S02 - Drawings 676-22-108.pdf

PDF 19 MB Posted

Attached to
Z1DA--676-22-108 Connect Generator to EP B406
Solicitation number
36C25226B0017
Issued by

About this file

This is a 100% Bid Document set of construction drawings for a federal project titled "Connect B406 AHU-5 to Emergency Power" at the Veterans Affairs Medical Center in Tomah, Wisconsin. The project is identified as Project No. 676-22-108 and is issued by the Office of Facilities Management as of November 20, 2025.

The construction package includes comprehensive architectural, civil, mechanical, and electrical drawings depicting the connection of Building 406's Air Handling Unit 5 (AHU-5) to emergency power systems. Key deliverables include site and work area plans showing demolition and new work phases; utility tunnel and crawlspace plans with photographic documentation of existing conditions; detailed floor plans for Buildings B406 and B446 with infection control assessments and hazardous materials documentation; mechanical specifications including motor starter schedules and HVAC system details; and electrical schematics with one-line diagrams, equipment connection schedules, and installation details for conduit, ductwork, and hanger systems. The drawings incorporate phasing plans to coordinate construction activities, general notes addressing work sequencing and safety requirements, and keyed notes identifying specific construction locations and procedures. The design team includes Penn Construction Group as project leader with consultants providing mechanical, plumbing, and electrical expertise. The fully sprinklered facility requires compliance with infection control protocols and hazardous materials handling procedures as outlined in the accompanying plans.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.: 676-22-108

PROJECT TEAM

PROJECT LEADER / ARCHITECT

PENN CONSTRUCTION GROUP

VETERANS AFFAIRS MEDICAL CENTER

500 E VETERANS ST

TOMAH, WI 54660

CAMPUS MAP SHEET INDEX

IN THE CASE OF CONFLICTS OR DISCREPANCIES

WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS

OR GREATER QUANTITY OF WORK, AS DETERMINED

BY THE GOVERNMENT, SHALL BE PROVIDED.

MECHANICAL

PENN CONSTRUCTION GROUP

PLUMBING

CONNECT B406 AHU'S TO EMERGENCY POWER

SHEET NUMBER SHEET NAME

PENN CONSTRUCTION GROUP

GENERAL INFORMATION

GI001 TITLE SHEET

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

GI001

KAB

TITLE SHEET

HFB

1021 N. Superior Unit 11 Tomah, Wisconsin 54660

ISSUED FOR

35% SD

9/02/2025

ISSUED FOR

65% DD

10/31/2025

ISSUED FOR

95% CD

11/14/2025

ISSUED FOR

BID

11/20/2025

1021 N. Superior Unit 11 Tomah, Wisconsin 54660

1021 N. Superior Unit 11 Tomah, Wisconsin 54660

ELECTRICAL

PENN CONSTRUCTION GROUP

1021 N. Superior Unit 11 Tomah, Wisconsin 54660

NORTH

SITE PLAN

PROJECT

LOCATIONS

ARCHITECTURAL

A001 LEGENDS, ABBREVIATIONS, AND NOTES

A101

X

B446/B406 PARTIAL FIRST FLOOR PLANS - NEW WORK

CIVIL

CD101

DETAILS

C001 LEGEND AND GENERAL NOTES

C501

PARTIAL SITE AND WORK AREA SITE PLANS - DEMOLITION

ELECTRICAL

E001 SYMBOLS AND ABBREVIATIONS

ED101 B406 UTILITY TUNNEL/UNDERGROUND PLAN - DEMOLITION

ED102 B406 PARTIAL CRAWLSPACE PLAN - DEMOLITION

EP101

EP102

X X X

X X

XE501 DETAILS & DIAGRAMS

ED601 ONE-LINE DIAGRAM - DEMOLITION

MECHANICAL

M001 LEGENDS, ABBREVIATIONS, AND NOTES

MH101 B446 FIRST FLOOR PLAN AND SCHEDULE - NEW WORK

DETAILS & DIAGRAMSM501

E601 ONE-LINE DIAGRAM - NEW WORK

GC101 LIFE SAFETY PLAN X

GC102 INFECTION CONTROL PLANS X

GC103 PHASING PLAN X

X X

X

X X

X X X

X

RE-ISSUED FOR

35% SD

9/22/2025

E602 ELECTRICAL SCHEDULES

X *

X *

X X X

X X

X

X X

X X X

* INDICATES DRAWING UPDATED OCTOBER 15, 2025

X * X *

X * X *

X * X *X *

X X X

X X

X

X X

X X X

X

ED103 B446/B406 PARTIAL FIRST FLOOR PLAN - DEMOLITION

X X X X

X X

X X

X X * X

XB446 FIRST FLOOR AND SECTIONS - NEW WORKEP103

C101 PARTIAL SITE AND WORK AREA SITE PLANS - NEW WORK X

B406 UTILITY TUNNEL/UNDERGROUND PLAN - NEW WORK

B406 PARTIAL CRAWLSPACE PLAN - NEW WORK

X X

X X

X X X

X

X X

X X X

X

X X X

X X

X X X

X

X

E401 SECTIONS X

X X

X X

X X X

X

X X

X X X

X

X X X

X X

X X X

X

X

X

HAZARDOUS

HA101 HAZARDOUS MATERIALS OVER-ALL FLOOR PLAN X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

1 1 1

X X

X X

X X

X X X X X

XXXXXXXX

X X

X

X X X

X

XXXXXXX

XXXXXXX

X

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

KEY PLAN

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

446/406

NORTH

GC101

KB

GENERAL

LIFE SAFETY PLAN

HFB

1 1/4"= 1'-0"

FIRST FLOOR PLAN

NORTH

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. REFER TO GC SHEETS FOR IC/PHASING PLANS. REFER TO GC SHEETS FOR IC/PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR SHALL REVIEW MECHANICAL, GENERAL CONTRACTOR SHALL REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION PLANS FOR ADDITIONAL CONSTRUCTION WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL CONSTRUCTION WORK. 4. MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK. 5. PATCH ALL SURFACES DISTURBED BY DEMOLITION PATCH ALL SURFACES DISTURBED BY DEMOLITION TO CREATE A SMOOTH AND CONSISTENT FINISH WITH ADJACENT MATERIALS. TYPICAL AT FLOORS, WALLS, AND CEILINGS. 6. DIMENSIONS ON FLOOR PLAN ARE BASED ON FACE DIMENSIONS ON FLOOR PLAN ARE BASED ON FACE OF FINISHED WALL TO FACE OF FINISHED WALL (NOMINAL). 7. INTERIOR PARTITIONS SHALL BE TYPE "A5" UNLESS INTERIOR PARTITIONS SHALL BE TYPE "A5" UNLESS NOTED OTHERWISE. SEE PARTITION TYPES ON SHEET A001. 8. PROVIDE IN-WALL BLOCKING FOR WALL HUNG PROVIDE IN-WALL BLOCKING FOR WALL HUNG EQUIPMENT, ACCESSORIES, CASEWORK, AND TRIM.

AutoCAD SHX Text APPLICABLE CODES: 2018 INTERNATIONAL BUILDING CODE - GROUP F2 LOW HAZARD FACTORY INDUSTRIAL 2018 EXISTING INTERNATIONAL BUILDING CODE - LEVEL 2 RENOVATION 2018 NFPA 101 LIFE SAFETY CODE - CHAPTER 40 INDUSTRIAL CONSTRUCTION TYPE: NFPA 220 TYPE II (0,0,0), IBC TYPE IIB UNPROTECTED STEEL FRAME WITH MASONRY EXTERIOR CLADDING NON-SPRINKLERED MEANS OF EGRESS DIRECT EGRESS TO BUILDING EXTERIOR MAXIMUM TRAVEL DISTANCE OF 200'-0" TO AN EXIT SECOND EXIT WITHIN 1/2 OF DIAGONAL DISTANCE OF FLOOR PLAN 50'-0" MAXIUMUM COMMON PATH OF TRAVEL MINIMUM 36" WIDE EXIT DOOR OCCUPANT LOAD: 5,280 GSF AT 300 GSF PER PERSON = 17 PEOPLE MAX ACTUAL OCCUPANT LOAD IS LESS THAN 5 PEOPLE AREAS: GENERATOR ROOM 187 SF 187 SF ELECTRICAL ROOM 130 SF 130 SF EGRESS WIDTH: REQUIRED: @ 0.20 PER OCCUPANT = 3.4" @ 0.20 PER OCCUPANT = 3.4" @ 34" MIN. PER DOOR = 68" MIN. PROVIDED: 135" 135"

AutoCAD SHX Text

BASIC BUILDING INFORMATION

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

2 HOUR FIRE RATED WALL EXIT TRAVEL DISTANCE COMMON PATH OF TRAVEL EXIT

AutoCAD SHX Text

FIRE AND SAFETY NOTES

AutoCAD SHX Text 1..

AutoCAD SHX Text MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS IN PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT BUILDINGS DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

AutoCAD SHX Text 2.

AutoCAD SHX Text IN ADDITION TO ALL VA MEDICAL CENTER POLICIES & REGULATIONS, ALL FEDERAL GOVERNMENT, STATE, AND LOCAL CODES AND ORDINANCES SHALL APPLY TO ALL OF THEIR CONTRACTORS AND SUB-CONTRACTORS.

AutoCAD SHX Text 3.

AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL PERTINENT OSHA SAFETY REQUIREMENTS.

AutoCAD SHX Text

EXIT TRAVEL DISTANCE = 18'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text 1615A

AutoCAD SHX Text 1615C

AutoCAD SHX Text 6C13

AutoCAD SHX Text 1617A

AutoCAD SHX Text

AutoCAD SHX Text 406E8

AutoCAD SHX Text 406E8A

AutoCAD SHX Text 6C12

AutoCAD SHX Text

TRAMWAY

AutoCAD SHX Text

EXIT TRAVEL DISTANCE = 16'-6"

AutoCAD SHX Text

EXIT TRAVEL DISTANCE = 24'-2"

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text B446

AutoCAD SHX Text B406

B425

1 1 1

X X

X X

X

MD-480-CR

ATS-480-EQ

LS-1-1

ATS-

208-

CR

ATS-

208-

LS

MD-

208-

CR

MD-

480-

EQ

MD-208-LS

ECB-208-CR

ECB-208-EQ

ECB-208-LS

B406-MDP

-480

B406-MDP

-208

INFECTION CONTROL GENERAL NOTES:INFECTION CONTROL RISK ASSESSMENT:

X

XXXXXXX

XXXXXXX

ACCH-1

AT-2G

PULLBOX

E-1-G

T-208-B406

PULLBOX TERM

CAB

1200A

ECB

480V B401

ECB

480V B406

CR

ECB

480V

TR

ECB

208V B406

GENERATOR

CP-1-G

ECB

480V B406

EQ

B446

ELECTRICAL

ROOM

B446

GENERATOR

ROOM

X

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

KEY PLAN

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

446/406

NORTH

GC102

KB

GENERAL

INFECTION CONTROL PLANS

HFB

1 1/4"= 1'-0"

B446 FLOOR PLAN

NORTH

1 1/4"= 1'-0"

B406 PART FIRST FLOOR PLAN

NORTH

AutoCAD SHX Text

ACCH-1

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text 406E8

AutoCAD SHX Text 406E8A

AutoCAD SHX Text 6C12

AutoCAD SHX Text

1. SEE SPECIFICATION SECTION 013526 FOR INFECTION CONTROL DESIGN SEE SPECIFICATION SECTION 013526 FOR INFECTION CONTROL DESIGN REQUIREMENTS. 2. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORKSITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 3. THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHO HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. 4. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR 5. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF. CONTRACTOR SHALL PROVIDE EXISTING POWER CONNECTIONS FOR TRIATEK ISOLATION MONITORS OR PROVIDE TEMPORARY POWER TO TRIATEK ISOLATION MONITORS DURING CONSTRUCTION. 6. PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK SERVING THE AFFECTED AREA. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED IN NOTE BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY. 7. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA. 8. AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION 013526 "SAFETY REQUIREMENTS") AND THEREON, REQUEST A NEW "INFECTION CONTROL CONSTRUCTION PERMIT" FROM THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT. 9. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. SEE DETAILS THIS SHEET & SPECIFICATION SECTION 013526. EXCEPTION: IF BARRIER IS ADJACENT TO A SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 6 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS. 10. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION ACCESS DOORS GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION ACCESS DOORS AND KEYPAD LOCKS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. IN OCCUPIED AREAS. 12. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AT ALL TIMES. 13. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.

AutoCAD SHX Text INFECTION CONTROL BARRIER PER CLASS REQUIREMENTS. SEE INFECTION CONTROL DESIGN NOTES THIS SHEET.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text B446

AutoCAD SHX Text B406

2 2 2 2

1 1 1

X X

X X

X X

X X X X X X X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXX

X X

X

X X X

X

XXXXXXX

XXXXXXX

EX XFMR

EX XFMR

EX XFMR

ACCH-1

AT-2G

PULLBOX

E-1-G

T-208-B406

PULLBOX TERM

CAB

1200A

ECB

480V B401

ECB

480V B406

CR

ECB

480V

TR

ECB

208V B406

MD-480-CR

ATS-480-EQ

LS-1-1

ATS-

208-

CR

ATS-

208-

LS

MD-

208-

CR

MD-

480-

EQ

MD-208-LS

ECB-208-CR

ECB-208-EQ

ECB-208-LS

B406-MDP

-480

B406-MDP

-208

GENERATOR

CP-1-G

ECB

480V B406

EQ

B446

ELECTRICAL

ROOM

B446

GENERATOR

ROOM

X

U N

K

UNK

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

KEY PLAN

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

446/406

NORTH

GC103

SJS

GENERAL

PHASING PLAN

HFB

1 1/4"= 1'-0"

FIRST FLOOR PLAN

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text 6C13

AutoCAD SHX Text 1617A

AutoCAD SHX Text

AutoCAD SHX Text S24

AutoCAD SHX Text 406E8

AutoCAD SHX Text 406E8A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6C12

AutoCAD SHX Text

TRAMWAY

AutoCAD SHX Text

PHASING PLAN NOTES:

AutoCAD SHX Text PHASE 1: INSTALL THE TEMPORARY FENCING AND GATES. INSTALL THE ENTRANCE TRACK PAD AND DOORS. INSTALL THE EROSION CONTROL FENCING. PHASE 2: ALL COMPONENTS OF THE SWITCHGEAR/TRANSFER SWITCH, CONDUITS, SUPPORTS, CORING, PATCHING, AND SEALING, MUST BE ONSITE BEFORE ANY WORK BEGINS. POTHOLE/DAYLIGHT TO CONFIRM LOCATION OF ANY UNDERGROUND PIPES, CONDUITS OR OTHER LOCATED UTILITY IN THE PATH OF THE NEW DUCTBANK. AFTER CONFIRMATION OF THE UNDERGOUND UTILITY PATH EXCAVATION FOR THE NEW DUCTBANK MAY BEGIN. TRENCH AND PROVIDE THE INSTALL AS DETAILED ON C501 AND APPROVED THROUGH SUBMITTALS. PHASE 3: B406 - ROUTE NEW CONDUITS AND CONDUCTORS INTO AND OUT OF THE EXISTING PANEL AS NOTED ON THE PLANS. - ROUTE NEW CONDUITS AND CONDUCTORS INTO AND OUT OF THE EXISTING PANEL AS NOTED ON THE PLANS. CRAWL SPACE AND B406 UTILITY TUNNEL - ROUTE CONDUITS AND CONDUCTORS AS NOTED ON PLANS. NEW CONDUITS AND CONDUCTORS SHALL BE ROUTED COMPLETE, ADJACENT - ROUTE CONDUITS AND CONDUCTORS AS NOTED ON PLANS. NEW CONDUITS AND CONDUCTORS SHALL BE ROUTED COMPLETE, ADJACENT TO THE EXISTING CONDUIT WHICH REMAINS UNTIL THE NEW IS COMPLETELY INSTALLED AND CONNECTED, AND FULLY FUNCTIONAL. B446 - INSTALL ALL COMPONENTS OF THE SWITCHGEAR/TRANSFER SWITCH, CONDUITS, SUPPORTS, CORING, PATCHING, AND SEALING, BEFORE DEMOLITION MAY BEGIN. - INSTALL ALL COMPONENTS OF THE SWITCHGEAR/TRANSFER SWITCH, CONDUITS, SUPPORTS, CORING, PATCHING, AND SEALING, BEFORE DEMOLITION MAY BEGIN. PHASE 4: B446 - ROUTE CONDUITS AND CONDUCTORS TO THE EXISTING CHILLER. ONCE READY THE CONTRACTOR AND THEIR SUB-CONTRACTORS HAVE 4 HOURS TO DISCONNECT AND PROVIDE THE NEW CONNECTION TO THE EXISTING CHILLER. PHASE 5: REMOVE/DEMOLISH CONDUITS, SUPPORTS, CONDUCTORS AND ASSOCIATED DEVICES AS NOTED ON DEMOLITION PLANS. GRADE, SEED, AND RESTORE SITE. REMOVE CONSTRUCTION FENCE AND EROSION CONTROL. NOTE: SEE CIVIL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SITE INFORMATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ECB-EQ2

AutoCAD SHX Text

ATS-EQ2

AutoCAD SHX Text

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 10'-3"

AutoCAD SHX Text 14'-9"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 27'-1"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NOTE: ALL KNOWN UNDERGROUND FEATURES AND UTILITIES ARE SHOWN ON THIS PHASING PLAN. SEE THE CIVIL DRAWINGS FOR DESCRIPTIONS AND ADDITIONAL INFORMATION ON ALL UNDERGROUND REQUIREMENTS AND WORK.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text B446

AutoCAD SHX Text B406

C001

JMD

CIVIL

LEGEND AND GENERAL NOTES

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

GRAVEL SHOULDER

AutoCAD SHX Text

NEW AC PAVEMENT

AutoCAD SHX Text

EXISTING AC PAVEMENT

AutoCAD SHX Text

EXISTING STRUCTURE

AutoCAD SHX Text

CONTOUR LINE

AutoCAD SHX Text

SPOT ELEVATION

AutoCAD SHX Text 93.6

AutoCAD SHX Text

EXISTING ROADS TO REMAIN

AutoCAD SHX Text

FINISH GRADE

AutoCAD SHX Text

OF INTERSECTION) AND

AutoCAD SHX Text

VPI (VERTICAL POINT

AutoCAD SHX Text

PI (POINT OF INTERSECTION)

