S02 - Contractor Production Report.pdf

PDF 87 KB Posted

Attached to
Z1DA--537-19-124 Upgrade Nurse Call
Solicitation number
36C25222B0012
Issued by

About this file

This document contains a Contractor Production Report template and details of a related federal contract opportunity for upgrading a nurse call system.

The Contractor Production Report is a daily log for a construction contractor to record weather conditions, work performed, job safety inspections, equipment used, labor hours by trade, materials received, and remarks. It includes fields for the contract and report numbers, schedule activity numbers corresponding to work locations, cumulative labor hours, and signatures. Contractors must complete this form daily to document performing the work necessary to fulfill the construction contract.

The federal contract opportunity is a solicitation from the Department of Veterans Affairs to replace the nurse call system at the Jesse Brown VA Medical Center in Chicago, Illinois. It is a firm-fixed-price contract with a total anticipated value between $2-5 million. Offerors must provide all labor, materials, equipment and supervision to complete the project within 428 calendar days of receiving the notice to proceed. The base bid line item is for a lump sum price to upgrade the entire nurse call system.

View the file

Other files

File Type Posted
36C25222B0012 0007.docx DOCX document
36C25222B0012 0006.docx DOCX document
36C25222B0012 0005.docx DOCX document
Pre-Bid RFI 537-19-124_AE and VA.xlsx XLSX spreadsheet
36C25222B0012 0004.docx DOCX document
P01 - Specifications.pdf PDF
36C25222B0012 0003.docx DOCX document
36C25222B0012 0002.docx DOCX document
02c1 - 537-19-124 SOW Att - Contract Progress Report.pdf PDF
537-19-124 - SOW Ex - Campus Floor Plan 2 of 2.pdf PDF
02b2 - 537-19-124 SOW Ex - Asbestos Survey Report.pdf PDF
537-19-124 - SOW Ex - Campus Floor Plan 1 of 2.pdf PDF
02a1 - 537-19-124 SOW CD - Construction Plans.pdf PDF
S02 - Asbestos Survey Report.pdf PDF
S02 - Nurse Call and Code Blue Systems.pdf PDF
S02 - Statement of Conditions-Campus Floor Plan.pdf PDF
S02 - Drawings.pdf PDF
36C25222B0012 0001.docx DOCX document
S02 - Wage Determination_DB_IL20210009.pdf PDF
S02 - Contract Progress Report.pdf PDF
S02 - Specifications.pdf PDF
S02 - Subcontractor Payment Summary.xlsx XLSX spreadsheet
36C25222B0012_1.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

DATE

CONTRACT NUMBER TITLE AND LOCATION (Title and Location of Construction Contract) REPORT NUMBER

CONTRACTOR SUPERINTENDENT

AM WEATHER (Weather data, include precipitation & winds) PM WEATHER (Weather data, include precipitation & winds) MAX TEMP (F) MIN TEMP (F)

WORK PERFORMED TODAY

SCHEDULE ACTIVITY NO. WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HOURS

JOB SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES, attach copy of the meeting minutes) YES NO

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES, attach copy of completed OSHA report) YES NO

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT

WORK DONE? (If YES, attach statement or checklist showing inspection performed)

YES NO

TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT

TOTAL WORK HOURS FROM START OF

CONSTRUCTION

SCHEDULE

ACTIVITY NO.

LIST ANY SAFETY ACTION TAKEN TODAY/SAFETY

INSPECTION CONDUCTED

(Include any safety topic covered during the safety meeting)

SAFETY REQUIREMENTS

HAVE BEEN MET

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (Indicate a schedule activity number) SCHEDULE ACTIVITY NO. SUBMITTAL NUMBER DESCRIPTION OF EQUIPMENT/MATERIAL RECEIVED

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY, INDICATE

HOURS USED AND SCHEDULE ACTIVITY NUMBER

SCHEDULE ACTIVITY NO. OWNER DESCRIPTION OF CONSTRUCTION EQUIPMENT USED TODAY (Include Make and Model)

SCHEDULE ACTIVITY NO. REMARKS

CONTRACTOR/SUPERINTENDENT DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

VA FORM

JUL 2018 10101

OMB No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes O M B No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes Department of Veterans Affairs LOGO

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

DATE

CONTRACT NUMBER

TITLE AND LOCATION (Title and Location of Construction Contract)

REPORT NUMBER

CONTRACTOR

SUPERINTENDENT

AM WEATHER (Weather data, include precipitation & winds) PM WEATHER (Weather data, include precipitation & winds)

MAX TEMP (F)

MIN TEMP (F)

WORK PERFORMED TODAY

SCHEDULE ACTIVITY NO.

WORK LOCATION AND DESCRIPTION

EMPLOYER

NUMBER

TRADE

HOURS

JOB SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES, attach copy of the meeting minutes)

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES, attach copy of completed OSHA report)

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT

WORK DONE? (If YES, attach statement or checklist showing inspection performed)

TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT

TOTAL WORK HOURS FROM START OF

CONSTRUCTION

SCHEDULE

ACTIVITY NO.

LIST ANY SAFETY ACTION TAKEN TODAY/SAFETY

INSPECTION CONDUCTED

(Include any safety topic covered during the safety meeting) EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (Indicate a schedule activity number)

SCHEDULE ACTIVITY NO.

SUBMITTAL NUMBER

DESCRIPTION OF EQUIPMENT/MATERIAL RECEIVED

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY, INDICATE

HOURS USED AND SCHEDULE ACTIVITY NUMBER

SCHEDULE ACTIVITY NO.

OWNER

DESCRIPTION OF CONSTRUCTION EQUIPMENT USED TODAY (Include Make and Model)

SCHEDULE ACTIVITY NO.

REMARKS

CONTRACTOR/SUPERINTENDENT

DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

VA FORMJUL 2018

V A Form 1 0 1 0 1, JULY 2018 10101 C:\Program Files\Adobe\Form Designer\Forms\Adobe.xft\VA3918.xft David Wachter April 2015 5.0

OA&MM

VA3918

{CF3222A7-20FA-11D4-ABC1-00D0B71D6ABB}

PDFForms.xml Spelling Checker;{224F7DEA-B7C1-11D3-AB40-00902712A5C9};PLSSpeller.cab Intra-Agency Transfer Request David Wachter VA Form 3918

JULY 2018

10101, CONTRACTOR, PRODUCTION, CONSTRUCTION

Missie Vaccaro-Palomaki VA Form 10101, CONTRACTOR PRODUCTION REPORT Rafael Taylor/Sterai Payne/Karen Bruce (003A2A)

DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid O M B number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.:

CONTRACTOR/SUPERINTENDENT:
SCHEDULE ACTIVITY NUMBER, line 4 of 4:
OWNER, line 4 of 4:
REMARKS, line 4 of 4:
SCHEDULE ACTIVITY NUMBER, LINE 4 OF 5:
WORK LOCATION AND DESCRIPTION, LINE 4 OF 5:
HOURS, LINE 4 OF 5:
SCHEDULE ACTIVITY NUMBER, LINE 5 OF 5:
WORK LOCATION AND DESCRIPTION, LINE 5 OF 5:
HOURS, LINE 5 OF 5:
SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

"NO" CHECK BOX.: 0
"NO" CHECK BOX.: 0
"NO" CHECK BOX.: 0
TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS:

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT:

TOTAL WORK HOURS FROM START OF

CONSTRUCTION (Auto calculated field):

File details come from the government source that posted it. Updated .