S02. Drawings - Architectural.pdf

PDF 35 MB Posted

Attached to
Y1NB--Renovate Operating Rooms - VAMC Cleveland
Solicitation number
Amend0002
Issued by

About this file

This amendment to a federal solicitation adds architectural drawings to a renovation project. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking bids to renovate operating rooms at the VAMC Cleveland. Amendment 0002 provides all drawings for the project and maintains the original bid opening date and time of September 9, 2020 at 12:00 PM EST, with all other terms of the solicitation remaining the same. The renovation involves operating rooms and the amendment supplies bidders with the necessary architectural drawings to develop their responses for the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BP

BP

BP

East Boulevard

East Boulevard

Staging areas for work in Phases 2C and 2D

Staging area for work in Phases 2, 2A, and 2B

Provide construction fencing to protect staging area and provide dumpster and chutes for refuse. Provide scaffolding and stairs for access to work areas

EXITEXIT

Contractor to maintain exits

EXIT

Contractor to maintain exits

Parking

Parking

Traffic Flow

Traffic

Flow

Traffic FlowTr af fic

Fl ow

Pavers

Pavers

EXIT

Maintain Exit Path

Maintain Exit Path

Contractor to maintain exits

Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn

Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn

Contractor to replace/repair any damaged site elements including but not limited to concrete, pavers, benches, plantings, trees, lawn

Key Plan

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 0:

A

M

0-A1-0 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW WJW

541-19-101Renovate Operating RoomsBid IssueSITE PLAN

Scale

8' 16' 32' 1/16" = 1'-0"

SITE PLAN1

Grass Area

Grass Area

Grass Area

Grass Area Grass

Area

Grass Area

Revisions: Date:

Bid Issue 06/26/2020

16C

17B 18E

18E

20A

20A

24C 25B

25B

21E

21E

26B

26B

27C

27C

28B

28B

32A

32A

21D 21F 25C 25D 27b 27d 27E

E1E1

C2C2

A1A1

ZZZZ

YYYY

XXXX

UUUU

RR RR

ssss

A A

B B

C C

D D

27B

VVVV

F1F1

27D

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

BB

CC

AA

DD

EE

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Key Plan

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Laser Scales Video

Equipment

Toilet 2D127C

Toilet 2D263

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Lounge / Dictation 2D251

Temp.

Anesthesia

Work 2D253

Corridor 2D250

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Nurse Mgr.

2D262

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Holding

Corridor 2500B

Implant Storage

Anesthesia Work Room

Corridor 2500H

OR-7

General

OR-6

General

Electric

EMS

Anesthesia Storage

EMS

2508A

Sub Sterile

Sub Sterile

Dictation

Sterile Storage

General

OR-5

General

OR-4

Storage

OI&T

OR-3

Orthopedic

Elec.

2517A

Sub Sterile

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

Stair 2S7

Soiled Holding

Office

Special Equipment Records

OR-2 Neuro

Bed/ Treatment

Room

Medication Prep Room

Workroom

Intake

Corridor 2C100E

Corridor 2500A

Pharmacy

Unisex RR

Corridor 2500J

Corridor 2C280

Foyer 2D255E

Alcove 2D251A

Soiled Utility 2D254

Sterile Supply

2D254A

Locker Room 2D252

Dictation 2D252A

Office 2D261A

Office 2D261B

Office

Corridor 2500E

Light Room 2500I

Soiled Elevator

Clean Elevator

Scrub 2500N

Scrub 2500O

Upper Mechanical

Room 2500Q

Hybrid OR (OR-03) 2-C366

Storage 2-C366CEquip

2-C366A

Sub-Sterile 2-C366B

Scrub 2-C360A

Equip 2-C362A

Control 2-C362C

Equip 2-C362D

Hybrid OR (OR-04) 2-C362

Sub-Sterile 2-C362B

Scrub 2-C357B

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Electrical Rm.

2519A

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Control 2D261

Dark Room

Gas Room Non Oxidizing

2514A

Equipment Storage

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 0:

A

M

0-A1-1 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssueEXISTING FLOOR PLAN

Scale

4' 8' 16' 1/8" = 1'-0"

Second Floor Existing Floor Plan1

Pre-Op

PACU

SICU

17B 18E

18E

20A

20A

24C 25B

25B

21E

21E

26B

26B

27C

27C

28B

28B

32A

32A

21D 21F 25C 25D 27b 27d 27E

E1E1

C2C2

A1A1

ZZZZ

YYYY

XXXX

UUUU

RR RR

ssss

A A

B B

C C

D D

27B

VVVV

F1F1

27D

Laboratory, Frozen Section 2C214

General OR

(OR-07)

2C212

Ortho OR

(OR-10)

2C217

Ortho OR

(OR-08)

2C215

Bed Holding 2C200E

Bed Holding 2C200M

Anesthesia Workroom

2C218

Ortho Equipment

2C215A

Electrical Room 2C213

Bed Holding 2C200H

General OR

(OR-09)

2C216

Office 2D283

Office 2D284

Office 2D285

Semi-Restricted 2C200F

Anesthesia Storage 2C222

Cart Holding 2C219

Soiled Holding 2D281

Cardio OR

(OR-01)

2C129

Cardio Equipment

2C127

Cardio Pump Room 2C128

Cardio OR

(OR-02)

2C126

General OR

(OR-05)

2C114

Immediate Use

Sterilization Room 2C123

Electrical Room 2C115

Alcove 2C100KEMS Closet

2D280

Bed Holding 2C100P

Robotic OR

(OR-06)

2C210

Alcove 2C100L

OI&T

2C122

Alcove 2C100M

Alcove 2C200Q

Bed Holding 2C200C

Scrub 2C200L

Bed Holding 2C200K

Scrub 2C200J

Scrub 2C200G

Scrub 2C200D

Bed Holding 2C100C

Scrub 2C100D

Scrub 2C100Q

Scrub 2C100U

Robotic Equipment

Storage 2C113

Semi-Restricted 2C100B

EMS

2C110

Gas Room 2C211

Anesthesia Storage 2C111

Equipment Storage 2C112

Clean Corridor 2C200P

Clean Corridor 2C200S

Clean Corridor 2C100J

Clean Corridor 2C100H

Semi-Restricted 2C100A

Semi-Restricted 2C100E

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Anesthesia Office 2D282

Dictation 2D251A

Implant 2D252

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Bed Holding 2C100T

Semi-Restricted 2C200A

Scrub 2C200B

Alcove 2C200R

Alcove 2C100N

Alcove 2D250A

Vestibule 2C200N

Nurse Manager 2D262

BB

CC

AA

DD

EE

Changing Alcove

2C250C

Medication Prep Room

2C219A

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Key Plan

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Toilet 2D127C

Staff Lounge 2D135

Toilet 2D263

Patient Room #6

2D113

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Men Lockers 2D255A

Lounge / Dictation 2D251

Corridor 2D250

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Stair 2S7

Foyer 2D255E

Alcove 2D251A

Soiled Elevator

Clean Elevator

Control 2D261

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 0:

A

M

0-A1-2 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssueCOMPLETED FLOOR PLAN

Scale

4' 8' 16' 1/8" = 1'-0"

Second Floor New Work Plan - Completed Floor Plan1

Pre-Op

PACU

SICU

18E

18E

20A

20A

25B

25B

26B

26B

27C

27C

28B

32A

32A

21D 21F 25C 25D 27b 27E

E1E1

C2C2

A1A1

ZZZZ

YYYY

XXXX

UUUU

RR RR

ssss

A A

B B

C C

D D

VVVV

F1F1

27D

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Office 2D285

Office 2D284

Office 2D283

Anesthesia Workroom

2C218

Ortho OR

(OR-10)

2C217

General OR

(OR-09)

2C216

Ortho OR

(OR-08)

2C215

Laboratory, Frozen Section 2C214

Ortho Equipment

2C215A

Electrical Room 2C213

Semi-Restricted 2C200F

Bed Holding 2C200M

Scrub 2C200L

Bed Holding 2C200K

Scrub 2C200J

Bed Holding 2C200H

Scrub 2C200G

General OR

(OR-6)

2C212

Bed Holding 2C200E

Scrub 2C200D

Bed Holding 2C200C

General OR

(OR-5)

2C210

Scrub 2C200B

Anesthesia Office 2D282

Anesthesia Storage 2C222 Medication

Prep Room 2C219A

Soiled Holding 2D281

Cart Holding 2C219

Clean Corridor 2C200P

Alcove 2C200Q

Alcove 2C200R

Robotic OR

(OR-5)

2C114

Immediate Use

Sterilization Room

2C123 OI&T

2C122

Electrical Room 2C115

Scrub 2C100D

Bed Holding 2C2100C

Gas Room 2C211

EMS

2C110

Anesthesia Storage 2C111

Semi-Restricted 2C100B

Robotic Equipment

Storage 2C213

Equipment Storage 2C112

Semi-Restricted 2C100A

Semi-Restricted 2C200A

EMS Closet 2D280

Alcove 2C100N

Alcove 2C100M Alcove

2C100K

Cardiac Equipment

2C127

Cardiac OR

(OR-1)

2C129

Cardiac OR

(OR-2)

2C126

Cardiac Pump Room

2C128

Scrub 2C100Q

Bed Holding 2C100P

Semi-Restricted 2C100E

Scrub 2C100U

Bed Holding 2C100T

Implant Storage 2D252

Mens Lockers 2D251A

Corridor 2D250

Clean Corridor 2C100J

Clean Corridor 2C100H

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0" ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 9' - 0"

GWB 9' - 6" GWB 9' - 6" GWB 9' - 6"

GWB 9' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

GWB 9' - 6"

GWB 9' - 6"

GWB 9' - 6"

GWB 9' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

GWB 9' - 6"

ACT-1 8' - 0"

ACT-1 8' - 0"

GWB 9' - 6"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 2"

GWB 7' - 2"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 0"

GWB 7' - 2"

GWB 7' - 0"

GWB 7' - 2"

GWB 8' - 0"

GWB 8' - 0"

GWB 8' - 0"

GWB 8' - 0"

GWB 8' - 0"GWB 8' - 0"GWB 8' - 0"

GWB 7' - 2"

GWB 7' - 2"

GWB 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

ACT-1 8' - 0"

Vestibule 2C200N

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Toilet 2D127C

Staff Lounge 2D135

Toilet 2D263

Patient Room #6

2D113

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Men Lockers 2D255A

Lounge / Dictation 2D251

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Nurse Mgr.

2D262

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Stair 2S7

Foyer 2D255E

Alcove 2D251A

Soiled Elevator

Clean Elevator

Control 2D261

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 5:

A

M

0-A1-3 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssueCOMPOSITE REFLECTED CEILING

PLAN

Scale

4' 8' 16' 1/8" = 1'-0"

Second Floor New Work Composite Reflected Ceiling Plan1

17B 18E

18E

20A

20A

24C 25B

25B

21E

21E

26B

26B

27C

27C

28B

28B

32A

32A

21D 21F 25C 25D 27b 27d 27E

E1E1

C2C2

A1A1

ZZZZ

YYYY

XXXX

UUUU

RR RR

ssss

A A

B B

C C

D D

27B

VVVV

F1F1

27D

Laboratory, Frozen Section 2C214

General OR

(OR-07)

2C212

Ortho OR

(OR-10)

2C217

Ortho OR

(OR-08)

2C215

Bed Holding 2C200E

Bed Holding 2C200M

Anesthesia Workroom

2C218

Ortho Equipment

2C215A

Electrical Room 2C213

Bed Holding 2C200H

General OR

(OR-09)

2C216

Office 2D283

Office 2D284

Office 2D285

Semi-Restricted 2C200F

Anesthesia Storage 2C222

Cart Holding 2C219

Soiled Holding 2D281

Cardio OR

(OR-01)

2C129

Cardio Equipment

2C127

Cardio Pump Room 2C128

Cardio OR

(OR-02)

2C126

General OR

(OR-05)

2C114

Immediate Use

Sterilization Room 2C123

Electrical Room 2C115

Alcove 2C100KEMS Closet

2D280

Bed Holding 2C100P

Robotic OR

(OR-06)

2C210

Alcove 2C100L

OI&T

2C122

Alcove 2C100M

Alcove 2C200Q

Bed Holding 2C200C

Scrub 2C200L

Bed Holding 2C200K

Scrub 2C200J

Scrub 2C200G

Scrub 2C200D

Bed Holding 2C100C

Scrub 2C100D

Scrub 2C100Q

Scrub 2C100U

PHASE 2 SCOPE OF WORK

PHASE 3 SCOPE OF WORK

Robotic Equipment

Storage 2C113

Semi-Restricted 2C100B

EMS

2C110

Gas Room 2C211

Anesthesia Storage 2C111

Equipment Storage 2C112

Clean Corridor 2C200P

Clean Corridor 2C200S

Clean Corridor 2C100J

Clean Corridor 2C100H

Semi-Restricted 2C100A

Semi-Restricted 2C100E

Phase 2

Phase 2A Phase 2B

Phase 3

Phase 3B Phase 3C

Ph as e 3A

Ph as e 3D

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Anesthesia Office 2D282

Dictation 2D251A Implant

2D252

Phase 1

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Alcove 2C200R

Semi-Restricted 2C200A

Scrub 2C200B

Alcove 2C100N

BB

CC

AA

DD

EE

Medication Prep Room

2C219A

Vestibule 2C200N

Key Plan

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Area Accessible to Public

Construction Area

Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.

Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements

Remove portion of existing ceilings and patch @ temporary partitions

Notes:

1. See also 01 00 00 General Requirements.

2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.

3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.

Provide new ceiling, trim, wall angle on public side

Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.

Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development

Continuous sound batt insulation

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Toilet 2D127C

Staff Lounge 2D135

Toilet 2D263

Patient Room #6

2D113

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Men Lockers 2D255A

Lounge / Dictation 2D251

Corridor 2D250

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Nurse Mgr.

2D262

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Stair 2S7

Foyer 2D255E

Alcove 2D251A

Soiled Elevator

Clean Elevator

PHASE 2 SCOPE OF WORK

Control 2D261

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 5:

A

M

0-A1-4 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - OVERALL

Scale

4' 8' 16' 1/8" = 1'-0"

Second Floor New Work Plan - Overall Project Phasing1

Typical Temporary Partition Detail

Path of construction debris removal

Path of patient transportation to ORs and Recovery

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

OR to be in operation during the entirety of Phase 1

PACU to be in operation during the entirety of Phase 1

PreOP and PACU to be in operation during the entirety of Phase 1

0-A1-5

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Viewing/Fellows 2-C155

Holding 2-C153

Clean Utility 2-C150

Soiled Utility 2-C149

Intervention 2-C148

Office 2-C146

Corridor 2-C140A

Staff Work 2-C151

Cath Lab 2-C147

Physicians 2-C141

E.P. Lab 2-C144

Storage 2-C143

E.C.

2-C203

Electrical Room 2-C202

Oxygen Assess 2-C201

O.P. Assess 2-C200

Report Room 2-C199

Fan Room 2-C198

Storage 2-C134

Endo/Cath Waiting 2-C133BFan Room

2-D300 Womens Room

2-C130

Scrub 2-C145

Control 2-C145B

Control 2-C145A

Office 2-B121E

Office 2-B121D

Exam 2-B121C

Pulmonary Service 2-B121 Clean Utility

2-B120 Lead Therapist

2-B119

Storage 2-B121A

PACU Soiled Utility 2-C321

PACU Meds 2-C324

PACU Nour.

2-C325

PACU Admin. Center 2-C323

PACU Cub. 12 2-C326F

PACU Cub. 13 2-C326G

PACU Cub. 14 2-C326H

PACU Storage 2-C328

PACU Clean 2-C330A

PACU Toilet 2-C322

PACU Cub. 7 2-C326A

PACU Cub. 8 2-C326B

PACU Cub. 9 2-C326C

PACU Cub. 10 2-C326D

PACU Cub. 11 2-C326E

Reception 2-B141

Office 2-B140

Shading indicates general area of work

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

OR to be in operation during the entirety of Phase 1

Existing Blood Bank refrigerator. Relocate in temporary space in Phase 3 area.

Provide duplex emergency power at new location during Phase 1.

Add temporary wall and door before initiating any other Phase 1 construction

Add temporary wall and door before initiating any other Phase 1 construction

Complete demolition in this area and construct new partitions and door before initiating any other Phase 1 construction

10' - 4 1/2"

2'

3/

4"

8' - 0"

Nurse Manager 2D262

Corridor 2D260J

Control 2D261

9'

1/

2"

Office 2D261C

Office 2D261A

Add temporary wall and door before initiating any other Phase 1 construction

Add temporary wall and door before initiating any other Phase 1 construction

Complete demolition in this area and construct new partitions and door before initiating any other Phase 1 construction

Corridor 2D260J

Control 2D261

Office 2D261C

Office 2D261A

Nurse Manager 2D262

Key Plan

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Area Accessible to Public

Construction Area

Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.

Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements

Remove portion of existing ceilings and patch @ temporary partitions

Notes:

1. See also 01 00 00 General Requirements.

2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.

3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.

Provide new ceiling, trim, wall angle on public side

Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.

Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development

Continuous sound batt insulation

Path of construction debris removal

Path of patient transfer

CONSTRUCTION PATH OF TRAVEL LEGEND

Phase Designation

Temporary Partition

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Toilet 2D127C

Staff Lounge 2D135

Toilet 2D263

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Men Lockers 2D255A

Lounge / Dictation 2D251

Corridor 2D250

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Nurse Mgr.

2D262

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Stair 2S7

Foyer 2D255E

Alcove 2D251A

Soiled Elevator

Clean Elevator

Gas Room Non

Oxidizing 2514A

Laser Scales Video

Equipment

Sub Sterile

General

OR-4

Storage

OI&T

Elec.

2517A

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

TEMP.

Implant

Storage Rm.

Office

Special Equipment Records

OR-2 Neuro

Corridor 2C100E

Dictation 2D252A

Office

Corridor 2C280

Light Room 2500I

TEMP.

Medical Prep

Rm.

Scrub 2500N

Scrub 2500O

Upper Mechanical

Room 2500Q

OR-3

Orthopedic

Electrical Rm.

2519A

Corridor 2500H

Soiled Holding

Locker Room 2D252

Sterile Supply

2D254A

Soiled Utility 2D254

Office 2D261B

Office 2D261A

Holding

Corridor 2500B

Implant Storage

Anesthesia Work Room

OR-7

General

Sub Sterile

OR-6

General

Anesthesia Storage

EMS

EMS

2508A

Electric

General

OR-5

Sub Sterile

Dictation

Sterile Storage

Pharmacy

Medication Prep Room

Bed/

Treatment Room

Workroom

Unisex RR

Corridor 2500J

Corridor 2500A

Temp.

Anesthesia

Work 2D253

Control 2D261

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 6:

A

M

0-A1-5 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 1

Scale

5.5' 10.5' 21' 3/32" = 1'-0"

Second Floor New Work Plan - Phase 11

Scale

2' 4' 8' 1/4" = 1'-0"

Phase 1 - Patient Circulation (New Work)2

Scale

2' 4' 8' 1/4" = 1'-0"

Phase 1 - Patient Circulation (Demolition)3

Typical Temporary Partition Detail

Semi-Restricted 2C200F

Clean Corridor 2C200S

General OR

(OR-07)

2C212

Ortho OR

(OR-10)

2C217

Ortho OR

(OR-08)

2C215

Scrub 2C200D

Bed Holding 2C200E

Scrub 2C200G

Scrub 2C200L

Bed Holding 2C200M

Anesthesia Workroom

2C218 Ortho

Equipment 2C215A Electrical

Room 2C213

General OR

(OR-09)

2C216

Office 2C283

Office 2D284

Office 2D285

Alcove 2C200Q

Clean Corridor 2C200P

Bed Holding 2C200K

Scrub 2C200J

Semi-Restricted 2C200A

Laboratory, Frozen Section 2C214

Cart Holding 2C219

Anesthesia Storage 2C222

Soiled Holding 2D281

Anesthesia Office 2D282

Bed Holding 2C200H

Path of patient transportation to

ORs and recovery

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

OR to be in operation during the entirety of Phase 2

PACU to be in operation during the entirety of Phase 2

PreOP and PACU to be in operation during the entirety of Phase 2

Shading indicates area of required staff access

0-A1-7

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Viewing/Fellows 2-C155

Holding 2-C153

Clean Utility 2-C150

Soiled Utility 2-C149

Intervention 2-C148

Office 2-C146

Corridor 2-C140A

Staff Work 2-C151

Cath Lab 2-C147

Physicians 2-C141

E.P. Lab 2-C144

Storage 2-C143

E.C.

2-C203

Electrical Room 2-C202

Oxygen Assess 2-C201

O.P. Assess 2-C200

Report Room 2-C199

Fan Room 2-C198

Storage 2-C134

Endo/Cath Waiting 2-C133BFan Room

2-D300 Womens Room

2-C130

Scrub 2-C145

Control 2-C145B

Control 2-C145A

Office 2-B121E

Office 2-B121D

Exam 2-B121C

Pulmonary Service 2-B121 Clean Utility

2-B120 Lead Therapist

2-B119

Storage 2-B121A

PACU Soiled Utility 2-C321

PACU Meds 2-C324

PACU Nour.

2-C325

PACU Admin. Center 2-C323

PACU Cub. 12 2-C326F

PACU Cub. 13 2-C326G

PACU Cub. 14 2-C326H

PACU Storage 2-C328

PACU Clean 2-C330A

PACU Toilet 2-C322

PACU Cub. 7 2-C326A

PACU Cub. 8 2-C326B

PACU Cub. 9 2-C326C

PACU Cub. 10 2-C326D

PACU Cub. 11 2-C326E

Reception 2-B141

Office 2-B140

Shading indicates general area of work

PHASE 2 SCOPE OF WORK

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Alcove 2C220R

Phase 2A Phase 2B

Medication Prep Room

2C219A

Contractor to seal off door and make sure wall extends to structure above to make sure dust does not enter the functional surgery suite

This alcove will be used as the temporary location for the Blood Bank refrigerator during Phase 2. During Phase 1 upgrade alcove to provide emergency power for this equipment

Contractor to make sure wall extends to structure above to make sure the dust does not enter the functional surgery suite

Vestibule 2C200N

Temp. Anesthesia Work

2D253

Clean Utility

Soiled Utility

Toilet

Pre-Op/Post/Op Holding Cubicles

Male Lockers

Toilet 2064A

Female Lockers

Toilet 2065A

Corridor 2C100B

Clean Utility

Procedure

Endoscopy Procedure

Endoscopy Procedure

Workroom / Inst Clean

Workroom / Inst Clean

Procedure

Substerile 2052A

Scrub 2C172

CICU/PCU

2D160

Physician/Consultant 2D161

Dietician Office 2D198

Communication (Monitor) Room

2D197

Family Lounge 2D196

Corridor 2D100M

Shaft

Stair #4 2D162

Quiet Room 2D163

Public Toilet 2D195

Lactation 2D194

Pharmacy 2D193

Staff Lounge 2D192

Female Lockers 2D192A

Staff Toilet/Shower 2D192B

2D1342D132

2D130B

2D125

2D133

2D124

2D130A

2D118

2D1222D121

2D131

2D119

2D120

2D117

2D116 2D115 2D114

2D255C

2D257C

2D258

2D256

2D192C

2D192D

2D264

2D265

2D266

2D265A

Work 2D260A

Work 2D260B

Key Plan

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Area Accessible to Public

Construction Area

Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.

Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements

Remove portion of existing ceilings and patch @ temporary partitions

Notes:

1. See also 01 00 00 General Requirements.

2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.

3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.

Provide new ceiling, trim, wall angle on public side

Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.

Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development

Continuous sound batt insulation

Path of construction debris removal

Path of patient transfer

CONSTRUCTION PATH OF TRAVEL LEGEND

Phase Designation

Temporary Partition

Patient Room #3 (Isolation) 2D127B

Anteroom 2D127A

EMS Closet 2D110

Toilet 2D127C

Staff Lounge 2D135

Toilet 2D263

Patient Room #5

2D112

Patient Room #4

2D111

Patient Room #2

2D126

Men Lockers 2D255A

Lounge / Dictation 2D251

Corridor 2D250

Women Lockers 2D257A

Shower 2D257D

Shower 2D255D

Surgery Waiting 2D270

Nurse Mgr.

2D262

Work 2D260C

Work 2D260D

Work 2D260E

Work 2D260F

Alcove 2D260H

Office 2D261C

Holding 2D260

Stair 2S7

Foyer 2D255E

Alcove 2D251A

Soiled Elevator

Clean Elevator

Gas Room Non

Oxidizing 2514A

Laser Scales Video

Equipment

Sub Sterile

General

OR-4

Storage

OI&T

Elec.

2517A

Sub Sterile

Storage

OR-1

Cardiac

Pump Room

Gas Room Oxidizing

TEMP.

Implant

Storage Rm.

Office

Special Equipment Records

OR-2 Neuro

Corridor 2C100E

Dictation 2D252A

Office

Corridor 2C280

Light Room 2500I

TEMP.

Medical Prep

Rm.

Scrub 2500N

Scrub 2500O

Upper Mechanical

Room 2500Q

OR-3

Orthopedic

Electrical Rm.

2519A

This room will be used as the temporary Implant Storage Room during Phase 2. During Phase 1, upgrade room to provide 1 hour fire-rated walls, positive air pressure, 45 minute fire-rated door frame assembly.

This room will be used as the temporary Med Prep Room with Pyxis and refrigerator during Phase 2. During Phase 1, upgrade room to provide emergency power and data, for this equipment

Control 2D261

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 6:

A

M

0-A1-6 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 2

Scale

5.5' 10.5' 21' 3/32" = 1'-0"

Second Floor New Work Plan - Phase 21

Typical Temporary Partition Detail

Cart Holding 2C219

Clean Corridor 2C200S

Soiled Elevator

Clean Elevator

This work to occur as an early part of Phase 2 (Temp walls) and at the later part of Phase 2 (HVAC and Ceiling work)

Access to Clean elevator by VA staff must be maintained but can be taken out of service for 20 days maximum

Remove door and infill wall before Phase 3

Drywall and finish to be built on this side under Phase 3

2C

9.

Build these walls and doors in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding

Install temporary partition before performing any demolition

Soiled Elevator

Clean Elevator

Pharmacy

Sterile Storage

This work to occur as an early part of Phase 2 (Temp walls) and at the later part of Phase 2 (HVAC and Ceiling work)

Path of OR Sterile Supply material movement. Access to this space by VA staff must be maintained at all times

Access to Clean elevator by VA staff must be maintained but can be taken out of service for 20 days maximum

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases

The project will consist of 3 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in calendar Days from Award days

Submittals Phase 90 days day 1-90

Notice to Proceed day 90

Phase 1 (Access) 20 days day 91-110 Note: No other work should occur until this phase is complete

Phase 2(North Scope) 240 days day 111-350

Phase 2A (Soiled) 30 days Concurrent within Phase 2, schedule with VA COR

Phase 2B (Clean) 20 days Concurrent within Phase 2, schedule with VA COR

VA Activation 90 days day 351-440

Phase 3(South Scope) 240 days day 441-680

Phase 3A (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3B (OR 3) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3C (OR 4) 30 days Concurrent within Phase 3, schedule with VA COR

Phase 3D (Corridor) 30 days Concurrent within Phase 3, schedule with VA COR

CONSTRUCTION DURATIONS

1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.

2. Work to occur during off hours - refer to specifications for approved hours of contractor work.

3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.

4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.

PHASING NOTES

Key Plan

Area Accessible to Public

Construction Area

Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.

Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements

Remove portion of existing ceilings and patch @ temporary partitions

Notes:

1. See also 01 00 00 General Requirements.

2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.

3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.

Provide new ceiling, trim, wall angle on public side

Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.

Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development

Continuous sound batt insulation

Path of construction debris removal

Path of patient transfer

CONSTRUCTION PATH OF TRAVEL LEGEND

Phase Designation

Temporary Partition

Build these walls and door in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding

Install temporary partition before performing any demolition

Access to this elevator by VA staff must be maintained but can be taken out of service for

30 days max.

Path of OR produced soiled material movement. Access to this space by VA staff must be maintained at all times

Restricted Area

Semi-Restricted Area

Install temporary partition before performing any demolition

This work to occur as an early part of Phase 2.

Coordinate with VA COR

9' - 0" 4 7/8" 10' - 7 3/4"

Soiled Elevator

Clean Elevator

Dictation 2D252A

Corridor 2500E

Pump Room

Sub Sterile

Locker Room 2D252

Sterile Supply 2D254A

Soiled Holding

Bed/ Treatment Room

For all existing walls separating construction area and functional Surgery Suite, contractor to make sure that walls go all the way to the deck and are sealed, TYP.

Drywall to be built on this side of temporary partition after demo of Phase 2A, TYP.

Drywall to be built on this side of temporary partition after demo of Phase 2A, TYP.

Coordinate demo of existing corridor walls with construction of new temporary walls to maintainstaff access to Soiled Holding at all timesBuild these walls and doors in conjunction with the temporary partitions before removing the existing corridor wall on the soiled holding

Install temporary partition before performing any demolition

Access to this elevator by VA staff must be maintained but can be taken out of service for

30 days max

Path of OR produced soiled material movement. Access to this space by VA staff must be maintained at all times

Remove door and infill wall before Phase 3

Restricted Area

Semi-Restricted Area

Install temporary partition before performing any demolition

Soiled Elevator

Clean Elevator

Dictation 2D252A

Corridor 2500E

Pump Room

Sub Sterile

Anesthesia Office 2D282

Soiled Holding 2D281

This work to occur as an early part of Phase 2

Drywall and finish to be built on this side under Phase 2B

Drywall and finish to be built on this side under Phase 2B

Drywall and finish to be built on this side under Phase 3

Drywall and finish to be built on this side under Phase 3

Anesthesia Storage 2C222

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:5 6:

A

M

0-A1-7 10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW AYA, WJW

541-19-101Renovate Operating RoomsBid IssuePROJECT PHASING - PHASE 2

DETAIL PLANS

Scale

2' 4' 8' 1/4" = 1'-0"

Phase 2B at Clean Utility (New Work)4 Scale

2' 4' 8' 1/4" = 1'-0"

Phase 2B at Clean Utility (Demolition)3

Typical Temporary Partition Detail

Phase 2A at Soiled Utility (Demolition)1Phase 2A at Soiled Utility (New Work)2 transportation to

ORs and Recovery

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of

Phase 3except durIng Phase

3B

OR to be in operation during the entirety of Phase 3 except durIng Phase 3C

PACU to be in operation during the entirety of Phase 3

PreOP and PACU to be in operation during the entirety of Phase 3

Shading indicated area of construction activity

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of Phase 3

OR to be in operation during the entirety of Phase 3

Shading indicated area of construction activity

5' - 0"

Temporary partition and doors

Remove portions of existing exterior curtain wall and glazing and install temp door and chute for material movement and refuse removal.

Remove portions of existing mechanical louver and install temp door and chute for material movement and refuse removal.

Temporary Procedure 2-C231

Temporary Procedure 2-C232

Temporary Procedure 2-C233

Sub-Sterile 2-C235

Passage 2-C230

Scrub 2-C230A

EMS

2-C234

Patient Area 1 2-C237A

Patient Area 2 2-C237B

Patient Area 3 2-C237C

Patient Area 4 2-C237D

Patient Area 5 2-C237E

Patient Area 6 2-C237F

Passage 2-C323A

Viewing/Fellows 2-C155

Holding 2-C153

Clean Utility 2-C150

Soiled Utility 2-C149

Intervention 2-C148

Office 2-C146

Corridor 2-C140A

Staff Work 2-C151

Cath Lab 2-C147

Physicians 2-C141

E.P. Lab 2-C144

Storage 2-C143

E.C.

2-C203

Electrical Room 2-C202

Oxygen Assess 2-C201

O.P. Assess 2-C200

Report Room 2-C199

Fan Room 2-C198

Storage 2-C134

Endo/Cath Waiting 2-C133BFan Room

2-D300 Womens Room

2-C130

Scrub 2-C145

Control 2-C145B

Control 2-C145A

Office 2-B121E

Office 2-B121D

Exam 2-B121C

Pulmonary Service 2-B121 Clean Utility

2-B120 Lead Therapist

2-B119

Storage 2-B121A

PACU Soiled Utility 2-C321

PACU Meds 2-C324

PACU Nour.

2-C325

PACU Admin. Center 2-C323

PACU Cub. 12 2-C326F

PACU Cub. 13 2-C326G

PACU Cub. 14 2-C326H

PACU Storage 2-C328

PACU Clean 2-C330A

PACU Toilet 2-C322

PACU Cub. 7 2-C326A

PACU Cub. 8 2-C326B

PACU Cub. 9 2-C326C

PACU Cub. 10 2-C326D

PACU Cub. 11 2-C326E

Reception 2-B141

Office 2-B140

Bed Holding 2C200C

Semi-Restricted 2C100E

Cardiac OR

(OR-1)

2C129

Cardiac Equipment

2C127

Cardiac Pump Room

2C128

Cardiac OR

(OR-2)

2C126

Robotic OR

(OR-5)

2C114

Electrical Room 2C115

Bed Holding 2C100C

Scrub 2C100D

Alcove 2C100KEMS Closet

2D280

Alcove 2C100L

OI&T

2C122

General OR

(OR-6)

2C210

Scrub 2C200B

Clean Corridor 2C100J

Clean Corridor 2C100H

Immediate Use

Sterilization Room 2C123

Scrub 2C100U

Bed Holding 2C100T

Scrub 2C100Q

Bed Holding 2C100P

Robotic Equipment

Storage 2C213

EMS

2C110

Gas Room 2C211

Anesthesia Storage 2C111

Equipment Storage 2C112

Semi-Restricted 2C100B

Alcove 2C100MAlcove

2C100N

Exam/Treatment 2-E313

Office 2-E312

Office 2-E310

Corridor 2-E300J

Corridor 2-E300A

Nurse Station 2-E316

Semi-Private 2-E370

Physicians 2-C132

Semi-Private 2-E314

Corridor 2-E300B

Corridor 2-E300C

Dictation 2D251B

Implant 2D253

Anesthesia Office 2D282

Soiled Holding 2D281

Cart Holding 2C219

Anesthesia Storage 2C222

Clean Corridor 2C200P

Alcove 2C200Q

Alcove 2C200R

Office 2D283

Office 2D284

Office 2D285

Anesthesia Workroom

2C218

Ortho OR

(OR-10)

2C217

General OR

(OR-09)

2C216

Ortho OR

(OR-08)

2C215

Laboratory, Frozen Section 2C214

Ortho Equipment

2C215A

Electrical Room 2C213

Bed Holding 2C200M

Scrub 2C200L

Bed Holding 2C200K

Scrub 2C200J

Semi-Restricted 2C200F

Scrub 2C200G

Clean Corridor 2C200S

Bed Holding 2C200H

General OR

(OR-07)

2C212

PHASE 3 SCOPE OF WORK

Hybrid OR (OR-03) 2C125

Storage 2C124BEquip

2C125A

Control 2C124A

Scrub 2C124

Equip 2C121A

Control 2C120A

Equip 2C120B

Hybrid OR (OR-04) 2C121

Scrub 2C120

Alcove 2C100S

Scrub 2C100R Alcove

2C100G

Scrub 2C100F

Medication Prep Room

2C219A

For all existing walls separating construction areas and functional SICU Suite, contractor to make sure that walls go all of the way to the deck and are sealed, TYP.

These two alcoves will temporarily house (2) refrigerators, (1) tissue freezer (new-provided by Surgery) and oxygen gas tanks during Phase 3.

Prepare these two alcoves with power/data as required for this equipment during Phase 2

Temporary partition and doors

Vestibule 2C200N

Clean Utility

Soiled Utility

Toilet

Pre-Op/Post/Op Holding Cubicles

Male Lockers

Toilet 2064A

Female Lockers

Toilet 2065A

Corridor 2C100B

Clean Utility

Procedure

Endoscopy Procedure

Endoscopy Procedure

Workroom…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .