S02. Drawings - Architectural.pdf
PDF 35 MB Posted
- Attached to
- Y1NB--Renovate Operating Rooms - VAMC Cleveland
- Solicitation number
- Amend0002
About this file
This amendment to a federal solicitation adds architectural drawings to a renovation project. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking bids to renovate operating rooms at the VAMC Cleveland. Amendment 0002 provides all drawings for the project and maintains the original bid opening date and time of September 9, 2020 at 12:00 PM EST, with all other terms of the solicitation remaining the same. The renovation involves operating rooms and the amendment supplies bidders with the necessary architectural drawings to develop their responses for the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BP
BP
BP
East Boulevard
East Boulevard
Staging areas for work in Phases 2C and 2D
Staging area for work in Phases 2, 2A, and 2B
Provide construction fencing to protect staging area and provide dumpster and chutes for refuse. Provide scaffolding and stairs for access to work areas
EXITEXIT
Contractor to maintain exits
EXIT
Contractor to maintain exits
Parking
Parking
Traffic Flow
Traffic
Flow
Traffic FlowTr af fic
Fl ow
Pavers
Pavers
EXIT
Maintain Exit Path
Maintain Exit Path
Contractor to maintain exits
Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn
Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn
Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn
Key Plan
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 0:
A
M
0-A1-0 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW WJW
541-19-101Renovate Operating RoomsBid IssueSITE PLAN
Scale
8' 16' 32' 1/16" = 1'-0"
SITE PLAN1
Grass Area
Grass Area
Grass Area
Grass Area Grass
Area
Grass Area
Revisions: Date:
Bid Issue 06/26/2020
16C
17B 18E
18E
20A
20A
24C 25B
25B
21E
21E
26B
26B
27C
27C
28B
28B
32A
32A
21D 21F 25C 25D 27b 27d 27E
E1E1
C2C2
A1A1
ZZZZ
YYYY
XXXX
UUUU
RR RR
ssss
A A
B B
C C
D D
27B
VVVV
F1F1
27D
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
BB
CC
AA
DD
EE
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Key Plan
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Laser Scales Video
Equipment
Toilet 2D127C
Toilet 2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Lounge / Dictation 2D251
Temp.
Anesthesia
Work 2D253
Corridor 2D250
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Nurse Mgr.
2D262
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Holding
Corridor 2500B
Implant Storage
Anesthesia Work Room
Corridor 2500H
OR-7
General
OR-6
General
Electric
EMS
Anesthesia Storage
EMS
2508A
Sub Sterile
Sub Sterile
Dictation
Sterile Storage
General
OR-5
General
OR-4
Storage
OI&T
OR-3
Orthopedic
Elec.
2517A
Sub Sterile
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
Stair 2S7
Soiled Holding
Office
Special Equipment Records
OR-2 Neuro
Bed/ Treatment
Room
Medication Prep Room
Workroom
Intake
Corridor 2C100E
Corridor 2500A
Pharmacy
Unisex RR
Corridor 2500J
Corridor 2C280
Foyer 2D255E
Alcove 2D251A
Soiled Utility 2D254
Sterile Supply
2D254A
Locker Room 2D252
Dictation 2D252A
Office 2D261A
Office 2D261B
Office
Corridor 2500E
Light Room 2500I
Soiled Elevator
Clean Elevator
Scrub 2500N
Scrub 2500O
Upper Mechanical
Room 2500Q
Hybrid OR (OR-03) 2-C366
Storage 2-C366CEquip
2-C366A
Sub-Sterile 2-C366B
Scrub 2-C360A
Equip 2-C362A
Control 2-C362C
Equip 2-C362D
Hybrid OR (OR-04) 2-C362
Sub-Sterile 2-C362B
Scrub 2-C357B
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Electrical Rm.
2519A
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Control 2D261
Dark Room
Gas Room Non Oxidizing
2514A
Equipment Storage
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 0:
A
M
0-A1-1 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssueEXISTING FLOOR PLAN
Scale
4' 8' 16' 1/8" = 1'-0"
Second Floor Existing Floor Plan1
Pre-Op
PACU
SICU
17B 18E
18E
20A
20A
24C 25B
25B
21E
21E
26B
26B
27C
27C
28B
28B
32A
32A
21D 21F 25C 25D 27b 27d 27E
E1E1
C2C2
A1A1
ZZZZ
YYYY
XXXX
UUUU
RR RR
ssss
A A
B B
C C
D D
27B
VVVV
F1F1
27D
Laboratory, Frozen Section 2C214
General OR
(OR-07)
2C212
Ortho OR
(OR-10)
2C217
Ortho OR
(OR-08)
2C215
Bed Holding 2C200E
Bed Holding 2C200M
Anesthesia Workroom
2C218
Ortho Equipment
2C215A
Electrical Room 2C213
Bed Holding 2C200H
General OR
(OR-09)
2C216
Office 2D283
Office 2D284
Office 2D285
Semi-Restricted 2C200F
Anesthesia Storage 2C222
Cart Holding 2C219
Soiled Holding 2D281
Cardio OR
(OR-01)
2C129
Cardio Equipment
2C127
Cardio Pump Room 2C128
Cardio OR
(OR-02)
2C126
General OR
(OR-05)
2C114
Immediate Use
Sterilization Room 2C123
Electrical Room 2C115
Alcove 2C100KEMS Closet
2D280
Bed Holding 2C100P
Robotic OR
(OR-06)
2C210
Alcove 2C100L
OI&T
2C122
Alcove 2C100M
Alcove 2C200Q
Bed Holding 2C200C
Scrub 2C200L
Bed Holding 2C200K
Scrub 2C200J
Scrub 2C200G
Scrub 2C200D
Bed Holding 2C100C
Scrub 2C100D
Scrub 2C100Q
Scrub 2C100U
Robotic Equipment
Storage 2C113
Semi-Restricted 2C100B
EMS
2C110
Gas Room 2C211
Anesthesia Storage 2C111
Equipment Storage 2C112
Clean Corridor 2C200P
Clean Corridor 2C200S
Clean Corridor 2C100J
Clean Corridor 2C100H
Semi-Restricted 2C100A
Semi-Restricted 2C100E
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Anesthesia Office 2D282
Dictation 2D251A
Implant 2D252
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Bed Holding 2C100T
Semi-Restricted 2C200A
Scrub 2C200B
Alcove 2C200R
Alcove 2C100N
Alcove 2D250A
Vestibule 2C200N
Nurse Manager 2D262
BB
CC
AA
DD
EE
Changing Alcove
2C250C
Medication Prep Room
2C219A
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Key Plan
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Toilet 2D127C
Staff Lounge 2D135
Toilet 2D263
Patient Room #6
2D113
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Men Lockers 2D255A
Lounge / Dictation 2D251
Corridor 2D250
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Stair 2S7
Foyer 2D255E
Alcove 2D251A
Soiled Elevator
Clean Elevator
Control 2D261
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 0:
A
M
0-A1-2 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssueCOMPLETED FLOOR PLAN
Scale
4' 8' 16' 1/8" = 1'-0"
Second Floor New Work Plan - Completed Floor Plan1
Pre-Op
PACU
SICU
18E
18E
20A
20A
25B
25B
26B
26B
27C
27C
28B
32A
32A
21D 21F 25C 25D 27b 27E
E1E1
C2C2
A1A1
ZZZZ
YYYY
XXXX
UUUU
RR RR
ssss
A A
B B
C C
D D
VVVV
F1F1
27D
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Office 2D285
Office 2D284
Office 2D283
Anesthesia Workroom
2C218
Ortho OR
(OR-10)
2C217
General OR
(OR-09)
2C216
Ortho OR
(OR-08)
2C215
Laboratory, Frozen Section 2C214
Ortho Equipment
2C215A
Electrical Room 2C213
Semi-Restricted 2C200F
Bed Holding 2C200M
Scrub 2C200L
Bed Holding 2C200K
Scrub 2C200J
Bed Holding 2C200H
Scrub 2C200G
General OR
(OR-6)
2C212
Bed Holding 2C200E
Scrub 2C200D
Bed Holding 2C200C
General OR
(OR-5)
2C210
Scrub 2C200B
Anesthesia Office 2D282
Anesthesia Storage 2C222 Medication
Prep Room 2C219A
Soiled Holding 2D281
Cart Holding 2C219
Clean Corridor 2C200P
Alcove 2C200Q
Alcove 2C200R
Robotic OR
(OR-5)
2C114
Immediate Use
Sterilization Room
2C123 OI&T
2C122
Electrical Room 2C115
Scrub 2C100D
Bed Holding 2C2100C
Gas Room 2C211
EMS
2C110
Anesthesia Storage 2C111
Semi-Restricted 2C100B
Robotic Equipment
Storage 2C213
Equipment Storage 2C112
Semi-Restricted 2C100A
Semi-Restricted 2C200A
EMS Closet 2D280
Alcove 2C100N
Alcove 2C100M Alcove
2C100K
Cardiac Equipment
2C127
Cardiac OR
(OR-1)
2C129
Cardiac OR
(OR-2)
2C126
Cardiac Pump Room
2C128
Scrub 2C100Q
Bed Holding 2C100P
Semi-Restricted 2C100E
Scrub 2C100U
Bed Holding 2C100T
Implant Storage 2D252
Mens Lockers 2D251A
Corridor 2D250
Clean Corridor 2C100J
Clean Corridor 2C100H
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0" ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 9' - 0"
GWB 9' - 6" GWB 9' - 6" GWB 9' - 6"
GWB 9' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
GWB 9' - 6"
GWB 9' - 6"
GWB 9' - 6"
GWB 9' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
GWB 9' - 6"
ACT-1 8' - 0"
ACT-1 8' - 0"
GWB 9' - 6"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 2"
GWB 7' - 2"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 0"
GWB 7' - 2"
GWB 7' - 0"
GWB 7' - 2"
GWB 8' - 0"
GWB 8' - 0"
GWB 8' - 0"
GWB 8' - 0"
GWB 8' - 0"GWB 8' - 0"GWB 8' - 0"
GWB 7' - 2"
GWB 7' - 2"
GWB 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
ACT-1 8' - 0"
Vestibule 2C200N
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Toilet 2D127C
Staff Lounge 2D135
Toilet 2D263
Patient Room #6
2D113
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Men Lockers 2D255A
Lounge / Dictation 2D251
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Nurse Mgr.
2D262
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Stair 2S7
Foyer 2D255E
Alcove 2D251A
Soiled Elevator
Clean Elevator
Control 2D261
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 5:
A
M
0-A1-3 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssueCOMPOSITE REFLECTED CEILING
PLAN
Scale
4' 8' 16' 1/8" = 1'-0"
Second Floor New Work Composite Reflected Ceiling Plan1
17B 18E
18E
20A
20A
24C 25B
25B
21E
21E
26B
26B
27C
27C
28B
28B
32A
32A
21D 21F 25C 25D 27b 27d 27E
E1E1
C2C2
A1A1
ZZZZ
YYYY
XXXX
UUUU
RR RR
ssss
A A
B B
C C
D D
27B
VVVV
F1F1
27D
Laboratory, Frozen Section 2C214
General OR
(OR-07)
2C212
Ortho OR
(OR-10)
2C217
Ortho OR
(OR-08)
2C215
Bed Holding 2C200E
Bed Holding 2C200M
Anesthesia Workroom
2C218
Ortho Equipment
2C215A
Electrical Room 2C213
Bed Holding 2C200H
General OR
(OR-09)
2C216
Office 2D283
Office 2D284
Office 2D285
Semi-Restricted 2C200F
Anesthesia Storage 2C222
Cart Holding 2C219
Soiled Holding 2D281
Cardio OR
(OR-01)
2C129
Cardio Equipment
2C127
Cardio Pump Room 2C128
Cardio OR
(OR-02)
2C126
General OR
(OR-05)
2C114
Immediate Use
Sterilization Room 2C123
Electrical Room 2C115
Alcove 2C100KEMS Closet
2D280
Bed Holding 2C100P
Robotic OR
(OR-06)
2C210
Alcove 2C100L
OI&T
2C122
Alcove 2C100M
Alcove 2C200Q
Bed Holding 2C200C
Scrub 2C200L
Bed Holding 2C200K
Scrub 2C200J
Scrub 2C200G
Scrub 2C200D
Bed Holding 2C100C
Scrub 2C100D
Scrub 2C100Q
Scrub 2C100U
PHASE 2 SCOPE OF WORK
PHASE 3 SCOPE OF WORK
Robotic Equipment
Storage 2C113
Semi-Restricted 2C100B
EMS
2C110
Gas Room 2C211
Anesthesia Storage 2C111
Equipment Storage 2C112
Clean Corridor 2C200P
Clean Corridor 2C200S
Clean Corridor 2C100J
Clean Corridor 2C100H
Semi-Restricted 2C100A
Semi-Restricted 2C100E
Phase 2
Phase 2A Phase 2B
Phase 3
Phase 3B Phase 3C
Ph as e 3A
Ph as e 3D
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Anesthesia Office 2D282
Dictation 2D251A Implant
2D252
Phase 1
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Alcove 2C200R
Semi-Restricted 2C200A
Scrub 2C200B
Alcove 2C100N
BB
CC
AA
DD
EE
Medication Prep Room
2C219A
Vestibule 2C200N
Key Plan
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Area Accessible to Public
Construction Area
Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.
Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements
Remove portion of existing ceilings and patch @ temporary partitions
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
Provide new ceiling, trim, wall angle on public side
Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.
Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development
Continuous sound batt insulation
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Toilet 2D127C
Staff Lounge 2D135
Toilet 2D263
Patient Room #6
2D113
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Men Lockers 2D255A
Lounge / Dictation 2D251
Corridor 2D250
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Nurse Mgr.
2D262
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Stair 2S7
Foyer 2D255E
Alcove 2D251A
Soiled Elevator
Clean Elevator
PHASE 2 SCOPE OF WORK
Control 2D261
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 5:
A
M
0-A1-4 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - OVERALL
Scale
4' 8' 16' 1/8" = 1'-0"
Second Floor New Work Plan - Overall Project Phasing1
Typical Temporary Partition Detail
Path of construction debris removal
Path of patient transportation to ORs and Recovery
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
OR to be in operation during the entirety of Phase 1
PACU to be in operation during the entirety of Phase 1
PreOP and PACU to be in operation during the entirety of Phase 1
0-A1-5
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Viewing/Fellows 2-C155
Holding 2-C153
Clean Utility 2-C150
Soiled Utility 2-C149
Intervention 2-C148
Office 2-C146
Corridor 2-C140A
Staff Work 2-C151
Cath Lab 2-C147
Physicians 2-C141
E.P. Lab 2-C144
Storage 2-C143
E.C.
2-C203
Electrical Room 2-C202
Oxygen Assess 2-C201
O.P. Assess 2-C200
Report Room 2-C199
Fan Room 2-C198
Storage 2-C134
Endo/Cath Waiting 2-C133BFan Room
2-D300 Womens Room
2-C130
Scrub 2-C145
Control 2-C145B
Control 2-C145A
Office 2-B121E
Office 2-B121D
Exam 2-B121C
Pulmonary Service 2-B121 Clean Utility
2-B120 Lead Therapist
2-B119
Storage 2-B121A
PACU Soiled Utility 2-C321
PACU Meds 2-C324
PACU Nour.
2-C325
PACU Admin. Center 2-C323
PACU Cub. 12 2-C326F
PACU Cub. 13 2-C326G
PACU Cub. 14 2-C326H
PACU Storage 2-C328
PACU Clean 2-C330A
PACU Toilet 2-C322
PACU Cub. 7 2-C326A
PACU Cub. 8 2-C326B
PACU Cub. 9 2-C326C
PACU Cub. 10 2-C326D
PACU Cub. 11 2-C326E
Reception 2-B141
Office 2-B140
Shading indicates general area of work
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
OR to be in operation during the entirety of Phase 1
Existing Blood Bank refrigerator. Relocate in temporary space in Phase 3 area.
Provide duplex emergency power at new location during Phase 1.
Add temporary wall and door before initiating any other Phase 1 construction
Add temporary wall and door before initiating any other Phase 1 construction
Complete demolition in this area and construct new partitions and door before initiating any other Phase 1 construction
10' - 4 1/2"
2'
3/
4"
8' - 0"
Nurse Manager 2D262
Corridor 2D260J
Control 2D261
9'
1/
2"
Office 2D261C
Office 2D261A
Add temporary wall and door before initiating any other Phase 1 construction
Add temporary wall and door before initiating any other Phase 1 construction
Complete demolition in this area and construct new partitions and door before initiating any other Phase 1 construction
Corridor 2D260J
Control 2D261
Office 2D261C
Office 2D261A
Nurse Manager 2D262
Key Plan
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Area Accessible to Public
Construction Area
Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.
Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements
Remove portion of existing ceilings and patch @ temporary partitions
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
Provide new ceiling, trim, wall angle on public side
Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.
Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development
Continuous sound batt insulation
Path of construction debris removal
Path of patient transfer
CONSTRUCTION PATH OF TRAVEL LEGEND
Phase Designation
Temporary Partition
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Toilet 2D127C
Staff Lounge 2D135
Toilet 2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Men Lockers 2D255A
Lounge / Dictation 2D251
Corridor 2D250
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Nurse Mgr.
2D262
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Stair 2S7
Foyer 2D255E
Alcove 2D251A
Soiled Elevator
Clean Elevator
Gas Room Non
Oxidizing 2514A
Laser Scales Video
Equipment
Sub Sterile
General
OR-4
Storage
OI&T
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant
Storage Rm.
Office
Special Equipment Records
OR-2 Neuro
Corridor 2C100E
Dictation 2D252A
Office
Corridor 2C280
Light Room 2500I
TEMP.
Medical Prep
Rm.
Scrub 2500N
Scrub 2500O
Upper Mechanical
Room 2500Q
OR-3
Orthopedic
Electrical Rm.
2519A
Corridor 2500H
Soiled Holding
Locker Room 2D252
Sterile Supply
2D254A
Soiled Utility 2D254
Office 2D261B
Office 2D261A
Holding
Corridor 2500B
Implant Storage
Anesthesia Work Room
OR-7
General
Sub Sterile
OR-6
General
Anesthesia Storage
EMS
EMS
2508A
Electric
General
OR-5
Sub Sterile
Dictation
Sterile Storage
Pharmacy
Medication Prep Room
Bed/
Treatment Room
Workroom
Unisex RR
Corridor 2500J
Corridor 2500A
Temp.
Anesthesia
Work 2D253
Control 2D261
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 6:
A
M
0-A1-5 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 1
Scale
5.5' 10.5' 21' 3/32" = 1'-0"
Second Floor New Work Plan - Phase 11
Scale
2' 4' 8' 1/4" = 1'-0"
Phase 1 - Patient Circulation (New Work)2
Scale
2' 4' 8' 1/4" = 1'-0"
Phase 1 - Patient Circulation (Demolition)3
Typical Temporary Partition Detail
Semi-Restricted 2C200F
Clean Corridor 2C200S
General OR
(OR-07)
2C212
Ortho OR
(OR-10)
2C217
Ortho OR
(OR-08)
2C215
Scrub 2C200D
Bed Holding 2C200E
Scrub 2C200G
Scrub 2C200L
Bed Holding 2C200M
Anesthesia Workroom
2C218 Ortho
Equipment 2C215A Electrical
Room 2C213
General OR
(OR-09)
2C216
Office 2C283
Office 2D284
Office 2D285
Alcove 2C200Q
Clean Corridor 2C200P
Bed Holding 2C200K
Scrub 2C200J
Semi-Restricted 2C200A
Laboratory, Frozen Section 2C214
Cart Holding 2C219
Anesthesia Storage 2C222
Soiled Holding 2D281
Anesthesia Office 2D282
Bed Holding 2C200H
Path of patient transportation to
ORs and recovery
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
OR to be in operation during the entirety of Phase 2
PACU to be in operation during the entirety of Phase 2
PreOP and PACU to be in operation during the entirety of Phase 2
Shading indicates area of required staff access
0-A1-7
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Viewing/Fellows 2-C155
Holding 2-C153
Clean Utility 2-C150
Soiled Utility 2-C149
Intervention 2-C148
Office 2-C146
Corridor 2-C140A
Staff Work 2-C151
Cath Lab 2-C147
Physicians 2-C141
E.P. Lab 2-C144
Storage 2-C143
E.C.
2-C203
Electrical Room 2-C202
Oxygen Assess 2-C201
O.P. Assess 2-C200
Report Room 2-C199
Fan Room 2-C198
Storage 2-C134
Endo/Cath Waiting 2-C133BFan Room
2-D300 Womens Room
2-C130
Scrub 2-C145
Control 2-C145B
Control 2-C145A
Office 2-B121E
Office 2-B121D
Exam 2-B121C
Pulmonary Service 2-B121 Clean Utility
2-B120 Lead Therapist
2-B119
Storage 2-B121A
PACU Soiled Utility 2-C321
PACU Meds 2-C324
PACU Nour.
2-C325
PACU Admin. Center 2-C323
PACU Cub. 12 2-C326F
PACU Cub. 13 2-C326G
PACU Cub. 14 2-C326H
PACU Storage 2-C328
PACU Clean 2-C330A
PACU Toilet 2-C322
PACU Cub. 7 2-C326A
PACU Cub. 8 2-C326B
PACU Cub. 9 2-C326C
PACU Cub. 10 2-C326D
PACU Cub. 11 2-C326E
Reception 2-B141
Office 2-B140
Shading indicates general area of work
PHASE 2 SCOPE OF WORK
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Alcove 2C220R
Phase 2A Phase 2B
Medication Prep Room
2C219A
Contractor to seal off door and make sure wall extends to structure above to make sure dust does not enter the functional surgery suite
This alcove will be used as the temporary location for the Blood Bank refrigerator during Phase 2. During Phase 1 upgrade alcove to provide emergency power for this equipment
Contractor to make sure wall extends to structure above to make sure the dust does not enter the functional surgery suite
Vestibule 2C200N
Temp. Anesthesia Work
2D253
Clean Utility
Soiled Utility
Toilet
Pre-Op/Post/Op Holding Cubicles
Male Lockers
Toilet 2064A
Female Lockers
Toilet 2065A
Corridor 2C100B
Clean Utility
Procedure
Endoscopy Procedure
Endoscopy Procedure
Workroom / Inst Clean
Workroom / Inst Clean
Procedure
Substerile 2052A
Scrub 2C172
CICU/PCU
2D160
Physician/Consultant 2D161
Dietician Office 2D198
Communication (Monitor) Room
2D197
Family Lounge 2D196
Corridor 2D100M
Shaft
Stair #4 2D162
Quiet Room 2D163
Public Toilet 2D195
Lactation 2D194
Pharmacy 2D193
Staff Lounge 2D192
Female Lockers 2D192A
Staff Toilet/Shower 2D192B
2D1342D132
2D130B
2D125
2D133
2D124
2D130A
2D118
2D1222D121
2D131
2D119
2D120
2D117
2D116 2D115 2D114
2D255C
2D257C
2D258
2D256
2D192C
2D192D
2D264
2D265
2D266
2D265A
Work 2D260A
Work 2D260B
Key Plan
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Area Accessible to Public
Construction Area
Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.
Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements
Remove portion of existing ceilings and patch @ temporary partitions
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
Provide new ceiling, trim, wall angle on public side
Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.
Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development
Continuous sound batt insulation
Path of construction debris removal
Path of patient transfer
CONSTRUCTION PATH OF TRAVEL LEGEND
Phase Designation
Temporary Partition
Patient Room #3 (Isolation) 2D127B
Anteroom 2D127A
EMS Closet 2D110
Toilet 2D127C
Staff Lounge 2D135
Toilet 2D263
Patient Room #5
2D112
Patient Room #4
2D111
Patient Room #2
2D126
Men Lockers 2D255A
Lounge / Dictation 2D251
Corridor 2D250
Women Lockers 2D257A
Shower 2D257D
Shower 2D255D
Surgery Waiting 2D270
Nurse Mgr.
2D262
Work 2D260C
Work 2D260D
Work 2D260E
Work 2D260F
Alcove 2D260H
Office 2D261C
Holding 2D260
Stair 2S7
Foyer 2D255E
Alcove 2D251A
Soiled Elevator
Clean Elevator
Gas Room Non
Oxidizing 2514A
Laser Scales Video
Equipment
Sub Sterile
General
OR-4
Storage
OI&T
Elec.
2517A
Sub Sterile
Storage
OR-1
Cardiac
Pump Room
Gas Room Oxidizing
TEMP.
Implant
Storage Rm.
Office
Special Equipment Records
OR-2 Neuro
Corridor 2C100E
Dictation 2D252A
Office
Corridor 2C280
Light Room 2500I
TEMP.
Medical Prep
Rm.
Scrub 2500N
Scrub 2500O
Upper Mechanical
Room 2500Q
OR-3
Orthopedic
Electrical Rm.
2519A
This room will be used as the temporary Implant Storage Room during Phase 2. During Phase 1, upgrade room to provide 1 hour fire-rated walls, positive air pressure, 45 minute fire-rated door frame assembly.
This room will be used as the temporary Med Prep Room with Pyxis and refrigerator during Phase 2. During Phase 1, upgrade room to provide emergency power and data, for this equipment
Control 2D261
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 6:
A
M
0-A1-6 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 2
Scale
5.5' 10.5' 21' 3/32" = 1'-0"
Second Floor New Work Plan - Phase 21
Typical Temporary Partition Detail
Cart Holding 2C219
Clean Corridor 2C200S
Soiled Elevator
Clean Elevator
This work to occur as an early part of Phase 2 (Temp walls) and at the later part of Phase 2 (HVAC and Ceiling work)
Access to Clean elevator by VA staff must be maintained but can be taken out of service for 20 days maximum
Remove door and infill wall before Phase 3
Drywall and finish to be built on this side under Phase 3
2C
9.
Build these walls and doors in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding
Install temporary partition before performing any demolition
Soiled Elevator
Clean Elevator
Pharmacy
Sterile Storage
This work to occur as an early part of Phase 2 (Temp walls) and at the later part of Phase 2 (HVAC and Ceiling work)
Path of OR Sterile Supply material movement. Access to this space by VA staff must be maintained at all times
Access to Clean elevator by VA staff must be maintained but can be taken out of service for 20 days maximum
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar Days from Award days
Submittals Phase 90 days day 1-90
Notice to Proceed day 90
Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete
Phase 2(North Scope) 240 days day 111-350
Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR
Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR
VA Activation 90 days day 351-440
Phase 3(South Scope) 240 days day 441-680
Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR
Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR
CONSTRUCTION DURATIONS
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
PHASING NOTES
Key Plan
Area Accessible to Public
Construction Area
Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.
Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements
Remove portion of existing ceilings and patch @ temporary partitions
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
Provide new ceiling, trim, wall angle on public side
Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.
Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development
Continuous sound batt insulation
Path of construction debris removal
Path of patient transfer
CONSTRUCTION PATH OF TRAVEL LEGEND
Phase Designation
Temporary Partition
Build these walls and door in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding
Install temporary partition before performing any demolition
Access to this elevator by VA staff must be maintained but can be taken out of service for
30 days max.
Path of OR produced soiled material movement. Access to this space by VA staff must be maintained at all times
Restricted Area
Semi-Restricted Area
Install temporary partition before performing any demolition
This work to occur as an early part of Phase 2.
Coordinate with VA COR
9' - 0" 4 7/8" 10' - 7 3/4"
Soiled Elevator
Clean Elevator
Dictation 2D252A
Corridor 2500E
Pump Room
Sub Sterile
Locker Room 2D252
Sterile Supply 2D254A
Soiled Holding
Bed/ Treatment Room
For all existing walls separating construction area and functional Surgery Suite, contractor to make sure that walls go all the way to the deck and are sealed, TYP.
Drywall to be built on this side of temporary partition after demo of Phase 2A, TYP.
Drywall to be built on this side of temporary partition after demo of Phase 2A, TYP.
Coordinate demo of existing corridor walls with construction of new temporary walls to maintainstaff access to Soiled Holding at all timesBuild these walls and doors in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding
Install temporary partition before performing any demolition
Access to this elevator by VA staff must be maintained but can be taken out of service for
30 days max
Path of OR produced soiled material movement. Access to this space by VA staff must be maintained at all times
Remove door and infill wall before Phase 3
Restricted Area
Semi-Restricted Area
Install temporary partition before performing any demolition
Soiled Elevator
Clean Elevator
Dictation 2D252A
Corridor 2500E
Pump Room
Sub Sterile
Anesthesia Office 2D282
Soiled Holding 2D281
This work to occur as an early part of Phase 2
Drywall and finish to be built on this side under Phase 2B
Drywall and finish to be built on this side under Phase 2B
Drywall and finish to be built on this side under Phase 3
Drywall and finish to be built on this side under Phase 3
Anesthesia Storage 2C222
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259
Expiration Date 12/31/2021
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTIS
S
AYARS
ST
AT
E OF OHIO
C :\U se rs
\jw al ko sa k\ D oc um en ts
\V
AM
P_ Su rg er y Ex pa ns io n_
PA
_1
C
D _R
9_ jw al ko sa k@ pe rs pe ct us ar ch
.c om
.rv t
6/
/2
:5 6:
A
M
0-A1-7 10701 East Blvd. Cleveland, OH 44106
06-26-2020 WJW AYA, WJW
541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 2
DETAIL PLANS
Scale
2' 4' 8' 1/4" = 1'-0"
Phase 2B at Clean Utility (New Work)4 Scale
2' 4' 8' 1/4" = 1'-0"
Phase 2B at Clean Utility (Demolition)3
Typical Temporary Partition Detail
Phase 2A at Soiled Utility (Demolition)1Phase 2A at Soiled Utility (New Work)2 transportation to
ORs and Recovery
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of
Phase 3except durIng Phase
3B
OR to be in operation during the entirety of Phase 3 except durIng Phase 3C
PACU to be in operation during the entirety of Phase 3
PreOP and PACU to be in operation during the entirety of Phase 3
Shading indicated area of construction activity
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of Phase 3
OR to be in operation during the entirety of Phase 3
Shading indicated area of construction activity
5' - 0"
Temporary partition and doors
Remove portions of existing exterior curtain wall and glazing and install temp door and chute for material movement and refuse removal.
Remove portions of existing mechanical louver and install temp door and chute for material movement and refuse removal.
Temporary Procedure 2-C231
Temporary Procedure 2-C232
Temporary Procedure 2-C233
Sub-Sterile 2-C235
Passage 2-C230
Scrub 2-C230A
EMS
2-C234
Patient Area 1 2-C237A
Patient Area 2 2-C237B
Patient Area 3 2-C237C
Patient Area 4 2-C237D
Patient Area 5 2-C237E
Patient Area 6 2-C237F
Passage 2-C323A
Viewing/Fellows 2-C155
Holding 2-C153
Clean Utility 2-C150
Soiled Utility 2-C149
Intervention 2-C148
Office 2-C146
Corridor 2-C140A
Staff Work 2-C151
Cath Lab 2-C147
Physicians 2-C141
E.P. Lab 2-C144
Storage 2-C143
E.C.
2-C203
Electrical Room 2-C202
Oxygen Assess 2-C201
O.P. Assess 2-C200
Report Room 2-C199
Fan Room 2-C198
Storage 2-C134
Endo/Cath Waiting 2-C133BFan Room
2-D300 Womens Room
2-C130
Scrub 2-C145
Control 2-C145B
Control 2-C145A
Office 2-B121E
Office 2-B121D
Exam 2-B121C
Pulmonary Service 2-B121 Clean Utility
2-B120 Lead Therapist
2-B119
Storage 2-B121A
PACU Soiled Utility 2-C321
PACU Meds 2-C324
PACU Nour.
2-C325
PACU Admin. Center 2-C323
PACU Cub. 12 2-C326F
PACU Cub. 13 2-C326G
PACU Cub. 14 2-C326H
PACU Storage 2-C328
PACU Clean 2-C330A
PACU Toilet 2-C322
PACU Cub. 7 2-C326A
PACU Cub. 8 2-C326B
PACU Cub. 9 2-C326C
PACU Cub. 10 2-C326D
PACU Cub. 11 2-C326E
Reception 2-B141
Office 2-B140
Bed Holding 2C200C
Semi-Restricted 2C100E
Cardiac OR
(OR-1)
2C129
Cardiac Equipment
2C127
Cardiac Pump Room
2C128
Cardiac OR
(OR-2)
2C126
Robotic OR
(OR-5)
2C114
Electrical Room 2C115
Bed Holding 2C100C
Scrub 2C100D
Alcove 2C100KEMS Closet
2D280
Alcove 2C100L
OI&T
2C122
General OR
(OR-6)
2C210
Scrub 2C200B
Clean Corridor 2C100J
Clean Corridor 2C100H
Immediate Use
Sterilization Room 2C123
Scrub 2C100U
Bed Holding 2C100T
Scrub 2C100Q
Bed Holding 2C100P
Robotic Equipment
Storage 2C213
EMS
2C110
Gas Room 2C211
Anesthesia Storage 2C111
Equipment Storage 2C112
Semi-Restricted 2C100B
Alcove 2C100MAlcove
2C100N
Exam/Treatment 2-E313
Office 2-E312
Office 2-E310
Corridor 2-E300J
Corridor 2-E300A
Nurse Station 2-E316
Semi-Private 2-E370
Physicians 2-C132
Semi-Private 2-E314
Corridor 2-E300B
Corridor 2-E300C
Dictation 2D251B
Implant 2D253
Anesthesia Office 2D282
Soiled Holding 2D281
Cart Holding 2C219
Anesthesia Storage 2C222
Clean Corridor 2C200P
Alcove 2C200Q
Alcove 2C200R
Office 2D283
Office 2D284
Office 2D285
Anesthesia Workroom
2C218
Ortho OR
(OR-10)
2C217
General OR
(OR-09)
2C216
Ortho OR
(OR-08)
2C215
Laboratory, Frozen Section 2C214
Ortho Equipment
2C215A
Electrical Room 2C213
Bed Holding 2C200M
Scrub 2C200L
Bed Holding 2C200K
Scrub 2C200J
Semi-Restricted 2C200F
Scrub 2C200G
Clean Corridor 2C200S
Bed Holding 2C200H
General OR
(OR-07)
2C212
PHASE 3 SCOPE OF WORK
Hybrid OR (OR-03) 2C125
Storage 2C124BEquip
2C125A
Control 2C124A
Scrub 2C124
Equip 2C121A
Control 2C120A
Equip 2C120B
Hybrid OR (OR-04) 2C121
Scrub 2C120
Alcove 2C100S
Scrub 2C100R Alcove
2C100G
Scrub 2C100F
Medication Prep Room
2C219A
For all existing walls separating construction areas and functional SICU Suite, contractor to make sure that walls go all of the way to the deck and are sealed, TYP.
These two alcoves will temporarily house (2) refrigerators, (1) tissue freezer (new-provided by Surgery) and oxygen gas tanks during Phase 3.
Prepare these two alcoves with power/data as required for this equipment during Phase 2
Temporary partition and doors
Vestibule 2C200N
Clean Utility
Soiled Utility
Toilet
Pre-Op/Post/Op Holding Cubicles
Male Lockers
Toilet 2064A
Female Lockers
Toilet 2065A
Corridor 2C100B
Clean Utility
Procedure
Endoscopy Procedure
Endoscopy Procedure
Workroom…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .