S02 Drawings 523-23-005 Replace Floors OR PACU SDSU.pdf

PDF 11 MB Posted

Attached to
Z1DA--523-23-005 Replace Floors OR PACU SDSU Federal contract opportunity
Solicitation number
36C24123B0015
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document provides details for a federal contract solicitation. The solicitation number is 36C24123B0015 and seeks bids to replace floors in the operating room and post-anesthesia care unit at the Veterans Affairs Medical Center in Jamaica Plain, Massachusetts. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Bids are sought to complete project 523-23-005, which involves replacing floors in the specified areas of the medical center located at 150 S Huntington Ave, Jamaica Plain, MA 02130. No further information is provided on response dates, award timing, pricing terms or other bid requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--523-23-005 Replace Floors OR PACU SDSU, newest first.
File Type Posted
S06 Altro-Whiterock System Accessories.pdf PDF
S07 Wage Rates MA20240001_03_20240301.pdf PDF
S06 Amendment 0003 RFIs.pdf PDF
36C24123B0015 0003.docx DOCX document
S06 Altro-Whiterock Diagram Detail.pdf PDF
S04 523-23-005 Sign in Sheet Combined.pdf PDF
36C24123B0015 0002.docx DOCX document
P07 Wage Rates MA20240001_02_20240209.pdf PDF
S06 Amendment 0002 RFIs.pdf PDF
36C24123B0015 0001.docx DOCX document
S07 Wage Rates MA20240001_01_20240119.pdf PDF
S02 Specifications 523-23-005 Replace Floors OR PACU SDSU.pdf PDF
S02 SOW 523-23-005 Replace Floors OR PACU SDSU.pdf PDF
36C24123B0015 Solicitation.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Boston-Jamaica Plains Veterans Affairs Medical Center

150 S. Huntington Ave., Boston, MA 02130

PROJECT #523-23-005

U.S. Department of Veterans Affairs

AutoCAD SHX Text

GI000

AutoCAD SHX Text

SJD

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

AutoCAD SHX Text

AutoCAD SHX Text

BV

AutoCAD SHX Text

PROJECT SITE MAP

AutoCAD SHX Text

PROJECT LOCATION MAP

AutoCAD SHX Text

CHIEF, ENGINEERING

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SIGNATURE BLOCK

AutoCAD SHX Text

THIRD FLOOR - O.C., PACU AND ASU FLOOR REPLACEMENT

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

HOSPITAL DIRECTOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

GI000

AutoCAD SHX Text

GI001

AutoCAD SHX Text

GI002

AutoCAD SHX Text

GI003.1

AutoCAD SHX Text

GI003.2

AutoCAD SHX Text

GI003.3

AutoCAD SHX Text

GI003.4

AutoCAD SHX Text

GI003.5

AutoCAD SHX Text

GI004

AutoCAD SHX Text

AD101

AutoCAD SHX Text

AD102.1

AutoCAD SHX Text

AD103

AutoCAD SHX Text

AD104

AutoCAD SHX Text

AD105

AutoCAD SHX Text

AI101

AutoCAD SHX Text

AI201

AutoCAD SHX Text

ABBREVIATIONS AND SYMBOLS

AutoCAD SHX Text

THIRD FLOOR LIFE SAFTEY PLAN

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE I

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE III

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE IV

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE V

AutoCAD SHX Text

INFECTION CONTROL PLAN AND NOTES

AutoCAD SHX Text

ENLARGED PHASE I DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

ROOM FINISH SCHEDULE

AutoCAD SHX Text

STANDARD FLOORING DETAILS

AutoCAD SHX Text

ENLARGED PHASE II DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

ENLARGED PHASE III DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

ENLARGED PHASE IV DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

ENLARGED PHASE VA AND VB DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

ENLARGED PHASE II DEMOLITION AND NEW WORK PLAN

AutoCAD SHX Text

AD102.2

AutoCAD SHX Text N

AutoCAD SHX Text

PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

GI003

AutoCAD SHX Text

OVERALL PHASING PLAN

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE II

OR-1

SDSU

PACU / RECOVERY

OR-2

OR-3OR-4

OR-5

OR-6

OR-7 OR-8

CENTRAL SUPPLY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

NOTE:

THIS LEGEND IS COMPRISED OF

STANDARD SYMBOLS AND ABBREVIATIONS

AND APPLIES TO THIS SET OF DRAWINGS

TO THE EXTENT APPLICABLE.

AutoCAD SHX Text

GI001

AutoCAD SHX Text

AB

AutoCAD SHX Text

BV

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

AutoCAD SHX Text

KEYPLAN - 3RD FLOOR

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

AutoCAD SHX Text

ABBREVIATIONS AND SYMBOLS

AutoCAD SHX Text

CONTRACT LIMIT LINE

AutoCAD SHX Text

ELEVATION INDICATOR

AutoCAD SHX Text

CENTER LINE INDICATOR

AutoCAD SHX Text

EXISTING TO REMAIN LINE

AutoCAD SHX Text

HIDDEN FEATURES LINE

AutoCAD SHX Text

BREAK, ROUND (USER DEFINES SIZE)

AutoCAD SHX Text

BREAK, STRAIGHT (SEE SECTION INDICATORS, BUILDING, WITH BREAK STANDARDS)

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

DIMENSION LINE

AutoCAD SHX Text

DRAWING BLOCK TITLE, TYPICAL

AutoCAD SHX Text

ELEVATION INDICATOR, EXTERIOR

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

AutoCAD SHX Text

CENTER LINE

AutoCAD SHX Text

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

AutoCAD SHX Text

GRAPHIC SCALE, "=1'-0"18"=1'-0"

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

COLUMN GRID

AutoCAD SHX Text

NORTH ARROW

AutoCAD SHX Text

BUILDING SECTION INDICATOR

AutoCAD SHX Text

SYMBOLS

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

AB

AutoCAD SHX Text

AC

AutoCAD SHX Text

AD

AutoCAD SHX Text

ADJT

AutoCAD SHX Text A/E

AutoCAD SHX Text

AFF

AutoCAD SHX Text

AFG

AutoCAD SHX Text

AGG

AutoCAD SHX Text

ALT

AutoCAD SHX Text

AP

AutoCAD SHX Text

APPROX

AutoCAD SHX Text

ARCH

AutoCAD SHX Text

ASPH

AutoCAD SHX Text

AVG

AutoCAD SHX Text

ANCHOR BOLT

AutoCAD SHX Text

AREA DRAIN

AutoCAD SHX Text

ADJACENT

AutoCAD SHX Text

ADJUSTABLE

AutoCAD SHX Text

ARCHITECT/ENGINEER

AutoCAD SHX Text

ABOVE FINISH FLOOR

AutoCAD SHX Text

ABOVE FINISH GRADE

AutoCAD SHX Text

AGGREGATE

AutoCAD SHX Text

ALUMINUM

AutoCAD SHX Text

ALTERNATE

AutoCAD SHX Text

ACCESS PANEL

AutoCAD SHX Text

APPROXIMATE

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

AVERAGE

AutoCAD SHX Text

ACOUSTICAL/AIR CONDITIONING

AutoCAD SHX Text

AL, ALUM

AutoCAD SHX Text

ADDITIONAL

AutoCAD SHX Text

ADD'L

AutoCAD SHX Text

ANOD

AutoCAD SHX Text

ANODIZED

AutoCAD SHX Text

ABV

AutoCAD SHX Text

ABOVE

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

APPROVED, APPLIED

AutoCAD SHX Text B/B

AutoCAD SHX Text B/C

AutoCAD SHX Text

BIT

AutoCAD SHX Text

BLDG

AutoCAD SHX Text

BLKG

AutoCAD SHX Text

BM

AutoCAD SHX Text

BOT

AutoCAD SHX Text

BP

AutoCAD SHX Text

BRG

AutoCAD SHX Text

BSMT

AutoCAD SHX Text

BTWN

AutoCAD SHX Text

BUR

AutoCAD SHX Text

BW

AutoCAD SHX Text

BASELINE

AutoCAD SHX Text

BACK TO BACK

AutoCAD SHX Text

BOTTOM OF CURB

AutoCAD SHX Text

BOTTOM OF FOOTING

AutoCAD SHX Text

BITUMINOUS

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

BLOCKING

AutoCAD SHX Text

BOTTOM

AutoCAD SHX Text

BASE PLATE

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

BEARING

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

BETWEEN

AutoCAD SHX Text

BUILT-UP ROOF

AutoCAD SHX Text

BOTH WAYS

AutoCAD SHX Text L

AutoCAD SHX Text B

AutoCAD SHX Text

BD

AutoCAD SHX Text

BOARD

AutoCAD SHX Text

BENCHMARK, BEAM

AutoCAD SHX Text B/F

AutoCAD SHX Text

BRK

AutoCAD SHX Text

CAB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CEM

AutoCAD SHX Text

CG

AutoCAD SHX Text

CH

AutoCAD SHX Text

CJ

AutoCAD SHX Text

CKBD

AutoCAD SHX Text

CLG

AutoCAD SHX Text

CLR

AutoCAD SHX Text

CMU

AutoCAD SHX Text

CMP

AutoCAD SHX Text

CO

AutoCAD SHX Text

COL

AutoCAD SHX Text

COMB

AutoCAD SHX Text

COMP

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONN

AutoCAD SHX Text

CONST

AutoCAD SHX Text

CONST JT

AutoCAD SHX Text

CONT

AutoCAD SHX Text

CONTR

AutoCAD SHX Text

COORD

AutoCAD SHX Text

COR

AutoCAD SHX Text

CORR

AutoCAD SHX Text

CRS

AutoCAD SHX Text

CT

AutoCAD SHX Text

CTR

AutoCAD SHX Text

CSK

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CABINET

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

CEMENT

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

CABINET HEATER

AutoCAD SHX Text

CHALKBOARD

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

CORRUGATED METAL PIPE

AutoCAD SHX Text

CLEANOUT

AutoCAD SHX Text

COLUMN

AutoCAD SHX Text

COMBINATION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

CONSTRUCTION JOINT

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CONTRACTOR

AutoCAD SHX Text

COORDINATE

AutoCAD SHX Text

CONTRACTING OFFICER REPRESENTATIVE

AutoCAD SHX Text

COURSE

AutoCAD SHX Text

CERAMIC TILE

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

COUNTERSUNK

AutoCAD SHX Text

CORRUGATED, CORRIDOR

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

COMPOSITION, COMPACTED

AutoCAD SHX Text

CU

AutoCAD SHX Text

CUBIC

AutoCAD SHX Text

DET

AutoCAD SHX Text

DF

AutoCAD SHX Text

DIA (OR )

AutoCAD SHX Text

DIAG

AutoCAD SHX Text

DIM

AutoCAD SHX Text

DIP

AutoCAD SHX Text

DL

AutoCAD SHX Text

DMPF

AutoCAD SHX Text

DN

AutoCAD SHX Text

DR

AutoCAD SHX Text

DS

AutoCAD SHX Text

DT

AutoCAD SHX Text

DTA

AutoCAD SHX Text

DWG

AutoCAD SHX Text

DRINKING FOUNTAIN

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

DIMENSION

AutoCAD SHX Text

DUCTILE IRON PIPE

AutoCAD SHX Text

DEAD LOAD

AutoCAD SHX Text

DAMPPROOFING

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

DOWNSPOUT

AutoCAD SHX Text

DRAIN TILE

AutoCAD SHX Text

DOVETAIL ANCHOR

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text

DETAIL, DETENTION

AutoCAD SHX Text

DES

AutoCAD SHX Text

DESIGN

AutoCAD SHX Text

EB

AutoCAD SHX Text

EF

AutoCAD SHX Text

EJ

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

EMG

AutoCAD SHX Text

ENCL

AutoCAD SHX Text E/P

AutoCAD SHX Text

EQ

AutoCAD SHX Text

ES

AutoCAD SHX Text

ESEW

AutoCAD SHX Text

EST

AutoCAD SHX Text

EW

AutoCAD SHX Text

EWC

AutoCAD SHX Text

EXH

AutoCAD SHX Text

EXP

AutoCAD SHX Text

EXT

AutoCAD SHX Text

EXPANSION BOLT

AutoCAD SHX Text

EACH FACE

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

ENCLOSE

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

EMERGENCY SHOWER

AutoCAD SHX Text

ESTIMATE

AutoCAD SHX Text

ELECTRIC WATER COOLER

AutoCAD SHX Text

EXHAUST

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXTERIOR

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

EL

AutoCAD SHX Text

EMERGENCY SHOWER & EYE WASH

AutoCAD SHX Text

EXPOSED, EXPANSION

AutoCAD SHX Text

FAS

AutoCAD SHX Text

FD

AutoCAD SHX Text

FDN

AutoCAD SHX Text

FE

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FF

AutoCAD SHX Text

FFE

AutoCAD SHX Text

FFL

AutoCAD SHX Text

FH

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FHR

AutoCAD SHX Text

FIN

AutoCAD SHX Text

FL

AutoCAD SHX Text

FLEX

AutoCAD SHX Text

FLG

AutoCAD SHX Text

FLR

AutoCAD SHX Text F/C

AutoCAD SHX Text F/F

AutoCAD SHX Text F/M

AutoCAD SHX Text F/S

AutoCAD SHX Text

FR

AutoCAD SHX Text

FS

AutoCAD SHX Text

FT

AutoCAD SHX Text

FTG

AutoCAD SHX Text

FUR

AutoCAD SHX Text

FASTEN(ER)

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FOUNDATION

AutoCAD SHX Text

FIRE EXTINGUISHER

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

FINISH FLOOR ELEVATION

AutoCAD SHX Text

FINISH FLOOR LINE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

FIRE HOSE CABINET

AutoCAD SHX Text

FIRE HOSE RACK

AutoCAD SHX Text

FINISH

AutoCAD SHX Text

FENCE LINE

AutoCAD SHX Text

FLEXIBLE

AutoCAD SHX Text

FLASHING

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FACE OF CONCRETE

AutoCAD SHX Text

FACE OF MASONRY

AutoCAD SHX Text

FACE OF STUDS

AutoCAD SHX Text

FIREPROOFING

AutoCAD SHX Text

FRAME

AutoCAD SHX Text

FOOT

AutoCAD SHX Text

FOOTING

AutoCAD SHX Text

FURRING

AutoCAD SHX Text

FINISH FLOOR, FAR FACE

AutoCAD SHX Text D

AutoCAD SHX Text

DEEP

AutoCAD SHX Text

ADJ

AutoCAD SHX Text

CLEAR

AutoCAD SHX Text

DIAGONAL, DIAGRAM

AutoCAD SHX Text

EACH WAY, EYE WASH, EAST WEST

AutoCAD SHX Text

FULL SIZE, FLOOR SINK

AutoCAD SHX Text

FP

AutoCAD SHX Text

ACOUSTIC TILE

AutoCAD SHX Text

ACT

AutoCAD SHX Text

FACE TO FACE, FLOOR TO FLOOR

AutoCAD SHX Text

EIFS

AutoCAD SHX Text

FACE BRICK

AutoCAD SHX Text

FB

AutoCAD SHX Text

FINISH SYSTEM

AutoCAD SHX Text

EXTERIOR INSULATING

AutoCAD SHX Text

GA

AutoCAD SHX Text

GALV

AutoCAD SHX Text

GL

AutoCAD SHX Text

GMP

AutoCAD SHX Text

GM

AutoCAD SHX Text

GOVT

AutoCAD SHX Text

GR

AutoCAD SHX Text

GRAN

AutoCAD SHX Text

GRBM

AutoCAD SHX Text

GRD

AutoCAD SHX Text

GUT

AutoCAD SHX Text

GYP

AutoCAD SHX Text

GAUGE

AutoCAD SHX Text

GALVANIZED

AutoCAD SHX Text

GLASS

AutoCAD SHX Text

GALVANIZED METAL PIPE

AutoCAD SHX Text

GAS METER

AutoCAD SHX Text

GOVERNMENT

AutoCAD SHX Text

GRADE

AutoCAD SHX Text

GRANULAR

AutoCAD SHX Text

GRADE BEAM

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GYPSUM

AutoCAD SHX Text

GYPSUM WALLBOARD

AutoCAD SHX Text

GWB

AutoCAD SHX Text

GEN

AutoCAD SHX Text

GENERAL, GENERATOR

AutoCAD SHX Text

GALLON

AutoCAD SHX Text

GAL

AutoCAD SHX Text

GC

AutoCAD SHX Text

GENERAL CONTRACTOR

AutoCAD SHX Text

HB

AutoCAD SHX Text

HDBD

AutoCAD SHX Text

HDR

AutoCAD SHX Text

HDW

AutoCAD SHX Text

HM

AutoCAD SHX Text

HR

AutoCAD SHX Text

HTG

AutoCAD SHX Text

HW

AutoCAD SHX Text

HWD

AutoCAD SHX Text

HOSE BIBB

AutoCAD SHX Text

HARDBOARD

AutoCAD SHX Text

HEADER

AutoCAD SHX Text

HARDWARE

AutoCAD SHX Text

HEIGHT

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HORIZONTAL

AutoCAD SHX Text

HEATING

AutoCAD SHX Text

HARDWOOD

AutoCAD SHX Text

HIGH POINT

AutoCAD SHX Text

HCP

AutoCAD SHX Text

HANDICAPPED

AutoCAD SHX Text

HD

AutoCAD SHX Text

HEAVY DUTY

AutoCAD SHX Text

HOUR, HANDRAIL

AutoCAD SHX Text

HP

AutoCAD SHX Text

HORIZ

AutoCAD SHX Text

HEADWALL

AutoCAD SHX Text

INSIDE DIAMETER

AutoCAD SHX Text

INSIDE FACE

AutoCAD SHX Text

INCH

AutoCAD SHX Text

INVERT

AutoCAD SHX Text

INCLUDE

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

INTERIOR

AutoCAD SHX Text

ID

AutoCAD SHX Text

IF

AutoCAD SHX Text

IN

AutoCAD SHX Text

INV

AutoCAD SHX Text

INCL

AutoCAD SHX Text

INSUL

AutoCAD SHX Text

INT

AutoCAD SHX Text

INFO

AutoCAD SHX Text

INFORMATION

AutoCAD SHX Text

JOIST

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

JOINT FILLER

AutoCAD SHX Text

JOINT

AutoCAD SHX Text

KNOCKDOWN

AutoCAD SHX Text

KILO-POUND

AutoCAD SHX Text

KNOCKOUT

AutoCAD SHX Text J

AutoCAD SHX Text

JAN

AutoCAD SHX Text

JF

AutoCAD SHX Text

JT

AutoCAD SHX Text

KD

AutoCAD SHX Text

KIP

AutoCAD SHX Text

KO

AutoCAD SHX Text

LAB

AutoCAD SHX Text

LAM

AutoCAD SHX Text

LAV

AutoCAD SHX Text

LF

AutoCAD SHX Text

LL

AutoCAD SHX Text

LLH

AutoCAD SHX Text

LLV

AutoCAD SHX Text

LTG

AutoCAD SHX Text

LTWT

AutoCAD SHX Text

LW

AutoCAD SHX Text

LABORATORY

AutoCAD SHX Text

LAMINATE

AutoCAD SHX Text

LAVATORY

AutoCAD SHX Text

LINEAL FOOT

AutoCAD SHX Text

LIVE LOAD

AutoCAD SHX Text

LONG LEG HORIZONTAL

AutoCAD SHX Text

LONG LEG VERTICAL

AutoCAD SHX Text

LOW POINT

AutoCAD SHX Text

LIGHTING

AutoCAD SHX Text

LIGHTWEIGHT

AutoCAD SHX Text

LONG WAY

AutoCAD SHX Text L

AutoCAD SHX Text

LB

AutoCAD SHX Text

POUND

AutoCAD SHX Text

LP

AutoCAD SHX Text

MAS

AutoCAD SHX Text

MAT

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MB

AutoCAD SHX Text

MEZZ

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MH

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MISC

AutoCAD SHX Text

MO

AutoCAD SHX Text

MOD

AutoCAD SHX Text

MOV

AutoCAD SHX Text

MR

AutoCAD SHX Text

MTD

AutoCAD SHX Text

MULL

AutoCAD SHX Text

MASONRY

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MAIL BOX

AutoCAD SHX Text

MEZZANINE

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MISCELLANEOUS

AutoCAD SHX Text

MASONRY OPENING

AutoCAD SHX Text

MOVABLE

AutoCAD SHX Text

MOP RECEPTOR

AutoCAD SHX Text

MOUNTED

AutoCAD SHX Text

MULLION

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MUNT

AutoCAD SHX Text

MUNTIN

AutoCAD SHX Text M

AutoCAD SHX Text

METER

AutoCAD SHX Text

MODULAR, MODIFY

AutoCAD SHX Text

LH

AutoCAD SHX Text

LEFT HAND

AutoCAD SHX Text

MM

AutoCAD SHX Text

MILLIMETER

AutoCAD SHX Text

NF

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NO

AutoCAD SHX Text

NOM

AutoCAD SHX Text

NTS

AutoCAD SHX Text

OC

AutoCAD SHX Text

OD

AutoCAD SHX Text

OF

AutoCAD SHX Text

OH

AutoCAD SHX Text

OPHD

AutoCAD SHX Text

OPNG

AutoCAD SHX Text

OPP

AutoCAD SHX Text

NEAR FACE

AutoCAD SHX Text

NUMBER

AutoCAD SHX Text

NOMINAL

AutoCAD SHX Text

NORTH SOUTH

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OUTSIDE DIAMETER

AutoCAD SHX Text

OUTSIDE FACE

AutoCAD SHX Text

OVERHEAD

AutoCAD SHX Text

OPPOSITE HAND

AutoCAD SHX Text

OPENING

AutoCAD SHX Text

OPPOSITE

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text O/O

AutoCAD SHX Text

OUT TO OUT

AutoCAD SHX Text N/A

AutoCAD SHX Text

NOT APPLICABLE

AutoCAD SHX Text

NS

AutoCAD SHX Text

PAV

AutoCAD SHX Text

PFN

AutoCAD SHX Text

PL

AutoCAD SHX Text

PLAS

AutoCAD SHX Text

PLBG

AutoCAD SHX Text

PLF

AutoCAD SHX Text

PLYWD

AutoCAD SHX Text

PNL

AutoCAD SHX Text

PRF

AutoCAD SHX Text

PROP

AutoCAD SHX Text

PSF

AutoCAD SHX Text

PSI

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

PAVING

AutoCAD SHX Text

PRE-FINISHED

AutoCAD SHX Text

PLATE

AutoCAD SHX Text

PLUMBING

AutoCAD SHX Text

POUNDS PER LINEAR FOOT

AutoCAD SHX Text

PLYWOOD

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

PRE-FORMED

AutoCAD SHX Text

PROPOSED

AutoCAD SHX Text

POUNDS PER SQUARE FOOT

AutoCAD SHX Text

POUNDS PER SQUARE INCH

AutoCAD SHX Text L

AutoCAD SHX Text P

AutoCAD SHX Text

QT

AutoCAD SHX Text

QUARRY TILE

AutoCAD SHX Text

PTW

AutoCAD SHX Text

PRESSURE TREATED WOOD

AutoCAD SHX Text

PLASTER, PLASTIC

AutoCAD SHX Text

PTN

AutoCAD SHX Text

PARTITION

AutoCAD SHX Text

PT

AutoCAD SHX Text

PAINT

AutoCAD SHX Text

PKG

AutoCAD SHX Text

PACKAGE, PARKING

AutoCAD SHX Text R

AutoCAD SHX Text

RBT

AutoCAD SHX Text

RCP

AutoCAD SHX Text

RD

AutoCAD SHX Text

REF

AutoCAD SHX Text

REFR

AutoCAD SHX Text

REINF

AutoCAD SHX Text

REQD

AutoCAD SHX Text

REV

AutoCAD SHX Text

RFG

AutoCAD SHX Text

RL

AutoCAD SHX Text

RM

AutoCAD SHX Text

RO

AutoCAD SHX Text R/W

AutoCAD SHX Text

RABBET

AutoCAD SHX Text

REINFORCED CONCRETE PIPE

AutoCAD SHX Text

ROOF DRAIN

AutoCAD SHX Text

REFERENCE

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

RESILIENT

AutoCAD SHX Text

ROOFING

AutoCAD SHX Text

ROOF LEADER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

ROUGH OPENING

AutoCAD SHX Text

RIGHT OF WAY

AutoCAD SHX Text

RES

AutoCAD SHX Text

RND

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

RH

AutoCAD SHX Text

RIGHT HAND

AutoCAD SHX Text H

AutoCAD SHX Text

HIGH

AutoCAD SHX Text

ANGLE, LONG

AutoCAD SHX Text

HT

AutoCAD SHX Text

RADIUS, RISER

AutoCAD SHX Text

REVISED, REVISION

AutoCAD SHX Text

REINFORCED, REINFORCING

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SCH

AutoCAD SHX Text

SECT

AutoCAD SHX Text

SF

AutoCAD SHX Text

SGT

AutoCAD SHX Text

SH

AutoCAD SHX Text

SHT

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SJ

AutoCAD SHX Text

SK

AutoCAD SHX Text

SL

AutoCAD SHX Text

SPC

AutoCAD SHX Text

SPEC

AutoCAD SHX Text

SQ

AutoCAD SHX Text

STA

AutoCAD SHX Text

STD

AutoCAD SHX Text

STL

AutoCAD SHX Text

STLJ

AutoCAD SHX Text

SUSP

AutoCAD SHX Text

SW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

SANITARY

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

SQUARE FOOT

AutoCAD SHX Text

STRUCTURAL GLAZED TILE

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SAW JOINT

AutoCAD SHX Text

SINK

AutoCAD SHX Text

SLEEVE

AutoCAD SHX Text

SPECIAL

AutoCAD SHX Text

SPECIFICATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

STEEL JOISTS

AutoCAD SHX Text

STRUCTURAL

AutoCAD SHX Text

SHORT WAY

AutoCAD SHX Text

SS

AutoCAD SHX Text

SYMMETRY, SYMMETRICAL

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

SCWD

AutoCAD SHX Text

TB

AutoCAD SHX Text

TBM

AutoCAD SHX Text

TEMP

AutoCAD SHX Text

TD

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TKBD

AutoCAD SHX Text

TYP

AutoCAD SHX Text

TREAD

AutoCAD SHX Text

TOP & BOTTOM

AutoCAD SHX Text

TEST BORING/TOP OF BEAM

AutoCAD SHX Text

TEMPORARY BENCH MARK

AutoCAD SHX Text

TOP OF COLUMN

AutoCAD SHX Text

TRENCH DRAIN

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TOP OF JOIST

AutoCAD SHX Text

TACKBOARD

AutoCAD SHX Text

TOP OF MASONRY

AutoCAD SHX Text

TOP OF SLAB

AutoCAD SHX Text

TOP OF WALL

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

TERRAZZO

AutoCAD SHX Text

UC

AutoCAD SHX Text

UG

AutoCAD SHX Text

UR

AutoCAD SHX Text

VPRD

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VCP

AutoCAD SHX Text

VTR

AutoCAD SHX Text

VWC

AutoCAD SHX Text

UNDERCUT

AutoCAD SHX Text

UNDERGROUND

AutoCAD SHX Text

URINAL

AutoCAD SHX Text

VINYL COMPOSITION TILE

AutoCAD SHX Text

VITRIFIED CLAY PIPE

AutoCAD SHX Text

VERTICAL

AutoCAD SHX Text

VENT THRU ROOF

AutoCAD SHX Text

VINYL WALL COVERING

AutoCAD SHX Text W/

AutoCAD SHX Text

WC

AutoCAD SHX Text

WD

AutoCAD SHX Text

WH

AutoCAD SHX Text

WL

AutoCAD SHX Text

WM

AutoCAD SHX Text W/O

AutoCAD SHX Text

WP

AutoCAD SHX Text

WSCT

AutoCAD SHX Text

WWF

AutoCAD SHX Text

YD

AutoCAD SHX Text

WITH

AutoCAD SHX Text

WATER CLOSET

AutoCAD SHX Text

WALL HYDRANT

AutoCAD SHX Text

WIND LOAD

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

WITHOUT

AutoCAD SHX Text

WATERPROOFING

AutoCAD SHX Text

WAINSCOT

AutoCAD SHX Text

WELDED WIRE FABRIC

AutoCAD SHX Text

YARD DRAIN

AutoCAD SHX Text

TEMPORARY, TEMPERATURE

AutoCAD SHX Text

TERR

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text T&B

AutoCAD SHX Text T

AutoCAD SHX Text T/C

AutoCAD SHX Text

T/COL

AutoCAD SHX Text T/M

AutoCAD SHX Text T/S

AutoCAD SHX Text T/W

AutoCAD SHX Text

THK

AutoCAD SHX Text

THICK

AutoCAD SHX Text

TOP OF CONCRETE, TOP OF CURB

AutoCAD SHX Text

UNO

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

UL

AutoCAD SHX Text

UNDERWRITERS LABORATORY

AutoCAD SHX Text W

AutoCAD SHX Text

WIDE

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

VIR

AutoCAD SHX Text

VERIFY IN FIELD

AutoCAD SHX Text C

AutoCAD SHX Text

VEST

AutoCAD SHX Text

VERT

AutoCAD SHX Text T/J

AutoCAD SHX Text

VAR

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

VAPOR RETARDER

AutoCAD SHX Text

SOLID CORE WOOD

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SQUARE

AutoCAD SHX Text

SUSPENDED

AutoCAD SHX Text

STRUC

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text N

AutoCAD SHX Text F1

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

DOOR INDICATOR

AutoCAD SHX Text

WALL TYPE

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

AutoCAD SHX Text

AE101

AutoCAD SHX Text

AutoCAD SHX Text

AE101

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AE101

AutoCAD SHX Text

AutoCAD SHX Text

AE101

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text A

A

UP

DN

DN.

UPDN.

DN.UP

DN.

UPUP

DN

UP

DN

DN UP

DN

CHASE

CHASE

3.17

CHASE

2.22

CHASE

1.99

CHASE

1.13

CHASE

2.5

CHASE

5.34

CHASE

4.5

CHASE3.46

CHASE

CHASE

CHASE

3.85

CHASE

CHASE

3.42

CHASE

CHASE

CHASE

CHASE

2.5

CHASE

CHASE

CHASE

CHASE

CHASE

5.83

CHASE

4.75

CHASE

CHASE

8.33

CLOSET

5.45

CHASE

5.45

CHASE 5.22

CHASE

3.75

CHASE

3.17

CHASE

5.72

CHASE

CHASE

3.79

CHASE

11.41

CHASE

5.5

CHASE

6.83

CHASE

CHASE

A3-12 11.87

DUMBWAITER

CHASE

9.33

CHASE

14.17

ELECTRICAL

CLOSET

A3-14 13.75

DUMBWAITER

A3-15 13.75

DUMBWAITER

B3-43A 11.96

TELEPHONE CLOSET

5.12

CHASE

16.81

ELECTRICAL CLOSET

10.2

CHASE

14.25

CHASE

12.65

CHASE

10.68

CHASE

11.92

CHASE

13.37

CHASE

A3-13 14.11

DUMBWAITER

11.67

CHASE

C3-34A 15.37

CLOSET

10.69

CHASE

12.36

CHASE

C3-7A 12.19

TELEPHONE CLOSET

E3-109B 20.62

TELEPHONE

CLOSET

C3-16A 21.19

RESTROOM

24.03

CHASE

22.19

CHASE

24.03

CHASE

B3-55 29.79 H.A.C. 20.64

CHASE

B3-57 34.12

STORAGE

22.95

CHASE

30.9

CHASE

22.22

CHASE

23.53

CHASE

E3-112 34.39

COMMUNICATIONS

ROOM

E3-98 39.88

RESTROOM

E3-103 41.99

RESTROOM

F3-02 38.48

TELEPHONE

CLOSET

A3-40 39.91

RESTROOM

E3-96 44.25

RESTROOM

31.46

CHASE

E3-105 46.71

RESTROOM

C3-21B 42.07

RESTROOM

C3-30 40.74

ELECTRICALB3-45A

55.27

STORAGE

C3-34 49.11

HAC

E3-100 47.51

RESTROOM

E3-101 47.51

RESTROOM

A3-41 51.18

RESTROOM

F3-21 53.35

RESTROOM

C3-29 53.16

CLOSET

B3-67-A 110.94

RESTROOM

49.92

CHASE

F3-37 61.51

HOUSEKEEPING

C3-19 66.08

STORAGE

42.21

CHASE

F3-58 63.9

SCRUB ROOM

50.31

CHASE

CHASE

F3-60 63.03

CLEAN

UTILITY

F3-22 56.16

RESTROOM

F3-69 72.87

HOUSE KEEPING

F3-23 56.16

RESTROOM

F3-64 66.8

STORAGE

F3-46 68.78

BIO MED

WORK ROOM

F3-45 68.79

STORAGE

F3-72 76.3

STORAGE

F3-57 65.02

UTILITY

ELEV. #3

75.72

ELEVATOR

ELEV. #4

75.28

ELEVATOR

F3-76 84.37

STORAGE

ELEV. #7

75.64

ELEVATOR

ELEV. #8

75.72

ELEVATOR

ELEV. #9

74.92

ELEVATOR

C3-16 76.51

OFFICE

ELEV. #5

77.25

ELEVATOR

81.67

CORRIDOR

F3-70 89.23

STORAGE

F3-73 86.13

EMERGENCY

ELECTRICAL

CLOSET

69.4

CHASE

F3-26 86.16

HOUSEKEEPING

D3-115B 88.35

CLOSET

ELEV. #6

78.86

ELEVATOR

ELEV. #10

79.67

ELEVATOR

F3-33A 119.48

SHOWER

F3-09 101.37

ANESTHESIA

OFFICE

E3-92 138.93

OFFICE

F3-36 102.96

NURSE

MANAGER

OFFICE

F3-17 93.32

ELECTRICAL

CLOSET

F3-25 102.43

LOUNGE

F3-42 92.36

UTILITY

F3-71 104.67

STORAGE

F3-28 100.32

ELECTRICAL

CLOSET

F3-24 93.3

MEDICATION

ROOM

F3-41 105.02

SCRUB ROOM

101.96

ELEVATOR

ELEV. #1

95.23

ELEVATOR,

SERVICE

ELEV. #2

93.48

ELEVATOR,

SERVICE

F3-27 98.06

SOLID UTILITY

C3-28 111.36

RESTROOM

102.08

ELEVATOR

F3-34 95.67

OFFICE?

F3-54 123.31

SCRUB ROOM

111.37

ELEVATOR

CR-F3-C11

124.38

CORRIDOR

F3-68 122.99

STORAGE

120.75

SHAFT

B3-61 113.59

OFFICE

D3-117 128.92

OFFICE

F3-75 140.1

MED ROOM

85.5

CHASE

85.5

CHASE

F3-10 101.26

WORK

ROOM

B3-63 118.08

STORAGE

B3-65A 133.74

OFFICE

D3-123 119.58

RESTROOM

E3-94 122.23

ELECTRICAL

B3-66 131.67

OFFICE

C3-26 130.49

RESTROOM

F3-62 124.65

UTILITY

F3-11 143.02

WORK ROOM

F3-12 152.52

RECEPTION

F3-33 84.56

CLEAN UTILITY

143.12

CHASE

D3-125 165.15

OFFICE

C3-32 160.82

OFFICE

E3-87 165.02

OFFICE

C3-6 163.08

OFFICE

C3-9 174.37

OFFICE

C3-3 157.89

OFFICE

F3-67 159.9

SCRUB ROOM

F3-53 154.58

UTILITY

C3-10

OFFICE

C3-11 163.44

OFFICE

C3-31 174.6

OFFICE

C3-33 173.24

OFFICE

ST-E3-93

156.35

STAIRWAY

B3-65 173.18

OFFICE

E3-110 165.56

MECH

D3-124 154.9

RESTROOM

C3-7 188.11

OFFICE

E3-90A 223.52

CHAPLAIN

ST-A3-126

157.64

STAIRWAY

A3-1 183.18

OFFICE

ST-D3-116

168.9

STAIRWAY

C3-4 196.15

OFFICE

F3-66 195.08

STORAGE

C3-25 176.56

OFFICE

E3-97 195.63

OFFICE

C3-13 193.64

OFFICE

E3-104 198.31

OFFICE

F3-32 205.87

PROCEDURE

ROOM

C3-2 191.19

PSTD

E3-95 205.68

OFFICE

E3-99 208.95

OFFICE

E3-102 209.25

OFFICE

201.87

STAIRWAY

E3-88 199.93

BREAK ROOM

F3-31 209.23

PROCEDURE

ROOM

E3-107 214.36

OFFICE

F3-35 225.78

WORK ROOM

C3-12 218.57

OFFICE

E3-106 216.69

READING ROOM

ST-C3-18

188.16

STAIRWAY

B3-68 220.79

OFFICE

F3-07 229.02

LOUNGE

ST-B3-58

192.57

STAIRWAY

E3-108 231.68

VETERANS

CLOTHING

STORAGE

3D-127 223.81

CHAPEL

B3-59 241.04

OFFICE

F3-39 233.72

ANESTHESIA

WORKROOM

ST-F3-52

205.61

STAIRWAY

B3-70 255.45

STORAGE

C3-17 255.76

OFFICE

F3-08 269.66

LOUNGE

ST-F3-S1

205.61

STAIRWAY

F3-03 380.12

FEMALE

LOCKER

ROOM

C3-21 453.59

WAITING ROOM

C3-15 439.06

OFFICE

F3-56 340.3

OR-7

F3-48 340.32

OR-8

C3-23A 93.34

OFFICE

C3-24 173.29

OFFICE

B3-61 365.02

OFFICE

B3-63 375.5

OFFICE

F3-55 351.93

OR-4

F3-52 351.92

OR-3

A3-76 679.27

KITCHEN

F3-05 539.86

MALE

LOCKER

ROOM

C3-8 252.67

OFFICE

B3-43 514.24

OFFICE

B3-69 562.47

OFFICE

CR-D3-114

573.72

CORRIDOR

F3-40 620.62

OR-1

F3-43 620.9

OR-2

F3-63 643.89

OR-5

F3-61 643.75

OR-6

D3-115A

VENDING

D3-85 868.13

SEATING

D3-84 1793.54

CANTEEN

D3-115 1833.81

RETAIL STORAGE

E3-109 567.18

IRM TRAINING ROOM

D3-118 1198.36

CANTEEN STORAGE

D3-118 236.68

OFFICE

D3-120-A 197.92

OFFICE

D3-121 184.53

OFFICE

D3-122 233.92

OFFICE

D3-122-A 200.4

OFFICE

E3-88A 389.03

STORAGE

E3-89 252.64

OFFICE

A3-76 44.56 H.A.C.

B3-42 195.7

OFFICE

11.43

CLOSET

A3-38 132.13

STORAGE

A3-37 170.98

STORAGE CR-F3-02

105.72

CORRIDOR

A3-37 378.48

STORAGE

CHASE

3C-35 230.34

RESOURCE

ROOM STORAGE

CR-F3-C10

790.19

CORRIDOR

CR-F3-C14

1481.07

CORRIDOR

CR-F3-C08

1331.43

CORRIDOR

3F-50 1466.74

CENTRAL SUPPLY

CR-3F-C15

737.95

CORRIDOR

CR-F3-05

1174.75

CORRIDOR

F3-29 2850.94

ASU

F3-13 1381.17

PACU / RECOVERY

CR-F3-C031

366.78

CORRIDOR

B3-45A 1715.7

COMPUTER ROOM

9.83

ELECTRICAL CLOSET

CR-B3-62

1130.38

CORRIDOR

CR-A3-78

1161.14

LOBBY

CR-A3-74

339.56

CORRIDOR

CR-C3-22

1231.39

CORRIDOR

10.86

ELECTRICAL

CLOSET

CR-E3-111

1245.44

CORRIDOR

CR-D3-127

838.77

CORRIDOR

11.43

CLOSET

CR-F3-C031

204.35

CORRIDOR

B3-74 156.67

KITCHEN

F3-04-1F 1899.43

ELEVATOR LOBBY

E3-109-B 245.42

TRAINING

ROOM

E3-109-A 231.96

OFFICE

E3-111 12.92

HOUSEKEEPING

257.1

CANTEEN

STORAGE

E3-112 60.96

4.43

CHASE

71.31

CHASE

E3-90 300.15

CHAPLIN

F3-74 112.78

NORMAL

ELECTRICAL

CLOSET

C3-21A 102.78

OFFICE

C3-24A 158.01

OFFICE

C3-23 160.32

OFFICE

C3-8A 239.85

CONFERENCE ROOM

D3-120 106.36

OFFICE

5.5

ELEC

A3-39 24.18

A3-77 22.17

FIRE ALARM

PANEL

C3-14 175.6

CORRIDOR

53.1

UNKNOWN

F3-06 114.07

MENS

RESTROOM

F3-04 112.33

WOMENS

RESTROOM

F3-18 116.12

STORAGE

F3-19 124.15

WORK STATION

1.56

CHASE

22.71

TEL ROOM

F3-38 142.48

ANASTHESIA

MED ROOM

F3-44 15.63

ELECTRICAL

F3-47 18.6

ELECTRICAL

F3-59 22.09

ELECTRICAL

F3-65 16.49

ELECTRICAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

ST-F3-52 205.61 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-F3-S1 205.61 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-B3-58 192.57 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-C3-18 188.16 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-A3-126 157.64 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-E3-93 156.35 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

ST-D3-166 158.9 STAIRWAY EGRESS CAPACITY: 210 PEOPLE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

THIRD FLOOR LIFE SAFETY PLAN

AutoCAD SHX Text

THIRD FLOOR LIFE SAFETY PLAN

AutoCAD SHX Text

GI002

AutoCAD SHX Text

AB

AutoCAD SHX Text

BVG

AutoCAD SHX Text F1

AutoCAD SHX Text

FB

AutoCAD SHX Text

SW

AutoCAD SHX Text

SR

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

LIFE SAFETY LINE TYPES

AutoCAD SHX Text

NOTE: ALL SYMBOLS MAY NOT BE USED EXISTING RATED WALLS SHOWN AS HALF-TONE

AutoCAD SHX Text

FIRE RESISTIVE RATED LINE, 1 HOUR

AutoCAD SHX Text

FIRE RESISTIVE RATED LINE, 2 HOUR

AutoCAD SHX Text

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

AutoCAD SHX Text

FIRE-RATED, FIRE BARRIER LINE, 2 HOUR

AutoCAD SHX Text

FIRE-RATED, SMOKE BARRIER LINE, 30 MIN

AutoCAD SHX Text

NON-RATED, SUITE LINE, (SMOKE RESISTIVE)

AutoCAD SHX Text

NON-RATED SMOKE RESISTIVE

AutoCAD SHX Text

HE

AutoCAD SHX Text

FEC

AutoCAD SHX Text

LIFE SAFETY PLAN LEGEND

AutoCAD SHX Text

NOTE: ALL SYMBOLS MAY NOT BE USED

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET / FIRE EXTINGUISHER

AutoCAD SHX Text

HORIZONTAL EXIT

AutoCAD SHX Text

EXIT SIGN

AutoCAD SHX Text

EGRESS PATH (COMMON PATH)

AutoCAD SHX Text

MEANS OF EGRESS

AutoCAD SHX Text NO. OF EXITS PROVIDED OF EXITS PROVIDED LEVEL 3 07 07 MAXIMUM TRAVEL DISTANCE (PER IBC 2018 TABLE 1017.2) 300'-0" SPRINKLED (B OCCUPANCY) 250'-0" SPRINKLED (A OCCUPANCY)

AutoCAD SHX Text

BUILDING CODE AND GUILDLINES

AutoCAD SHX Text VA FIRE PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015 VA FIRE PROTECTION DESIGN MANUAL, 6TH EDITION, 2011 INTERNATIONAL BUILDING CODE (FOR HEIGHT AND AREA INFORMATION ONLY) NFPA 101, LIFE SAFETY CODE, 2015 NFPA 1, FIRE CODE, 2015 NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 NFPA 70, NATIONAL ELECTRICAL CODE, 2014 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2013 NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, 2015 NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2013 NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2013 NATIONAL STANDARD PLUMBING CODE (NSPC) OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) ASHRAE/IESNA STANDARD 90.1 - 2007 ENERGY STANDARD, APPENDIX G

AutoCAD SHX Text

EMERGENCY BATTERY WALL PACK LIGHT

AutoCAD SHX Text

FE

AutoCAD SHX Text N

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

DN

DN

PHASE III

OR 5 & 6

PHASE II

OR 3 & 4

PHASE I

OR 1 & 2

PHASE IV

CEN. SUPP

PHASE VA

SDSU

PHASE II

PACU

PHASE

VI & VII

STAGING

AREA

PHASE I

OR 1 & 2

PHASE III

OR 1 & 2

PHASE VB

SDSU

PHASE II

OR 7 & 8

F3-21 53.35

RESTROOM

F3-37 61.51

HOUSEKEEPING

42.21

CHASE

F3-58 63.9

SCRUB ROOM

50.31

CHASE

F3-60 63.03

CLEAN

UTILITY

F3-22 56.16

RESTROOM

F3-69 72.87

HOUSE KEEPING

F3-23 56.16

RESTROOM

F3-64 66.8

STORAGE

F3-46 68.78

BIO MED

WORK ROOM

F3-45 68.79

STORAGE

F3-72 76.3

STORAGE

F3-57 65.02

UTILITY

F3-76 84.37

STORAGE

F3-70 89.23

STORAGE

F3-73 86.13

EMERGENCY

ELECTRICAL

CLOSET

F3-26 86.16

HOUSEKEEPING

F3-33A 119.48

SHOWER

F3-09 101.37

ANESTHESIA

OFFICE

F3-36 102.96

NURSE

MANAGER

OFFICE

F3-17 93.32

ELECTRICAL

CLOSET

F3-25 102.43

LOUNGE

F3-42 92.36

UTILITY

F3-71 104.67

STORAGE

F3-28 100.32

ELECTRICAL

CLOSET

F3-24 93.3

MEDICATION

ROOM

F3-41 105.02

SCRUB ROOM

101.96

ELEVATOR

F3-27 98.06

SOLID UTILITY

102.08

ELEVATOR

F3-34 95.67

OFFICE?

F3-54 123.31

SCRUB ROOM

111.37

ELEVATOR

CR-F3-C11

124.38

CORRIDOR

F3-68 122.99

STORAGE

120.75

SHAFT

F3-75 140.1

MED ROOM

85.5

CHASE

85.5

CHASE

F3-10 101.26

WORK

ROOM

F3-62 124.65

UTILITY

F3-11 143.02

WORK ROOM

F3-12 152.52

RECEPTION

F3-33 84.56

CLEAN UTILITY

F3-67 159.9

SCRUB ROOM

F3-53 154.58

UTILITY

F3-66 195.08

STORAGE

F3-32 205.87

PROCEDURE

ROOM

F3-31 209.23

PROCEDURE

ROOM

F3-35 225.78

WORK ROOM

F3-07 229.02

LOUNGE

F3-39 233.72

ANESTHESIA

WORKROOM

ST-F3-52

205.61

STAIRWAY

F3-08 269.66

LOUNGE

ST-F3-S1

205.61

STAIRWAY

F3-56 340.3

OR-7

F3-48 340.32

OR-8

F3-55 351.93

OR-4

F3-52 351.92

OR-3

F3-40 620.62

OR-1

F3-43 620.9

OR-2

F3-63 643.89

OR-5

F3-61 643.75

OR-6

CR-F3-C10

790.19

CORRIDOR

CR-F3-C14

1481.07

CORRIDOR

CR-F3-C08

1331.43

CORRIDOR

3F-50 1466.74

CENTRAL SUPPLY

CR-3F-C15

737.95

CORRIDOR

CR-F3-05

1174.75

CORRIDOR

F3-29 2850.94

ASU

F3-13 1381.17

PACU / RECOVERY

CR-F3-C031

204.35

CORRIDOR

F3-04-1F 1899.43

ELEVATOR LOBBY

F3-74 112.78

NORMAL

ELECTRICAL

CLOSET

F3-18 116.12

STORAGEF3-19

124.15

WORK STATION

1.56

CHASE

22.71

TEL ROOM

F3-38 142.48

ANASTHESIA

MED ROOM

F3-44 15.63

ELECTRICAL

F3-47 18.6

ELECTRICAL

F3-59 22.09

ELECTRICAL

F3-65 16.49

ELECTRICAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text 5'-7 "12"

AutoCAD SHX Text 3/32" = 1'-0"

AutoCAD SHX Text

OVERALL PHASING PLANS

AutoCAD SHX Text

OVERALL PHASING PLANS

AutoCAD SHX Text

GI003

AutoCAD SHX Text

AB

AutoCAD SHX Text

BV

AutoCAD SHX Text P1

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

GENERAL PHASING PLAN NOTES

AutoCAD SHX Text PHASE I: PHASE I CONSISTS OF THE CONSTRUCTION OF A TEMPORARY CONSTRUCTION CONTAINMENT WALLS, CHANGE AREA, THE DEMOLITION OF THE SHEET VINYL FLOORING AND COVE BASE AND THE INSTALLATION OF NEW FLUID-APPLIED FLOORING AND COVE BASE. A. REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FROM THE CENTRAL SUPPLY ROOM (3F-50). WORK TO BE PERFORMED BY THE VAMC. B. REMOVE AND SALVAGE THE DOORS FROM THE CENTRAL SUPPLY ROOM INTO REMOVE AND SALVAGE THE DOORS FROM THE CENTRAL SUPPLY ROOM INTO THE OPERATION ROOMS AND INSTALL TEMPORARY CONSTRUCTION CONTAINMENT BARRIER WALLS. REFER TO SHEET AEXXX AND SPECIFICATIONS FOR INFORMATION REGARDING CONTAINMENT BARRIER CONSTRUCTION AND INSTALLATION PROTOCOLS. C. REMOVE EXISTING SHEET VINYL FLOORING AND COVE BASE; PREP (REPAIR REMOVE EXISTING SHEET VINYL FLOORING AND COVE BASE; PREP (REPAIR AS REQUIRE) THE EXISTING CONCRETE SLAB FOR NEW FLOOR FINISH. PREP, REPAIR OR REPLACE WALL ASSEMBLY FOR NEW COVE BASE AND WALL PAINT. D. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE. NEW FLOORING TO INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE. NEW FLOORING TO TERMINATE AT THE CENTERLINE OF DOOR OPENINGS. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. E. INSTALL PLASTIC CONTAINMENT BARRIER FROM THE CENTRAL SUPPLY TO INSTALL PLASTIC CONTAINMENT BARRIER FROM THE CENTRAL SUPPLY TO THE OPERATING ROOM. F. WORK TO BE PERFORMED PRIOR TO START OF EACH SCHEDULED PHASE WORK TO BE PERFORMED PRIOR TO START OF EACH SCHEDULED PHASE WORK: 1. REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FOR THE CENTRAL SUPPLY ROOM. WORK TO BE PERFORMED BY THE VAMC. 2. THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION CONTAINMENT WALLS 3. DEMOLITION OF TEMPORARY CONTAINMENTS TO CENTRAL SUPPLY.DEMOLITION OF TEMPORARY CONTAINMENTS TO CENTRAL SUPPLY.

AutoCAD SHX Text

PHASING PLAN NOTES

AutoCAD SHX Text A. REFER TO SHEET GI001 FOR LEGEND, ABBREVIATIONS, AND OTHER GENERAL NOTES REFER TO SHEET GI001 FOR LEGEND, ABBREVIATIONS, AND OTHER GENERAL NOTES RELATED TO THIS PROJECT. B. THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. UNLESS OTHERWISE DIRECTED BY THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. UNLESS OTHERWISE DIRECTED BY THE VAMC COR, THE WORK DESCRIBED IN THIS CONTRACT IS TO BE PERFORMED BETWEEN THE HOURS OF 6:00 PM AND 6:00 AM DURING THE WEEKDAYS. WEEKENDS TO BE COORDINATED WITH THE VA C. CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE OWNER. ALL CONSTRUCTION WORKERS, MATERIALS AND CLOTHING WILL BE TRANSPORTED THROUGH THE HOSPITAL DUST FREE. ANY DUSTY, ODOROUS, OR WET MATERIALS SHALL BE TRANSPORTED IN SEALED CLEAN BAGS. TRAFFIC ROUTES WILL BE AT THE DISCRETION OF THE OWNER. D. PROTECT WORK DONE IN PRIOR PHASES. PROTECT WORK DONE IN PRIOR PHASES. E. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH VA. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH VA. F. ALLOW 10 DAYS FROM START TO FINISH FOR INSTALLATION OF POURED EPOXY ALLOW 10 DAYS FROM START TO FINISH FOR INSTALLATION OF POURED EPOXY FLOORS. G. ALLOW 2 DAYS FROM START TO FINISH FOR INSTALLATION OF ALTRO WALL PANELS. ALLOW 2 DAYS FROM START TO FINISH FOR INSTALLATION OF ALTRO WALL PANELS. H. CONTRACTOR IS NOT RESPONSIBLE FOR CLEANING ACCORDING TO HIPPA STANDARDS. CONTRACTOR IS NOT RESPONSIBLE FOR CLEANING ACCORDING TO HIPPA STANDARDS. I. CONTRACTOR TO DISCUSS POSSIBLE STAGING AREA LOCATIONS WITH VA. CONTRACTOR TO DISCUSS POSSIBLE STAGING AREA LOCATIONS WITH VA. J. REFER TO AD-SERIES SHEETS FOR ARCHITECTURAL DEMOLITION AND NEW WORK REFER TO AD-SERIES SHEETS FOR ARCHITECTURAL DEMOLITION AND NEW WORK PLANS.

AutoCAD SHX Text PHASES I, II, III, & IV: - - PHASES CONSISTS OF WORK TO BE PERFORMED IN THE OPERATING ROOMS, SCRUB ROOM AND UTILITY. A. REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FOR THE CENTRAL SUPPLY ROOM (3F-50). WORK TO BE PERFORMED BY THE VAMC. B. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. C. DEMOLITION OF THE SHEET VINYL FLOORING, COVE BASE, PROTECTIVE DEMOLITION OF THE SHEET VINYL FLOORING, COVE BASE, PROTECTIVE WALL COVERING AND STAINLESS STEEL CORNER GUARDS. D. PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR REPLACE WALLS AS REQUIRED FOR NEW PROTECTIVE WALL COVERING AND PAINT FINISH. E. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE, SHEET VINYL INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE, SHEET VINYL PROTECTIVE WALL COVERING, STAINLESS STEEL CORNER GUARDS. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. F. REINSTALL SALVAGED DOORS WITHIN EACH SCHEDULED PHASE, INCLUDING REINSTALL SALVAGED DOORS WITHIN EACH SCHEDULED PHASE, INCLUDING THE DOOR TO THE CENTRAL SUPPLY. G. WORK TO BE PERFORMED PRIOR TO START OF PHASE VI AND VII WORK: WORK TO BE PERFORMED PRIOR TO START OF PHASE VI AND VII WORK: 1. REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES. WORK TO BE PERFORMED BY THE VAMC. 2. THE CONSTRUCTION TEMPORARY CONSTRUCTION CONTAINMENT WALLS THE CONSTRUCTION TEMPORARY CONSTRUCTION CONTAINMENT WALLS FOR STAGING AREA WITHIN SDUS. 3. THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION CONTAINMENT WALLS.

AutoCAD SHX Text PHASES II, VA AND VB: - - PHASES CONSISTS WORK TO BE PERFORMED IN THE PACU/RECOVERY SUITE (PHASE II) AND THE ASU SUITE AND ADJACENT PROCEDURE ROOMS (PHASE VA & VB.) A. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. B. DEMOLISH SHEET VINYL FLOORING, COVE BASE, AND STAINLESS STEEL DEMOLISH SHEET VINYL FLOORING, COVE BASE, AND STAINLESS STEEL CORNER GUARDS. C. PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR REPLACE WALLS AS REQUIRED FOR NEW PAINT FINISH. D. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE AND STAINLESS INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE AND STAINLESS STEEL CORNER GUARDS. E. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. F. REINSTALL SALVAGED DOORS IN SAME LOCATION.REINSTALL SALVAGED DOORS IN SAME LOCATION.

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

AutoCAD SHX Text

PRINT SHEET IN COLOR

PHASE I

OR 1 & 2

PHASE I

OR 1 & 2

F3-37 61.51

HOUSEKEEPING

42.21

CHASE

F3-58 63.9

SCRUB ROOM

F3-60 63.03

CLEAN

UTILITY

F3-23 56.16

RESTROOM

F3-64 66.8

STORAGE

F3-46 68.78

BIO MED

WORK ROOM

F3-45 68.79

STORAGE

F3-57 65.02

UTILITY

F3-33A 119.48

SHOWER

F3-09 101.37

ANESTHESIA

OFFICE

F3-36 102.96

NURSE

MANAGER

OFFICE

F3-42 92.36

UTILITY

F3-41 105.02

SCRUB ROOM

101.96

ELEVATOR

102.08

ELEVATOR

F3-34 95.67

OFFICE?

F3-54 123.31

SCRUB ROOM

85.5

CHASE

85.5

CHASE

F3-10 101.26

WORK

ROOM

F3-11 143.02

WORK ROOM

F3-12 152.52

RECEPTION

F3-33 84.56

CLEAN UTILITY

F3-53 154.58

UTILITY

F3-32 205.87

PROCEDURE

ROOM

F3-31 209.23

PROCEDURE

ROOM

F3-35 225.78

WORK ROOM

LOUNGE

F3-39 233.72

ANESTHESIA

WORKROOM

F3-08 269.66

LOUNGE

F3-56 340.3

OR-7

F3-48 340.32

OR-8

F3-55 351.93

OR-4

F3-52 351.92

OR-3

F3-40 620.62

OR-1

F3-43 620.9

OR-2

CR-F3-C14

1481.07

CORRIDOR

CR-F3-C08

1331.43

CORRIDOR

3F-50 1466.74

CENTRAL SUPPLY

CR-3F-C15

737.95

CORRIDOR

CR-F3-05

1174.75

CORRIDOR

CR-F3-C031

204.35

CORRIDOR

1.56

CHASE

22.71

TEL ROOM

F3-38 142.48

ANASTHESIA

MED ROOM

F3-44 15.63

ELECTRICAL

F3-47 18.6

ELECTRICAL

F3-59 22.09

ELECTRICAL

F3-65 16.49

ELECTRICAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text 3/16" = 1'-0"

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE I

AutoCAD SHX Text

ENLARGED PHASING PLANS - PHASE I

AutoCAD SHX Text

GI003.1

AutoCAD SHX Text

AB

AutoCAD SHX Text

BV

AutoCAD SHX Text P1

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

GENERAL PHASING PLAN NOTES

AutoCAD SHX Text PHASE I: PHASE I CONSISTS OF THE CONSTRUCTION OF A TEMPORARY CONSTRUCTION CONTAINMENT WALLS, CHANGE AREA, THE DEMOLITION OF THE SHEET VINYL FLOORING AND COVE BASE AND THE INSTALLATION OF NEW FLUID-APPLIED FLOORING AND COVE BASE. A. REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FROM THE CENTRAL SUPPLY ROOM (3F-50). WORK TO BE PERFORMED BY THE VAMC. B. REMOVE AND SALVAGE THE DOORS FROM THE CENTRAL SUPPLY ROOM INTO REMOVE AND SALVAGE THE DOORS FROM THE CENTRAL SUPPLY ROOM INTO THE OPERATION ROOMS AND INSTALL TEMPORARY CONSTRUCTION CONTAINMENT BARRIER WALLS. REFER TO SHEET AEXXX AND SPECIFICATIONS FOR INFORMATION REGARDING CONTAINMENT BARRIER CONSTRUCTION AND INSTALLATION PROTOCOLS. C. REMOVE EXISTING SHEET VINYL FLOORING AND COVE BASE; PREP (REPAIR REMOVE EXISTING SHEET VINYL FLOORING AND COVE BASE; PREP (REPAIR AS REQUIRE) THE EXISTING CONCRETE SLAB FOR NEW FLOOR FINISH. PREP, REPAIR OR REPLACE WALL ASSEMBLY FOR NEW COVE BASE AND WALL PAINT. D. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE. NEW FLOORING TO INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE. NEW FLOORING TO TERMINATE AT THE CENTERLINE OF DOOR OPENINGS. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. E. INSTALL PLASTIC CONTAINMENT BARRIER FROM THE CENTRAL SUPPLY TO INSTALL PLASTIC CONTAINMENT BARRIER FROM THE CENTRAL SUPPLY TO THE OPERATING ROOM. F. WORK TO BE PERFORMED PRIOR TO START OF EACH SCHEDULED PHASE WORK TO BE PERFORMED PRIOR TO START OF EACH SCHEDULED PHASE WORK: 1. REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FOR THE CENTRAL SUPPLY ROOM. WORK TO BE PERFORMED BY THE VAMC. 2. THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION CONTAINMENT WALLS 3. DEMOLITION OF TEMPORARY CONTAINMENTS TO CENTRAL SUPPLY.DEMOLITION OF TEMPORARY CONTAINMENTS TO CENTRAL SUPPLY.

AutoCAD SHX Text

PHASING PLAN NOTES

AutoCAD SHX Text A. REFER TO SHEET GI001 FOR LEGEND, ABBREVIATIONS, AND OTHER GENERAL NOTES REFER TO SHEET GI001 FOR LEGEND, ABBREVIATIONS, AND OTHER GENERAL NOTES RELATED TO THIS PROJECT. B. THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. UNLESS OTHERWISE DIRECTED BY THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. UNLESS OTHERWISE DIRECTED BY THE VAMC COR, THE WORK DESCRIBED IN THIS CONTRACT IS TO BE PERFORMED BETWEEN THE HOURS OF 6:00 PM AND 6:00 AM DURING THE WEEKDAYS. WEEKENDS TO BE COORDINATED WITH THE VA C. CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE OWNER. ALL CONSTRUCTION WORKERS, MATERIALS AND CLOTHING WILL BE TRANSPORTED THROUGH THE HOSPITAL DUST FREE. ANY DUSTY, ODOROUS, OR WET MATERIALS SHALL BE TRANSPORTED IN SEALED CLEAN BAGS. TRAFFIC ROUTES WILL BE AT THE DISCRETION OF THE OWNER. D. PROTECT WORK DONE IN PRIOR PHASES. PROTECT WORK DONE IN PRIOR PHASES. E. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH VA. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH VA. F. ALLOW 10 DAYS FROM START TO FINISH FOR INSTALLATION OF POURED EPOXY ALLOW 10 DAYS FROM START TO FINISH FOR INSTALLATION OF POURED EPOXY FLOORS. G. ALLOW 2 DAYS FROM START TO FINISH FOR INSTALLATION OF ALTRO WALL PANELS. ALLOW 2 DAYS FROM START TO FINISH FOR INSTALLATION OF ALTRO WALL PANELS. H. CONTRACTOR IS NOT RESPONSIBLE FOR CLEANING ACCORDING TO HIPPA STANDARDS. CONTRACTOR IS NOT RESPONSIBLE FOR CLEANING ACCORDING TO HIPPA STANDARDS. I. CONTRACTOR TO DISCUSS POSSIBLE STAGING AREA LOCATIONS WITH VA. CONTRACTOR TO DISCUSS POSSIBLE STAGING AREA LOCATIONS WITH VA. J. REFER TO AD-SERIES SHEETS FOR ARCHITECTURAL DEMOLITION AND NEW WORK REFER TO AD-SERIES SHEETS FOR ARCHITECTURAL DEMOLITION AND NEW WORK PLANS.

AutoCAD SHX Text PHASES I, II, III, & IV: - - PHASES CONSISTS OF WORK TO BE PERFORMED IN THE OPERATING ROOMS, SCRUB ROOM AND UTILITY. A. REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES FOR THE CENTRAL SUPPLY ROOM (3F-50). WORK TO BE PERFORMED BY THE VAMC. B. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. C. DEMOLITION OF THE SHEET VINYL FLOORING, COVE BASE, PROTECTIVE DEMOLITION OF THE SHEET VINYL FLOORING, COVE BASE, PROTECTIVE WALL COVERING AND STAINLESS STEEL CORNER GUARDS. D. PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR REPLACE WALLS AS REQUIRED FOR NEW PROTECTIVE WALL COVERING AND PAINT FINISH. E. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE, SHEET VINYL INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE, SHEET VINYL PROTECTIVE WALL COVERING, STAINLESS STEEL CORNER GUARDS. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. F. REINSTALL SALVAGED DOORS WITHIN EACH SCHEDULED PHASE, INCLUDING REINSTALL SALVAGED DOORS WITHIN EACH SCHEDULED PHASE, INCLUDING THE DOOR TO THE CENTRAL SUPPLY. G. WORK TO BE PERFORMED PRIOR TO START OF PHASE VI AND VII WORK: WORK TO BE PERFORMED PRIOR TO START OF PHASE VI AND VII WORK: 1. REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL REMOVE OF ALL MEDICAL EQUIPMENT, SHELVING UNITS AND MEDICAL SUPPLIES. WORK TO BE PERFORMED BY THE VAMC. 2. THE CONSTRUCTION TEMPORARY CONSTRUCTION CONTAINMENT WALLS THE CONSTRUCTION TEMPORARY CONSTRUCTION CONTAINMENT WALLS FOR STAGING AREA WITHIN SDUS. 3. THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION THE CONSTRUCTION OF "CORRIDOR SIDE" TEMPORARY CONSTRUCTION CONTAINMENT WALLS.

AutoCAD SHX Text PHASES II, VA AND VB: - - PHASES CONSISTS WORK TO BE PERFORMED IN THE PACU/RECOVERY SUITE (PHASE II) AND THE ASU SUITE AND ADJACENT PROCEDURE ROOMS (PHASE VA & VB.) A. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. REMOVE AND SALVAGE ALL DOORS WITHIN EACH SCHEDULED PHASE. B. DEMOLISH SHEET VINYL FLOORING, COVE BASE, AND STAINLESS STEEL DEMOLISH SHEET VINYL FLOORING, COVE BASE, AND STAINLESS STEEL CORNER GUARDS. C. PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR PREP AND REPAIR EXISTING FLOORING FOR NEW FINISH. PREP, REPAIR OR REPLACE WALLS AS REQUIRED FOR NEW PAINT FINISH. D. INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE AND STAINLESS INSTALL NEW FLUID-APPLIED FLOORING AND COVE BASE AND STAINLESS STEEL CORNER GUARDS. E. PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR PAINT WALLS ABOVE THE NEW COVE BASE, PAINT TYPE, FINISH AND COLOR TO MATCH EXISTING CONDITIONS. F. REINSTALL SALVAGED DOORS IN SAME LOCATION.REINSTALL SALVAGED DOORS IN SAME LOCATION.

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX Text

28-NOVEMBER-2023

AutoCAD SHX Text

150 S. HUNTINGTON AVE, BOSTON, MA 02130

AutoCAD SHX Text

VAMC BOSTON, JAMAICA PLAINS

PHASE II

OR 3 & 4

PHASE II

OR 7 & 8

F3-58 63.9

SCRUB ROOM

F3-60 63.03

CLEAN

UTILITY

F3-64 66.8

STORAGE

F3-46 68.78

BIO MED

WORK ROOM

F3-45 68.79

STORAGE

F3-57 65.02

UTILITY

F3-54 123.31

SCRUB ROOM

85.5

CHASECHASE

F3-53 154.58

UTILITY

F3-56 340.3

OR-7

F3-48 340.32

OR-8

F3-55 351.93

OR-4

F3-52 351.92

OR-3

CR-F3-C08

1331.43

CORRIDOR

3F-50 1466.74

CENTRAL SUPPLY

F3-44 15.63

ELECTRICAL

F3-47 18.6

ELECTRICAL

F3-59 22.09

ELECTRICAL

F3-65 16.49

ELECTRICAL

DN

PHASE II

PACU

F3-21 53.35

RESTROOM

50.31

CHASE

F3-22 56.16

RESTROOM

F3-23 56.16

RESTROOM

F3-26 86.16

HOUSEKEEPING

F3-17 93.32

ELECTRICAL

CLOSET

F3-25 102.43

LOUNGE

F3-28 100.32

ELECTRICAL

CLOSET

F3-24 93.3

MEDICATION

ROOM

F3-27 98.06

SOLID UTILITY120.75

SHAFT ST-F3-S1

205.61

STAIRWAY

CR-F3-05

1174.75

CORRIDOR

F3-13 1381.17

PACU / RECOVERY

F3-18 116.12

STORAGEF3-19

124.15

WORK STATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BOSTON VA

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

ENLARGED PHASING PLAN - PHASE 2

AutoCAD SHX Text

GI003.1

AutoCAD SHX Text

AB

AutoCAD SHX Text

BV

AutoCAD SHX Text

BID DOCUMENTS

AutoCAD SHX Text

THIRD FLOOR O.R., PACU & ASU FLOOR REPLACEMENT

AutoCAD SHX Text 532-23-005

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .