S02. Drawings - Fire Protection.pdf
PDF 8 MB Posted
- Attached to
- Y1NB--Renovate Operating Rooms - VAMC Cleveland
- Solicitation number
- Amend0002
About this file
This amendment to a solicitation modifies the scope of work for a renovation project at the Veterans Affairs Medical Center in Cleveland, Ohio. The Department of Veterans Affairs is seeking bids to renovate operating rooms, including mechanical, electrical, and plumbing work. The amendment adds all drawings related to fire protection for the project, covering phasing plans, demolition plans, and new work for three phases. Bids are still due on September 9, 2020 at 12:00 PM EST, with all other terms of the original solicitation remaining the same.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:5
P
M
0-FP1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEFIRE PROTECTION LEGEND AND GENERAL
NOTES
FIRE SUPPRESSION PIPING LEGEND
SPRINKLER RISER DETAIL
FSTS
ZONE DRAIN VALVE
UNION
SIGHT GLASS
TEST VALVE
TO SYSTEM
F
D
FS
TS
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
MANUAL AIR VENT
VALVED AND CAPPED FIRE DEPARTMENT VALVE
MAV
FIRE DEPARTMENT VALVE
STAND PIPE
FIRE RISER
FIRE SUPPRESSION PIPING
FLOW SWITCH
TAMPER SWITCH ON VALVE
PRESSURE GAUGE
ELECTRICAL CONTRACTOR
HVAC CONTRACTOR
FIRE SUPPRESSION CONTRACTOR
GENERAL CONTRACTOR
ISOLATION VALVE
GC
FSC
HC
EC
FDV
SP
FR
F
DETAIL MARK
DETAIL NO.
DRAWING
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING
BUILDING, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE
OF VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE
COORDINATION AND INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO
ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH
THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!
THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN
ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY
CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE
PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS
HAVE BEEN ADDRESSED.
1-FP1-1
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED FROM
EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING SYSTEMS WITH VA A MINIMUM OF TEN
WORKING DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH
VA AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE
LOCATION OF CEILING MOUNTED DEVICES.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS FROM
THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAWINGS FOR LOCATION OF PANELS.
THE FIRE SUPPRESSION CONTRACTOR SHALL PROVIDE DETAILED DESIGN OF THE SPRINKLER
SYSTEM. REFER TO SPECIFICATIONS.
UNLESS OTHERWISE NOTED NEW SPRINKLERS SHALL BE AS FOLLOWS:
G.1. AREAS WITH CEILINGS: SEMI-RECESSED CONCEALED STYLE WITH CHROME PLATE.
G.2. EXPOSED STRUCTURE: UPRIGHT OR PENDENT TYPE.
G.3. OPERATING ROOMS: RECESSED CONCEALED STYLE WITH COVER PLATES.
ALL SPRINKLERS FURNISHED AS PART OF THIS PROJECT SHALL HAVE COVER PLATES WITH THE
SAME SHAPE AND SIZE. COLOR SHALL BE SELECTED BY ARCHITECT.
THE FIRE PROTECTION SYSTEM IS PERFORMANCE SPECIFIED. ALL SPRINKLER PIPE SIZES
SHALL BE DETERMINED BY FIRE PROTECTION CONTRACTOR, BASED ON HYDRAULIC
CALCULATIONS.
PROVIDE SUPPLEMENTAL DRAINS AS NECESSARY TO PROVIDE 100% SYSTEM DRAINAGE. LOCATE
DRAINS ABOVE ACCESSIBLE CEILINGS.
REFER TO ARCHITECTURAL PLANS FOR EXACT PHASING REQUIREMENTS.
REFER TO SPECIFICATIONS FOR FIRE SUPPRESSION HAZARD OCCUPANCY CLASSIFICATIONS.
SPRINKLER PIPING SHALL BE A MINIMUM OF ONE INCH.
UNLESS OTHERWISE STATED ON DRAWINGS OR IN THE SPECIFICATIONS, ALL SPRINKLER HEADS
SHALL BE QUICK RESPONSE.
ALL HEADS SHALL BE UL LISTED AND FM APPROVED.
ALL SPRINKLER HEADS LOCATED IN CEILING TILES SHALL BE LOCATED IN CENTER OF THE
CEILING TILE.
ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL
PLANS FOR INFORMATION ON SMOKE COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO
COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO
THIS WORK.
LIMIT OF DEMOLITION
CONNECT TO EXISTING
SCALE: NONE
PROJECT COORDINATION NOTES:
FIRE SUPPRESSION GENERAL NOTES:
A.
B.
C.
D.
E.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
Revisions: Date:
Bid Issue 06/26/2020
16C 17B 18E 20A 24C21E21F
D
F2 F1
27i27m27n
E
G1
17a 2119c 23b
X-SPRINKLER
ZONE 2-9
EXISTING SPRINKLER MAIN PIPING , BRANCH PIPING AND SPRINKLER HEADS TO BE
REMOVED. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE REMOVED TO
OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS OUTSIDE OF
SHADED AREA SHALL REMAIN 100% SPRINKLERED, REFER TO ARCHITECTURAL
PLANS FOR ADDITIONAL PHASING INFORMATION.
16C 17B 18E 20A 24C21E21F
D
F2 F1
27i27m27n
E
G1
17a 2119c 23b
X-SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-8
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
LIGHT HAZARD OCCUPANCY.
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:4
P
M
1-FP1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION
PLANS - PHASE 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 1 1
FIRE SUPPRESSION LEGEND
N
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
# CODED NOTES
1 EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES
SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR
ADDITIONAL INFORMATION.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION PLAN
- PHASE 1 2N
16C 17B 18E 20A 24C 25B21E 26B 28B 32A21D21F 25C 25D 27b 27E
C2
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27f 27g
27h
27i27m27n 27r 27s 27t
27u
27cc
E
G1
C1
21 24b 3119c 23b
X-SPRINKLER
ZONE 2-9
T S
F S
X-4" TO
ZONE 2-9
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
P H
A S
E
S C
O P
E O
F W
O R
K EXISTING SPRINKLER MAIN PIPING , BRANCH PIPING AND SPRINKLER HEADS TO BE
REMOVED. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE REMOVED TO
OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS OUTSIDE OF
SHADED AREA SHALL REMAIN 100% SPRINKLERED, REFER TO ARCHITECTURAL
PLANS FOR ADDITIONAL PHASING INFORMATION.
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Lounge / Dictation
2D251
Corridor
2D250
Women Lockers
2D257A
Surgery Waiting
2D270
Nurse Mgr.
2D262
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Holding
2D260
Holding
Corridor
2500B
Implant Storage
Anesthesia Work Room
Corridor
2500H
OR-7
General
OR-6
General
Electric
EMS
Anesthesia Storage
EMS
2508A
Sub Sterile
Sub Sterile
Dictation
Sterile Storage
General
OR-5
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Soiled Holding
Office
Special Equipment Records
OR-2
Neuro
Bed/ Treatment
Room
Medication Prep
Room
Workroom
Corridor
2C100E
Corridor
2500A
Pharmacy
Unisex RR
Corridor
2500J
Corridor
2C280
Foyer
2D255E
Alcove
2D251A
Soiled Utility
2D254
Sterile Supply
2D254A
Locker Room
2D252
Dictation
2D252A
Office
2D261A
Office
2D261B
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Soiled Elevator
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:1
P
M
2-FP1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 2
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 2 1
FIRE SUPPRESSION LEGEND
N
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
# CODED NOTES
1 WORK IN OUTLINED AREA SHALL BE PERFORMED ON WEEKENDS.
16C 17B 18E 20A 24C 25B21E 26B 27C 28B21D21F 25C 25D 27b 27E
A1
ZZ
YY
XX
UU
RR
ss
A
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27cc
E
G1
C1
17a 21 24b 26a 3119c 23b
TS
TS
FROM SPRINKLER
ZONE 2-9
TS
FROM SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-9
FROM X-
SPRINKLER ZONE
X-SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-8
X-SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-8
X-4" FIRE
T S
F S
EXISTING TAMPER AND
FLOW SWITCH
X-4" TO
ZONE 2-9
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Anesthesia Office
2D282
Clean Corridor
2C200P
Anesthesia Storage
2C222
Medication Prep
Room
2C219A
Soiled Holding
2D281
Cart Holding
2C219
Clean Corridor
2C200S
General
OR
(OR-07)
2C212
Semi-Restricted
2C200A
Electrical Room
2C213
Ortho Equipment
2C215A
Laboratory, Frozen Section
2C214 Ortho OR
(OR-08)
2C215
General
OR
(OR-09)
2C216
Ortho OR
(OR-10)
2C217
Anesthesia Workroom
2C218
Office
2D284
Office
2D285
Office
2C283
Semi-Restricted
2C200F
P H
A S
E
S C
O P
E O
F W
O R
K
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
LIGHT HAZARD OCCUPANCY.
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
ORDINARY HAZARD GROUP 1 OCCUPANCY.
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
ORDINARY HAZARD GROUP 2 OCCUPANCY.
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #4
2D111
Lounge / Dictation
2D251
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Sub Sterile
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Office
Special Equipment Records
OR-2
Neuro
Corridor
2C100E
Foyer
2D255E
Dictation
2D252A
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:3
P
M
2-FP2-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION
PLAN - PHASE 2
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION PLAN
- PHASE 2 1
FIRE SUPPRESSION LEGEND
# CODED NOTES
1 PROVIDE SHUT-OFF VALVE WITH TAMPER SWITCH TO SPRINKLER BRANCH FEEDING ELECTRIC ROOM.
EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES
SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR
ADDITIONAL INFORMATION.
PROVIDE SHUT-OFF VALVE WITH TAMPER SWITCH TO SPRINKLER BRANCH FEEDING ELEVATOR SHAFT.
PROVIDE UPRIGHT SPRINKLER HEAD AT TOP OF ELEVATOR SHAFT. SPRINKLER SHALL BE
TEMPERATURE RATED PER SPECIFICVATIONS.
WORK IN OUTLINED AREA SHALL BE PERFORMED ON WEEKENDS.
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
N
REWORK EXISTING SPRINKLER BRANCH PIPING TO ACCOMMODATE NEW
DUCTWORK LAYOUT IN MECHANICAL ROOM AND INTERSTITIAL SPACE BELOW
MECHANICAL ROOM. SEE HVAC PLANS FOR NEW DUCTWORK LAYOUT. PROVIDE
UPRIGHT SPRINKLER HEADS. PROVIDE FULL COVERAGE ABOVE AND BELOW ALL
DUCTWORK, EQUIPMENT, ETC. WHERE SPRINKLERS ARE LOCATED BELOW 8'-0" AFF
OR ARE SUBJECT TO DAMAGE, PROVIDE PROTECTIVE CAGE AROUND HEADS.
SPRINKLER PER NFPA 13. ORDINARY HAZARD GROUP 1 OCCUPANCY.
16C 17B 18E 20A 24C 25B21E 26B 27C21D21F 25C 25D 27b 27E
C2
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27c
27f
27g 27h
27i27m27n27o27p 27r 27s 27t 27cc
E
G1
C1
17a 21 26a19c 23b
MECHANICAL
PENTHOUSE
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:5
P
M
2-FP2-2
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPENTHOUSE FIRE PROTECTION PLAN - PHASE
FIRE SUPPRESSION LEGEND
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PENTHOUSE FIRE PROTECTION PLAN - PHASE 2 1N
REWORK EXISTING SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE
RENOVATIONS, INSTALLATION OF ALL NEW TRADES AND INSTALLATION OF NEW
SECOND FLOOR STRUCTURE. NEW STRUCTURE IS BEING INSTALLED IN EXISTING 2-
STORY AREA OF MECHANICAL ROOM. CONTRACTOR SHALL TEMPORARILY SUPPORT
EXISTING SPRINKLER SYSTEMS WITHIN MECHANICAL ROOM AS REQUIRED.
SPRINKLER PIPING SERVING UPPER LEVEL OF MECHANICAL ROOM SHALL BE
REMOVED COMPLETELY. REFER TO NEW PLAN 3-FP2-1 FOR ADDITIONAL
INFORMATION.
16C 17B 18E 20A 24C 25B21E 26B 27C 28B 32A21D21F 25C 25D 27b 27E
C2
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27cc
E
G1
C1
17a 18b 21 24b 26a 3119c 23b
X-SPRINKLER
ZONE 1-7
X-FIRE DEPARTMENT
CONNECTION
X-4" TO ZONE 1-6
X-4" TO
ZONE 1-7
EXISTING
TAMPER AND
FLOW SWITCH
X-4" FIRE
EXISTING TAMPER
AND FLOW SWITCH
TS
T S
FS
F S
X-4" FIRE DOWN
X-SPRINKLER
ZONE 1-6
Sterile Storage
Preparation
Sterilization122
Gas-CleanGas-Soiled
Dispatch Cart Area
Computer Room
Computer Room
Switchgear Room
Cart Wash
Cart Driving
115A Vascular Lab
S125
Exam Room
S123
Office
S101B
Director's Office S129D
Sterile Storage
PHASE 3 SCOPE OF WORK
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:4
:5
P
M
3-FP1-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 3
FIRE SUPPRESSION LEGEND
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 3 1N
16C 17B 18E 20A 24C 25B21E 26B 27C 28B 32A21D21F 25C 25D 27b 27E
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27f 27g 27h
27i27m27n 27r 27s 27t
27cc
E
G1
C1
17a 21 24b 26a 3119c 23b
X-4" FIRE
T S
F S
EXISTING TAMPER AND
FLOW SWITCH
X-SPRINKLER
ZONE 1-7
X-SPRINKLER
ZONE 2-9
X-4" TO
ZONE 2-9
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING 3 3
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
Cart Holding
2C219
Medication Prep
Room
2C219A
Anesthesia Storage
2C222
Anesthesia Office
2D282
Soiled Holding
2D281
Anesthesia Workroom
2C218
Office
2D283
Office
2D284
Office
2D285
Ortho OR
(OR-10)
2C217
Semi-Restricted
2C200F
General
OR
(OR-09)
2C216 Semi-Restricted
2C200A
Electrical Room
2C213
Ortho Equipment
2C215A
Laboratory, Frozen Section
2C214 Ortho OR
(OR-08)
2C215
General
OR
(OR-07)
2C212 Clean
Corridor
2C200S
Clean Corridor
2C200P
Clean Corridor
2C100J
Procedure
2C231
Procedure
2C232
Procedure
2C233
Sub-Sterile
2C235
PACU EMS
2C234
Stair #9
2C202
PACU
Cubicle 1
2C237A
PACU
Passage
2C323A
HAC
2C224
PHASE 3 SCOPE OF WORK
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
EXISTING SPRINKLER BRANCH PIPING AND SPRINKLER HEADS TO BE REMOVED.
EXISTING SPRINKLER MAIN PIPING TO BE REMOVED UPON INSTALLATION OF NEW
MAIN PIPING SO AS TO MAINTAIN SERVICE TO ADJACENT SPACES WHILE MINIMIZING
SYSTEM SHUTDOWN. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE
REMOVED TO OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS
OUTSIDE OF SHADED AREA SHALL REMAIN 100% SPRINKLERED. REFER TO
ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORMATION.
EXISTING AREA OPEN TO FIRST FLOOR. REMOVE EXISTING SPRINKLER HEADS,
MAINS, AND BRANCH PIPING SERVING THIS AREA.
Patient Room #3 (Isolation)
2D127B
Anteroom
2D127A
EMS
Closet
2D110
Gas Room Non
Oxidizing
2514A
Laser Scales Video
Equipment
Toilet
2D127C
Toilet
2D263
Patient Room #4
2D111
Lounge / Dictation
2D251
Work
2D260D
Work
2D260E
Work
2D260F
Office
2D261C
Sub Sterile
General
OR-4
Storage
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant Storage
Rm.
Stair
2S7
Office
Special Equipment Records
OR-2
Neuro
Corridor
2C100E
Foyer
2D255E
Dictation
2D252A
Office
Corridor
2C280
Light Room
2500I
TEMP.
Medical
Prep Rm.
Clean Elevator
Scrub
2500N Scrub
2500O
Upper Mechanical
Room
2500Q
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:1
P
M
3-FP1-2
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN - PHASE 3 1
FIRE SUPPRESSION LEGEND
N
# CODED NOTES
1 EXISTING SPRINKLERS IN OUTLINED AREA TO REMAIN. AREA SERVED BY ZONE 2-9. SPRINKLER SHALL
REMAIN ACTIVE DURING CONSTRUCTION. SHUTDOWNS SHALL BE COORDINATED WITH VA COR.
AS PART OF DEDUCT ALTERNATE 2, SPRINKLER COVERAGE IN OUTLINED AREA SHALL REMAIN.
REWORK SPRINKLER SYSTEM IN OUTLINED AREA AS REQUIRED TO ACCOMMODATE HVAC REVISIONS.
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27cc
E
G1
C1
17a 18b 21 24b 26a 3119c 23b
X-SPRINKLER
ZONE 1-7
X-SPRINKLER
ZONE 1-6
X - 4" SPR
X - 4" SPR
X - 4" SPR
X - 4" SPR
Sterile Storage
Preparation
Sterilization122
Gas-CleanGas-Soiled
Dispatch Cart Area
Computer Room
Computer Room
Switchgear Room
Cart Wash
Cart Driving
115A Vascular Lab
S125
Exam Room
S123
Office
S101B
Director's Office S129D
Sterile Storage
PHASE 3 SCOPE OF WORK
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE NEW
FLOOR SLAB AT SECOND FLOOR LEVEL. PROVIDE ALL NEW BRANCH PIPING AND
SPRINKLER HEADS IN MECHANICAL ROOM SHADED AREA. HEADS SHALL BE
UPRIGHT-TYPE. PROVIDE PROTECTIVE CAGES WHERE HEADS ARE LOCATED BELOW
8'-0" AFF OR IN LOCATION NEAR EQUIPMENT ACCESS. SPRINKLER PER NFPA 13,
ORDINARY HAZARD GROUP 1 OCCUPANCY.
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:3
P
M
3-FP2-1
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR FIRE PROTECTION
PLAN - PHASE 3
FIRE SUPPRESSION LEGEND
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR FIRE PROTECTION PLAN -
PHASE 3 1N
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27f 27g
27h
27i27m27n 27r 27s 27t
27cc
E
G1
C1
17a 18b 21 24b 26a 3119c 23b
X-4" FIRE
T S
F S
EXISTING TAMPER AND
FLOW SWITCH
X-4" TO
ZONE 2-9
X-SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-8
X-SPRINKLER
ZONE 2-9
X-SPRINKLER
ZONE 2-8
3 3
Hybrid OR
2C366
Hybrid OR
2C366
Control
2C362c Control
2C362b
Equip
2C362a
EMS
Closet
2D280
Cardiac Equipment
2C127
Cardiac Pump Room
2C128
Scrub
2C100U
Cardiac
OR (OR-1)
2C129
Cardiac Equipment
2C127
Immediate Use
Sterilization Room
2C123
Clean Corridor
2C100H
Cardiac
OR (OR-2)
2C126
Alcove
2C100K
Robotic
OR (OR-5)
2C114 Robotic
Equipment Storage
2C213
Semi-Restricted
2C100B
EMS
2C110
Gas Room
2C211 Anesthesia
Storage
2C111
Equipment Storage
2C112
General
OR (OR-6)
2C210
Procedure
2C231
Procedure
2C232
Passage
2C230
Sub-Sterile
2C235
Procedure
2C233
HAC
2C224
PACU EMS
2C234
Stair #9
2C202
PACU
Cubicle 1
2C237A
PACU
Passage
2C323A
Electrical Room
2C213
Ortho Equipment
2C215A
General
OR
(OR-07)
2C212
Clean Corridor
2C200S
Clean Corridor
2C200P
Cart Holding
2C219
Medication Prep
Room
2C219A
Anesthesia Storage
2C222
Soiled Holding
2D281
Anesthesia Office
2D282
Alcove
2C200Q Alcove
2C200R
Ortho OR
(OR-10)
2C217
General
OR
(OR-09)
2C216
Anesthesia Workroom
2C218
Office
2D283
Office
2D284
Office
2D285
Semi-Restricted
2C200F
Laboratory, Frozen Section
2C214
Semi-Restricted
2C200A
PHASE 3 SCOPE OF WORK
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
REFER TO ARCHITECTURAL
PLANS FOR SUB-
PHASING/SEQUENCING
Implant
2D253
Dictation
2D251B
Semi-Restricted
2C100O
Clean Corridor
2C100J
Semi-Restricted
2C100E
Semi-Restricted
2C100A
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
LIGHT HAZARD OCCUPANCY.
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
ORDINARY HAZARD GROUP 1 OCCUPANCY.
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.
PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE
WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,
ORDINARY HAZARD GROUP 2 OCCUPANCY.
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:5
P
M
3-FP2-2
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION
PLAN - PHASE 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL SECOND FLOOR FIRE PROTECTION PLAN
- PHASE 3 1
FIRE SUPPRESSION LEGEND
# CODED NOTES
1 EXISTING SPRINKLERS IN OUTLINED AREA TO REMAIN. AREA SERVED BY ZONE 2-9. SPRINKLER SHALL
REMAIN ACTIVE DURING CONSTRUCTION. SHUTDOWNS SHALL BE COORDINATED WITH VA COR.
AS PART OF DEDUCT ALTERNATE 2, DELETE NEW SPRINKLERS IN OUTLINED AREA.
REWORK SPRINKLER SYSTEM IN OUTLINED AREA AS REQUIRED TO ACCOMMODATE HVAC REVISIONS.
AS PART OF DEDUCT ALTERNATE 1, THIS REWORK SHALL BE DELETED.
EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES
SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR
ADDITIONAL INFORMATION.
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
N
REWORK EXISTING SPRINKLER BRANCH PIPING TO ACCOMMODATE NEW
DUCTWORK LAYOUT IN MECHANICAL ROOM AND INTERSTITIAL SPACE BELOW
MECHANICAL ROOM FLOOR. SEE HVAC PLANS FOR NEW DUCTWORK LAYOUT.
PROVIDE UPRIGHT SPRINKLER HEADS. PROVIDE FULL COVERAGE ABOVE AND
BELOW ALL DUCTWORK, EQUIPMENT, ETC. WHERE SPRINKLERS ARE LOCATED
BELOW 8'-0" AFF OR ARE SUBJECT TO DAMAGE, PROVIDE PROTECTIVE CAGE
AROUND HEADS. SPRINKLER PER NFPA 13. ORDINARY HAZARD GROUP 1
OCCUPANCY.
16C 17B 18E 20A 24C 25B21E 26B 27C21D21F 25C 25D 27b 27E
C2
A1
ZZ
YY
XX
UU
RR
ss
B
D
27B
F2
VV
27A
F1
27D
27c
27f
27g
27h
27i27m27n27o27p 27r 27s 27t 27cc
E
G1
C1
17a 21 24b 26a19c 23b
MECHANICAL
PENTHOUSE
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS FOR PURPOSES OTHER THAN THE
SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED
WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE. COPYRIGHT C 2019.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
18067
Z M y D o c u m e n ts
\1
F
F H
C F
R
J C a rt e r5
.r v t
/2
/2
:5
:1
P
M
3-FP2-3
10701 East Blvd. Cleveland, OH 44106
06/26/2020 LDH DML
541-19-101Renovate Operating RoomsBID ISSUEPENTHOUSE FIRE PROTECTION PLAN - PHASE
FIRE SUPPRESSION LEGEND
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PENTHOUSE FIRE PROTECTION PLAN - PHASE 3 1N
| 18067 FFH CF R19_JCarter57 |
| 0-FP1-1 - FIRE PROTECTION LEGEND AND GENERAL NOTES |
| 3-FP2-3 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-FP2-3 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 3 |
| 3-FP2-2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-FP2-2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3 |
| 3-FP2-1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-FP2-1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3 |
| 3-FP1-2 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-FP1-2 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3 |
| 3-FP1-1 - PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3.pdf |
| 18067 FFH CF R19_JCarter57 |
| 3-FP1-1 - PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3 |
| 2-FP2-2 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-FP2-2 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 2 |
| 2-FP2-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-FP2-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2 |
| 2-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2.pdf |
| 18067 FFH CF R19_JCarter57 |
| 2-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2 |
| 1-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLANS - PHASE 1.pdf |
| 18067 FFH CF R19_JCarter57 |
| 1-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLANS - PHASE 1 |
File details come from the government source that posted it. Updated .