S06 Amendment 0002 RFIs.pdf

PDF 82 KB Posted

Attached to
Z1DA--523-23-005 Replace Floors OR PACU SDSU Federal contract opportunity
Solicitation number
36C24123B0015
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This solicitation is for project 523-23-005, Replace Floors OR PACU SDSU at the Veterans Affairs Medical Center in Jamaica Plain, Massachusetts. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking bids to replace floors in the operating room and post-anesthesia care unit at the facility located at 150 S Huntington Ave. Interested parties should review the instructions for responding to solicitation number 36C24123B0015 by the specified due date. The summary includes relevant details about the federal agency, project name and location, work requirements, and solicitation number to provide necessary context for understanding this invitation for bids.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--523-23-005 Replace Floors OR PACU SDSU, newest first.
File Type Posted
S07 Wage Rates MA20240001_03_20240301.pdf PDF
S06 Amendment 0003 RFIs.pdf PDF
36C24123B0015 0003.docx DOCX document
S06 Altro-Whiterock System Accessories.pdf PDF
S06 Altro-Whiterock Diagram Detail.pdf PDF
36C24123B0015 0002.docx DOCX document
P07 Wage Rates MA20240001_02_20240209.pdf PDF
S04 523-23-005 Sign in Sheet Combined.pdf PDF
36C24123B0015 0001.docx DOCX document
S07 Wage Rates MA20240001_01_20240119.pdf PDF
S02 Specifications 523-23-005 Replace Floors OR PACU SDSU.pdf PDF
S02 SOW 523-23-005 Replace Floors OR PACU SDSU.pdf PDF
36C24123B0015 Solicitation.docx DOCX document
S02 Drawings 523-23-005 Replace Floors OR PACU SDSU.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24123B0015 / 523-23-005 Replace Floors OR PACU SDSU Amendment 0002 RFIs

001 Will the contractor be required to provide their own medical PPE while working on the project site?

Yes, the contractor will be required to provide all medical PPE including, but not limited to gowns, hair coverings, facemasks, gloves, boot covers, and any other medical PPE required by VA regulations, guidelines, or Operating Room Staff. All PPE shall be approved by the VACOR prior to use.

002 Can we confirm the LF of 4" epoxy cove base to be installed? Roughly 1400-1500LF?

Contractor shall use scaled plans to estimate total quantity of 4" epoxy cove base to be installed.

003 Will we be able to work normal working hours?

All work shall be conducted during off-business hours unless otherwise authorized by the VA CO.

Construction work hours will be between 18:30-05:30. All work, to include cleanup, shall be complete, and the space vacated by 05:30.

004 What kind of floors is it?

New flooring to be installed is identified on contract plans and specifications. Existing flooring varies by location but is generally adhered.

005 Do you expect each phase one after another with no breaks in between?

The general intent is to complete one phase after another, so that the entire contract can be completed within the POP. The contractor should anticipate minor breaks between phasing to allow clinical engineering to set-up renovated spaces and remove equipment in areas for subsequent phasing.

006 Is there an asbestos / mastic / abatement / hazardous material report or study available?

No report is available. The last asbestos material report is from 2010, which is prior to the building addition.

007 Will it be possible to have a dumpster kept on site for the demolition process?

Space is limited at the Jamaica Plains VA campus. The facilities team will try to accommodate a dumpster on site, however there is no explicit location that is guaranteed or reserved for contractors. If space is available at the time of construction, the VA will provide a location to place a dumpster. The available location may no be immediately adjacent to the job site. If no space is available, the contractor will be responsible for hauling debris daily.

36C24123B0015 / 523-23-005 Replace Floors OR PACU SDSU Amendment 0002 RFIs

008 Will a negative pressure containment system be required during the floor installation process or just the demolition process?

The contractor will be required to comply with Level IV ICRA requirements throughout construction. This includes demolition and installation. The contractor shall provide as many negative air machines as necessary to provide adequate pressure differentials between the construction area and adjacent areas to remain compliant with VA IC policies.

009 Will it be the contractor’s responsibility to disassemble any medical equipment in any areas where work is to be performed?

The Contractor will not be responsible for removing clinical equipment or furniture. To be removed by VA. Contractor to coordinate with VA for removal based on approved phasing plans and contract schedule.

010 From the site-walk, it appears the electrical rooms F3-44 and F3-65 may be mislabeled and are storage closets. Is the floor to be replace in these rooms.

The contractor shall install flooring in all storage rooms that are directly connected to OR Rooms 1-8 so long as the flooring is continuous. Including F3-44 and F3-65