S06 Amendment 0003 RFIs.pdf
PDF 76 KB Posted
- Attached to
- Z1DA--523-23-005 Replace Floors OR PACU SDSU Federal contract opportunity
- Solicitation number
- 36C24123B0015
About this file
This document contains responses to requests for information (RFIs) related to a solicitation for project 523-23-005 to replace floors in the operating room and post-anesthesia care unit at the Veterans Affairs Medical Center in Jamaica Plain, Massachusetts. The RFIs address edge trim options and tie-in details for Altro Whiterock wall panels, the requirement for heat-welded panel seams, and whether any underlying floor issues are known in patched areas. The contractor will be responsible for preparing all surfaces to receive flooring according to specifications and manufacturer requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 Altro-Whiterock Diagram Detail.pdf | ||
| S06 Altro-Whiterock System Accessories.pdf | ||
| 36C24123B0015 0003.docx | DOCX document | |
| S07 Wage Rates MA20240001_03_20240301.pdf | ||
| S06 Amendment 0002 RFIs.pdf | ||
| S04 523-23-005 Sign in Sheet Combined.pdf | ||
| P07 Wage Rates MA20240001_02_20240209.pdf | ||
| 36C24123B0015 0002.docx | DOCX document | |
| 36C24123B0015 0001.docx | DOCX document | |
| S02 Drawings 523-23-005 Replace Floors OR PACU SDSU.pdf | ||
| 36C24123B0015 Solicitation.docx | DOCX document | |
| S07 Wage Rates MA20240001_01_20240119.pdf | ||
| S02 Specifications 523-23-005 Replace Floors OR PACU SDSU.pdf | ||
| S02 SOW 523-23-005 Replace Floors OR PACU SDSU.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24123B0015 / 523-23-005 Replace Floors OR PACU SDSU Amendment 0003 RFIs
011 Is there a detail about what you want to use on the top edge of the Altro-white rock panel?
The manufacturer provides several edge trim options (refer to the attached document [S06 Altro Whiterock System Accessories.pdf]) that are acceptable to the VA. Final product to be submitted and approved during construction submittal process 012.
012 How do you want it tied into the epoxy base?
Both the fluid-applied flooring (reference sheet AI201) and wall panel (refer to attached document [S06 Altro-Whiterock Diagram Detail.pdf]) manufacturers provides standard details on how the assemblies tie together.
013 Is there a certain way you want the seams between the Altro panels? heat welded, or joiner strips.
Heat Welded
014 Are there any known underlying issues in the floor areas that have been patched?
We cannot determine if there are underlying conditions in areas that have been patched.
Contractor shall be responsible for preparing all surfaces to receive flooring in accordance with specifications and manufacturers requirements.
File details come from the government source that posted it. Updated .