About this file

This document is an amendment to a solicitation for a construction project to correct entrance access and parking at the Sacramento VA Medical Center campus in Mather, California.

The amendment extends the proposal due date to November 30, 2023 at 1:00 PM Pacific time. It also provides responses to contractor questions, clarifying that the performance period is extended to 230 calendar days from notice to proceed. Pre-construction submittal review will take one month. The site superintendent may also serve as the safety and health officer but not as quality control manager. A soils report will be provided. LEED requirements and formal commissioning are not required for this project. An electric kiosk will need to be removed and reset at a new location with a new concrete foundation.

The solicitation is for the Department of Veterans Affairs through VISN 21 for a project at the VA Medical Center in Mather, California to correct entrance access and parking. The number is 36C26124R0007.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 612-24-1-6011-0003 612A4-21-011 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 391 Taylor Boulevard, Suite 110 Pleasant Hill CA 94523 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 391 Taylor Boulevard, Suite 110 Pleasant Hill CA 94523 To all Offerors/Bidders

36C26124R0007 11-02-2023

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: Thursday, November 30, 2023, 1:00 PM PDT X -- 1 -- See next page for purpose of amendment.

Angela M. Oppenheimer Contracting Officer The purpose of this amendment 0002 is as follows:

A. Extend proposal due date (from Tuesday, November 14th, 2023) to Thursday, November 30th, 2023, 1:00 PM Pacific.

B. Respond to the following Requests for Information (RFIs):

1. RFP, page 10 of 35, Statement of Bid Items #6 states that roads must be accessible during business hours. The Period of Performance for this project is 150 calendar days from receipt of Notice To Proceed, including all pre-construction activities and post-construction testing and acceptance. Specification Section 01 00 00, Part 1.4-B states that the VA requires 14 days for A/E submittal review and an additional 5-14 days for VA review. This submittal review process clearly adds up to one month for review of all submittals. This will be a multi-phased project and keeping the roads open during business hours and/or working at night will cut the normal construction work production by at least one third. Will the VA consider extending the Period of Performance to a minimum of 230 calendar days?

VA Response: Yes, VA has considered the request and will extend period of performance to 230 calendar days from issuance of Notice to Proceed (NTP). Recommend that GC submit their proposed phasing with a matching payment draw schedule.

1. Will the VA clarify if the Contractor’s Site Superintendent, if duly qualified, may also serve in the roles of SSHO and CQC, or will a separate individual be required for either of those two roles?

VA Response: The site super may serve as SSHO but not CQC and may only serve one VA project at a time.

1. Specification Section 01 00 00, Part 1.13-D requires the Contractor to complete the NPDES permit process. Will the VA confirm that the Govt. will pay for any fees or permit costs related to the NPDES permit process?

VA Response: VA will submit any permitting to the State Water boards. Contractor will be responsible to update VA Mather specific SWPPP report specific to this project. VA will provide the template.

1. Specification Section 01 00 00, Part 1.15-D & C indicate a Soils Report was prepared by Burrell Consulting Group and will be made available to bidders upon request. Since the Soils Report will provide information relative to the costs for the earthwork for this project, will the VA make this report available in the next amendment?

VA Response: Yes, VA will provide soils report in next amendment.

1. Specification Section 01 00 00, Part 1.25 deals with the installation of new telephone equipment. Will the VA confirm that this is not applicable to this project?

VA Response: Confirming that no new telephone equipment needs to be installed.

1. Specification Section 01 00 00, Part 1.33 requires the Contractor to obtain a subscription to “Submittal Exchange” to use as a collaborative online platform for this project. Our firm has utilized Procore as a collaborative platform for this hospital and at many other VA hospitals. Will the VA clarify if an alternate online platform (Procore) may be utilized for this project, or if not, provide the approved sole source J & A for the use of “Submittal Exchange” for this project?

VA Response: Procore is acceptable.

1. Specification Section 01 00 00, Part 1.34 requires the contractor to hire a professional commercial photographer to document this project. Since this will add significant costs to the project and will likely create additional performance delays, will the VA clarify if photographs can be taken by in-house Contractor resources instead of by a professional commercial photographer?

VA Response: Site super, safety, or QC may perform this as part of the pre survey of existing conditions to be conducted before groundbreaking starts with VA COR at the same time.

1. Specification Section 01 35 26, Part 1.13 requires the Contractor to obtain pre-placement TB screening tests for all personnel assigned to this project. Since this will be a sitework project, will the VA clarify if this will be required for this particular project?

VA Response: Confirmed. TB screening test is not needed.

1. Specification Section 01 45 00, Part 3.4-A & D requires the Contractor to retain additional specialized individuals who must be present at all times during work in these individual’s specific area of responsibility. For this project, this requirement would mean the Contractor must retain a Civil Engineer (or CM), Electrical Engineer, and an Environmental Engineer, all to be present onsite during activities in their respective areas of responsibility. Since this will add huge costs to this project, will the VA clarify whether this will be a requirement for this project?

VA Response: It is up to the GC to determine any quality control staff it requires to ensure compliance with the contract. Section 3.4D allows the work to be completed by persons with more than one area of responsibility, as long as they meet the qualifications in the Experience Matrix.

1. Specification Section 01 91 00, Part 1.4-C requires the Contractor to implement commissioning activities to support USGBC LEED credits for building construction activities not found within the scope of this project. Will the VA confirm there will be no LEED requirements for this project?

VA Response: Confirmed. No LEED requirements are needed for this project.

1. Specification Section 01 91 00, Part 1.8-C states that the VA will engage the Commissioning Agent (CxA) under their contract. First, will the VA clarify if formal commissioning will be required for this project? Secondly, if formal commissioning will be required, will the VA clarify if the CxA will be retained by the Contractor or by the VA?

VA Response: No formal commissioning is required in the contract.

1. VA RFI: the electric kiosk in front of building 707 will need to be removed and reset in concrete at new location, boxed in red in screenshot below The electrical line can be intercepted at the southwest corner of building 707 and pulled to the new location, panel is located inside building 707 see below. We estimate the existing concrete foundation is 6ft by 6ft by 3ft deep. New foundation will need to be set of same size.

image1.png