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text

DRAINAGE DITCH

AutoCAD SHX Text

TEST PIT

AutoCAD SHX Text

RADIAL POINT

AutoCAD SHX Text

PIEZOMETER

AutoCAD SHX Text

TP1

AutoCAD SHX Text

SB1

AutoCAD SHX Text

PZ1I

AutoCAD SHX Text

TELEPHONE POLE

AutoCAD SHX Text

NEW UTILITY OR

AutoCAD SHX Text

TELEPHONE POLE

AutoCAD SHX Text

EXISTING UTILITY OR

AutoCAD SHX Text

BORING LOCATION AND NUMBER

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

SW

AutoCAD SHX Text

AREA-LIGHTING BASE

AutoCAD SHX Text

SURFACE ELEVATION

AutoCAD SHX Text

POINT OF INTERSECTION

AutoCAD SHX Text

SURVEY BASE LINE MONUMENT

AutoCAD SHX Text

ELECTRICAL HANDHOLE

AutoCAD SHX Text

ELECTRICAL MANHOLE

AutoCAD SHX Text

CATCH BASIN, STORMWATER INLET

AutoCAD SHX Text

PLANT STRUCTURE

AutoCAD SHX Text

NEW STRUCTURE-THIS CONTRACT

AutoCAD SHX Text

REMODELED EXISTING

AutoCAD SHX Text

PLAN HOLDING AREA LIMITS

AutoCAD SHX Text

STAGING, STOCKPILE, AND

AutoCAD SHX Text

CENTERLINE, BUILDING, ROAD, ETC.

AutoCAD SHX Text

DRAWING MATCH LINE

AutoCAD SHX Text

DRAINAGE WAY OR DITCH

AutoCAD SHX Text 35.7

AutoCAD SHX Text 1000.0

AutoCAD SHX Text 1000.0

AutoCAD SHX Text 96.0

AutoCAD SHX Text 96.5

AutoCAD SHX Text

OR

AutoCAD SHX Text 93.6

AutoCAD SHX Text

OR

AutoCAD SHX Text

CB

AutoCAD SHX Text

OR

AutoCAD SHX Text

OR

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

ROAD

AutoCAD SHX Text P/L

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

LIGHT STANDARD

AutoCAD SHX Text

RAILROAD TRACKS

AutoCAD SHX Text

DI (DROP INLET)

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

SURVEY REFERENCE LINE

AutoCAD SHX Text

CENTER LINE, BUILDING, ROAD, ETC.

AutoCAD SHX Text

EASEMENTS LINE

AutoCAD SHX Text R/W

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

STRUCTURE NUMBER

AutoCAD SHX Text

EXISTING TREES TO REMAIN

AutoCAD SHX Text

PROPOSED STRUCTURE

AutoCAD SHX Text

TYPES ABOVE)

AutoCAD SHX Text P

AutoCAD SHX Text

UNDERGROUND TELEPHONE LINE

AutoCAD SHX Text

RELOCATED OVERHEAD POWER LINE

AutoCAD SHX Text

POWER POLE WITH GUY SUPPORT

AutoCAD SHX Text

GATE (SHOWN WITH FENCE

AutoCAD SHX Text

NO.3

AutoCAD SHX Text %%uNOTE:

AutoCAD SHX Text

ON THIS SHEET AND NOT ON THE PLANS.

AutoCAD SHX Text

THIS IS A STANDARD LEGEND SHEET. THEREFORE

AutoCAD SHX Text

SOME SYMBOLS OR ABBREVIATIONS MAY APPEAR

AutoCAD SHX Text

NATURAL GAS LINE

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

STORM SEWER LINE

AutoCAD SHX Text

SANITARY SEWER LINE

AutoCAD SHX Text

UNDERGROUND ELECTRIC

AutoCAD SHX Text

COMMUNICATIONS LINE

AutoCAD SHX Text

TELEPHONE LINE

AutoCAD SHX Text

FIBER OPTIC LINE

AutoCAD SHX Text E

AutoCAD SHX Text

DRAIN TILE

AutoCAD SHX Text

ST

AutoCAD SHX Text

ST

AutoCAD SHX Text

CONNECT TO EXISTING

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

TREES

AutoCAD SHX Text

EXISTING TO BE DEMOLISHED

AutoCAD SHX Text

CURB AND GUTTER

AutoCAD SHX Text

SITE FENCE

AutoCAD SHX Text

CONSTRUCTION FENCE

AutoCAD SHX Text

CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT BUILDING IDENTIFICATION

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

TREE PROTECTION FENCE

AutoCAD SHX Text

FLOW ARROW

AutoCAD SHX Text

INLET PROTECTION

AutoCAD SHX Text

WASH OUT AREA

AutoCAD SHX Text CONSTRUCTION ENTRANCE AND CONSTRUCTION PAD PROTECTION, SIMILAR TO PRESTO GEOSYSTEMS GEOTERRA GTO OR EQUAL. HIGH DENSITY POLYETHYLENE INTERLOCKING MATS FOR EXISTING SURFACE PROTECTION, APPROXIMATELY 17.5" x 36.5" x 2" THICK INDIVIDUAL MATS CAPABLE OF BOLTING TO EACH OTHER TO FORM A CONTINUOUS PAD.

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

LANDSCAPING PLANT(ER) AREA

AutoCAD SHX Text

TRAFFIC SIGN/CONTROL POLE

AutoCAD SHX Text

1. CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. A MINIMUM OF 10-HOUR OSHA TRAINING IS REQUIRED FOR ALL CONTRACT WORKERS ON SITE. TRAINING MUST BE CURRENT WITHIN THE LAST TWO YEARS. 2. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORK SITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 3. ALL HOT WORK PERMITS MUST BE OBTAINED FROM THE VA FIRE DEPARTMENT. PERMIT IS VALID ALL HOT WORK PERMITS MUST BE OBTAINED FROM THE VA FIRE DEPARTMENT. PERMIT IS VALID FOR ONE WEEK. 4. ALL DISTURBED GRASS SHALL BE RE-SODDED AT END OF THE CONSTRUCTION. ALL DAMAGED ALL DISTURBED GRASS SHALL BE RE-SODDED AT END OF THE CONSTRUCTION. ALL DAMAGED LAWN WILL BE OVERCUT BY 6" OR MORE TO ACCOMMODATE FULL WIDTH ROLLS OF SOD. CONTRACTOR SHALL PROVIDE 3" BROWN SIFTED TOPSOIL. TOPSOIL TO BE TILLED AND GRADED TO A SMOOTH MATCHING GRADE OF UNDAMAGED LAWN. SLOPE NEW GRADE AWAY FROM BUILDING 1A. SOD TO BE THOROUGHLY SATURATED WITH WATER UPON PLACEMENT. THE CONTRACTOR IS RESPONSIBLE FOR WATERING NEW SOD UNTIL PROJECT ACCEPTANCE BY THE COR. 5. CONSTRUCTION STAGING (LIMITS OF CONSTRUCTION) AREA SHALL BE COMPLETELY FENCED IN AND CONSTRUCTION STAGING (LIMITS OF CONSTRUCTION) AREA SHALL BE COMPLETELY FENCED IN AND LOCKED DURING OFF HOURS. ADDITIONAL SPACE IF REQUIRED SHALL BE COORDINATED WITH THE VA CONSTRUCTION MANAGER. 6. THE CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES FOR ALL CONTRACTOR AND THE CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES FOR ALL CONTRACTOR AND SUB-CONTRACTORS USE THROUGHOUT THE DURATION OF THE PROJECT. FACILITY RESTROOM USE IS NOT ALLOWED BY ANY CONSTRUCTION PERSONNEL. 7. ALL CONSTRUCTION AREAS SHALL BE CLEANED DAILY. ALL CONSTRUCTION AREAS SHALL BE CLEANED DAILY. 8. ALL CONTRACTOR AND SUB-CONTRACTOR VEHICLES SHALL PARK IN THE DESIGNATED AREA. ALL CONTRACTOR AND SUB-CONTRACTOR VEHICLES SHALL PARK IN THE DESIGNATED AREA. 9. ONE CONSTRUCTION TRAILER MAY BE PARKED IN THE DESIGNATED AREA PROVIDED BY THE VA. ONE CONSTRUCTION TRAILER MAY BE PARKED IN THE DESIGNATED AREA PROVIDED BY THE VA. ELECTRICAL HOOK UP SHALL BE THE CONTRACTORS RESPONSIBILITY AND COORDINATED WITH THE VA CONSTRUCTION MANAGER. EACH CONNECTION SHALL BE METERED INDIVIDUALLY. 10. NO SANITARY OR WATER CONNECTIONS ALLOWED. NO SANITARY OR WATER CONNECTIONS ALLOWED. 11. CONTRACTOR SHALL REPAIR ALL ROADWAY DAMAGED FROM CONSTRUCTION TO MATCH EXISTING CONTRACTOR SHALL REPAIR ALL ROADWAY DAMAGED FROM CONSTRUCTION TO MATCH EXISTING CONDITIONS. RECORD EXISTING CONDITIONS BY DATED PHOTOGRAPH OF SITE. 12. CONTRACTOR TO ENSURE ALL FIRE HYDRANTS AROUND BUILDING ARE NOT BLOCKED OFF OR CONTRACTOR TO ENSURE ALL FIRE HYDRANTS AROUND BUILDING ARE NOT BLOCKED OFF OR UNUSABLE. 13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD BEFORE STARTING CONSTRUCTION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD BEFORE STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE VA AND A/E IMMEDIATELY. 14. THE UNDERGROUND UTILITY INFORMATION AS SHOWN HEREON IS BASED, UPON INFORMATION THE UNDERGROUND UTILITY INFORMATION AS SHOWN HEREON IS BASED, UPON INFORMATION COLLECTED ON OCTOBER 31, 2025. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED OR CERTIFIED. GC TO PROVIDE VERIFICATION UTILITY LOCATING PRIOR TO ANY EARTH WORK.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

UNK

CD101

JMD

CIVIL

PARTIAL SITE AND WORK AREA

SITE PLANS - DEMOLITION

HFB

1 NTS

PARTIAL SITE PLAN

NORTH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

2 1/8"= 1'-0"

WORK AREA SITE PLAN

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

B406 TRAMWAY CONNECTOR 1-STORY BRICK

AutoCAD SHX Text

B446 SWITCHGEAR AND GENERATOR BUILDING

AutoCAD SHX Text

EXISTING AIR COOLED CHILLER

AutoCAD SHX Text

EXISTING CHILLED WATER BUFFER TANK AND PAD

AutoCAD SHX Text

EXISTING CHAIN LINK FENCE ENCLOSURE FOR EXISTING AT GRADE CHILLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

B401 TO B407 TRAMWAY, EXISTING FLOOR ELEV 953.3

AutoCAD SHX Text

BURIED FUEL TANK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING 2" BURIED FUEL VENT PIPE

AutoCAD SHX Text

EXISTING 2" BURIED FUEL VENT PIPE

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUITS TO B401

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUITS TO B401

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED 12" STORM PIPE

AutoCAD SHX Text

EXISTING BURIED SANITARY PIPE

AutoCAD SHX Text

EXISTING BURIED WATER PIPE

AutoCAD SHX Text

EXISTING BURIED WATER PIPE

AutoCAD SHX Text

EXIST COMM MANHOLE RIM=951.94

AutoCAD SHX Text

EXIST STEPS INTO B406 SWITCHGEAR ELEC ROOM

AutoCAD SHX Text

EXISTING FLOOR ELEV 953.4

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

EXISTING GRAVEL ACCESS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING BURIED CWS PIPE

AutoCAD SHX Text

EXISTING BURIED CWR PIPE

AutoCAD SHX Text

AutoCAD SHX Text

CAUTION!!!

AutoCAD SHX Text

CAUTIION!!!

AutoCAD SHX Text

1. REFER TO PHASING PLANS GC103. ALL WORK TO BE DONE IN REFER TO PHASING PLANS GC103. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, AND GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, AND ARCHITECTURAL PLANS FOR ADDITIONAL NEW WORK. ALL WORK FOR WALL, CEILING AND FLOOR ASSEMBLIES NECESSARY TO FACILITATE COMPLETE SYSTEM IS PART OF THE CONTRACTOR'S SCOPE OF WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW CONSTRUCTION WORK. 4. MAINTAIN UTILITIES SERVICE TO ALL CAMPUS BUILDINGS AND ALL MAINTAIN UTILITIES SERVICE TO ALL CAMPUS BUILDINGS AND ALL SPACES IN BUILDINGS. COORDINATE WITH VA COR FOR ANY DISRUPTION IN UTILITY SERVICES REQUIRED TO PERFORM WORK. 5. PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER AND SYSTEM CONNECTIONS, PUMPS, FANS, HVAC TERMINAL UNITS, CONTROL DEVICES AND VALVES. CONTRACTOR SHALL REFER TO MECHANICAL, ELECTRICAL, AND ARCHITECTURAL DEMOLITION AND NEW PLANS, DETAILS, AND DIAGRAMS FOR CONNECTIONS TO EQUIPMENT. 6. PROVIDE 3 WEEK WRITTEN NOTICE TO THE VA COR AND CCR PROVIDE 3 WEEK WRITTEN NOTICE TO THE VA COR AND CCR REPRESENTATIVES FOR ANY INTERRUPTION OF THE BUILDING UTILITIES, SYSTEMS OR RELATED SERVICES INCLUDING CONSTRUCTION RELATED ROAD CLOSURES OR CONFINED SPACE WORK. 7. CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. A MINIMUM OF 10-HOUR OSHA TRAINING IS REQUIRED FOR ALL CONTRACT WORKERS ON SITE. TRAINING MUST BE CURRENT WITHIN THE LAST TWO YEARS. 8. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORK SITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 9. ALL HOT WORK PERMITS MUST BE OBTAINED FROM THE VA FIRE ALL HOT WORK PERMITS MUST BE OBTAINED FROM THE VA FIRE DEPARTMENT. PERMIT IS VALID AS STATED ON FORM. 10. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 11. THE GENERAL CONTRACTOR MAY CONTRACT WITH A PRIVATE THE GENERAL CONTRACTOR MAY CONTRACT WITH A PRIVATE UTILITY LOCATOR CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES. UNDERGROUND MAPPING PROVIDED IN THESE DOCUMENTS PERFORMED ON OCTOBER 31, 2025. LOCATIONS ARE NOT VERIFIED. THIS CONTRACTOR SHALL USE THE SERVICES OF A CONTRACTOR SPECIALIZING IN DAYLIGHTING OR POTHOLING TO VERIFY UNDERGROUND UTILITIES BEFORE EXCAVATION OR DIRECTIONAL BORING TAKES PLACE. 12. ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR FEATURES SHALL BE COMPLETED WITHIN 15 WORKING DAYS FROM THE VA TOMAH ACCEPTED END OF EACH DEFINABLE TASK OF WORK, UNLESS OTHERWISE DESCRIBED OR NOTED IN THESE DOCUMENTS. COOPERATE AND OTHERWISE WORK WITH THE ALL CONTRACTORS TO QUICKLY FINISH OPEN TRENCHES, AND QUICKLY COMPLETE CONTRACTORS DUTIES. 13. CONSTRUCTION STAGING (LIMITS OF CONSTRUCTION) AREA SHALL CONSTRUCTION STAGING (LIMITS OF CONSTRUCTION) AREA SHALL BE COMPLETELY FENCED IN AND LOCKED DURING OFF HOURS. ADDITIONAL SPACE IF REQUIRED SHALL BE COORDINATED WITH THE VA CONSTRUCTION MANAGER. 14. THE CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES THE CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES FOR ALL CONTRACTOR AND SUB-CONTRACTORS USE THROUGHOUT THE DURATION OF THE PROJECT. FACILITY RESTROOM USE IS NOT ALLOWED BY ANY CONSTRUCTION PERSONNEL. 15. ALL CONSTRUCTION AREAS SHALL BE CLEANED DAILY. ALL CONSTRUCTION AREAS SHALL BE CLEANED DAILY. 16. ALL CONTRACTOR AND SUB-CONTRACTOR VEHICLES SHALL PARK ALL CONTRACTOR AND SUB-CONTRACTOR VEHICLES SHALL PARK IN THE DESIGNATED AREA. 17. ONE CONSTRUCTION TRAILER MAY BE PARKED IN THE DESIGNATED ONE CONSTRUCTION TRAILER MAY BE PARKED IN THE DESIGNATED AREA. NO SANITARY OR WATER CONNECTIONS ALLOWED. ELECTRICAL CONNECTION BY CONTRACTOR AND METERED SEPARATELY AND PAID FULLY BY THE CONTRACTOR. 18. CONTRACTOR SHALL REPAIR ALL ROADWAY DAMAGED FROM CONTRACTOR SHALL REPAIR ALL ROADWAY DAMAGED FROM CONSTRUCTION TO MATCH EXISTING CONDITIONS. RECORD EXISTING CONDITIONS BY DATED PHOTOGRAPH OF SITE. 19. CONTRACTOR TO ENSURE ALL FIRE HYDRANTS AROUND BUILDING CONTRACTOR TO ENSURE ALL FIRE HYDRANTS AROUND BUILDING ARE NOT BLOCKED OFF OR UNUSABLE. 20. PARKING FOR CONSTRUCTION PERSONNEL IN DESIGNATED PARKING FOR CONSTRUCTION PERSONNEL IN DESIGNATED LOCATIONS PROVIDED AT THE CONSTRUCTION KICK-OFF METTING. CONTRACTORS AND SUB-CONTRACTORS MUST PARK ONLY IN THE DESIGNATED AREA FOR THE DURATION OF THE PROJECT.

AutoCAD SHX Text CONSTRUCTION FENCE, SEE DETAIL 1 ON C501. PROVIDE THE REQUIRED 6' WIDE FENCE OPENING WITH 2 PERSONNEL ACCESS GATES, NOT SHOWN, COORDINATE LOCATION WITH SAFETY REQUIREMENTS. SILT FENCE, SEE DETAIL 7 ON DWG C501. CONSTRUCTION SITE SIGN, SEE DETAIL 2 ON DWG C501. CONSTRUCTION FENCE WARNING SIGN, SEE DETAIL 5 ON DWG C501. CONSTRUCTION SAFETY SIGN, SEE DETAIL 8 ON DWG C501. REMOVE EXISTING CONCRETE STOOP COMPLETE. PROVIDE CONSTRUCTION TRACK PAD AND EROSION CONTROL. SEE DETAILS 4 AND 6 ON C501. EXCAVATE FOR NEW DUCTBANK. THE CONTRACTOR IS REQUIRED TO HIRE THE SERVICES OF A POTHOLE/ DAYLIGHT CONTRACTOR TO VERIFY LOCATIONS SHOWN ON THE UNDERGROUND MAPPING PLAN BEFORE EXCAVATION BEGINS. ELECTRICAL CONTRACTOR SHALL REMOVE THE EXISTING CONDUCTORS AFTER THE EXISTING CHILLER IS CONNECTED TO ITS NEW CONDUCTORS. ELECTRICAL CONTRACTOR TO PROVIDE A WATERTIGHT PLUG INSIDE B406 UTILITY TUNNEL AT THE EXISTING PULL BOX. BURIED CONDUIT IS NOW AN EMPTY SPARE. PROVIDE TRENCH BOX. OPTIONAL: PROVIDE SHORING FOR EXCAVATION WORK. SEE NOTES FOR REQUIRED DEWATERING AT ALL EXCAVATION WORK. EX. BURIED CONDUIT WITH POWER FOR CHILLER, SEE ELECTRICAL DRAWINGS FOR REQUIREMENTS. CONTRACTOR TO HAND DIG TO EXPOSED CONDUIT, DUCTBANK, AND EXISTING BURIED UTILITIES HERE.

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

KEYED NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UGENERAL CIVIL WORK NOTES:

AutoCAD SHX Text

1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE GENERAL CONTRACTOR MUST CONTRACT WITH A POTHOLING/DAYLIGHTING THE GENERAL CONTRACTOR MUST CONTRACT WITH A POTHOLING/DAYLIGHTING CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES BEFORE ANY EXCAVATION TAKES PLACE. 4. TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY GENERAL CONTRACTORS PRIVATE UTILITY LOCATOR CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. COORDINATE REQUIRED EARTHWORK WITH THE GC. ELECTRICAL CONTRACTOR COORDINATE REQUIRED EARTHWORK WITH THE GC. ELECTRICAL CONTRACTOR TO WORK WITH THE CIVIL CONTRACTOR TO LOCATE THE REQUIRED DUCTBANK ROUTE. 6. VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER REQUIREMENTS MEETING MINIMUM AND INDUSTRY STANDARD DEPTHS, COVER, BEDDING, TRACING AND RESTORATION. 7. THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS WITH GEOTEXTILE FABRIC. THE FIRE ALARM CONTRACTOR WILL ENSURE AND VERIFY THESE ARE DONE AND MAINTAINED. REPORT ISSUES TO THE PROJECT CCR IMMEDIATELY. SEE DETAILS. 8. ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR FEATURES SHALL BE COMPLETED WITHIN 15 WORKING DAYS FROM THE VA TOMAH ACCEPTED END OF THE WORK, UNLESS OTHERWISE DESCRIBED OR NOTED IN THESE DOCUMENTS. COOPERATE AND OTHERWISE WORK WITH THE ALL CONTRACTORS TO QUICKLY FINISH OPEN TRENCHES, AND QUICKLY COMPLETE CONTRACTORS DUTIES.

AutoCAD SHX Text NOTE: THE GENERAL CONTRACTOR SHALL DIRECTLY HIRE A SPECIALIZED DEWATERING CONTRACTOR. THE GC AND DEWATERING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING DURING CONSTRUCTION. SEE SPECIFICATION SECTION 312319 FOR ADDITIONAL INFORMATION. PREVIOUS SITE EVALUATION REPORTS HAVE NOTED THE GROUND WATER IN AND AROUND THE TOMAH VAMC CAMPUS SITE AS HIGH AS 3' TO 4' BELOW GRADE. ALL PENETRATIONS IN THE GROUNDWATER REQUIRE DEWATERING. PREVIOUS EVALUATION REPORTS RECOMMEND REMOVING GROUNDWATER FROM EXCAVATIONS WITH CONVENTIONAL PUMPS. THE DEWATERING CONTRACTOR MUST DEVELOP A DEWATERING PLAN FOR SUBMISSION AND REVIEW BY THE AE AND VA. GROUNDWATER REMOVAL SHALL BE PERFORMED BY THE DEWATERING CONTRACTOR. REVIEW ALL SPECIFICATIONS IN THE CONSTRUCTION DOCUMENTS FOR DEWATERING REQUIREMENTS BEYOND THOSE LISTED HERE.

AutoCAD SHX Text NOTE: CONTRACTOR TO PROTECT ALL CONSTRUCTION SITES ACTIVELY AND WORK WITH CONSTRUCTION TEMPORARY FENCE. SECURE PANELS TO EACH OTHER WITH BOLTED CONNECTORS. GATE OR ACCESS PANELS SHALL HAVE CHAINS WITH KEY LOCKS MATCHING G22 KEY USED BY TOMAH VA. GATE OR ACCESS SHALL BE SECURED 24/7.

AutoCAD SHX Text

8" RCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

4" CIP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

6" CIP

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

4" CIP

AutoCAD SHX Text

4" CIP

AutoCAD SHX Text

15" RCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

4" VCP

AutoCAD SHX Text

12" RCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text 6"

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

10" VCP

AutoCAD SHX Text

12" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

4" VCP

AutoCAD SHX Text

4" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

4" PVC

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

12" PVC

AutoCAD SHX Text

VCP

AutoCAD SHX Text

8" VCP

AutoCAD SHX Text

6" VCP

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

BUILDING 446 AREA OF WORK

AutoCAD SHX Text

CONTRACTOR'S CONSTRUCTION TRAILER LOCATION ALONG B416 PARKING AREA.

AutoCAD SHX Text B455

AutoCAD SHX Text B452

AutoCAD SHX Text B424

AutoCAD SHX Text B402

AutoCAD SHX Text B401

AutoCAD SHX Text B425

AutoCAD SHX Text B23

AutoCAD SHX Text B25

AutoCAD SHX Text B406

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

2 2 2

1 1 1 1 1 1 1

XXXXXX

X X

X X

X X

X X

X X X X X X X X X X X X X

X X

X X

X X

X X

XXX

X X

X

UNK

C101

JMD

CIVIL

PARTIAL SITE AND WORK AREA

SITE PLANS - NEW WORK

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

D

C

B

A

97 8654321

Tomah, Wisconsin

676-22-108 Office of Facilities

Management

100% BD DOCUMENT

November 20, 2025

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Connect B406 AHU-5 to Emergency Power

1021 N. Superior, Unit 11 Tomah, Wisconsin 54660

1 NTS

PARTIAL SITE PLAN

NORTH

2 1/8"= 1'-0"

WORK AREA SITE PLAN

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text 1615A

AutoCAD SHX Text 1615C

AutoCAD SHX Text 6C13

AutoCAD SHX Text 1617A

AutoCAD SHX Text

AutoCAD SHX Text S24

AutoCAD SHX Text 406E8

AutoCAD SHX Text 406E8A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6C12

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING AIR COOLED CHILLER

AutoCAD SHX Text

EXISTING CHAIN LINK FENCE ENCLOSURE FOR EXISTING AT GRADE CHILLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

EXISTING TRANSFORMER

AutoCAD SHX Text

B406 TRAMWAY CONNECTOR 1-STORY BRICK

AutoCAD SHX Text

B446 SWITCHGEAR AND GENERATOR BUILDING

AutoCAD SHX Text

EXISTING AIR COOLED CHILLER

AutoCAD SHX Text

EXISTING CHILLED WATER BUFFER TANK AND PAD

AutoCAD SHX Text

EXISTING CHAIN LINK FENCE ENCLOSURE FOR EXISTING AT GRADE CHILLER

AutoCAD SHX Text

B401 TO B407 TRAMWAY, EXISTING FLOOR ELEV 953.3

AutoCAD SHX Text

BURIED FUEL TANK

AutoCAD SHX Text

EXISTING 2" BURIED FUEL VENT PIPE

AutoCAD SHX Text

EXISTING 2" BURIED FUEL VENT PIPE

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUITS TO B401

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUITS TO B401

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED ELECTRICAL CONDUIT(S)

AutoCAD SHX Text

EXISTING BURIED 12" STORM PIPE

AutoCAD SHX Text

EXISTING BURIED SANITARY PIPE

AutoCAD SHX Text

EXISTING BURIED WATER PIPE

AutoCAD SHX Text

EXISTING BURIED WATER PIPE

AutoCAD SHX Text

EXIST COMM MANHOLE RIM=951.94

AutoCAD SHX Text

EXIST STEPS INTO B406 SWITCHGEAR ELEC ROOM

AutoCAD SHX Text

EXISTING FLOOR ELEV 953.4

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

GRASS AREA

AutoCAD SHX Text

EXISTING GRAVEL ACCESS

AutoCAD SHX Text

EXISTING BURIED CWS PIPE

AutoCAD SHX Text

EXISTING BURIED CWR PIPE

AutoCAD SHX Text

AutoCAD SHX Text

NOTE!!!

AutoCAD SHX Text

NOTE!!!

AutoCAD SHX Text 18" x 36" x 6" THICK CONCRETE EQUIPMENT PAD, TOP OF PAD 1" HIGHER THAN EXISTING CRUSHED STONE EQUIPMENT PAD. SEE DETAIL 1 ON A001. . SEE DETAIL 1 ON A001. COORDINATE WITH ELECTRICAL CONTRACTOR. EXCAVATE FOR NEW ELECTRICAL CONDUIT DUCT BANK. SEE E501 DETAIL 2, 4-WAY DUCT LINE INSTALLATION REQUIRED. RESTORE SITE WITHIN 10 DAYS OF DUCT LINE FINISH AND VA ACCEPTANCE. PROVIDE NEW STOOP, SEE DETAIL 3 ON C501. PROVIDE NEW DUCTBANK. THE CONTRACTOR IS REQUIRED TO HIRE THE SERVICES OF A POTHOLE/ DAYLIGHT CONTRACTOR TO VERIFY LOCATIONS SHOWN ON THE UNDERGROUND MAPPING PLAN BEFORE EXCAVATION BEGINS. SEE DETAIL 2 ON E501. PROVIDE TRENCH BOX AT EXCAVATIONS. OPTIONAL: PROVIDE SHORING FOR EXCAVATION WORK. SEE NOTES FOR REQUIRED DEWATERING AT ALL EXCAVATION WORK. THE EXISTING SIZE, DEPTH, QUANTITIES OF THE NEWLY EXPOSED EXISTING DUCTBANK, CONDUITS, AND BURIED UTILITIES FOUND DURING HAND DIGGING SHALL BE SUBMITTED THROUGH A CONSTRUCTION RFI BY THE CONTRACTOR TO DETERMINE THE PATH AND DEPTH OF THE NEW DUCTBANK. DRAWING E501, DETAIL 2 REQUIRES 24" BURIED DEPTH TO TOP OF NEW DUCTBANK, DEPENDING ON SIZE, DEPTH, QUANTITY, AND TYPE OF EXPOSED UTILITIES THE SIZE AND DEPTH OF THE NEW DUCTBANK MAY BE ALTERED THROUGH THE CONTRACTOR'S SUBMITTED CONSTRUCTION RFI. SUBMISSION FOR THIS RFI IS REQUIRED.

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

KEYED NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. REFER TO PHASING PLANS GC103. ALL WORK TO BE DONE IN REFER TO PHASING PLANS GC103. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, AND GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, AND ARCHITECTURAL PLANS FOR ADDITIONAL NEW WORK. ALL WORK FOR WALL, CEILING AND FLOOR ASSEMBLIES NECESSARY TO FACILITATE COMPLETE SYSTEM IS PART OF THE CONTRACTOR'S SCOPE OF WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW CONSTRUCTION WORK. 4. MAINTAIN UTILITIES SERVICE TO ALL CAMPUS BUILDINGS AND ALL MAINTAIN UTILITIES SERVICE TO ALL CAMPUS BUILDINGS AND ALL SPACES IN BUILDINGS. COORDINATE WITH VA COR FOR ANY DISRUPTION IN UTILITY SERVICES REQUIRED TO PERFORM WORK. 5. PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER AND SYSTEM CONNECTIONS, PUMPS, FANS, HVAC TERMINAL UNITS, CONTROL DEVICES AND VALVES. CONTRACTOR SHALL REFER TO MECHANICAL, ELECTRICAL, AND ARCHITECTURAL DEMOLITION AND NEW PLANS, DETAILS, AND DIAGRAMS FOR CONNECTIONS TO EQUIPMENT. 6. PROVIDE 3 WEEK WRITTEN NOTICE TO THE VA COR AND CCR PROVIDE 3 WEEK WRITTEN NOTICE TO THE VA COR AND CCR REPRESENTATIVES FOR ANY INTERRUPTION OF THE BUILDING UTILITIES, SYSTEMS OR RELATED SERVICES INCLUDING CONSTRUCTION RELATED ROAD CLOSURES OR CONFINED SPACE WORK. 7.