02a1 - 537-19-124 SOW CD - Construction Plans.pdf

PDF 13 MB Posted

Attached to
Z1DA--537-19-124 Upgrade Nurse Call
Solicitation number
36C25222B0012
Issued by

About this file

This document provides details for a federal contract solicitation to replace the nurse call system at the Jesse Brown VA Medical Center in Chicago, Illinois. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 seeking bids for Project #537-19-124. Offerors are invited to submit fixed-price bids on a lump sum basis for furnishing all labor, materials, equipment, supervision, and other items required to complete the nurse call system replacement. The estimated price range for the project is $2,000,000 to $5,000,000. All work must be completed within 428 calendar days of receiving the notice to proceed. Bids are due by the date specified in solicitation number 36C25222B0012.

View the file

Other files

File Type Posted
36C25222B0012 0007.docx DOCX document
36C25222B0012 0006.docx DOCX document
36C25222B0012 0005.docx DOCX document
Pre-Bid RFI 537-19-124_AE and VA.xlsx XLSX spreadsheet
36C25222B0012 0004.docx DOCX document
P01 - Specifications.pdf PDF
36C25222B0012 0003.docx DOCX document
36C25222B0012 0002.docx DOCX document
02c1 - 537-19-124 SOW Att - Contract Progress Report.pdf PDF
537-19-124 - SOW Ex - Campus Floor Plan 2 of 2.pdf PDF
02b2 - 537-19-124 SOW Ex - Asbestos Survey Report.pdf PDF
537-19-124 - SOW Ex - Campus Floor Plan 1 of 2.pdf PDF
S02 - Asbestos Survey Report.pdf PDF
S02 - Nurse Call and Code Blue Systems.pdf PDF
S02 - Statement of Conditions-Campus Floor Plan.pdf PDF
S02 - Drawings.pdf PDF
36C25222B0012 0001.docx DOCX document
S02 - Contractor Production Report.pdf PDF
S02 - Wage Determination_DB_IL20210009.pdf PDF
S02 - Contract Progress Report.pdf PDF
S02 - Specifications.pdf PDF
S02 - Subcontractor Payment Summary.xlsx XLSX spreadsheet
36C25222B0012_1.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nurse Call Jessie Brown Veterans Administration Medical Center

Chicago, IL

Project Number: 537-19-124

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \C ov er

.d w g C

O

VE

R 5/

2/

:5

PM

B y U se r

COVER

COVER SHEET

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

1 LOCATION MAP

NTS

2 EXISTING SITE PLAN

NTS

COVER COVER SHEET

E001 SYMBOLS AND GENERAL NOTES

B01A ED101-N BUILDING 01A DAMEN FIRST FLOOR DEMOLITION PLAN NORTH

B01A ED101-S BUILDING 01A DAMEN FIRST FLOOR DEMOLITION PLAN SOUTH

B01B ED101 BUILDING 01B DAMEN FIRST FLOOR DEMOLITION PLAN

B01A ED102 BUILDING 01A DAMEN SECOND FLOOR DEMOLITION PLAN

B01B ED102 BUILDING 01B DAMEN SECOND FLOOR DEMOLITION PLAN

B01A ED103 BUILDING 01A DAMEN THIRD FLOOR DEMOLITION PLAN

B01B ED103 BUILDING 01B DAMEN THIRD FLOOR DEMOLITION PLAN

B01A ED104 BUILDING 01A DAMEN FOURTH FLOOR DEMOLITION PLAN

B01B ED104 BUILDING 01B DAMEN FOURTH DEMOLITION FLOOR PLAN

B01A ED105-N BUILDING 01A DAMEN FIFTH FLOOR DEMOLITION PLAN NORTH

B01A ED105-S BUILDING 01A DAMEN FIFTH FLOOR DEMOLITION PLAN SOUTH

B01B ED105 BUILDING 01B DAMEN FIFTH FLOOR DEMOLITION PLAN

B01A ED106-N BUILDING 01A DAMEN SIXTH FLOOR DEMOLITION PLAN NORTH

B01A ED106-S BUILDING 01A DAMEN SIXTH FLOOR DEMOLITION PLAN SOUTH

B01B ED106 BUILDING 01B DAMEN SIXTH DEMOLITION FLOOR PLAN

B01A ED107-N BUILDING 01A DAMEN SEVENTH FLOOR DEMOLITION PLAN NORTH

B01A ED107-S BUILDING 01A DAMEN SEVENTH FLOOR DEMOLITION PLAN SOUTH

B01B ED107 BUILDING 01B DAMEN SEVENTH DEMOLITION FLOOR PLAN

B01A ED108 BUILDING 01A DAMEN EIGHTH FLOOR DEMOLITION PLAN

B01B ED108 BUILDING 01B DAMEN EIGHTH DEMOLITION FLOOR PLAN

B01A ED109-N BUILDING 01A DAMEN NINTH FLOOR DEMOLITION PLAN NORTH

B01A ED109-S BUILDING 01A DAMEN NINTH FLOOR DEMOLITION PLAN SOUTH

B01B ED109 BUILDING 01B DAMEN NINTH DEMOLITION FLOOR PLAN

B01A ED110 BUILDING 01A DAMEN TENTH FLOOR DEMOLITION PLAN

B11A ED101 BUILDING 11A TAYLOR FIRST FLOOR DEMOLITION PLAN

B11B ED101 BUILDING 11B OGDEN FIRST FLOOR DEMOLITION PLAN

B11A ED102 BUILDING 11A TAYLOR SECOND FLOOR DEMOLITION PLAN

B11B ED102 BUILDING 11B OGDEN SECOND DEMOLITION FLOOR PLAN

B11A ED103 BUILDING 11A TAYLOR THIRD FLOOR DEMOLITION PLAN

B11B ED103 BUILDING 11B OGDEN THIRD FLOOR DEMOLITION PLAN

B11A ED104 BUILDING 11A TAYLOR FOURTH FLOOR DEMOLITION PLAN

B11B ED104 BUILDING 11B OGDEN FOURTH DEMOLITION FLOOR PLAN

B11A ED105 BUILDING 11A TAYLOR FIFTH FLOOR DEMOLITION PLAN

B11B ED105 BUILDING 11B OGDEN FIFTH FLOOR DEMOLITION PLAN

B11A ED106 BUILDING 11A TAYLOR SIXTH FLOOR DEMOLITION PLAN

B11B ED106 BUILDING 11B OGDEN SIXTH FLOOR DEMOLITION PLAN

B11A ED107 BUILDING 11A OGDEN SEVENTH DEMOLITION FLOOR PLAN

B30 ED101-S BUILDING 30 ATRIUM FIRST FLOOR DEMOLITION PLAN - SOUTH

B30 ED101-N BUILDING 30 ATRIUM FIRST FLOOR DEMOLITION PLAN - NORTH

B32 ED101 BUILDING 32 FIRST FLOOR DEMOLITION PLAN

B40 ED101-E BUILDING 40 BED TOWER FIRST FLOOR DEMOLITION PLAN - EAST

B40 ED101-W BUILDING 40 BED TOWER FIRST FLOOR DEMOLITION PLAN - WEST

B40 ED102-E BUILDING 40 BED TOWER SECOND FLOOR DEMOLITION PLAN - EAST

B40 ED102-W BUILDING 40 BED TOWER SECOND FLOOR DEMOLITION PLAN - WEST

B40 ED104-E BUILDING 40 BED TOWER FOURTH FLOOR DEMOLITION PLAN - EAST

B40 ED104-W BUILDING 40 BED TOWER FOURTH FLOOR DEMOLITION PLAN - WEST

B40 ED105-E BUILDING 40 BED TOWER FIFTH FLOOR DEMOLITION PLAN - EAST

B40 ED105-W BUILDING 40 BED TOWER FIFTH FLOOR DEMOLITION PLAN - WEST

B40 ED106-E BUILDING 40 BED TOWER SIXTH FLOOR DEMOLITION PLAN - EAST

B40 ED106-W BUILDING 40 BED TOWER SIXTH FLOOR DEMOLITION PLAN - WEST

B40 ED107-E BUILDING 40 BED TOWER SEVENTH FLOOR DEMOLITION PLAN - EAST

B40 ED107-W BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - WEST

B01A EY101-N BUILDING 01A DAMEN FIRST FLOOR PLAN NORTH

B01A EY101-S BUILDING 01A DAMEN FIRST FLOOR PLAN SOUTH

B01B EY101 BUILDING 01B DAMEN FIRST FLOOR PLAN

B01A EY102 BUILDING 01A DAMEN SECOND FLOOR PLAN

B01B EY102 BUILDING 01B DAMEN SECOND FLOOR PLAN

B01A EY103 BUILDING 01A DAMEN THIRD FLOOR PLAN

B01B EY103 BUILDING 01B DAMEN THIRD FLOOR PLAN

B01A EY104 BUILDING 01A DAMEN FOURTH FLOOR PLAN

B01B EY104 BUILDING 01B DAMEN FOURTH FLOOR PLAN

B01A EY105-N BUILDING 01A DAMEN FIFTH FLOOR PLAN NORTH

B01A EY105-S BUILDING 01A DAMEN FIFTH FLOOR PLAN SOUTH

B01B EY105 BUILDING 01B DAMEN FIFTH FLOOR PLAN

B01A EY106-N BUILDING 01A DAMEN SIXTH FLOOR PLAN NORTH

B01A EY106-S BUILDING 01A DAMEN SIXTH FLOOR PLAN SOUTH

B01B EY106 BUILDING 01B DAMEN SIXTH FLOOR PLAN

B01A EY107-N BUILDING 01A DAMEN SEVENTH FLOOR PLAN NORTH

B01A EY107-S BUILDING 01A DAMEN SEVENTH FLOOR PLAN SOUTH

B01B EY107 BUILDING 01B DAMEN SEVENTH FLOOR PLAN

B01A EY108-N BUILDING 01A DAMEN EIGHTH FLOOR PLAN - NORTH

B01A EY108-S BUILDING 01A DAMEN EIGHTH FLOOR PLAN - SOUTH

B01B EY108 BUILDING 01B DAMEN EIGHTH FLOOR PLAN

B01A EY109-N BUILDING 01A DAMEN NINTH FLOOR PLAN NORTH

B01A EY109-S BUILDING 01A DAMEN NINTH FLOOR PLAN SOUTH

B01B EY109 BUILDING 01B DAMEN NINTH FLOOR PLAN

B01A EY110 BUILDING 01A DAMEN TENTH FLOOR PLAN

B11A EY101 BUILDING 11A TAYLOR FIRST FLOOR PLAN

B11B EY101 BUILDING 11B OGDEN FIRST FLOOR PLAN

B11A EY102 BUILDING 11A TAYLOR SECOND FLOOR PLAN

B11B EY102 BUILDING 11B OGDEN SECOND FLOOR PLAN

B11A EY103 BUILDING 11A TAYLOR THIRD FLOOR PLAN

B11B EY103 BUILDING 11B OGDEN THIRD FLOOR PLAN

B11A EY104 BUILDING 11A TAYLOR FOURTH FLOOR PLAN

B11B EY104 BUILDING 11B OGDEN FOURTH FLOOR PLAN

B11A EY105 BUILDING 11A TAYLOR FIFTH FLOOR PLAN

B11B EY105 BUILDING 11B OGDEN FIFTH FLOOR PLAN

B11A EY106 BUILDING 11A TAYLOR SIXTH FLOOR PLAN

B11B EY106 BUILDING 11B OGDEN SIXTH FLOOR PLAN

B11A EY107 BUILDING 11A TAYLOR SEVENTH FLOOR PLAN

B30 EY101-S BUILDING 30 ATRIUM FIRST FLOOR PLAN - SOUTH

B30 EY101-N BUILDING 30 ATRIUM FIRST FLOOR PLAN - NORTH

B32 EY101 BUILDING 32 FIRST FLOOR PLAN

B40 EY101-E BUILDING 40 BED TOWER FIRST FLOOR PLAN - EAST

B40 EY101-W BUILDING 40 BED TOWER FIRST FLOOR PLAN - WEST

B40 EY102-E BUILDING 40 BED TOWER SECOND FLOOR PLAN - EAST

B40 EY102-W BUILDING 40 BED TOWER SECOND FLOOR PLAN - WEST

B40 EY104-E BUILDING 40 BED TOWER FOURTH FLOOR PLAN - EAST

B40 EY104-W BUILDING 40 BED TOWER FOURTH FLOOR PLAN - WEST

B40 EY105-E BUILDING 40 BED TOWER FIFTH FLOOR PLAN - EAST

B40 EY105-W BUILDING 40 BED TOWER FIFTH FLOOR PLAN - WEST

B40 EY106-E BUILDING 40 BED TOWER SIXTH FLOOR PLAN - EAST

B40 EY106-W BUILDING 40 BED TOWER SIXTH FLOOR PLAN - WEST

B40 EY107-E BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - EAST

B40 EY107-W BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - WEST

E501 BACKBONE CABLING RISER

SHEET INDEX

RECEPTACLES

STANDARD RECEPTACLE

CEILING MOUNTED RECEPTACLES (W / CIRCLE)

FLOOR MOUNTED RECEPTACLES (W / SQUARE)

WALL MOUNTED RECEPTACLES (W / STEM)

INSTALL LEVEL WITH FINISHED CEILING.

DUPLEX

DUPLEX

DOUBLE

MOUNTING HEIGHT 1'-6"

SUPPORT TO STRUCTURE.

GENERAL BRANCH CIRCUIT NOTES

171'-250' IN LENGTH: 6#8,1#8G,1"C

101'-170' IN LENGTH: 6#10,1#10G,3/4"C

0'-100' IN LENGTH: 6#12,1#12G,3/4"C

C) THREE (3) BRANCH CIRCUITS PER HOMERUN-

171'-250' IN LENGTH: 4#8,1#8G,3/4"C

101'-170' IN LENGTH: 4#10,1#10G,3/4"C

0'-100' IN LENGTH: 4#12,1#12G,3/4"C

B) TWO (2) BRANCH CIRCUITS PER HOMERUN-

CONNECTED TO 208Y/120 VOLT SYSTEMS SHALL BE, U.N.O.:

BRANCH CIRCUIT WIRING FOR 20 AMP, 120 VOLT CIRCUITS

BRANCH CIRCUITS SHALL BE CONNECTED TO 20A,1P CB'S, U.N.O.1.

2.

171'-250' IN LENGTH: 2#8,1#8G,3/4"C

101'-170' IN LENGTH: 2#10,1#10G,3/4"C

0'-100' IN LENGTH: 2#12,1#12G,3/4"C

A) ONE (1) BRANCH CIRCUIT PER HOMERUN-

PROVIDE A DEDICATED NEUTRAL WITH EACH BRANCH CIRCUIT.3.

PROVIDE AN INSULATED GROUND WIRE WITH EACH CIRCUIT.4.

ABOVE COUNTER

ABOVE FINISHED FLOOR

CIRCUIT BREAKER

CIRCUIT

DISCONNECT

DOWN

EXISTING TO REMAIN

EXISTING TO BE RELOCATED

GROUND FAULT INTERRUPTER

GROUND

JUNCTION BOX

NOT TO SCALE

PANEL

ABBREVIATIONS

AC

AFF

CB

CCT

DISC

DN

EX

EXR

GFI

GRD

JB

NTS

PNL

CRITICAL POWERCR

NURSE CALLNC

NURSE CALL SYMBOLS

PULL CORD STATION3

THE ENTIRE NURSE CALL SYSTEM SHALL BE INSTALLED IN

RACEWAY (3/4" MINIMUM) WITHIN WALLS AND CEILINGS.

SINGLE PATIENT STATION

1 3 GANG JUNCTION BOX

2-1/2" DEEP WITH 3 GANG RING

1900 BOX

2-1/2" DEEP WITH 1 GANG RING

PULL CORD STATION3A 1900 BOX

2-1/2" DEEP WITH 1 GANG RINGWITH AUDIO

CORRIDOR LIGHT - 4 POSITION4 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

NURSE ANNUNCIATOR5 1900 BOX

2-1/2" DEEP WITH 1 GANG RINGCONSOLE

6 NURSE CALL HEAD END

WALL MOUNTED CABINET

DUTY STATION9 3 GANG JUNCTION BOX

2-1/2" DEEP WITH 3 GANG RING

2-JACK AUXILIARY STATION12 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

PUSH FOR HELP STATION13 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

37 PIN BED RECEPTACLE15 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

STAFF TERMINAL STATION16 3 GANG JUNCTION BOX

2-1/2" DEEP WITH 3 GANG RING

STAFF ASSIST / CODE STATION23 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

CORRIDOR ZONE LIGHT7 1900 BOX

2-1/2" DEEP WITH 1 GANG RING

WITH BOTH PUSH FOR HELP

AND CODE BLUE STATION

1. PROVIDE RACEWAY, 120V POWER, AND GROUNDING FOR

THE NURSE CALL SYSTEM.

2. FEEDER AND BRANCH CIRCUIT WIRING SHALL BE SIZED

FOR A MAXIMUM 5% VOLTAGE DROP TOTAL. UPSIZE

FEEDER AND BRANCH CIRCUIT WIRING AS REQUIRED FOR

RUN LENGTH IN THE FIELD.

3. THE NURSE SYSTEM SHALL BE INSTALLED IN A COMPLETE

AND SEPARATE DEDICATED RACEWAY SYSTEM WITHIN

4. THESE DRAWINGS ARE DIAGRAMMATICAL IN NATURE,

AND INDICATE THE GENERAL ARRANGEMENT OF

EQUIPMENT, BUT ACCURACY IS NOT GUARANTEED. FIELD

VERIFICATION OF LOCATIONS AND DIMENSIONS MAY BE

REQUIRED.

5. THESE DRAWINGS WILL NOT SHOW ALL INSTALLATION

DETAILS. IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO MAKE A COMPLETE AND SATISFACTORY

INSTALLATION IN ACCORDANCE WITH NECA 1 AND

MODERN PRACTICE METHODS.

6. EQUIPMENT DIMENSIONS SHOWN ON PLANS AND

ELEVATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR

SHALL USE THE SHOP DRAWINGS FOR PROPER LAYOUT,

FOR FINAL INSTALLATION, WITHOUT ANY ADDITIONAL

COST TO THE OWNER.

7. ELECTRICAL CONTRACTOR SHALL MAKE THEIR OWN

COUNT OF ALL EQUIPMENT TO BE WIRED BASED ON

PLANS AND SPECIFICATIONS.

8. ALL NEW CIRCUITS SHALL BE RUN WITH DEDICATED

NEUTRALS PER 2014 NEC 200.4. SHARED NEUTRALS ARE

NOT ALLOWED.

9. PROVIDE AN INSULATED GROUND WIRE WITH ALL

CIRCUITS.

10. LABEL EACH RECEPTACLE WITH THE PANEL NAME AND

CIRCUIT NUMBER SERVING THEM.

11. ALL NEW RECEPTACLES CONNECTED TO CRITICAL

POWER SHALL HAVE RED BODIES AND COVER PLATES.

GENERAL NOTES

12. NURSE CALL DEVICES ARE SHOWN AS SEEN IN THE

FIELD, VIA SITE VISITS, AND EXISTING AS BUILT DRAWINGS.

THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF

EACH DEVICE IN THE FIELD, PRIOR TO ROUGH-IN.

WALLS AND SOLID CEILINGS. RUN CABLING ACROSS J-HOOKS

WITHIN ACCESSIBLE CORRIDOR CEILING SPACES.

1. PROVIDE A CAT 5E CABLE AND #14 AWG FOR POWER FROM THE

NETWORK NURSE CALL DEVICE CABLING

CONTROL CABINET(S), TO THE FIRST DONE LIGHT, THEN CAT 5E

SHALL BE DAISY CHANGED BETWEEN SUBSEQUENT DOME

LIGHTS AND DOMELESS INTERFACE. MAXIMUM OF FOUR (4)

DOMES PER HOMERUN.

2. PROVIDE A CAT 5E CABLE FROM THE DOME LIGHT OR DOME

INTERFACE MODULES TO THE PATIENT STATION, STAFF AND/OR

DUTY STATION.

3. PROVIDE A CAT 5E CABLE FROM THE DOME LIGHT OR DOME

INTERFACE MODULES TO THE AUXILIARY JACK, PULL CORD,

CODE BLUE, OR DUAL PUSHBUTTON STATION.

4. PROVIDE A CAT 5E CABLE FROM THE INPUT MODULE INPUTS TO

THE CONTACT CLOSURE.

5. PROVIDE A CAT 5E CABLE FROM THE PATIENT STATION TO THE

FEATURE BED MODULE.

6. PROVIDE A CAT 5E CABLE FROM A POE NETWORK SWITCH IN

TELECOM CLOSETS TO THE ANNUNCIATOR CONSOLE.

7. PROVIDE A CAT 5E CABLE FROM A POE NETWORK SWITCH IN

TELECOM CLOSETS TO THE STAFF TERMINAL STATION.

PHASE 1 = BUILDING 40 (BED TOWER)

PHASING

PHASE 2 = BUILDINGS 1A/1B (DAMEN PAVILION) & 30 (ATRIUM)

PHASE 3 = BUILDINGS 11A/1B (TAYLOR/OGDEN) & 32 (TEMPORARY)

IN CORRIDORS, NO MORE THAN TWO (2) CEILING TILES SHALL BE

CONTRACTOR WORK PHASING STRATEGY

REMOVED AT A TIME AND A J-HOOK SHALL BE PROVIDED AT EACH

2-TILE SECTION. CABLING SHALL BE RUN A MAXIMUM OF TWO (2)

EACH CORRIDOR AREA WILL BE CLEANED BEFORE MOVING TO

THE NEW AREA, UNLESS OTHERWISE SPECIFIED AND REQUIRED

BY THE VA JESSE BROWN MEDICAL CENTER. SURROUNDING

AREAS SHALL NOT BE AFFECTED. ONLY THE AREAS DIRECTLY

UNDERNEATH THE SPECIFIC AREA WHERE TILES ARE BEING

THE BUILDING SYSTEMS SHALL REMAIN IN FULL OPERATION AT

ALL TIMES.

REMOVED WILL BE AFFECTED.

CEILING TILES AT A TIME.

IN INDIVIDUAL ROOMS, THE NEW NURSE CALL SYSTEM DEVICE(S)

WILL BE INSTALLED ON A ROOM BY ROOM BASIS. THE EXISTING

DEVICE SHALL NOT BE REMOVED, UNTIL A NEW DEVICE IS

READY FOR INSTALLATION.

THE NEW NURSE CALL SYSTEM WILL WORK SIMULTANEOUSLY

WITH THE EXISTING SYSTEM. THE EXISTING SYSTEM IN EACH

COORDINATION WILL NEED TO TAKE PLACE EACH WEEK TO

GATHER WHAT ROOMS ARE GOING TO BE WORKED ON EACH

SPECIFIC DAY FOR THE STAFF'S KNOWLEDGE. AS NEW DEVICES

AREA SHALL NOT BE REMOVED UNTIL THE NEW DEVICES ARE

CONNECTED TO THE NEW SYSTEM AND IS OPERATIONAL.

ARE INSTALLED IN A ROOM, THE OLD DEVICES SHALL BE REMOVED.

ONCE THE AREA HAS ALL OF THE EXISTING DEVICES REMOVED

BACK TO THEIR RESPECTIVE HEADEND(S), THE EXISTING

HEADENDS CAN BE REMOVED AND ALL THAT WILL BE LEFT WILL

BE THE NEW SYSTEM.

IN BUILDING 40, A MAXIMUM OF FOUR (4) PATIENT ROOMS WILL

BE DOWN AT ANY ONE TIME. COORDINATE WILL NEED TO TAKE

IS A FLOOR IN THE BED TOWER BEING UNDERUTILIZED AND

THESE ROOMS CAN BE TEMPORARILY USED, IF NECESSARY.

THE PER UNIT SEQUENCE OF INSTALLATION EVENTS ARE AS

PLACE SO THE STAFF CAN PROVIDE FOUR (4) BEDS IN A

DIFFERENT AREA/FLOOR, IF NECESSARY. CURRENTLY, THERE

FOLLOWS:

1) CONNECTION OF THE SERVER TO THE VA NETWORK, THE PC

WORKSTATIONS, AND THE NURSE CALL SYSTEM SHALL

OCCUR AT THE BEGINNING OF EACH PROJECT PHASE.

2) ROUGH-IN THE NURSE CALL SYSTEM NURSE CALL SYSTEM

POWER, 5 L-NET CABLING AND CONSOLE WIRING.

3) INSTALL THE HEAD END AND CONSOLE AND CONNECT TO THE

NEW POWER. PROGRAMMING SHALL TAKE PLACE.

THE NURSE CALL ANNUNCIATOR CONSOLE WILL REQUIRE

TEMPORARY INSTALLATION AT THE NURSES STATIONS UNTIL

ALL THE DEVCIES ON THE OLD SYSTEM HAVE BEEN REPLACED.

4) REMOVE OLD DEVICES AND CABLING AND INSTALL NEW

DEVICES AND CABLING ROOM BY ROOM. IN BUILDING 40,

THE MAXIMUM SHALL BE FOUR (4) PATIENT ROOMS AT A TIME.

THE REQUIRED ON-SITE TRAINING FOR THE STAFF WILL TAKE

PLACE, PRIOR TO THE INSTALLATION OF THE NEW SYSTEM.

ALL EXISTING NURSE CALL DEVICES AND HEADEND EQUIPMENT

WILL BE REMOVED AND RETURNED TO THE OWNER. EXISTING

WIRING WILL BE REMOVED. ALL EXISTING BOXES WILL BE

NEW RACEWAY REQUIRED FOR NON-HEADWALL DEVICES MAY

BE RUN IN SURFACE MOUNTED WIREMOLD TO DECREASE ANY

ISSUE WITH DUST AND INFECTION CONTROL.

REUSED WHERE AN EXISTING DEVICE IS TO BE REPLACED. IF THE

EXISTING BACKBOX DOES NOT MEET THE REQUIREMENT OF THE

NURSE CALL VENDOR, THEN THE ELECTRICAL CONTRACTOR SHALL

PROVIDE THE NEW CORRECT BACKBOX AS SPECIFIED BY THE

SPECIFIC VENDOR.

EXISTING SYSTEMS INTERFACE

EXISTING TV INTERFACE:

EACH EXISTING ROOM WHERE THE TV WAS ONCE CONNECTED

TO THE EXISTING NURSE CALL SYSTEM, WILL BE CONNECTED TO

THE NEW NURSE CALL SYSTEM AND NEW FEATURE BED

INTERFACE COMPONENTS WHERE APPLICABLE.

EXISTING LIGHT CONTROL INTERFACE:

EACH EXISTING PATIENT ROOM THAT UTILIZES EXISTING LIGHT

CONTROLLERS CONNECTED TO EXISTING LIGHTS, WILL BE

REUSED WITH THE NEW NURSE CALL SYSTEM AND NEW

FEATURE BED INTERFACE COMPONENTS.

EXISTING FEATURE BED INTERFACE

EACH EXISTING ROOM WHERE THE FEATURE BEDS ARE

CURRENTLY CONNECTED TO THE EXISTING 37-PIN BED

RECEPTACLE, UP-LIGHT, DOWN-LIGHT AND TV WILL BE

RECONNECTED TO A NEW 37-PIN WALL RECEPTACLE. THE

NURSE CALL INTERFACE, UP-LIGHT, DOWN-LIGHT AND TV

CONTROLS WILL FUNCTION WITH THE NEW RECEPTACLE AND

NURSE CALL SYSTEM. THE EXISTING FEATURE BED WITH

FEATURE BED-TO-WALL CABLE WILL BE RECONNECTED TO THE

NEW 37-PIN WALL RECEPTACLE.

EXISTING OVERHEAD PAGING INTERFACE

EACH EXISTING UNIT THAT CURRENTLY UTILIZES OVERHEAD

PAGING THROUGH THE NURSE CALL SYSTEM WILL HAVE AN

INTERFACE TO THE SYSTEM THROUGH THE LOCAL PAGING

AMPLIFIERS. EXISTING UNITS WITH NO PAGING SYSTEM WILL

NOT RECEIVE ANY NEW INTERFACE TO A PAGING SYSTEM

WHICH DOES NOT EXIST.

SIP SERVER SOFTWARE

NURSE CALL SIP SERVER SOFTWARE IS TO BE INCLUDED FOR

TELEPHONY INTEGRATIONS. THIS SIP SERVER PERFORMS AS A

REGISTRAR AND PROXY FOR THE AUDIO NURSE CALL COMPONENTS

OF THE SYSTEM SUCH AS PATIENT STATIONS, AUDIO BATH

STATIONS, ANNUNCIATORS AND STAFF STATIONS. THE SIP SERVER

CAN ALSO BE USED TO CONNECT TO A TELEPHONE SYSTEM'S SIP

SERVER WHERE THE PHONES/DEVICES ARE REGISTERED. THE

TELEPHONE SYSTEM'S SIP SERVER CREATES A "SIP TRUNK" TO THE

NURSE CALLS SIP SERVER. A DEDICATED STANDALONE SERVER IS

REQUIRED FOR THE SIP SERVER SOFTWARE AND SHALL BE

PROVIDED BY THE VENDOR AND ASSOCIATED CONTRACTOR. THE

SIP SERVER SHOULD ALWAYS BE INSTALLED ON A STANDALONE

SERVER.

E001

SYMBOLS AND

GENERAL NOTES

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \E

1.

dw g

E0

5/ 2/

:5

PM

B y

U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

COMPENSATION

AND PENSION

ROLLING SHUTTER

OVER HEAD DOOR

LOUVER

FEC

HAC

STORAGE

FIRE

CLOSET

PNEUMATIC

TUBE

FAC

FAC

TEL

FIRE

HOSE

11E1

RADIOLOGY

SCHEDULING

ELEVATOR

NO S5

ELEVATOR

NO S6

ELEVATOR

NO P1

ELEVATOR

NO P2

CORRIDOR

C1404

TOILET

1491A

CORRIDOR

C1401

CORRIDOR

C1403

CORRIDOR

C1402

CORRIDOR

C1405

CORRIDOR

C1407

CORRIDOR

C1406

CORRIDOR

C1409

CORRIDOR

C1445

OPTICAL

DISPENSARY

1410A

ELECTRICAL

SWITCH RM

14E2

ADDICTION

CONSULT

RM

RECEPTION

CONSULT

RM

PATIENT

ADVOCATE

1459A

E D OFFICE

ELECTRICAL

14E3

DECENDENT

AFFAIRS

CONSULT

RM

HAC

TOILET

1446 TEL

14T1

VESTIBULE/STAIR

STAIR

NO 2

PAC

CO-ORDR

OFFICE

CHIEF

CONSULT

RM

CONSULT

RM

CONSULT

RM

EMS

HOUSE

KEEPING

ELEVATOR

NO P7

ELEVATOR

NO P8

TEL

CLOSET

14T2

14E4

STAIR

NO 1

ELEVATOR

NO P3

ELEVATOR

NO P4

NURSE STATION EMERGENCY RM

EQUIP STORAGE

LOUNGE

ELECTRICAL

14E6

COMM

14T3

BEREAVEMENT

RM

1475A

SOILED

UTILITY

EXAM RM-7

1470G

EXAM RM-6

1470F

EXAM RM-5

1470E

EXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

E D MGR

CFD SUPPLY

EXAM RM-1

1470A

ER HALLWAY

EMS STORAGE

1431A

ER STORAGE

1431B

TRIAGE

E D ATTENDING

TRIAGE

MEDICAL

SUPPORT

SUPERV

1431C

VAM NURSE

MNGR.

TOILET

VESTIBULE

C1408

GARAGE

LIFT

EQUIP.

CLEAN

SUPPLY

CLEAN

LINEN

TOILET

NEGATIVE

PRESSURE

RM

EXAM RM-15

1470R

EXAM RM-14

1470Q

EXAM RM-13

1470P

EXAM RM-12

1470N

EXAM RM-11

1470M

PARAMEDIC RM

1470L

MEDS

1470H

EXAM RM-8

1470J

EXAM RM-9

1470K

MENS

TOILET

CONFERENCE RM

WOMENS

TOILET

TOILET

ON CALL

ADMIN OFFICE

EXAM RM

ON CALL

1491B

STAIR

EXAM

RM

EXAM RM

EXAM RM

DONATED

CLOTHING

1508 EMS LINEN RM

CORRIDOR

C1501

PHARMACY IV

STORAGE

BIOHAZARD

CONTAINER

GAS

STORAGE

1503 ELEVATOR

MECH

ELEVATOR

FOYER

MORGUE

ELEVATOR

STAIR

NO 5 TELECOMMUNICATION RM

14T4

ELECTRICAL

14E7

TOILET

1499A

DOCTOR

OFFICE

DOCTOR

OFFICE

DOCTOR

OFFICE

SECRET

OFFICE

STORAGE

COMP AND

PENS STAFF

WAITING RM

SUPV OFFICE

EXAM RM

DOCTOR

OFFICE

DOCTOR

OFFICE

MECH RM

VESTIBULE

CORRIDOR

C1505

CORRIDOR

C1504

ELECTRICAL

1541B

SUPPLY

CORRIDOR

C1502

HAC

CORRIDOR

C1503

GAS CYLINDER

STORAGE

CORRIDOR

CORRIDOR

VESTIBULE

ELECTRICAL

CLOSET

OPTICAL

WAITING RM

CORRIDOR

C1505

1499B

1490A M1

NO 5A

1436A

NO 2

1410B

C1404

C1404

ELECTRIC

CLOSET

14E5

3 3

4 4 4 4

13 13 13

4A

13 13 13 13 13 13

13 13 13 13 13

4 4 4 4

B01B ED101 - 1

B01A ED101-NB30 ED101-S

B0 1A

E D

1-

N

B0 1B

E D

- 2

B01B ED101 - 2

B3

ED

1- S

B01

B FLO

ORS ABOVE O

VERLA

P BUILD

IN

G 30

ED101-N

BUILDING 01A DAMEN

FIRST FLOOR DEMOLITION PLAN NORTH

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

1.

dw g B0

1A E

D

1- N

5/ 2/

:5

PM

B y

U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

WHERE DEVICES ARE NOT BEING REPLACED, PROVIDE A

BLANK COVER PLATE OVER THE JUNCTION BOX.

ROLLING SHUTTER ROLLING SHUTTER

FAC

OGY

ICE

ICS

PLY RM

RY RM

TOILET

ELECTRICAL

CLEAN SUPPLY

CORRIDOR

C1102

ENTRANCE

C1101

CORRIDOR

C1445

WAITING RM

WOMENS

TOILET

MENS TOILET

HEALTH VET

CO-ORDR

CREDIT

UNION

FIRE

CONTROL

PATIENT

ADVOCATE

OFFICE

OPTICAL

DISPENSARY

1410A

TRIAGE

TRIAGE

ELECTRICAL

SWITCH RM

14E2

TRIAGE

ED PHYSICIAN

1414ELECTRICAL

14E1

CONSULT

RM

HAC

TOILET

1446 TEL

14T1

VESTIBULE/STAIR

STAIR

NO 2

PAC

CO-ORDR

OFFICE

CHIEF

ER HALLWAY

TRAVEL PAY

STORAGE

RECEPTION AND

ADMISSION

AMBULATORY

CARE SUPV

OFFICE

CHIEF

AMBULATORY

CORRIDOR

C1411

MANAGER

EMS STORAGE

1431A

ER STORAGE

1431B

TRIAGE

E D ATTENDING

TRIAGE

MEDICAL

SUPPORT

SUPERV

1431C

VAM NURSE

MNGR.

TOILET

VESTIBULE

C1408

GARAGE

LIFT

EQUIP.

CLEAN

SUPPLY

VESTIBULE

ENTRANCE/LOBBY

C1103

ELECTRICAL

1541B

CORRIDOR

OPTICAL

WAITING RM

C1505

NO 2

1410B

B01B ED101 - 1

B01A ED101-NB30 ED101-S

B0 1A

E D

1-

N

B01B ED101 - 2

B3

ED

1- S

1S

T FLO

OR D

EMO O

N B30

ED10

1-N

THIS AREA O

NLY

B01

B FLO

ORS ABOVE O

VERLA

P BUILD

IN

G 30

B3

ED

1- S

B3

ED

1- N

ED101-S

BUILDING 01A DAMEN

FIRST FLOOR DEMOLITION PLAN SOUTH

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

1.

dw g B0

1A E

D

1- S

5/ 2/

:5

PM

B y

U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

LOUVER

1540 - 49

RADIOLOGY

COURTYARD

CLOSET

CLOSET

1541A

FAC

1575B

CLOSET

1545B

DIGITAL RADIOLOGY

CORRIDOR

C1511

PREP/

RECOVERY

VESTIBULE

C1507

POLICE

OPERATION

CORRIDOR

C1510

CORRIDOR

C1505

ARMORY RM

TOILET

STORAGE

1554B

SQUAD RM OFFICE

DETECTIVE

1540B

DETECTIVE

1540A

EVIDENCE

STORAGE

1542AEVIDENCE

OFFICE VIEW

1544A

INVESTIGATION

SECTION

DEPUTY CHIEF

VESTIBULE

CORRIDOR

C1505

CORRIDOR

C1504

ELECTRICAL

1541B

VESTIBULE

C1116

SECY OFFICE

OFFICE/

COPIER

1545A

CORRIDOR

C1509

POLICE CHIEF

RAD EXAM

DOCTOR

OFFICE

RAD

OFFICE

ULTRASOUND

HOLD

CELL

1556 HOLD

CELL

RADIOLOGY

OFFICE

RADIOLOGY

READING RM

RADIOLOGY

OFFICE

RAD

OFFICE

ULTRASOUND

TOILET

SPS SUPV

OFFICE

SPS RECEIVING

STORAGE

SECY OFFICE

RADIOLOGY SVC

CONFERENCE RM

FAN RM

PACS

MANAGER

COMPUTER

CABINET

1581A

ADMIN OFFICE

CHIEF RADIOLOGY

ELECTRICAL

CLOSET

15E2

TELEPHONE

CLOSET

15T1

HAC

STAIR

NO 3

WAITING RM

CONSULT

RM - 1

CONSULT

RM - 2

BREAK

ROOM

FILES

REFRIG

RECEPTION

TECH WORK

TOILET

BREAK

ROOM

INPT

HOLDING

CORRIDOR

C1506

CORRIDOR

CORRIDOR

C1508

CLEAN

CLEAN

SUPPLY

1516 HAC

FIRE ALARM

CORRIDOR

C1503

GAS CYLINDER

STORAGE

EMS STORAGE

CT IMAGING RM - 2

CONTROL RM - 2

1528B

TOILET

1528A

CONTROL RM - 1

1530A

TOILET

1530B

CT IMAGING RM - 1

ELECTRICAL RM

15E3 RADIOLOGY /

FLUOROSCOPIC RM

TOILET

1533A

MECH

ULTRASOUND

RADIOLOGY

SUPPLY

DIGITAL RADIOLOGY

ELECTRICAL

15E4

SWITCHGEAR RM

15E5

TOILET

1538A

STAIR

NO 14

I R READING

RM

1539A

COMMUNICATIONS

1538F

ANTE

RM

1538B

EQUIP RM

1538E CONTROL RM - 3

1538D

SPECIAL

PROCEDURES

INTERVENTIONAL

1538C

STAIRWELL

VESTIBULE

VESTIBULE

CLOSET

1538G

C1506B

1570A

C1506A

1521A

1555B

ATS RM

1570C

SUPERVISOR

OFFICE

POLICE

OFFICE

3 3

4 4

4 4

B01B ED101 - 1

B01A ED101-NB30 ED101-S

B0 1B

E D

- 2

B01B ED101 - 2

B01B ED101 - 1

B40 ED101-E

B01B ED101 - 1

B40 ED101-E

COURTYARD

CHIEF

VESTIBULE

ENTRANCE/LOBBY

C1103

ELECTRICAL

1541B

VESTIBULE

C1116

SECY OFFICE

CORRIDOR

C1505

B01B ED101 - 1

B01A ED101-NB30 ED101-S

B0 1B

E D

- 2

B01B ED101 - 2

ED101

BUILDING 01B DAMEN

FIRST FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

1.

dw g B0

1B E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

1 FIRST FLOOR NORTH

1/8" = 1'-0"

2 FIRST FLOOR SOUTH

1/8" = 1'-0"

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

NUCLEAR MEDICINE

A C

CHIEF OF STAFF

B

TV

A-120

RAMP DN

ROOF

TEL

24E2 STORAGE

FAC

2479A

ELECTRICAL

CLOSET

24E3

COAT CLOSET

2438C

STORAGE

2438A

TOILET

2438B

STORAGE

2440A

2447A

CONNECTING

CORRIDOR

C2307

ASSISTANT

DIRECTOR

CORRIDOR

C2401

ELEVATOR

ELEVATOR

CORRIDOR

C2409

CORRIDOR

C2404

CORRIDOR

C2408

STORAGE

AUTOPSY

AREA

ELEVATOR

NO P4

ELEVATOR

NO P3

ELEVATOR

NO P2

ELEVATOR

NO P1

SOILED

UTILITY

TOILET/

SHOWER

2497A

MORGUE CLEAN UTILITY

REFR

2477A

MECH SPACE

VOLUNTARY

STORAGE

VTS FLEET OPER

2449A

SUPV

OFFICE

2449B

ELEVATOR

NO P7

ELEVATOR

NO P8

PATIENT

ADVOCATE OFFICE

CORRIDOR

C2405

CONFERENCE RM

CPP AND

RESOURCE

TELEPHONE

CLOSET

24T1

STAIR

NO 1

CORRIDOR

C2407

MENS TOILET

2415TEL

STAIR

NO 2

DIRECTOR

OFFICE

TOILET

2413B

STORAGE

2413A

ELECTRICAL

24E1

SECRET

SECRET

PUBLIC

AFFAIRS

STAFF

OFFICE

ASST TO

DIRECTOR

AUDITORIUM

ELECTRICAL

24E6

CORRIDOR

C2406

STAFF

ATTORNEY

PROGRAM

ANALYST

SECY STAFF

OFFICE

COS

OFFICE

AD OFFICE

ACOS CLINIC

AFFAIRS

OFFICE

STORAGE

BREAK

RM

WOMENS

TOILET

OFFICE

STORAGE

2446D

LOBBY

STRATEGIC

PLANNER

ELECTRICAL

RECEPTION

2444A VESTIBULE

MENS TOILET

STORAGE

2446A

WOMENS TOILET

UNISEX

TOILET

KITCHEN

2446B

CORRIDOR

C2402

STAIR

CORRIDOR

C2403

MECH SPACE

ELEVATOR

FAMILY VIEWING

TOILET

STORAGE

2492A

STAIR

NO 5

ELEVATOR

LAB

INJECTION

RM

PROCESSING

RM

ELECTRICAL

24E5

NUCLEAR MEDICINE

SCANNING AREA

TREATMENT RM

CHIEF OF STAFF

NURSE

EXECUTIVE

STORAGE

AND EQUIP

2446C

DRESSING

RM

2462APIV

PIV

PIV

VISUAL

CO-ORDR

TOILET

2474A

LOW AND

BLIND VISION

TREATMENT RM

STRESS LAB

WAITING

INJECTION RM

NUCLEAR

MED

RECEPTION

HAC

FILE RM

STAFF

PHYSICIAN

SECTION

CHIEF

BONE DENSITY

PROCEDURE RM

OPERATION

MANAGER

STAFF

OFFICE

M-1

NO 5A

2446H

2446F

2446G

WALL PARTITION CLOSETWALL PARTITION CLOSET

FIRE

CLOSET

FIRE

CLOSET

CLEAN

UTILITY

ASSISTANT

DIRECTOR

ROOF

ROOF

ELECTRICAL

CLOSET

24E4

3 3 3 3 3 3 3 3

4 4

B01B ED102 - 1

B01A ED102B30 ED102

B0 1A

E D

B0 1B

E D

- 2

B01B ED102 - 2

B0 1A

E D

B0 1B

E D

- 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

2.

dw g B0

1A E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32 ED102

BUILDING 01A DAMEN

SECOND FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

RECEIVING

CART

ELEVATOR

LOBBY

EQUIPMENT

PARKING

PARKING

EQUIPMENT

PARKING

EQUIPMENT

PARKING

EQUIPMENT

PARKING

EQUIPMENT

EQUIPMENT

PARKING

EQUIPMENT

PARKING

EQUIPMENT

EQUIPMENT

PARKING

PARKING

ELECTRICAL

CLOSET

25E2

ELECTRICAL

CLOSET

25E1

CLOSET

CLOSET

CLOSET

OCCUPATIONAL

THERAPY

2514A

ELECTRICAL

CLOSET

25E3

FAC

CONNECTING

CORRIDOR

C2307

CORRIDOR

C2601

NO 27

STERILE CORE

ELECTRICAL

RM

26E2

STERILE

CORE

ELEVATOR

NO 26

VESTIBULE

OR SUPPORT

OR-3

(LARGE)

OR-4

(LARGE)

OR SUPPORT

PHYSICAL

THERAPY CLINIC

CORRIDOR

C2502

CORRIDOR

C2503

OCCUPATIONAL

THERAPY

KINESIOTHERAPY CLINIC

STORAGE

MENS

TOILET

LOCKER

2580A

MENS

TOILET

PATIENT RM

WOMENS

LOCKER

HAC

WOMENS

TOILET

TOILET

2521A

OFFICE STAFF

STAIR

NO 3

WORK RM

OFFICE

PM AND R

SECY STAFF

PM AND R

CHIEF

RESIDENT

OFFICE

DOCTOR

OFFICE

CONFERENCE RM

OT

OFFICE

KITCHEN

ASSESSMENT

OCCUPATIONAL

THERAPY

ADL RM

STAIR

NO 4

MULTIPURPOSE

THERAPY

STORAGE

DOCTOR

OFFICE

DOCTOR

OFFICE

CORRIDOR

C2501

STORAGE

STORAGE

IRM STORAGE

IRM STORAGE

WAITING RM

CANTEEN STORAGE

STORAGE

STORAGE

2554B

2554A

2520A

2585A

2585B

2585C

IRM STORAGEIRM

STORAGE

IRM

STORAGE

GENERAL

STORAGE

GENERAL

STORAGE

FUTURE

CORRIDOR

UNASSIGNED

ROOF

ROOF

EMERGENCY

SUBSTATION

RM

2556B

VESTIBULE

NORMAL

SUBSTATION

RM

2556A

CANTEEN

STORAGE

2505A

B01B ED102 - 1

B01A ED102B30 ED102

B0 1B

E D

- 2

B01B ED102 - 2

B01B ED102 - 1

B40 ED102-E

B01B ED102 - 1

B40 ED102-E

B0 1B

E D

- 1

CONNECTING

CORRIDOR

C2307

B01B ED102 - 1

B01A ED102B30 ED102

B0 1B

E D

- 2

B01B ED102 - 2

B0 1B

E D

- 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

2.

dw g B0

1B E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

1 SECOND FLOOR NORTH

1/8" = 1'-0"

2 SECOND FLOOR SOUTH

1/8" = 1'-0"

ED102

BUILDING 01B DAMEN

SECOND FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01B

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

1 BED 1 BED

CARDIOLOGY

1 BED

DIALYSIS

DIALYSIS

OFFICE

HAC

TOILET

3426A

UNISEX

TOILET

3475A

SOILED

UTILITY

ELECTRICAL CLOSET

3487TOILET

FAC

ELECTRICAL

34E4

BACKUP

GENERATOR RM

3472C

STORAGE

3472B

STORAGE

3455A

ELECTRICAL

3495A

ELECTRICAL

3497A

VESTIBULE/

CHASE

LINEN CHUTE

ELECTRICAL

34E2

TOILET

3443A

VESTIBULE

3439ASUPPLY CLOSET

TOILET

3424A

TOILET

3428A

TOILET

3432A

STORAGE

CLOSET

3434A

TOILET

3429A

TOILET

3427A

MENS

SHOWER

3425A

ELECTRICAL CLOSET

34E1

STORAGE

3485A

FAC

TOILET

3439B

FAC

3447A

CLOSET

CORRIDOR

C3401

CORRIDOR

C3405

NUTRITION AND FOOD

KITCHEN

CORRIDOR

C3402

CORRIDOR

C3404

CORRIDOR

C3403

CORRIDOR

C3406

ELEVATOR LOBBY

ELEVATOR

ELEVATOR

ELEVATOR

P-4

FOOD SVC

AND SUPV

ELEVATOR

P-3

ELEVATOR

P-2

ELEVATOR

P-1

HAC

HAC

OXYGEN

TANKS

DRESSING

ROOM

3475B

STORAGE

3475C LOCKER ROOM

DOCTORS

OFFICE

STAIR

NO 5

RESIDENT

GROUP

DOCTORS

OFFICE

DOCTORS

OFFICE

CHIEF

ENT

DOCTORS

OFFICE

DOCTORS

OFFICE

3494A

DOCTORS

OFFICE

RESIDENT

COORD.

DOCTORS

OFFICE

3488SURGERY STAFF

SECRETARY/

COPIER

HAC

BREAK ROOM

OFFICE

OFFICE

STORAGE

MECH RM

3472A

EQUIPMENT

STORAGE

LAB

MECH RM

3466A

SUPPLY RM

RECEPTION

3461CHIEF OFFICE

3460TANK RM

3454A

STORAGE

3454BDIALYSIS

STORAGE

CARDIO

STORAGE

NON

VA MED

CARE

DIALYSIS RM

DIALYSIS

EQUIPMENT

FILE

STORAGE

SPD SUPPLY

DIALYSIS

SOLUTIONS-B

DIALYSIS

SOLUTIONS-A

STORAGE

STORAGE

MECH RM

ELEVATOR

P-7

ELEVATOR

P-8

CLINIC NUTRITION

TEL

34T1

STAIR

NO 1

DIALYSIS

WAITING

NURSE

STATION

LOCKER

3439C

LOUNGE

CRASH CART

STORAGE

OFFICE

CUBICLE

STAIR

NO 2

SUPPLY

ANALYSIS

SPD

SUPERVISOR

SYSTEM

ANALYST

STORAGE

3406 DIALYSIS

RM

SOCIAL

WORK

NURSE

MGR

OXYGEN TANKS

IV RM

MENS TOILET

LEAD TECH

HEMO DIALYSIS

DIR OFFICE

CONSL MGR

MECH RM

S-5

S-6

CORRIDOR

3468A

ROOF

ROOF

ROOF

ROOF

ELECTRICAL

CLOSET

34E4

3A

3 3

3A

3 3

4 4

B01B ED103

B01A ED103

ED103

BUILDING 01A DAMEN

THIRD FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

3.

dw g B0

1A E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

UNIT DOSE

DRUG AND SUPPLY PROCESSING

NUTRITION AND FOOD SVC

PAVILION

MGR CLINICAL

NUTRITION

MULTIPURPOSE RM

VESTIBULE/

CHASE

LINEN CHUTE

STORAGE

3535A

STORAGE

3535B

REST RM NIC

3523 TELECOM

CORRIDOR

C3502

CORRIDOR

C3503

CORRIDOR

C3505

PHARMACY

NARCOTIC VAULT NIC

SUPV

CLEAN RM

DRUG AREA

MECH RM

FREEZER

STAGING AREA

REFR-1

REFR-2

35E1

STAIR

NO 3

OFFICE /

STORAGE

CAN FOOD STORAGE

FOOD MGNT

FOOD OPER

AUTO ASSIST

3553 CALL CENTER

DIETICIAN STAFF

OFFICE

CHIEF

NUTRITION AND

FOOD SVC OFFICE

STAIR

NO 4

PATIENT DINING RM

N AND FS

SERVING KITCHEN

3560A

CORRIDOR

C3501

NUTRITION AND FOOD

CORRIDOR

C3504

CONFERENCE

ROOM

SUPV OFFICE

SUPV OFFICE

3530REFR WALK-IN

MENS

TOILET

3535C

STORAGE

REFR

3534A

REFR

REFR

FEMALE

BREAK ROOM

WOMENS

TOILET

MECH RM

HAC

STORAGE

FEC

3560B

ELECTRICAL

FEC

VESTIBULE

3595A

VESTIBULE

3520C

ALCOVE

3520B

CLOSET

3520A

ROOF

ROOF

ROOF

3 3

B01B ED103

B01A ED103

B01B ED103

n/a

B01B ED103

n/a

ED103

BUILDING 01B DAMEN

THIRD FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

3.

dw g B0

1B E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

FEC

DN UP

FEC

DNUP

UP DN

PANORAMIC RM

ELECTRICAL

CLOSET

ELECTRIC

CLOSET

44E5

MED

CLOSET

SOILED

SPD CART

HOLDING

TEL/DATA

44T2

CLEAN SUPPLY

SOILED

SPD CART

HOLDING

4405A

STORAGE

4407A

CONTROL RM

BARIATRIC

TOILET

SOILED UTILITY

NITROUS TANK

STORAGE

VESTIBULE/CHASE

4507 LINEN CHUTE

ELECTRICAL

CLOSET

ELECTRICAL

44E2

CLOSET

4447A

OLD CLOSET

4496A

ELECTRIC/

FAC CLOSET

44E4

TREATMENT BAY

4418A

CORRIDOR

C4501

CORRIDOR

C4408

CORRIDOR

C4404

CORRIDOR

C4402

CORRIDOR

C4401

PATHOLOGY

RESIDENTS

NEUROLOGY

OFFICE

NURSE

OFFICE

STAFF LOUNGE

ELEVATOR

P-7

ELEVATOR

P-8

MOVE COORD

STORAGE

ELEVATOR

LOBBY

ELEVATOR

P-1

ELEVATOR

P-2

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

S-5

ELEVATOR

S-6

MED OFFICE

LOCKER

JANITOR

CLOSET

TOILET TOILET

TOILET TOILET

PATIENT

TOILET

SURGY

MGR

RECOVERY BAY

STAIR

NO 5

SURGY

TEAM RM

PATIENT

TOILET

OFFICE

MAXILLOFACIAL- 4 MAXILLOFACIAL-3

CONE BEAM

MAXILLOFACIAL-1

MAXILLOFACIAL-2

INSTRUMENT

PREP

ORAL SURGY RM

ORAL SURGY RM

CORRIDOR

C4403

OFFICE

ENDOSCOPY-2

ENDOSCOPY-1

STORAGE

CONSULT RM

PERIODONTAL-1

PERIODONTAL-2

INSTRUMENT

PREP

CLEAN

LINEN

MECH RM

RECEPTION / ADMISSION

4427A

WAITINGWAITING

TEL

44T1

STAIR

NO 1

CORRIDOR

C4405

CORRIDOR

C4406

CORRIDOR

C4407

ORAL SURGERY-2

INSTRUMENT

PREP

HYGIENIST

OFFICE PREP

ORAL SURGERY-1

TREATMENT BAY

MECH RM

OFFICE

OFFICE

INSTRUMENT

PREP

ORAL

SURGERY-3

OFFICE

STAIR

NO 2

TREATMENT BAY

4407ALCOVE

TREATMENT BAY

HYGIENIST

STORAGE

RESIDENT

TEAM RM

CERAMICS

4401A 44E1

TREATMENT BAY

ROOF

ROOF

ROOF

ROOF

ROOF

ELECTRICAL

CLOSET

44E3

CORRIDOR4427B

STORAGE

B01B ED104

B01A ED104

ED104

BUILDING 01A DAMEN

FOURTH FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

4.

dw g B0

1A E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

PATHOLOGY &

LABORATORY

MEDICINE

LAB(PATHOLOGY)

MENS

TOILET

WOMENS

TOILET

STORAGE

4584A

FAC

4581A

VESTIBULE/CHASE

ELECTRICAL

45E1

LINEN CHUTE

CLOSET

4516A

SUPPLY

CLOSET

CORRIDOR

C4502

CORRIDOR

C4503

STAIR

NO 4

MICRO BIOLOGY LAB

4549B

MECH

4549A

MICRO BIOLOGY LAB

LAB MGR

SUPPLY

BLOOD

DRAW AREA

TEL

45T1

ELECTRICAL

45E2

STAIR

NO 3

MENS LOCKER

CONFERENCE RM

LOUNGE

STORAGE

WALK IN

REFR

STORAGE

LEAD PATHOLOGIST

PATH AND LAB

MEDICINE OFFICE

HAC

FROZEN

SECTION

ACCESSIONING

LAB

LAB

LAB

LAB

GYTOLOGY

WOMENS

LOCKER

TOILET

WOMENS

LOUNGE

4526 SUPV

OFFICE

LAB OFFICE

TOILET

PLMS SECY

OFFICE

PATHOLOGIST

OFFICE

UIC PATHOLOGISTS

AND DIRECTOR OF

OPERATIONS

OFFICE

PATHOLOGY

RESIDENTS

CLEAN

SUPPLIES

4515A

COMPRESSOR

RM

NEUROLOGY

OFFICE

WALK IN

REFR

4545A

ROOF

ROOF

ROOF

ROOF

ROOF

4543A

RESIDENTS

OFFICE

4508A

B01B ED104

B01A ED104

B01B ED104

B40 ED104-E

B01B ED104

B40 ED104-E

ED104

BUILDING 01B DAMEN

FOURTH DEMOLITION FLOOR PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

4.

dw g B0

1B E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

STORAGE

SUPPLY CLOSET

FIRE CLOSET

5447A

WOMENS

LOCKER

TOILET

5434A

TOILET

5430A

DRESSING

RM

DRESSING

RM

TOILET

5429A

TOILET

5425A

TOILET

5423A

SOILED

UTILITY

LOCKER

RM

CLEAN LINEN

TOILET

5424A

TOILET

5439A

TOILET

5433A

ELECTRICAL

PANEL

54E4SUPPLY CLOSET

ELECTRICAL

CLOSET

5412A

STORAGE

5496A

TELECOM

CLOSET

54E2

REGISTRATION

DESK

ELECTRICAL

CLOSET

54E5

CORRIDOR

C5406

CORRIDOR

C5401

CORRIDOR

C5402

CORRIDOR

C5403

CORRIDOR

C5404

CORRIDOR

5500C

MENS TOILET

GROUP RM

PROCEDURE RM

RESEARCH

OFFICE

MEDICINE

PREP

STAIR

NO 2

TEAM RM

LOCKER

WAITING

EQUIPMENT

STORAGE

EXAM RM

EXAM RM

DAY

SURGY

EXAM RM

PHARMACIST

OFFICE

TOILET

5435A

TOILET

5436A

OFFICE

PSYCHOLOGIST

EXAM RM

EXAM RM

NURSE

STATION

BREAK

RM

WAITING RM

LINEN

HAC

5440 PATIENT

EDUCATION

RM

CLEAN

SUPPLY

TOILET

WAITING AREA

OFFICE

DOCTOR

LOUNGE

HAC

5462 CLEAN LINEN

TOILET

TOILET

5458A

MENS

LOCKER

NURSE

STATION

TOILET

RECOVERY AREA

DRESSING

TOILET

STORAGE

TOILET

5482 PROCEDURE

RM-5

PROCEDURE

RM-4

SCOPE

REPROCESSING

CLEAN RM

PROCEDURE

RM-3

PROCEDURE

RM-2

SUPPLY

CLEANING RM

MECH

RM

5489PROCEDURE

RM-1

STAIR

NO 5

OFFICE

MED

ATTEND

NURSE

MGR

FELLOW

OFFICE

OFFICE

ENDO

OFFICE

ENDO

DIRECTOR

SPD

SUPPLIES

ELEVATOR

P-1

ELEVATOR

P-2

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

S-5

ELEVATOR

S-6

TEL

54T1

STAIR

NO 1

CHECK-IN

ELEVATOR

P-8

ELEVATOR

P-7

FIRE/ELECTRICAL CLOSET

5417A

SERVICE

ELEVATOR

ROOF

ROOF

ROOF

ROOF

ROOF

ELECTRICAL CLOSET

54E3

UNISEX TOILET

UNISEX TOILET

DRESS

RM

DRESS

RM

TOILET

STAFF LOCKER RM

TRAINING RM

FILE

CABINET

VESTIBULE/CHASE

TOILET

CORRIDOR

C5501

4A

3 3

3 3

4 4

4 4

4 4

B01B ED105

B01A ED105-N

B0 1A

E D

5-

N B0

1A E

D

5- S

ED105-N

BUILDING 01A DAMEN

FIFTH FLOOR DEMOLITION PLAN NORTH

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

5.

dw g B0

1A E

D

5- N

5/ 2/

:5

PM

B y

U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

SICU SUPPLY CLOSET

UNISEX

TOILET

ELECTRICAL

CLOSET

54E1

DIRTY LINEN

5400B

CLEAN LINEN

5400A

TOILET

5423A

SUPPLY CLOSET

RECEPTION

AREA

CORRIDOR

C5405

RESEARCH

OFFICE

MEDICINE

PREP

STAIR

NO 2

TEAM RM

LOCKER

5412LOUNGE

TREATMENT BED-5

TREATMENT BED-4

TREATMENT BED-3

TREATMENT BED-2

TREATMENT BED-1

TOILET

5406A

WAITING

EQUIPMENT

STORAGE

EXAM RM

EXAM RM

DAY

SURGY

EXAM RM

PHARMACIST

OFFICE

TOILET

5435A

FIRE/ELECTRICAL CLOSET

5417A

ROOF

13 13

4 4

4 4

4 4

B01B ED105

B01A ED105-N

B0 1A

E D

5-

N B0

1A E

D

5- S

ED105-N

BUILDING 01A DAMEN

FIFTH FLOOR DEMOLITION PLAN SOUTH

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

5.

dw g B0

1A E

D

5- S

5/ 2/

:5

PM

B y

U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

ELECTRICAL

55E1

FIRE

CLOSET

ELECTRICAL

55E2

ROOF

ROOF

ROOF

ROOF

FEC

FEC

FEC

FEC

JANITOR

CLOSET

EMS

UPS

5560A

EQUIP

5524A

ADA

TOILET

5524B

CLOSET

5558B

WORK

RM

ECHO

PROCEDURE

RM

ECHO

PROCEDURE

RM

ECHO

PROCEDURE

RM

HOLTER

READING

STERILE

SUPPLY

LINEN

DOCTOR

OFFICE

DOCTOR

OFFICE

ECHO

READING

RM

DOCTOR

OFFICE

EKG

STRESS

LAB

STRESS

ECHO LAB

CONSULT

ELECTRICAL

CLOSET

5520A

CHIEF

CARDIOLOGY

OFFICE

DOCTOR OFFICE

UNISEX TOILET

TRAINING RM

FILE

CABINET

VESTIBULE/CHASE

EP ATTENDING

SUB

WAITING

NURSE

MANAGER

FELLOWS

OFFICE

SOILED UTILITY

INVENTORY

MGR.

TECH

OFFICE

JANITORS

CLOSET

RECOVERY

RECOVERY

RECOVERY

RECOVERY

TOILET

5549A

ADA

TOILET

5547 DRESS RM

5549B

DRESS RM

5549D

STAIR

NO 4

VIEWING

ALCOVE

LEAD VEST

STORAGE

5553 EQUIP

5555A

EP LAB

CONTROL

OBSERVATION

CATH LAB

CATH

EQUIP

5551A

STERILE

STORAGE

TEE

STORAGE

5546A

SOILED

WORK TEE

TEE

STORAGE

5544B

MEDS/NOURISH

5544A

NURSE

STATION

LAB NURSE

5542NURSE

MGR

ELECTRICAL

55E3

STAIR

NO 3

CORRIDOR

C5503

CORRIDOR

CORRIDOR

C5506

CORRIDOR

C5504

CORRIDOR

C5502

UNISEX

LOCKERS

CORRIDOR

C5507

CLEAN LINEN

STORAGE

STAFF LOUNGE

5564 TOILET

5563A

BED RM-6

BED RM-5

CORRIDOR

C5508

TOILET-4

5568A

TOILET-5

5565A

BED RM-4

BED RM-3

5569SOILED

LINEN

TOILET-1

5570A

BED RM-1

BED RM-2

TOILET-2

5571A

TOILET-3

5569A

FEC

FEC

C5505

CHASE

13 5 4

2313 4

13 23

4 4 4

4 4 44 4 4

B01B ED105

B01A ED105-N

B01B ED105

B40 ED105-E

B01B ED105

B40 ED105-E

ED105

BUILDING 01B DAMEN

FIFTH FLOOR DEMOLITION PLAN

03/09/2020

ISSUED FOR BID AND

CONSTRUCTION

ISSUED FOR BID AND CONSTRUCTION 03/09/2020

B01B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

6/

/2

:3 9:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins

Nurse Call Jesse Brown VAMC

Chicago, IL

537-19-124

Project Director

Revisions: Date:

1/8"=1'-0"

4' 8'0 16'

Keyplan:

© 2020 Virtual Energy Solutions, Inc.

M :\E ng in ee rin g\ Pr oj ec ts \1

5- M

AT

O

C -J

B N ur se

C al l 5

-1 9-

4\

Pr od uc tio n D oc um en ts

\E le ct ric al \B

E

D

5.

dw g B0

1B E

D

5/

2/

:5

PM

B y U se r

B30-S

B11A B11B B01B

B01A-N

B40-E

B40 -W

B01A-S

B30-N

B32

GENERAL SHEET NOTES :

1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL

ELECTRICAL NOTES.

2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL

DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK

TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,

LEAVING THE 120V POWER CONNECTIONS. THE EXISTING

RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING

SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE

BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.

SHOWER

AREA

LOCKER LOCKER

STORAGE

TOILET

6423A

SIMULATION LAB

SUPPLY

ATTENDING

SOIL ROOM

TOILET

6461A

TOILET

6457A

LINEN CHUTE

FAC

NURSE UNION

ELECTRICAL

64E4

TOILET

6471A

TOILET

6473A

TOILET

6477A

E E O

STORAGE

6466TOILET

6468A

TOILET

6470A

TOILET

6472A

TOILET

6476A

TOILET

6422A

TOILET

6424A

TOILET

6426A

TOILET

6430A

ELECTRICAL

CLOSET

64E1

SUPPLY

TOILET

6425A

TOILET

6427A

TOILET

6431A

ELECTRICAL

CLOSET

64E2

TOILET

6439A

TOILET

6435A

FAC

PHONE

6453A

CLOSET

6497A

CORRIDOR

C6404

GENERAL

FOREMAN EMS

OFFICE

EMS SUPV

OFFICE

ELEVATOR

P-1

ELEVATOR

P-4

ELEVATOR

P-3

ELEVATOR

P-2

ELEVATOR

ELEVATOR

ELEVATOR

LOBBY

NURSE RECRUITER

ELEVATOR

P-7

ELEVATOR

P-8

CHIEF UROLOGY

OFFICE

TEL

64T1

6469A

CORRIDOR

C6402

STORAGE

CORRIDOR

C6403 CORRIDOR

C6401

STAIR

NO 1

NURSE

OFFICE

SOCIAL

WORKER

OFFICE

RECEPTION

RECEPTION

STAIR

NO 2

OFFICE

OFFICE

6434A

STORAGE

VACANT

6482STORAGE

SINK RM

FILE

STORAGE

STORAGE

TELE MOVE

PGM OFFICE

OFFICE

HOME

TELEHEALTH

STORAGE

6462A

SAFETY

STORAGE

STORAGE

UNISEX TOILET

STAIR

NO 5

UNION…