This amendment to a solicitation modifies the scope of work for a renovation project at the Veterans Affairs Medical Center in Cleveland, Ohio. The Department of Veterans Affairs is seeking bids to renovate operating rooms, including mechanical, electrical, and plumbing work. The amendment adds all drawings related to fire protection for the project, covering phasing plans, demolition plans, and new work for three phases. Bids are still due on September 9, 2020 at 12:00 PM EST, with all other terms of the original solicitation remaining the same.

View the file

Other files

File Type Posted
S02. Drawings - Structural.pdf PDF
S02. Drawings - Safety and Security.pdf PDF
S06. 36C25020B0022 Amend 0002.docx DOCX document
S02. Drawings - Plumbing.pdf PDF
S02. Drawings - Mechanical.pdf PDF
S02. Drawings - Medical Gas.pdf PDF
S02. Drawings - Architectural.pdf PDF
S02. Drawings - Technology.pdf PDF
S02. Drawings - Electrical.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:5

P

M

0-FP1-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEFIRE PROTECTION LEGEND AND GENERAL

NOTES

FIRE SUPPRESSION PIPING LEGEND

SPRINKLER RISER DETAIL

FSTS

ZONE DRAIN VALVE

UNION

SIGHT GLASS

TEST VALVE

TO SYSTEM

F

D

FS

TS

EXISTING TO REMAIN

EXISTING TO BE REMOVED

X

XR

MANUAL AIR VENT

VALVED AND CAPPED FIRE DEPARTMENT VALVE

MAV

FIRE DEPARTMENT VALVE

STAND PIPE

FIRE RISER

FIRE SUPPRESSION PIPING

FLOW SWITCH

TAMPER SWITCH ON VALVE

PRESSURE GAUGE

ELECTRICAL CONTRACTOR

HVAC CONTRACTOR

FIRE SUPPRESSION CONTRACTOR

GENERAL CONTRACTOR

ISOLATION VALVE

GC

FSC

HC

EC

FDV

SP

FR

F

DETAIL MARK

DETAIL NO.

DRAWING

THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING

BUILDING, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE

OF VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE

COORDINATION AND INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO

ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH

THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE

OF CONSTRUCTION.

THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!

THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN

ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.

IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE

CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY

CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE

PROJECT PLANS.

A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE

CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS

HAVE BEEN ADDRESSED.

1-FP1-1

LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED FROM

EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO

COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT

PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.

COORDINATE ALL SHUT-DOWNS OF EXISTING SYSTEMS WITH VA A MINIMUM OF TEN

WORKING DAYS IN ADVANCE.

PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH

VA AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE

LOCATION OF CEILING MOUNTED DEVICES.

PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS FROM

THE EQUIPMENT MANUFACTURER.

NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL

DRAWINGS FOR LOCATION OF PANELS.

THE FIRE SUPPRESSION CONTRACTOR SHALL PROVIDE DETAILED DESIGN OF THE SPRINKLER

SYSTEM. REFER TO SPECIFICATIONS.

UNLESS OTHERWISE NOTED NEW SPRINKLERS SHALL BE AS FOLLOWS:

G.1. AREAS WITH CEILINGS: SEMI-RECESSED CONCEALED STYLE WITH CHROME PLATE.

G.2. EXPOSED STRUCTURE: UPRIGHT OR PENDENT TYPE.

G.3. OPERATING ROOMS: RECESSED CONCEALED STYLE WITH COVER PLATES.

ALL SPRINKLERS FURNISHED AS PART OF THIS PROJECT SHALL HAVE COVER PLATES WITH THE

SAME SHAPE AND SIZE. COLOR SHALL BE SELECTED BY ARCHITECT.

THE FIRE PROTECTION SYSTEM IS PERFORMANCE SPECIFIED. ALL SPRINKLER PIPE SIZES

SHALL BE DETERMINED BY FIRE PROTECTION CONTRACTOR, BASED ON HYDRAULIC

CALCULATIONS.

PROVIDE SUPPLEMENTAL DRAINS AS NECESSARY TO PROVIDE 100% SYSTEM DRAINAGE. LOCATE

DRAINS ABOVE ACCESSIBLE CEILINGS.

REFER TO ARCHITECTURAL PLANS FOR EXACT PHASING REQUIREMENTS.

REFER TO SPECIFICATIONS FOR FIRE SUPPRESSION HAZARD OCCUPANCY CLASSIFICATIONS.

SPRINKLER PIPING SHALL BE A MINIMUM OF ONE INCH.

UNLESS OTHERWISE STATED ON DRAWINGS OR IN THE SPECIFICATIONS, ALL SPRINKLER HEADS

SHALL BE QUICK RESPONSE.

ALL HEADS SHALL BE UL LISTED AND FM APPROVED.

ALL SPRINKLER HEADS LOCATED IN CEILING TILES SHALL BE LOCATED IN CENTER OF THE

CEILING TILE.

ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL

PLANS FOR INFORMATION ON SMOKE COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.

CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO

COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.

CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO

THIS WORK.

LIMIT OF DEMOLITION

CONNECT TO EXISTING

SCALE: NONE

PROJECT COORDINATION NOTES:

FIRE SUPPRESSION GENERAL NOTES:

A.

B.

C.

D.

E.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

Revisions: Date:

Bid Issue 06/26/2020

16C 17B 18E 20A 24C21E21F

D

F2 F1

27i27m27n

E

G1

17a 2119c 23b

X-SPRINKLER

ZONE 2-9

EXISTING SPRINKLER MAIN PIPING , BRANCH PIPING AND SPRINKLER HEADS TO BE

REMOVED. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE REMOVED TO

OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS OUTSIDE OF

SHADED AREA SHALL REMAIN 100% SPRINKLERED, REFER TO ARCHITECTURAL

PLANS FOR ADDITIONAL PHASING INFORMATION.

16C 17B 18E 20A 24C21E21F

D

F2 F1

27i27m27n

E

G1

17a 2119c 23b

X-SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-8

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

LIGHT HAZARD OCCUPANCY.

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:4

P

M

1-FP1-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION

PLANS - PHASE 1

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 1 1

FIRE SUPPRESSION LEGEND

N

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

# CODED NOTES

1 EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES

SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION PLAN

- PHASE 1 2N

16C 17B 18E 20A 24C 25B21E 26B 28B 32A21D21F 25C 25D 27b 27E

C2

A1

ZZ

YY

XX

UU

RR

ss

A

B

D

27B

F2

VV

27A

F1

27f 27g

27h

27i27m27n 27r 27s 27t

27u

27cc

E

G1

C1

21 24b 3119c 23b

X-SPRINKLER

ZONE 2-9

T S

F S

X-4" TO

ZONE 2-9

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

P H

A S

E

S C

O P

E O

F W

O R

K EXISTING SPRINKLER MAIN PIPING , BRANCH PIPING AND SPRINKLER HEADS TO BE

REMOVED. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE REMOVED TO

OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS OUTSIDE OF

SHADED AREA SHALL REMAIN 100% SPRINKLERED, REFER TO ARCHITECTURAL

PLANS FOR ADDITIONAL PHASING INFORMATION.

Patient Room #3 (Isolation)

2D127B

Anteroom

2D127A

EMS

Closet

2D110

Gas Room Non

Oxidizing

2514A

Laser Scales Video

Equipment

Toilet

2D127C

Toilet

2D263

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Lounge / Dictation

2D251

Corridor

2D250

Women Lockers

2D257A

Surgery Waiting

2D270

Nurse Mgr.

2D262

Work

2D260D

Work

2D260E

Work

2D260F

Office

2D261C

Holding

2D260

Holding

Corridor

2500B

Implant Storage

Anesthesia Work Room

Corridor

2500H

OR-7

General

OR-6

General

Electric

EMS

Anesthesia Storage

EMS

2508A

Sub Sterile

Sub Sterile

Dictation

Sterile Storage

General

OR-5

General

OR-4

Storage

OR-3

Orthopedic

Elec.

2517A

Sub Sterile

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

TEMP.

Implant Storage

Rm.

Stair

2S7

Soiled Holding

Office

Special Equipment Records

OR-2

Neuro

Bed/ Treatment

Room

Medication Prep

Room

Workroom

Corridor

2C100E

Corridor

2500A

Pharmacy

Unisex RR

Corridor

2500J

Corridor

2C280

Foyer

2D255E

Alcove

2D251A

Soiled Utility

2D254

Sterile Supply

2D254A

Locker Room

2D252

Dictation

2D252A

Office

2D261A

Office

2D261B

Office

Corridor

2C280

Light Room

2500I

TEMP.

Medical

Prep Rm.

Soiled Elevator

Clean Elevator

Scrub

2500N Scrub

2500O

Upper Mechanical

Room

2500Q

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:1

P

M

2-FP1-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 2

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 2 1

FIRE SUPPRESSION LEGEND

N

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

# CODED NOTES

1 WORK IN OUTLINED AREA SHALL BE PERFORMED ON WEEKENDS.

16C 17B 18E 20A 24C 25B21E 26B 27C 28B21D21F 25C 25D 27b 27E

A1

ZZ

YY

XX

UU

RR

ss

A

B

D

27B

F2

VV

27A

F1

27D

27f 27g

27h

27i27m27n 27r 27s 27t

27cc

E

G1

C1

17a 21 24b 26a 3119c 23b

TS

TS

FROM SPRINKLER

ZONE 2-9

TS

FROM SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-9

FROM X-

SPRINKLER ZONE

X-SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-8

X-SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-8

X-4" FIRE

T S

F S

EXISTING TAMPER AND

FLOW SWITCH

X-4" TO

ZONE 2-9

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

Anesthesia Office

2D282

Clean Corridor

2C200P

Anesthesia Storage

2C222

Medication Prep

Room

2C219A

Soiled Holding

2D281

Cart Holding

2C219

Clean Corridor

2C200S

General

OR

(OR-07)

2C212

Semi-Restricted

2C200A

Electrical Room

2C213

Ortho Equipment

2C215A

Laboratory, Frozen Section

2C214 Ortho OR

(OR-08)

2C215

General

OR

(OR-09)

2C216

Ortho OR

(OR-10)

2C217

Anesthesia Workroom

2C218

Office

2D284

Office

2D285

Office

2C283

Semi-Restricted

2C200F

P H

A S

E

S C

O P

E O

F W

O R

K

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

LIGHT HAZARD OCCUPANCY.

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

ORDINARY HAZARD GROUP 1 OCCUPANCY.

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

ORDINARY HAZARD GROUP 2 OCCUPANCY.

Patient Room #3 (Isolation)

2D127B

Anteroom

2D127A

EMS

Closet

2D110

Gas Room Non

Oxidizing

2514A

Laser Scales Video

Equipment

Toilet

2D127C

Toilet

2D263

Patient Room #4

2D111

Lounge / Dictation

2D251

Work

2D260D

Work

2D260E

Work

2D260F

Office

2D261C

Sub Sterile

General

OR-4

Storage

OR-3

Orthopedic

Elec.

2517A

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

TEMP.

Implant Storage

Rm.

Stair

2S7

Office

Special Equipment Records

OR-2

Neuro

Corridor

2C100E

Foyer

2D255E

Dictation

2D252A

Office

Corridor

2C280

Light Room

2500I

TEMP.

Medical

Prep Rm.

Clean Elevator

Scrub

2500N Scrub

2500O

Upper Mechanical

Room

2500Q

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:3

P

M

2-FP2-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION

PLAN - PHASE 2

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION PLAN

- PHASE 2 1

FIRE SUPPRESSION LEGEND

# CODED NOTES

1 PROVIDE SHUT-OFF VALVE WITH TAMPER SWITCH TO SPRINKLER BRANCH FEEDING ELECTRIC ROOM.

EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES

SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

PROVIDE SHUT-OFF VALVE WITH TAMPER SWITCH TO SPRINKLER BRANCH FEEDING ELEVATOR SHAFT.

PROVIDE UPRIGHT SPRINKLER HEAD AT TOP OF ELEVATOR SHAFT. SPRINKLER SHALL BE

TEMPERATURE RATED PER SPECIFICVATIONS.

WORK IN OUTLINED AREA SHALL BE PERFORMED ON WEEKENDS.

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

N

REWORK EXISTING SPRINKLER BRANCH PIPING TO ACCOMMODATE NEW

DUCTWORK LAYOUT IN MECHANICAL ROOM AND INTERSTITIAL SPACE BELOW

MECHANICAL ROOM. SEE HVAC PLANS FOR NEW DUCTWORK LAYOUT. PROVIDE

UPRIGHT SPRINKLER HEADS. PROVIDE FULL COVERAGE ABOVE AND BELOW ALL

DUCTWORK, EQUIPMENT, ETC. WHERE SPRINKLERS ARE LOCATED BELOW 8'-0" AFF

OR ARE SUBJECT TO DAMAGE, PROVIDE PROTECTIVE CAGE AROUND HEADS.

SPRINKLER PER NFPA 13. ORDINARY HAZARD GROUP 1 OCCUPANCY.

16C 17B 18E 20A 24C 25B21E 26B 27C21D21F 25C 25D 27b 27E

C2

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27c

27f

27g 27h

27i27m27n27o27p 27r 27s 27t 27cc

E

G1

C1

17a 21 26a19c 23b

MECHANICAL

PENTHOUSE

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:5

P

M

2-FP2-2

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPENTHOUSE FIRE PROTECTION PLAN - PHASE

FIRE SUPPRESSION LEGEND

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PENTHOUSE FIRE PROTECTION PLAN - PHASE 2 1N

REWORK EXISTING SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE

RENOVATIONS, INSTALLATION OF ALL NEW TRADES AND INSTALLATION OF NEW

SECOND FLOOR STRUCTURE. NEW STRUCTURE IS BEING INSTALLED IN EXISTING 2-

STORY AREA OF MECHANICAL ROOM. CONTRACTOR SHALL TEMPORARILY SUPPORT

EXISTING SPRINKLER SYSTEMS WITHIN MECHANICAL ROOM AS REQUIRED.

SPRINKLER PIPING SERVING UPPER LEVEL OF MECHANICAL ROOM SHALL BE

REMOVED COMPLETELY. REFER TO NEW PLAN 3-FP2-1 FOR ADDITIONAL

INFORMATION.

16C 17B 18E 20A 24C 25B21E 26B 27C 28B 32A21D21F 25C 25D 27b 27E

C2

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27f 27g

27h

27i27m27n 27r 27s 27t

27cc

E

G1

C1

17a 18b 21 24b 26a 3119c 23b

X-SPRINKLER

ZONE 1-7

X-FIRE DEPARTMENT

CONNECTION

X-4" TO ZONE 1-6

X-4" TO

ZONE 1-7

EXISTING

TAMPER AND

FLOW SWITCH

X-4" FIRE

EXISTING TAMPER

AND FLOW SWITCH

TS

T S

FS

F S

X-4" FIRE DOWN

X-SPRINKLER

ZONE 1-6

Sterile Storage

Preparation

Sterilization122

Gas-CleanGas-Soiled

Dispatch Cart Area

Computer Room

Computer Room

Switchgear Room

Cart Wash

Cart Driving

115A Vascular Lab

S125

Exam Room

S123

Office

S101B

Director's Office S129D

Sterile Storage

PHASE 3 SCOPE OF WORK

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:4

:5

P

M

3-FP1-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 3

FIRE SUPPRESSION LEGEND

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL FIRST FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 3 1N

16C 17B 18E 20A 24C 25B21E 26B 27C 28B 32A21D21F 25C 25D 27b 27E

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27f 27g 27h

27i27m27n 27r 27s 27t

27cc

E

G1

C1

17a 21 24b 26a 3119c 23b

X-4" FIRE

T S

F S

EXISTING TAMPER AND

FLOW SWITCH

X-SPRINKLER

ZONE 1-7

X-SPRINKLER

ZONE 2-9

X-4" TO

ZONE 2-9

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING 3 3

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

Cart Holding

2C219

Medication Prep

Room

2C219A

Anesthesia Storage

2C222

Anesthesia Office

2D282

Soiled Holding

2D281

Anesthesia Workroom

2C218

Office

2D283

Office

2D284

Office

2D285

Ortho OR

(OR-10)

2C217

Semi-Restricted

2C200F

General

OR

(OR-09)

2C216 Semi-Restricted

2C200A

Electrical Room

2C213

Ortho Equipment

2C215A

Laboratory, Frozen Section

2C214 Ortho OR

(OR-08)

2C215

General

OR

(OR-07)

2C212 Clean

Corridor

2C200S

Clean Corridor

2C200P

Clean Corridor

2C100J

Procedure

2C231

Procedure

2C232

Procedure

2C233

Sub-Sterile

2C235

PACU EMS

2C234

Stair #9

2C202

PACU

Cubicle 1

2C237A

PACU

Passage

2C323A

HAC

2C224

PHASE 3 SCOPE OF WORK

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

EXISTING SPRINKLER BRANCH PIPING AND SPRINKLER HEADS TO BE REMOVED.

EXISTING SPRINKLER MAIN PIPING TO BE REMOVED UPON INSTALLATION OF NEW

MAIN PIPING SO AS TO MAINTAIN SERVICE TO ADJACENT SPACES WHILE MINIMIZING

SYSTEM SHUTDOWN. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE

REMOVED TO OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS

OUTSIDE OF SHADED AREA SHALL REMAIN 100% SPRINKLERED. REFER TO

ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORMATION.

EXISTING AREA OPEN TO FIRST FLOOR. REMOVE EXISTING SPRINKLER HEADS,

MAINS, AND BRANCH PIPING SERVING THIS AREA.

Patient Room #3 (Isolation)

2D127B

Anteroom

2D127A

EMS

Closet

2D110

Gas Room Non

Oxidizing

2514A

Laser Scales Video

Equipment

Toilet

2D127C

Toilet

2D263

Patient Room #4

2D111

Lounge / Dictation

2D251

Work

2D260D

Work

2D260E

Work

2D260F

Office

2D261C

Sub Sterile

General

OR-4

Storage

OR-3

Orthopedic

Elec.

2517A

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

TEMP.

Implant Storage

Rm.

Stair

2S7

Office

Special Equipment Records

OR-2

Neuro

Corridor

2C100E

Foyer

2D255E

Dictation

2D252A

Office

Corridor

2C280

Light Room

2500I

TEMP.

Medical

Prep Rm.

Clean Elevator

Scrub

2500N Scrub

2500O

Upper Mechanical

Room

2500Q

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:5

:1

P

M

3-FP1-2

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 3

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN - PHASE 3 1

FIRE SUPPRESSION LEGEND

N

# CODED NOTES

1 EXISTING SPRINKLERS IN OUTLINED AREA TO REMAIN. AREA SERVED BY ZONE 2-9. SPRINKLER SHALL

REMAIN ACTIVE DURING CONSTRUCTION. SHUTDOWNS SHALL BE COORDINATED WITH VA COR.

AS PART OF DEDUCT ALTERNATE 2, SPRINKLER COVERAGE IN OUTLINED AREA SHALL REMAIN.

REWORK SPRINKLER SYSTEM IN OUTLINED AREA AS REQUIRED TO ACCOMMODATE HVAC REVISIONS.

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27f 27g

27h

27i27m27n 27r 27s 27t

27cc

E

G1

C1

17a 18b 21 24b 26a 3119c 23b

X-SPRINKLER

ZONE 1-7

X-SPRINKLER

ZONE 1-6

X - 4" SPR

X - 4" SPR

X - 4" SPR

X - 4" SPR

Sterile Storage

Preparation

Sterilization122

Gas-CleanGas-Soiled

Dispatch Cart Area

Computer Room

Computer Room

Switchgear Room

Cart Wash

Cart Driving

115A Vascular Lab

S125

Exam Room

S123

Office

S101B

Director's Office S129D

Sterile Storage

PHASE 3 SCOPE OF WORK

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE NEW

FLOOR SLAB AT SECOND FLOOR LEVEL. PROVIDE ALL NEW BRANCH PIPING AND

SPRINKLER HEADS IN MECHANICAL ROOM SHADED AREA. HEADS SHALL BE

UPRIGHT-TYPE. PROVIDE PROTECTIVE CAGES WHERE HEADS ARE LOCATED BELOW

8'-0" AFF OR IN LOCATION NEAR EQUIPMENT ACCESS. SPRINKLER PER NFPA 13,

ORDINARY HAZARD GROUP 1 OCCUPANCY.

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:5

:3

P

M

3-FP2-1

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL FIRST FLOOR FIRE PROTECTION

PLAN - PHASE 3

FIRE SUPPRESSION LEGEND

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN -

PHASE 3 1N

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27f 27g

27h

27i27m27n 27r 27s 27t

27cc

E

G1

C1

17a 18b 21 24b 26a 3119c 23b

X-4" FIRE

T S

F S

EXISTING TAMPER AND

FLOW SWITCH

X-4" TO

ZONE 2-9

X-SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-8

X-SPRINKLER

ZONE 2-9

X-SPRINKLER

ZONE 2-8

3 3

Hybrid OR

2C366

Hybrid OR

2C366

Control

2C362c Control

2C362b

Equip

2C362a

EMS

Closet

2D280

Cardiac Equipment

2C127

Cardiac Pump Room

2C128

Scrub

2C100U

Cardiac

OR (OR-1)

2C129

Cardiac Equipment

2C127

Immediate Use

Sterilization Room

2C123

Clean Corridor

2C100H

Cardiac

OR (OR-2)

2C126

Alcove

2C100K

Robotic

OR (OR-5)

2C114 Robotic

Equipment Storage

2C213

Semi-Restricted

2C100B

EMS

2C110

Gas Room

2C211 Anesthesia

Storage

2C111

Equipment Storage

2C112

General

OR (OR-6)

2C210

Procedure

2C231

Procedure

2C232

Passage

2C230

Sub-Sterile

2C235

Procedure

2C233

HAC

2C224

PACU EMS

2C234

Stair #9

2C202

PACU

Cubicle 1

2C237A

PACU

Passage

2C323A

Electrical Room

2C213

Ortho Equipment

2C215A

General

OR

(OR-07)

2C212

Clean Corridor

2C200S

Clean Corridor

2C200P

Cart Holding

2C219

Medication Prep

Room

2C219A

Anesthesia Storage

2C222

Soiled Holding

2D281

Anesthesia Office

2D282

Alcove

2C200Q Alcove

2C200R

Ortho OR

(OR-10)

2C217

General

OR

(OR-09)

2C216

Anesthesia Workroom

2C218

Office

2D283

Office

2D284

Office

2D285

Semi-Restricted

2C200F

Laboratory, Frozen Section

2C214

Semi-Restricted

2C200A

PHASE 3 SCOPE OF WORK

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

REFER TO ARCHITECTURAL

PLANS FOR SUB-

PHASING/SEQUENCING

Implant

2D253

Dictation

2D251B

Semi-Restricted

2C100O

Clean Corridor

2C100J

Semi-Restricted

2C100E

Semi-Restricted

2C100A

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

LIGHT HAZARD OCCUPANCY.

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

ORDINARY HAZARD GROUP 1 OCCUPANCY.

PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO

ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW TRADES.

PROVIDE ALL NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE

WITH ARCHITECTURAL REFLECTED CEILING PLAN. SPRINKLER PER NFPA 13,

ORDINARY HAZARD GROUP 2 OCCUPANCY.

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:5

:5

P

M

3-FP2-2

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPARTIAL SECOND FLOOR FIRE PROTECTION

PLAN - PHASE 3

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL SECOND FLOOR FIRE PROTECTION PLAN

- PHASE 3 1

FIRE SUPPRESSION LEGEND

# CODED NOTES

1 EXISTING SPRINKLERS IN OUTLINED AREA TO REMAIN. AREA SERVED BY ZONE 2-9. SPRINKLER SHALL

REMAIN ACTIVE DURING CONSTRUCTION. SHUTDOWNS SHALL BE COORDINATED WITH VA COR.

AS PART OF DEDUCT ALTERNATE 2, DELETE NEW SPRINKLERS IN OUTLINED AREA.

REWORK SPRINKLER SYSTEM IN OUTLINED AREA AS REQUIRED TO ACCOMMODATE HVAC REVISIONS.

AS PART OF DEDUCT ALTERNATE 1, THIS REWORK SHALL BE DELETED.

EXTEND EXISTING ADJACENT SPRINKLER ZONE 2-8 TO COVER OUTLINED AREA. SPRINKLER ZONES

SHALL BE MAINTAINED WITHIN SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

N

REWORK EXISTING SPRINKLER BRANCH PIPING TO ACCOMMODATE NEW

DUCTWORK LAYOUT IN MECHANICAL ROOM AND INTERSTITIAL SPACE BELOW

MECHANICAL ROOM FLOOR. SEE HVAC PLANS FOR NEW DUCTWORK LAYOUT.

PROVIDE UPRIGHT SPRINKLER HEADS. PROVIDE FULL COVERAGE ABOVE AND

BELOW ALL DUCTWORK, EQUIPMENT, ETC. WHERE SPRINKLERS ARE LOCATED

BELOW 8'-0" AFF OR ARE SUBJECT TO DAMAGE, PROVIDE PROTECTIVE CAGE

AROUND HEADS. SPRINKLER PER NFPA 13. ORDINARY HAZARD GROUP 1

OCCUPANCY.

16C 17B 18E 20A 24C 25B21E 26B 27C21D21F 25C 25D 27b 27E

C2

A1

ZZ

YY

XX

UU

RR

ss

B

D

27B

F2

VV

27A

F1

27D

27c

27f

27g

27h

27i27m27n27o27p 27r 27s 27t 27cc

E

G1

C1

17a 21 24b 26a19c 23b

MECHANICAL

PENTHOUSE

74490

L.D. HENDRIX, JR

GN

S S

A

ION EL

T

F EGE

P R O

R

SI NRE I

E E R

D

E

AT

S

ET

O

OI

HO

F

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS FOR PURPOSES OTHER THAN THE

SPECIFIC PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED WITHOUT THE EXPRESSED

WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE. COPYRIGHT C 2019.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

18067

Z M y D o c u m e n ts

\1

F

F H

C F

R

J C a rt e r5

.r v t

/2

/2

:5

:1

P

M

3-FP2-3

10701 East Blvd. Cleveland, OH 44106

06/26/2020 LDH DML

541-19-101Renovate Operating RoomsBID ISSUEPENTHOUSE FIRE PROTECTION PLAN - PHASE

FIRE SUPPRESSION LEGEND

ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A

WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND

VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS

TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER

HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,

REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION

NOTES FOR ADDITIONAL INFORMATION.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PENTHOUSE FIRE PROTECTION PLAN - PHASE 3 1N

18067 FFH CF R19_JCarter57
0-FP1-1 - FIRE PROTECTION LEGEND AND GENERAL NOTES
3-FP2-3 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 3.pdf
18067 FFH CF R19_JCarter57
3-FP2-3 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 3
3-FP2-2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3.pdf
18067 FFH CF R19_JCarter57
3-FP2-2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3
3-FP2-1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3.pdf
18067 FFH CF R19_JCarter57
3-FP2-1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3
3-FP1-2 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3.pdf
18067 FFH CF R19_JCarter57
3-FP1-2 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3
3-FP1-1 - PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3.pdf
18067 FFH CF R19_JCarter57
3-FP1-1 - PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3
2-FP2-2 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 2.pdf
18067 FFH CF R19_JCarter57
2-FP2-2 - PENTHOUSE FIRE PROTECTION PLAN - PHASE 2
2-FP2-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2.pdf
18067 FFH CF R19_JCarter57
2-FP2-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2
2-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2.pdf
18067 FFH CF R19_JCarter57
2-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2
1-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLANS - PHASE 1.pdf
18067 FFH CF R19_JCarter57
1-FP1-1 - PARTIAL SECOND FLOOR FIRE PROTECTION PLANS - PHASE 1

File details come from the government source that posted it. Updated .