAPE, IRRIGATION, ETC.)
DEMOLISHED DURING CONSTRUCTION SHALL BE REPLACED IN KIND.
5. THE CONTRACTOR TO FIELD VERIFY PROPOSED SURFACE IMPROVEMENTS WITH
EXISTING CONDITIONS AS SHOWN ON PLANS.
6. CONTRACTOR TO COORDINATE TIMING OF PAVING WITH VA STAFF.
SURFACE IMPROVEMENTS LEGEND
VEHICULAR CONCRETE
(7"PCC/ 6" CLASS II AB)
CONCRETE WALK
(4" PCC)
ASPHALT
CAST-IN-PLACE DETECTABLE
WARNING SURFACE
LANDSCAPED AREA (SLD)
FLUSH CURB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-304
SURFACE PAVEMENT
HOSPITAL
57 ROS 25
M
ATHER
HOSPITAL
57 ROS 25
SURFACE IMPROVEMENTS NOTES
1. THE LIMITS OF WORK ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR
MATCHING EXISTING SURROUNDINGS, LANDSCAPE, AND OTHER IMPROVEMENTS WITH
A SMOOTH TRANSITION, AVOIDING ANY ABRUPT OR APPARENT CHANGES IN GRADES
OR CROSS-SLOPES OR HAZARDOUS CONDITIONS.
2. EXISTING CONCRETE SHALL BE REMOVED AT THE NEAREST EXPANSION JOINTS.
3. NEW WORK SHALL MATCH EXISTING AS CLOSELY AS POSSIBLE IN FINISH, SCORING,
AND COLOR.
4. EXISTING SITE FEATURES (CURBS, CONCRETE WALKS, LANDSCAPE, IRRIGATION, ETC.)
DEMOLISHED DURING CONSTRUCTION SHALL BE REPLACED IN KIND.
5. THE CONTRACTOR TO FIELD VERIFY PROPOSED SURFACE IMPROVEMENTS WITH
EXISTING CONDITIONS AS SHOWN ON PLANS.
6. CONTRACTOR TO COORDINATE TIMING OF PAVING WITH VA STAFF.
SURFACE IMPROVEMENTS LEGEND
VEHICULAR CONCRETE
(7"PCC/ 6" CLASS II AB)
CONCRETE WALK
(4" PCC)
ASPHALT
CAST-IN-PLACE DETECTABLE
WARNING SURFACE
LANDSCAPED AREA (SLD)
FLUSH CURB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-305
SURFACE PAVEMENT-LOT
GRADING NOTES
1. PROPOSED SITE PLAN AND UTILITIES HAS BEEN SCREENED FOR CLARITY.
2. GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS
AND THE REQUIREMENTS AND RECOMMENDATIONS CONTAINED IN THE PROJECT
GEOTECHNICAL REPORT.
3. THE CONTRACTOR SHALL EXERCISE EXTREME CARE TO CONFORM TO THE LINES, GRADES,
SECTIONS, AND DIMENSIONS AS SET FORTH ON THESE PLANS. GRADED AREAS SHALL CONFORM
TO THE VERTICAL ELEVATIONS SHOWN WITHIN TOLERANCE OF ONE-TENTH OF A FOOT IN
LANDSCAPED AREAS AND TWO-HUNDREDTHS OF A FOOT IN HARDSCAPED OR PAVED AREAS.
WHERE GRADED AREAS DO NOT CONFORM TO THESE TOLERANCES, THE CONTRACTOR SHALL
BE REQUIRED TO DO CORRECTIVE GRADING, AT NO EXTRA COST TO THE OWNER.
4. CONTRACTOR SHALL FIELD VERIFY FINISHED FLOOR ELEVATIONS OF EXISTING BUILDINGS PRIOR
TO STARTING CONSTRUCTION.
5. CONTRACTOR SHALL TAKE CAUTION WHEN GRADING ADJACENT TO EXISTING BUILDINGS, TO
PROTECT EXISTING FOUNDATIONS AND TO NOT TO COVER EXISTING VENTS.
6. RIMS OF UTILITY STRUCTURES SHALL BE ADJUSTED TO FINISHED GRADE IN AREAS OF
RE-GRADING. IN PAVED AREAS, ELEVATION DIFFERENCE SHALL NOT BE MORE THAN 1
4 INCH
BETWEEN RIMS AND ADJACENT SURFACE.
7. WHERE IMPROVEMENTS INVOLVE ABAAS ACCESSIBILITY, CONTRACTOR'S ATTENTION IS
DIRECTED TO THE FOLLOWING PARAMETERS THAT NEED TO BE MET WITH THE FINISHED
CONSTRUCTION:
a. ALL SITE WORK SHALL BE IN CONFORMANCE WITH THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS EXCEPT AS MODIFIED BY THE DEPARTMENT OF VETERANS
AFFAIRS BARRIER FREE DESIGN GUIDE (PG-18-13).
b. CURB RAMPS SHALL BE A MINIMUM OF 4 FEET WIDE AND NOT EXCEED A SLOPE OF 1:20 (5%).
c. WALKS SHALL NOT EXCEED A SLOPE OF 1:33 (3%). PEDESTRIAN RAMPS SHALL NOT EXCEED 1:20 (5%).
d. A 2% MAXIMUM SLOPE LANDING SHALL BE PROVIDED AT PRIMARY ENTRANCES TO BUILDINGS, THE LANDINGS SHALL HAVE A MINIMUM WIDTH OF 72" WHEN THE DOOR OPENS INTO THE
BUILDING. WHEN THE DOOR OPENS ONTO THE LANDING THE DEPTH SHALL BE 42" PLUS THE
WIDTH OF THE DOOR MINIMUM.
e. RAMPS ARE DEFINED AS ANY WALKWAY WITH SLOPES BETWEEN 1:33 (3%) AND 1:20 (5%), AND
SHALL HAVE A MAXIMUM CROSS SLOPE OF 2%. RAMPS SHALL HAVE INTERMEDIATE (2%
MAXIMUM SLOPE) LANDINGS A MINIMUM OF 60" BY 60" IN SIZE. LANDINGS SHALL BE EVERY 40
FEET FOR RAMPS BETWEEN 1:33 AND 1:25, AND EVERY 35 FEET FOR RAMPS BETWEEN 1:25
AND 1:20. ALL RAMPS SHALL HAVE HANDRAILS, AND EDGE PROTECTION OR GUIDE RAILS.
f. MAXIMUM CROSS SLOPE ON ANY WALK OR RAMP SHALL BE 2% MAXIMUM. SLOPE WITHIN
PARKING STALLS DESIGNATED AS ACCESSIBLE PARKING SHALL BE 2% MAXIMUM IN ANY
DIRECTION.
* CONTRACTOR SHALL FIELD VERIFY EXISTING GRADES AT CONFORMS PRIOR TO FORMING/AC
WORK.
ABBREVIATIONS
ELEVATION LABEL
AC ASPHALTIC CONCRETE
CC CONCRETE
RIM UTILITY STRUCTURE RIM
TC TOP OF CURB
TFC TOP OF FLUSH CURB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-401
GRADING PLAN
1" = 20'
1" = 20'
HOSPITAL
57 ROS 25
GRADING NOTES
1. PROPOSED SITE PLAN AND UTILITIES HAS BEEN SCREENED FOR CLARITY.
2. GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS
AND THE REQUIREMENTS AND RECOMMENDATIONS CONTAINED IN THE PROJECT
GEOTECHNICAL REPORT.
3. THE CONTRACTOR SHALL EXERCISE EXTREME CARE TO CONFORM TO THE LINES, GRADES,
SECTIONS, AND DIMENSIONS AS SET FORTH ON THESE PLANS. GRADED AREAS SHALL CONFORM
TO THE VERTICAL ELEVATIONS SHOWN WITHIN TOLERANCE OF ONE-TENTH OF A FOOT IN
LANDSCAPED AREAS AND TWO-HUNDREDTHS OF A FOOT IN HARDSCAPED OR PAVED AREAS.
WHERE GRADED AREAS DO NOT CONFORM TO THESE TOLERANCES, THE CONTRACTOR SHALL
BE REQUIRED TO DO CORRECTIVE GRADING, AT NO EXTRA COST TO THE OWNER.
4. CONTRACTOR SHALL FIELD VERIFY FINISHED FLOOR ELEVATIONS OF EXISTING BUILDINGS PRIOR
TO STARTING CONSTRUCTION.
5. CONTRACTOR SHALL TAKE CAUTION WHEN GRADING ADJACENT TO EXISTING BUILDINGS, TO
PROTECT EXISTING FOUNDATIONS AND TO NOT TO COVER EXISTING VENTS.
6. RIMS OF UTILITY STRUCTURES SHALL BE ADJUSTED TO FINISHED GRADE IN AREAS OF
RE-GRADING. IN PAVED AREAS, ELEVATION DIFFERENCE SHALL NOT BE MORE THAN 1
4 INCH
BETWEEN RIMS AND ADJACENT SURFACE.
7. WHERE IMPROVEMENTS INVOLVE ABAAS ACCESSIBILITY, CONTRACTOR'S ATTENTION IS
DIRECTED TO THE FOLLOWING PARAMETERS THAT NEED TO BE MET WITH THE FINISHED
CONSTRUCTION:
a. ALL SITE WORK SHALL BE IN CONFORMANCE WITH THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS EXCEPT AS MODIFIED BY THE DEPARTMENT OF VETERANS
AFFAIRS BARRIER FREE DESIGN GUIDE (PG-18-13).
b. CURB RAMPS SHALL BE A MINIMUM OF 4 FEET WIDE AND NOT EXCEED A SLOPE OF 1:20 (5%).
c. WALKS SHALL NOT EXCEED A SLOPE OF 1:33 (3%). PEDESTRIAN RAMPS SHALL NOT EXCEED 1:20 (5%).
d. A 2% MAXIMUM SLOPE LANDING SHALL BE PROVIDED AT PRIMARY ENTRANCES TO BUILDINGS, THE LANDINGS SHALL HAVE A MINIMUM WIDTH OF 72" WHEN THE DOOR OPENS INTO THE
BUILDING. WHEN THE DOOR OPENS ONTO THE LANDING THE DEPTH SHALL BE 42" PLUS THE
WIDTH OF THE DOOR MINIMUM.
e. RAMPS ARE DEFINED AS ANY WALKWAY WITH SLOPES BETWEEN 1:33 (3%) AND 1:20 (5%), AND
SHALL HAVE A MAXIMUM CROSS SLOPE OF 2%. RAMPS SHALL HAVE INTERMEDIATE (2%
MAXIMUM SLOPE) LANDINGS A MINIMUM OF 60" BY 60" IN SIZE. LANDINGS SHALL BE EVERY 40
FEET FOR RAMPS BETWEEN 1:33 AND 1:25, AND EVERY 35 FEET FOR RAMPS BETWEEN 1:25
AND 1:20. ALL RAMPS SHALL HAVE HANDRAILS, AND EDGE PROTECTION OR GUIDE RAILS.
f. MAXIMUM CROSS SLOPE ON ANY WALK OR RAMP SHALL BE 2% MAXIMUM. SLOPE WITHIN
PARKING STALLS DESIGNATED AS ACCESSIBLE PARKING SHALL BE 2% MAXIMUM IN ANY
DIRECTION.
* CONTRACTOR SHALL FIELD VERIFY EXISTING GRADES AT CONFORMS PRIOR TO FORMING/AC
WORK.
ABBREVIATIONS
ELEVATION LABEL
AC ASPHALTIC CONCRETE
CC CONCRETE
RIM UTILITY STRUCTURE RIM
TC TOP OF CURB
TFC TOP OF FLUSH CURB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-402
GRADING PLAN
HOSPITAL
57 ROS 25
SDMH
RIM 92.75
12" PVC INV(N)= UNK
15" PVC INV(E)= UNK
15" PVC INV(W)= UNK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-501
UTILITY PLAN
HOSPITAL
57 ROS 25
M
ATHER
HOSPITAL
57 ROS 25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C-502
UTILITY PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202) 304-9784
Correct Mather Entrance Access and Parking
08/04/2023Revisions: Date:
Schematic Design (35%) 06/24/2022 Design Development (65%) 10/21/2022
JS MM
10535 HOSPITAL WAY MATHER, CA.980 9TH STREET
SUITE 2300
SACRAMENTO, CA 95814
(916) 556-5800 www.bkf.com
Design Development (95%) 03/17/2023 Construction Documents (100%) 08/04/2023
C- 503
LOT 8 GRADING AND
UTILITY ENLARGEMENTS
1" = 20' 1" = 20'
HOSPITAL
57 ROS 25
SDMH
RIM 92.75
12" PVC INV(N)= UNK
15" PVC INV(E)= UNK
15" PVC INV(W)= UNK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION DOCUMENTS
(100%) SUBMISSION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
612A4-21-011
B
IM
M at he r E nt ra nc es
S id ew al ks /M at he r_ E nt ra nc es
+S id ew al ks .rv t
/7 /2
3:
:1
P M
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
(202)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .