02a1 - 537-19-124 SOW CD - Construction Plans.pdf
PDF 13 MB Posted
- Attached to
- Z1DA--537-19-124 Upgrade Nurse Call
- Solicitation number
- 36C25222B0012
About this file
This document provides details for a federal contract solicitation to replace the nurse call system at the Jesse Brown VA Medical Center in Chicago, Illinois. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 seeking bids for Project #537-19-124. Offerors are invited to submit fixed-price bids on a lump sum basis for furnishing all labor, materials, equipment, supervision, and other items required to complete the nurse call system replacement. The estimated price range for the project is $2,000,000 to $5,000,000. All work must be completed within 428 calendar days of receiving the notice to proceed. Bids are due by the date specified in solicitation number 36C25222B0012.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nurse Call Jessie Brown Veterans Administration Medical Center
Chicago, IL
Project Number: 537-19-124
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \C ov er
.d w g C
O
VE
R 5/
2/
:5
PM
B y U se r
COVER
COVER SHEET
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
1 LOCATION MAP
NTS
2 EXISTING SITE PLAN
NTS
COVER COVER SHEET
E001 SYMBOLS AND GENERAL NOTES
B01A ED101-N BUILDING 01A DAMEN FIRST FLOOR DEMOLITION PLAN NORTH
B01A ED101-S BUILDING 01A DAMEN FIRST FLOOR DEMOLITION PLAN SOUTH
B01B ED101 BUILDING 01B DAMEN FIRST FLOOR DEMOLITION PLAN
B01A ED102 BUILDING 01A DAMEN SECOND FLOOR DEMOLITION PLAN
B01B ED102 BUILDING 01B DAMEN SECOND FLOOR DEMOLITION PLAN
B01A ED103 BUILDING 01A DAMEN THIRD FLOOR DEMOLITION PLAN
B01B ED103 BUILDING 01B DAMEN THIRD FLOOR DEMOLITION PLAN
B01A ED104 BUILDING 01A DAMEN FOURTH FLOOR DEMOLITION PLAN
B01B ED104 BUILDING 01B DAMEN FOURTH DEMOLITION FLOOR PLAN
B01A ED105-N BUILDING 01A DAMEN FIFTH FLOOR DEMOLITION PLAN NORTH
B01A ED105-S BUILDING 01A DAMEN FIFTH FLOOR DEMOLITION PLAN SOUTH
B01B ED105 BUILDING 01B DAMEN FIFTH FLOOR DEMOLITION PLAN
B01A ED106-N BUILDING 01A DAMEN SIXTH FLOOR DEMOLITION PLAN NORTH
B01A ED106-S BUILDING 01A DAMEN SIXTH FLOOR DEMOLITION PLAN SOUTH
B01B ED106 BUILDING 01B DAMEN SIXTH DEMOLITION FLOOR PLAN
B01A ED107-N BUILDING 01A DAMEN SEVENTH FLOOR DEMOLITION PLAN NORTH
B01A ED107-S BUILDING 01A DAMEN SEVENTH FLOOR DEMOLITION PLAN SOUTH
B01B ED107 BUILDING 01B DAMEN SEVENTH DEMOLITION FLOOR PLAN
B01A ED108 BUILDING 01A DAMEN EIGHTH FLOOR DEMOLITION PLAN
B01B ED108 BUILDING 01B DAMEN EIGHTH DEMOLITION FLOOR PLAN
B01A ED109-N BUILDING 01A DAMEN NINTH FLOOR DEMOLITION PLAN NORTH
B01A ED109-S BUILDING 01A DAMEN NINTH FLOOR DEMOLITION PLAN SOUTH
B01B ED109 BUILDING 01B DAMEN NINTH DEMOLITION FLOOR PLAN
B01A ED110 BUILDING 01A DAMEN TENTH FLOOR DEMOLITION PLAN
B11A ED101 BUILDING 11A TAYLOR FIRST FLOOR DEMOLITION PLAN
B11B ED101 BUILDING 11B OGDEN FIRST FLOOR DEMOLITION PLAN
B11A ED102 BUILDING 11A TAYLOR SECOND FLOOR DEMOLITION PLAN
B11B ED102 BUILDING 11B OGDEN SECOND DEMOLITION FLOOR PLAN
B11A ED103 BUILDING 11A TAYLOR THIRD FLOOR DEMOLITION PLAN
B11B ED103 BUILDING 11B OGDEN THIRD FLOOR DEMOLITION PLAN
B11A ED104 BUILDING 11A TAYLOR FOURTH FLOOR DEMOLITION PLAN
B11B ED104 BUILDING 11B OGDEN FOURTH DEMOLITION FLOOR PLAN
B11A ED105 BUILDING 11A TAYLOR FIFTH FLOOR DEMOLITION PLAN
B11B ED105 BUILDING 11B OGDEN FIFTH FLOOR DEMOLITION PLAN
B11A ED106 BUILDING 11A TAYLOR SIXTH FLOOR DEMOLITION PLAN
B11B ED106 BUILDING 11B OGDEN SIXTH FLOOR DEMOLITION PLAN
B11A ED107 BUILDING 11A OGDEN SEVENTH DEMOLITION FLOOR PLAN
B30 ED101-S BUILDING 30 ATRIUM FIRST FLOOR DEMOLITION PLAN - SOUTH
B30 ED101-N BUILDING 30 ATRIUM FIRST FLOOR DEMOLITION PLAN - NORTH
B32 ED101 BUILDING 32 FIRST FLOOR DEMOLITION PLAN
B40 ED101-E BUILDING 40 BED TOWER FIRST FLOOR DEMOLITION PLAN - EAST
B40 ED101-W BUILDING 40 BED TOWER FIRST FLOOR DEMOLITION PLAN - WEST
B40 ED102-E BUILDING 40 BED TOWER SECOND FLOOR DEMOLITION PLAN - EAST
B40 ED102-W BUILDING 40 BED TOWER SECOND FLOOR DEMOLITION PLAN - WEST
B40 ED104-E BUILDING 40 BED TOWER FOURTH FLOOR DEMOLITION PLAN - EAST
B40 ED104-W BUILDING 40 BED TOWER FOURTH FLOOR DEMOLITION PLAN - WEST
B40 ED105-E BUILDING 40 BED TOWER FIFTH FLOOR DEMOLITION PLAN - EAST
B40 ED105-W BUILDING 40 BED TOWER FIFTH FLOOR DEMOLITION PLAN - WEST
B40 ED106-E BUILDING 40 BED TOWER SIXTH FLOOR DEMOLITION PLAN - EAST
B40 ED106-W BUILDING 40 BED TOWER SIXTH FLOOR DEMOLITION PLAN - WEST
B40 ED107-E BUILDING 40 BED TOWER SEVENTH FLOOR DEMOLITION PLAN - EAST
B40 ED107-W BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - WEST
B01A EY101-N BUILDING 01A DAMEN FIRST FLOOR PLAN NORTH
B01A EY101-S BUILDING 01A DAMEN FIRST FLOOR PLAN SOUTH
B01B EY101 BUILDING 01B DAMEN FIRST FLOOR PLAN
B01A EY102 BUILDING 01A DAMEN SECOND FLOOR PLAN
B01B EY102 BUILDING 01B DAMEN SECOND FLOOR PLAN
B01A EY103 BUILDING 01A DAMEN THIRD FLOOR PLAN
B01B EY103 BUILDING 01B DAMEN THIRD FLOOR PLAN
B01A EY104 BUILDING 01A DAMEN FOURTH FLOOR PLAN
B01B EY104 BUILDING 01B DAMEN FOURTH FLOOR PLAN
B01A EY105-N BUILDING 01A DAMEN FIFTH FLOOR PLAN NORTH
B01A EY105-S BUILDING 01A DAMEN FIFTH FLOOR PLAN SOUTH
B01B EY105 BUILDING 01B DAMEN FIFTH FLOOR PLAN
B01A EY106-N BUILDING 01A DAMEN SIXTH FLOOR PLAN NORTH
B01A EY106-S BUILDING 01A DAMEN SIXTH FLOOR PLAN SOUTH
B01B EY106 BUILDING 01B DAMEN SIXTH FLOOR PLAN
B01A EY107-N BUILDING 01A DAMEN SEVENTH FLOOR PLAN NORTH
B01A EY107-S BUILDING 01A DAMEN SEVENTH FLOOR PLAN SOUTH
B01B EY107 BUILDING 01B DAMEN SEVENTH FLOOR PLAN
B01A EY108-N BUILDING 01A DAMEN EIGHTH FLOOR PLAN - NORTH
B01A EY108-S BUILDING 01A DAMEN EIGHTH FLOOR PLAN - SOUTH
B01B EY108 BUILDING 01B DAMEN EIGHTH FLOOR PLAN
B01A EY109-N BUILDING 01A DAMEN NINTH FLOOR PLAN NORTH
B01A EY109-S BUILDING 01A DAMEN NINTH FLOOR PLAN SOUTH
B01B EY109 BUILDING 01B DAMEN NINTH FLOOR PLAN
B01A EY110 BUILDING 01A DAMEN TENTH FLOOR PLAN
B11A EY101 BUILDING 11A TAYLOR FIRST FLOOR PLAN
B11B EY101 BUILDING 11B OGDEN FIRST FLOOR PLAN
B11A EY102 BUILDING 11A TAYLOR SECOND FLOOR PLAN
B11B EY102 BUILDING 11B OGDEN SECOND FLOOR PLAN
B11A EY103 BUILDING 11A TAYLOR THIRD FLOOR PLAN
B11B EY103 BUILDING 11B OGDEN THIRD FLOOR PLAN
B11A EY104 BUILDING 11A TAYLOR FOURTH FLOOR PLAN
B11B EY104 BUILDING 11B OGDEN FOURTH FLOOR PLAN
B11A EY105 BUILDING 11A TAYLOR FIFTH FLOOR PLAN
B11B EY105 BUILDING 11B OGDEN FIFTH FLOOR PLAN
B11A EY106 BUILDING 11A TAYLOR SIXTH FLOOR PLAN
B11B EY106 BUILDING 11B OGDEN SIXTH FLOOR PLAN
B11A EY107 BUILDING 11A TAYLOR SEVENTH FLOOR PLAN
B30 EY101-S BUILDING 30 ATRIUM FIRST FLOOR PLAN - SOUTH
B30 EY101-N BUILDING 30 ATRIUM FIRST FLOOR PLAN - NORTH
B32 EY101 BUILDING 32 FIRST FLOOR PLAN
B40 EY101-E BUILDING 40 BED TOWER FIRST FLOOR PLAN - EAST
B40 EY101-W BUILDING 40 BED TOWER FIRST FLOOR PLAN - WEST
B40 EY102-E BUILDING 40 BED TOWER SECOND FLOOR PLAN - EAST
B40 EY102-W BUILDING 40 BED TOWER SECOND FLOOR PLAN - WEST
B40 EY104-E BUILDING 40 BED TOWER FOURTH FLOOR PLAN - EAST
B40 EY104-W BUILDING 40 BED TOWER FOURTH FLOOR PLAN - WEST
B40 EY105-E BUILDING 40 BED TOWER FIFTH FLOOR PLAN - EAST
B40 EY105-W BUILDING 40 BED TOWER FIFTH FLOOR PLAN - WEST
B40 EY106-E BUILDING 40 BED TOWER SIXTH FLOOR PLAN - EAST
B40 EY106-W BUILDING 40 BED TOWER SIXTH FLOOR PLAN - WEST
B40 EY107-E BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - EAST
B40 EY107-W BUILDING 40 BED TOWER SEVENTH FLOOR PLAN - WEST
E501 BACKBONE CABLING RISER
SHEET INDEX
RECEPTACLES
STANDARD RECEPTACLE
CEILING MOUNTED RECEPTACLES (W / CIRCLE)
FLOOR MOUNTED RECEPTACLES (W / SQUARE)
WALL MOUNTED RECEPTACLES (W / STEM)
INSTALL LEVEL WITH FINISHED CEILING.
DUPLEX
DUPLEX
DOUBLE
MOUNTING HEIGHT 1'-6"
SUPPORT TO STRUCTURE.
GENERAL BRANCH CIRCUIT NOTES
171'-250' IN LENGTH: 6#8,1#8G,1"C
101'-170' IN LENGTH: 6#10,1#10G,3/4"C
0'-100' IN LENGTH: 6#12,1#12G,3/4"C
C) THREE (3) BRANCH CIRCUITS PER HOMERUN-
171'-250' IN LENGTH: 4#8,1#8G,3/4"C
101'-170' IN LENGTH: 4#10,1#10G,3/4"C
0'-100' IN LENGTH: 4#12,1#12G,3/4"C
B) TWO (2) BRANCH CIRCUITS PER HOMERUN-
CONNECTED TO 208Y/120 VOLT SYSTEMS SHALL BE, U.N.O.:
BRANCH CIRCUIT WIRING FOR 20 AMP, 120 VOLT CIRCUITS
BRANCH CIRCUITS SHALL BE CONNECTED TO 20A,1P CB'S, U.N.O.1.
2.
171'-250' IN LENGTH: 2#8,1#8G,3/4"C
101'-170' IN LENGTH: 2#10,1#10G,3/4"C
0'-100' IN LENGTH: 2#12,1#12G,3/4"C
A) ONE (1) BRANCH CIRCUIT PER HOMERUN-
PROVIDE A DEDICATED NEUTRAL WITH EACH BRANCH CIRCUIT.3.
PROVIDE AN INSULATED GROUND WIRE WITH EACH CIRCUIT.4.
ABOVE COUNTER
ABOVE FINISHED FLOOR
CIRCUIT BREAKER
CIRCUIT
DISCONNECT
DOWN
EXISTING TO REMAIN
EXISTING TO BE RELOCATED
GROUND FAULT INTERRUPTER
GROUND
JUNCTION BOX
NOT TO SCALE
PANEL
ABBREVIATIONS
AC
AFF
CB
CCT
DISC
DN
EX
EXR
GFI
GRD
JB
NTS
PNL
CRITICAL POWERCR
NURSE CALLNC
NURSE CALL SYMBOLS
PULL CORD STATION3
THE ENTIRE NURSE CALL SYSTEM SHALL BE INSTALLED IN
RACEWAY (3/4" MINIMUM) WITHIN WALLS AND CEILINGS.
SINGLE PATIENT STATION
1 3 GANG JUNCTION BOX
2-1/2" DEEP WITH 3 GANG RING
1900 BOX
2-1/2" DEEP WITH 1 GANG RING
PULL CORD STATION3A 1900 BOX
2-1/2" DEEP WITH 1 GANG RINGWITH AUDIO
CORRIDOR LIGHT - 4 POSITION4 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
NURSE ANNUNCIATOR5 1900 BOX
2-1/2" DEEP WITH 1 GANG RINGCONSOLE
6 NURSE CALL HEAD END
WALL MOUNTED CABINET
DUTY STATION9 3 GANG JUNCTION BOX
2-1/2" DEEP WITH 3 GANG RING
2-JACK AUXILIARY STATION12 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
PUSH FOR HELP STATION13 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
37 PIN BED RECEPTACLE15 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
STAFF TERMINAL STATION16 3 GANG JUNCTION BOX
2-1/2" DEEP WITH 3 GANG RING
STAFF ASSIST / CODE STATION23 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
CORRIDOR ZONE LIGHT7 1900 BOX
2-1/2" DEEP WITH 1 GANG RING
WITH BOTH PUSH FOR HELP
AND CODE BLUE STATION
1. PROVIDE RACEWAY, 120V POWER, AND GROUNDING FOR
THE NURSE CALL SYSTEM.
2. FEEDER AND BRANCH CIRCUIT WIRING SHALL BE SIZED
FOR A MAXIMUM 5% VOLTAGE DROP TOTAL. UPSIZE
FEEDER AND BRANCH CIRCUIT WIRING AS REQUIRED FOR
RUN LENGTH IN THE FIELD.
3. THE NURSE SYSTEM SHALL BE INSTALLED IN A COMPLETE
AND SEPARATE DEDICATED RACEWAY SYSTEM WITHIN
4. THESE DRAWINGS ARE DIAGRAMMATICAL IN NATURE,
AND INDICATE THE GENERAL ARRANGEMENT OF
EQUIPMENT, BUT ACCURACY IS NOT GUARANTEED. FIELD
VERIFICATION OF LOCATIONS AND DIMENSIONS MAY BE
REQUIRED.
5. THESE DRAWINGS WILL NOT SHOW ALL INSTALLATION
DETAILS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO MAKE A COMPLETE AND SATISFACTORY
INSTALLATION IN ACCORDANCE WITH NECA 1 AND
MODERN PRACTICE METHODS.
6. EQUIPMENT DIMENSIONS SHOWN ON PLANS AND
ELEVATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR
SHALL USE THE SHOP DRAWINGS FOR PROPER LAYOUT,
FOR FINAL INSTALLATION, WITHOUT ANY ADDITIONAL
COST TO THE OWNER.
7. ELECTRICAL CONTRACTOR SHALL MAKE THEIR OWN
COUNT OF ALL EQUIPMENT TO BE WIRED BASED ON
PLANS AND SPECIFICATIONS.
8. ALL NEW CIRCUITS SHALL BE RUN WITH DEDICATED
NEUTRALS PER 2014 NEC 200.4. SHARED NEUTRALS ARE
NOT ALLOWED.
9. PROVIDE AN INSULATED GROUND WIRE WITH ALL
CIRCUITS.
10. LABEL EACH RECEPTACLE WITH THE PANEL NAME AND
CIRCUIT NUMBER SERVING THEM.
11. ALL NEW RECEPTACLES CONNECTED TO CRITICAL
POWER SHALL HAVE RED BODIES AND COVER PLATES.
GENERAL NOTES
12. NURSE CALL DEVICES ARE SHOWN AS SEEN IN THE
FIELD, VIA SITE VISITS, AND EXISTING AS BUILT DRAWINGS.
THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF
EACH DEVICE IN THE FIELD, PRIOR TO ROUGH-IN.
WALLS AND SOLID CEILINGS. RUN CABLING ACROSS J-HOOKS
WITHIN ACCESSIBLE CORRIDOR CEILING SPACES.
1. PROVIDE A CAT 5E CABLE AND #14 AWG FOR POWER FROM THE
NETWORK NURSE CALL DEVICE CABLING
CONTROL CABINET(S), TO THE FIRST DONE LIGHT, THEN CAT 5E
SHALL BE DAISY CHANGED BETWEEN SUBSEQUENT DOME
LIGHTS AND DOMELESS INTERFACE. MAXIMUM OF FOUR (4)
DOMES PER HOMERUN.
2. PROVIDE A CAT 5E CABLE FROM THE DOME LIGHT OR DOME
INTERFACE MODULES TO THE PATIENT STATION, STAFF AND/OR
DUTY STATION.
3. PROVIDE A CAT 5E CABLE FROM THE DOME LIGHT OR DOME
INTERFACE MODULES TO THE AUXILIARY JACK, PULL CORD,
CODE BLUE, OR DUAL PUSHBUTTON STATION.
4. PROVIDE A CAT 5E CABLE FROM THE INPUT MODULE INPUTS TO
THE CONTACT CLOSURE.
5. PROVIDE A CAT 5E CABLE FROM THE PATIENT STATION TO THE
FEATURE BED MODULE.
6. PROVIDE A CAT 5E CABLE FROM A POE NETWORK SWITCH IN
TELECOM CLOSETS TO THE ANNUNCIATOR CONSOLE.
7. PROVIDE A CAT 5E CABLE FROM A POE NETWORK SWITCH IN
TELECOM CLOSETS TO THE STAFF TERMINAL STATION.
PHASE 1 = BUILDING 40 (BED TOWER)
PHASING
PHASE 2 = BUILDINGS 1A/1B (DAMEN PAVILION) & 30 (ATRIUM)
PHASE 3 = BUILDINGS 11A/1B (TAYLOR/OGDEN) & 32 (TEMPORARY)
IN CORRIDORS, NO MORE THAN TWO (2) CEILING TILES SHALL BE
CONTRACTOR WORK PHASING STRATEGY
REMOVED AT A TIME AND A J-HOOK SHALL BE PROVIDED AT EACH
2-TILE SECTION. CABLING SHALL BE RUN A MAXIMUM OF TWO (2)
EACH CORRIDOR AREA WILL BE CLEANED BEFORE MOVING TO
THE NEW AREA, UNLESS OTHERWISE SPECIFIED AND REQUIRED
BY THE VA JESSE BROWN MEDICAL CENTER. SURROUNDING
AREAS SHALL NOT BE AFFECTED. ONLY THE AREAS DIRECTLY
UNDERNEATH THE SPECIFIC AREA WHERE TILES ARE BEING
THE BUILDING SYSTEMS SHALL REMAIN IN FULL OPERATION AT
ALL TIMES.
REMOVED WILL BE AFFECTED.
CEILING TILES AT A TIME.
IN INDIVIDUAL ROOMS, THE NEW NURSE CALL SYSTEM DEVICE(S)
WILL BE INSTALLED ON A ROOM BY ROOM BASIS. THE EXISTING
DEVICE SHALL NOT BE REMOVED, UNTIL A NEW DEVICE IS
READY FOR INSTALLATION.
THE NEW NURSE CALL SYSTEM WILL WORK SIMULTANEOUSLY
WITH THE EXISTING SYSTEM. THE EXISTING SYSTEM IN EACH
COORDINATION WILL NEED TO TAKE PLACE EACH WEEK TO
GATHER WHAT ROOMS ARE GOING TO BE WORKED ON EACH
SPECIFIC DAY FOR THE STAFF'S KNOWLEDGE. AS NEW DEVICES
AREA SHALL NOT BE REMOVED UNTIL THE NEW DEVICES ARE
CONNECTED TO THE NEW SYSTEM AND IS OPERATIONAL.
ARE INSTALLED IN A ROOM, THE OLD DEVICES SHALL BE REMOVED.
ONCE THE AREA HAS ALL OF THE EXISTING DEVICES REMOVED
BACK TO THEIR RESPECTIVE HEADEND(S), THE EXISTING
HEADENDS CAN BE REMOVED AND ALL THAT WILL BE LEFT WILL
BE THE NEW SYSTEM.
IN BUILDING 40, A MAXIMUM OF FOUR (4) PATIENT ROOMS WILL
BE DOWN AT ANY ONE TIME. COORDINATE WILL NEED TO TAKE
IS A FLOOR IN THE BED TOWER BEING UNDERUTILIZED AND
THESE ROOMS CAN BE TEMPORARILY USED, IF NECESSARY.
THE PER UNIT SEQUENCE OF INSTALLATION EVENTS ARE AS
PLACE SO THE STAFF CAN PROVIDE FOUR (4) BEDS IN A
DIFFERENT AREA/FLOOR, IF NECESSARY. CURRENTLY, THERE
FOLLOWS:
1) CONNECTION OF THE SERVER TO THE VA NETWORK, THE PC
WORKSTATIONS, AND THE NURSE CALL SYSTEM SHALL
OCCUR AT THE BEGINNING OF EACH PROJECT PHASE.
2) ROUGH-IN THE NURSE CALL SYSTEM NURSE CALL SYSTEM
POWER, 5 L-NET CABLING AND CONSOLE WIRING.
3) INSTALL THE HEAD END AND CONSOLE AND CONNECT TO THE
NEW POWER. PROGRAMMING SHALL TAKE PLACE.
THE NURSE CALL ANNUNCIATOR CONSOLE WILL REQUIRE
TEMPORARY INSTALLATION AT THE NURSES STATIONS UNTIL
ALL THE DEVCIES ON THE OLD SYSTEM HAVE BEEN REPLACED.
4) REMOVE OLD DEVICES AND CABLING AND INSTALL NEW
DEVICES AND CABLING ROOM BY ROOM. IN BUILDING 40,
THE MAXIMUM SHALL BE FOUR (4) PATIENT ROOMS AT A TIME.
THE REQUIRED ON-SITE TRAINING FOR THE STAFF WILL TAKE
PLACE, PRIOR TO THE INSTALLATION OF THE NEW SYSTEM.
ALL EXISTING NURSE CALL DEVICES AND HEADEND EQUIPMENT
WILL BE REMOVED AND RETURNED TO THE OWNER. EXISTING
WIRING WILL BE REMOVED. ALL EXISTING BOXES WILL BE
NEW RACEWAY REQUIRED FOR NON-HEADWALL DEVICES MAY
BE RUN IN SURFACE MOUNTED WIREMOLD TO DECREASE ANY
ISSUE WITH DUST AND INFECTION CONTROL.
REUSED WHERE AN EXISTING DEVICE IS TO BE REPLACED. IF THE
EXISTING BACKBOX DOES NOT MEET THE REQUIREMENT OF THE
NURSE CALL VENDOR, THEN THE ELECTRICAL CONTRACTOR SHALL
PROVIDE THE NEW CORRECT BACKBOX AS SPECIFIED BY THE
SPECIFIC VENDOR.
EXISTING SYSTEMS INTERFACE
EXISTING TV INTERFACE:
EACH EXISTING ROOM WHERE THE TV WAS ONCE CONNECTED
TO THE EXISTING NURSE CALL SYSTEM, WILL BE CONNECTED TO
THE NEW NURSE CALL SYSTEM AND NEW FEATURE BED
INTERFACE COMPONENTS WHERE APPLICABLE.
EXISTING LIGHT CONTROL INTERFACE:
EACH EXISTING PATIENT ROOM THAT UTILIZES EXISTING LIGHT
CONTROLLERS CONNECTED TO EXISTING LIGHTS, WILL BE
REUSED WITH THE NEW NURSE CALL SYSTEM AND NEW
FEATURE BED INTERFACE COMPONENTS.
EXISTING FEATURE BED INTERFACE
EACH EXISTING ROOM WHERE THE FEATURE BEDS ARE
CURRENTLY CONNECTED TO THE EXISTING 37-PIN BED
RECEPTACLE, UP-LIGHT, DOWN-LIGHT AND TV WILL BE
RECONNECTED TO A NEW 37-PIN WALL RECEPTACLE. THE
NURSE CALL INTERFACE, UP-LIGHT, DOWN-LIGHT AND TV
CONTROLS WILL FUNCTION WITH THE NEW RECEPTACLE AND
NURSE CALL SYSTEM. THE EXISTING FEATURE BED WITH
FEATURE BED-TO-WALL CABLE WILL BE RECONNECTED TO THE
NEW 37-PIN WALL RECEPTACLE.
EXISTING OVERHEAD PAGING INTERFACE
EACH EXISTING UNIT THAT CURRENTLY UTILIZES OVERHEAD
PAGING THROUGH THE NURSE CALL SYSTEM WILL HAVE AN
INTERFACE TO THE SYSTEM THROUGH THE LOCAL PAGING
AMPLIFIERS. EXISTING UNITS WITH NO PAGING SYSTEM WILL
NOT RECEIVE ANY NEW INTERFACE TO A PAGING SYSTEM
WHICH DOES NOT EXIST.
SIP SERVER SOFTWARE
NURSE CALL SIP SERVER SOFTWARE IS TO BE INCLUDED FOR
TELEPHONY INTEGRATIONS. THIS SIP SERVER PERFORMS AS A
REGISTRAR AND PROXY FOR THE AUDIO NURSE CALL COMPONENTS
OF THE SYSTEM SUCH AS PATIENT STATIONS, AUDIO BATH
STATIONS, ANNUNCIATORS AND STAFF STATIONS. THE SIP SERVER
CAN ALSO BE USED TO CONNECT TO A TELEPHONE SYSTEM'S SIP
SERVER WHERE THE PHONES/DEVICES ARE REGISTERED. THE
TELEPHONE SYSTEM'S SIP SERVER CREATES A "SIP TRUNK" TO THE
NURSE CALLS SIP SERVER. A DEDICATED STANDALONE SERVER IS
REQUIRED FOR THE SIP SERVER SOFTWARE AND SHALL BE
PROVIDED BY THE VENDOR AND ASSOCIATED CONTRACTOR. THE
SIP SERVER SHOULD ALWAYS BE INSTALLED ON A STANDALONE
SERVER.
E001
SYMBOLS AND
GENERAL NOTES
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \E
1.
dw g
E0
5/ 2/
:5
PM
B y
U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
COMPENSATION
AND PENSION
ROLLING SHUTTER
OVER HEAD DOOR
LOUVER
FEC
HAC
STORAGE
FIRE
CLOSET
PNEUMATIC
TUBE
FAC
FAC
TEL
FIRE
HOSE
11E1
RADIOLOGY
SCHEDULING
ELEVATOR
NO S5
ELEVATOR
NO S6
ELEVATOR
NO P1
ELEVATOR
NO P2
CORRIDOR
C1404
TOILET
1491A
CORRIDOR
C1401
CORRIDOR
C1403
CORRIDOR
C1402
CORRIDOR
C1405
CORRIDOR
C1407
CORRIDOR
C1406
CORRIDOR
C1409
CORRIDOR
C1445
OPTICAL
DISPENSARY
1410A
ELECTRICAL
SWITCH RM
14E2
ADDICTION
CONSULT
RM
RECEPTION
CONSULT
RM
PATIENT
ADVOCATE
1459A
E D OFFICE
ELECTRICAL
14E3
DECENDENT
AFFAIRS
CONSULT
RM
HAC
TOILET
1446 TEL
14T1
VESTIBULE/STAIR
STAIR
NO 2
PAC
CO-ORDR
OFFICE
CHIEF
CONSULT
RM
CONSULT
RM
CONSULT
RM
EMS
HOUSE
KEEPING
ELEVATOR
NO P7
ELEVATOR
NO P8
TEL
CLOSET
14T2
14E4
STAIR
NO 1
ELEVATOR
NO P3
ELEVATOR
NO P4
NURSE STATION EMERGENCY RM
EQUIP STORAGE
LOUNGE
ELECTRICAL
14E6
COMM
14T3
BEREAVEMENT
RM
1475A
SOILED
UTILITY
EXAM RM-7
1470G
EXAM RM-6
1470F
EXAM RM-5
1470E
EXAM RM-4
1470D
EXAM RM-3
1470C
EXAM RM-2
1470B
E D MGR
CFD SUPPLY
EXAM RM-1
1470A
ER HALLWAY
EMS STORAGE
1431A
ER STORAGE
1431B
TRIAGE
E D ATTENDING
TRIAGE
MEDICAL
SUPPORT
SUPERV
1431C
VAM NURSE
MNGR.
TOILET
VESTIBULE
C1408
GARAGE
LIFT
EQUIP.
CLEAN
SUPPLY
CLEAN
LINEN
TOILET
NEGATIVE
PRESSURE
RM
EXAM RM-15
1470R
EXAM RM-14
1470Q
EXAM RM-13
1470P
EXAM RM-12
1470N
EXAM RM-11
1470M
PARAMEDIC RM
1470L
MEDS
1470H
EXAM RM-8
1470J
EXAM RM-9
1470K
MENS
TOILET
CONFERENCE RM
WOMENS
TOILET
TOILET
ON CALL
ADMIN OFFICE
EXAM RM
ON CALL
1491B
STAIR
EXAM
RM
EXAM RM
EXAM RM
DONATED
CLOTHING
1508 EMS LINEN RM
CORRIDOR
C1501
PHARMACY IV
STORAGE
BIOHAZARD
CONTAINER
GAS
STORAGE
1503 ELEVATOR
MECH
ELEVATOR
FOYER
MORGUE
ELEVATOR
STAIR
NO 5 TELECOMMUNICATION RM
14T4
ELECTRICAL
14E7
TOILET
1499A
DOCTOR
OFFICE
DOCTOR
OFFICE
DOCTOR
OFFICE
SECRET
OFFICE
STORAGE
COMP AND
PENS STAFF
WAITING RM
SUPV OFFICE
EXAM RM
DOCTOR
OFFICE
DOCTOR
OFFICE
MECH RM
VESTIBULE
CORRIDOR
C1505
CORRIDOR
C1504
ELECTRICAL
1541B
SUPPLY
CORRIDOR
C1502
HAC
CORRIDOR
C1503
GAS CYLINDER
STORAGE
CORRIDOR
CORRIDOR
VESTIBULE
ELECTRICAL
CLOSET
OPTICAL
WAITING RM
CORRIDOR
C1505
1499B
1490A M1
NO 5A
1436A
NO 2
1410B
C1404
C1404
ELECTRIC
CLOSET
14E5
3 3
4 4 4 4
13 13 13
4A
13 13 13 13 13 13
13 13 13 13 13
4 4 4 4
B01B ED101 - 1
B01A ED101-NB30 ED101-S
B0 1A
E D
1-
N
B0 1B
E D
- 2
B01B ED101 - 2
B3
ED
1- S
B01
B FLO
ORS ABOVE O
VERLA
P BUILD
IN
G 30
ED101-N
BUILDING 01A DAMEN
FIRST FLOOR DEMOLITION PLAN NORTH
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
1.
dw g B0
1A E
D
1- N
5/ 2/
:5
PM
B y
U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
WHERE DEVICES ARE NOT BEING REPLACED, PROVIDE A
BLANK COVER PLATE OVER THE JUNCTION BOX.
ROLLING SHUTTER ROLLING SHUTTER
FAC
OGY
ICE
ICS
PLY RM
RY RM
TOILET
ELECTRICAL
CLEAN SUPPLY
CORRIDOR
C1102
ENTRANCE
C1101
CORRIDOR
C1445
WAITING RM
WOMENS
TOILET
MENS TOILET
HEALTH VET
CO-ORDR
CREDIT
UNION
FIRE
CONTROL
PATIENT
ADVOCATE
OFFICE
OPTICAL
DISPENSARY
1410A
TRIAGE
TRIAGE
ELECTRICAL
SWITCH RM
14E2
TRIAGE
ED PHYSICIAN
1414ELECTRICAL
14E1
CONSULT
RM
HAC
TOILET
1446 TEL
14T1
VESTIBULE/STAIR
STAIR
NO 2
PAC
CO-ORDR
OFFICE
CHIEF
ER HALLWAY
TRAVEL PAY
STORAGE
RECEPTION AND
ADMISSION
AMBULATORY
CARE SUPV
OFFICE
CHIEF
AMBULATORY
CORRIDOR
C1411
MANAGER
EMS STORAGE
1431A
ER STORAGE
1431B
TRIAGE
E D ATTENDING
TRIAGE
MEDICAL
SUPPORT
SUPERV
1431C
VAM NURSE
MNGR.
TOILET
VESTIBULE
C1408
GARAGE
LIFT
EQUIP.
CLEAN
SUPPLY
VESTIBULE
ENTRANCE/LOBBY
C1103
ELECTRICAL
1541B
CORRIDOR
OPTICAL
WAITING RM
C1505
NO 2
1410B
B01B ED101 - 1
B01A ED101-NB30 ED101-S
B0 1A
E D
1-
N
B01B ED101 - 2
B3
ED
1- S
1S
T FLO
OR D
EMO O
N B30
ED10
1-N
THIS AREA O
NLY
B01
B FLO
ORS ABOVE O
VERLA
P BUILD
IN
G 30
B3
ED
1- S
B3
ED
1- N
ED101-S
BUILDING 01A DAMEN
FIRST FLOOR DEMOLITION PLAN SOUTH
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
1.
dw g B0
1A E
D
1- S
5/ 2/
:5
PM
B y
U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
LOUVER
1540 - 49
RADIOLOGY
COURTYARD
CLOSET
CLOSET
1541A
FAC
1575B
CLOSET
1545B
DIGITAL RADIOLOGY
CORRIDOR
C1511
PREP/
RECOVERY
VESTIBULE
C1507
POLICE
OPERATION
CORRIDOR
C1510
CORRIDOR
C1505
ARMORY RM
TOILET
STORAGE
1554B
SQUAD RM OFFICE
DETECTIVE
1540B
DETECTIVE
1540A
EVIDENCE
STORAGE
1542AEVIDENCE
OFFICE VIEW
1544A
INVESTIGATION
SECTION
DEPUTY CHIEF
VESTIBULE
CORRIDOR
C1505
CORRIDOR
C1504
ELECTRICAL
1541B
VESTIBULE
C1116
SECY OFFICE
OFFICE/
COPIER
1545A
CORRIDOR
C1509
POLICE CHIEF
RAD EXAM
DOCTOR
OFFICE
RAD
OFFICE
ULTRASOUND
HOLD
CELL
1556 HOLD
CELL
RADIOLOGY
OFFICE
RADIOLOGY
READING RM
RADIOLOGY
OFFICE
RAD
OFFICE
ULTRASOUND
TOILET
SPS SUPV
OFFICE
SPS RECEIVING
STORAGE
SECY OFFICE
RADIOLOGY SVC
CONFERENCE RM
FAN RM
PACS
MANAGER
COMPUTER
CABINET
1581A
ADMIN OFFICE
CHIEF RADIOLOGY
ELECTRICAL
CLOSET
15E2
TELEPHONE
CLOSET
15T1
HAC
STAIR
NO 3
WAITING RM
CONSULT
RM - 1
CONSULT
RM - 2
BREAK
ROOM
FILES
REFRIG
RECEPTION
TECH WORK
TOILET
BREAK
ROOM
INPT
HOLDING
CORRIDOR
C1506
CORRIDOR
CORRIDOR
C1508
CLEAN
CLEAN
SUPPLY
1516 HAC
FIRE ALARM
CORRIDOR
C1503
GAS CYLINDER
STORAGE
EMS STORAGE
CT IMAGING RM - 2
CONTROL RM - 2
1528B
TOILET
1528A
CONTROL RM - 1
1530A
TOILET
1530B
CT IMAGING RM - 1
ELECTRICAL RM
15E3 RADIOLOGY /
FLUOROSCOPIC RM
TOILET
1533A
MECH
ULTRASOUND
RADIOLOGY
SUPPLY
DIGITAL RADIOLOGY
ELECTRICAL
15E4
SWITCHGEAR RM
15E5
TOILET
1538A
STAIR
NO 14
I R READING
RM
1539A
COMMUNICATIONS
1538F
ANTE
RM
1538B
EQUIP RM
1538E CONTROL RM - 3
1538D
SPECIAL
PROCEDURES
INTERVENTIONAL
1538C
STAIRWELL
VESTIBULE
VESTIBULE
CLOSET
1538G
C1506B
1570A
C1506A
1521A
1555B
ATS RM
1570C
SUPERVISOR
OFFICE
POLICE
OFFICE
3 3
4 4
4 4
B01B ED101 - 1
B01A ED101-NB30 ED101-S
B0 1B
E D
- 2
B01B ED101 - 2
B01B ED101 - 1
B40 ED101-E
B01B ED101 - 1
B40 ED101-E
COURTYARD
CHIEF
VESTIBULE
ENTRANCE/LOBBY
C1103
ELECTRICAL
1541B
VESTIBULE
C1116
SECY OFFICE
CORRIDOR
C1505
B01B ED101 - 1
B01A ED101-NB30 ED101-S
B0 1B
E D
- 2
B01B ED101 - 2
ED101
BUILDING 01B DAMEN
FIRST FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
1.
dw g B0
1B E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
1 FIRST FLOOR NORTH
1/8" = 1'-0"
2 FIRST FLOOR SOUTH
1/8" = 1'-0"
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
NUCLEAR MEDICINE
A C
CHIEF OF STAFF
B
TV
A-120
RAMP DN
ROOF
TEL
24E2 STORAGE
FAC
2479A
ELECTRICAL
CLOSET
24E3
COAT CLOSET
2438C
STORAGE
2438A
TOILET
2438B
STORAGE
2440A
2447A
CONNECTING
CORRIDOR
C2307
ASSISTANT
DIRECTOR
CORRIDOR
C2401
ELEVATOR
ELEVATOR
CORRIDOR
C2409
CORRIDOR
C2404
CORRIDOR
C2408
STORAGE
AUTOPSY
AREA
ELEVATOR
NO P4
ELEVATOR
NO P3
ELEVATOR
NO P2
ELEVATOR
NO P1
SOILED
UTILITY
TOILET/
SHOWER
2497A
MORGUE CLEAN UTILITY
REFR
2477A
MECH SPACE
VOLUNTARY
STORAGE
VTS FLEET OPER
2449A
SUPV
OFFICE
2449B
ELEVATOR
NO P7
ELEVATOR
NO P8
PATIENT
ADVOCATE OFFICE
CORRIDOR
C2405
CONFERENCE RM
CPP AND
RESOURCE
TELEPHONE
CLOSET
24T1
STAIR
NO 1
CORRIDOR
C2407
MENS TOILET
2415TEL
STAIR
NO 2
DIRECTOR
OFFICE
TOILET
2413B
STORAGE
2413A
ELECTRICAL
24E1
SECRET
SECRET
PUBLIC
AFFAIRS
STAFF
OFFICE
ASST TO
DIRECTOR
AUDITORIUM
ELECTRICAL
24E6
CORRIDOR
C2406
STAFF
ATTORNEY
PROGRAM
ANALYST
SECY STAFF
OFFICE
COS
OFFICE
AD OFFICE
ACOS CLINIC
AFFAIRS
OFFICE
STORAGE
BREAK
RM
WOMENS
TOILET
OFFICE
STORAGE
2446D
LOBBY
STRATEGIC
PLANNER
ELECTRICAL
RECEPTION
2444A VESTIBULE
MENS TOILET
STORAGE
2446A
WOMENS TOILET
UNISEX
TOILET
KITCHEN
2446B
CORRIDOR
C2402
STAIR
CORRIDOR
C2403
MECH SPACE
ELEVATOR
FAMILY VIEWING
TOILET
STORAGE
2492A
STAIR
NO 5
ELEVATOR
LAB
INJECTION
RM
PROCESSING
RM
ELECTRICAL
24E5
NUCLEAR MEDICINE
SCANNING AREA
TREATMENT RM
CHIEF OF STAFF
NURSE
EXECUTIVE
STORAGE
AND EQUIP
2446C
DRESSING
RM
2462APIV
PIV
PIV
VISUAL
CO-ORDR
TOILET
2474A
LOW AND
BLIND VISION
TREATMENT RM
STRESS LAB
WAITING
INJECTION RM
NUCLEAR
MED
RECEPTION
HAC
FILE RM
STAFF
PHYSICIAN
SECTION
CHIEF
BONE DENSITY
PROCEDURE RM
OPERATION
MANAGER
STAFF
OFFICE
M-1
NO 5A
2446H
2446F
2446G
WALL PARTITION CLOSETWALL PARTITION CLOSET
FIRE
CLOSET
FIRE
CLOSET
CLEAN
UTILITY
ASSISTANT
DIRECTOR
ROOF
ROOF
ELECTRICAL
CLOSET
24E4
3 3 3 3 3 3 3 3
4 4
B01B ED102 - 1
B01A ED102B30 ED102
B0 1A
E D
B0 1B
E D
- 2
B01B ED102 - 2
B0 1A
E D
B0 1B
E D
- 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
2.
dw g B0
1A E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32 ED102
BUILDING 01A DAMEN
SECOND FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
RECEIVING
CART
ELEVATOR
LOBBY
EQUIPMENT
PARKING
PARKING
EQUIPMENT
PARKING
EQUIPMENT
PARKING
EQUIPMENT
PARKING
EQUIPMENT
EQUIPMENT
PARKING
EQUIPMENT
PARKING
EQUIPMENT
EQUIPMENT
PARKING
PARKING
ELECTRICAL
CLOSET
25E2
ELECTRICAL
CLOSET
25E1
CLOSET
CLOSET
CLOSET
OCCUPATIONAL
THERAPY
2514A
ELECTRICAL
CLOSET
25E3
FAC
CONNECTING
CORRIDOR
C2307
CORRIDOR
C2601
NO 27
STERILE CORE
ELECTRICAL
RM
26E2
STERILE
CORE
ELEVATOR
NO 26
VESTIBULE
OR SUPPORT
OR-3
(LARGE)
OR-4
(LARGE)
OR SUPPORT
PHYSICAL
THERAPY CLINIC
CORRIDOR
C2502
CORRIDOR
C2503
OCCUPATIONAL
THERAPY
KINESIOTHERAPY CLINIC
STORAGE
MENS
TOILET
LOCKER
2580A
MENS
TOILET
PATIENT RM
WOMENS
LOCKER
HAC
WOMENS
TOILET
TOILET
2521A
OFFICE STAFF
STAIR
NO 3
WORK RM
OFFICE
PM AND R
SECY STAFF
PM AND R
CHIEF
RESIDENT
OFFICE
DOCTOR
OFFICE
CONFERENCE RM
OT
OFFICE
KITCHEN
ASSESSMENT
OCCUPATIONAL
THERAPY
ADL RM
STAIR
NO 4
MULTIPURPOSE
THERAPY
STORAGE
DOCTOR
OFFICE
DOCTOR
OFFICE
CORRIDOR
C2501
STORAGE
STORAGE
IRM STORAGE
IRM STORAGE
WAITING RM
CANTEEN STORAGE
STORAGE
STORAGE
2554B
2554A
2520A
2585A
2585B
2585C
IRM STORAGEIRM
STORAGE
IRM
STORAGE
GENERAL
STORAGE
GENERAL
STORAGE
FUTURE
CORRIDOR
UNASSIGNED
ROOF
ROOF
EMERGENCY
SUBSTATION
RM
2556B
VESTIBULE
NORMAL
SUBSTATION
RM
2556A
CANTEEN
STORAGE
2505A
B01B ED102 - 1
B01A ED102B30 ED102
B0 1B
E D
- 2
B01B ED102 - 2
B01B ED102 - 1
B40 ED102-E
B01B ED102 - 1
B40 ED102-E
B0 1B
E D
- 1
CONNECTING
CORRIDOR
C2307
B01B ED102 - 1
B01A ED102B30 ED102
B0 1B
E D
- 2
B01B ED102 - 2
B0 1B
E D
- 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
2.
dw g B0
1B E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
1 SECOND FLOOR NORTH
1/8" = 1'-0"
2 SECOND FLOOR SOUTH
1/8" = 1'-0"
ED102
BUILDING 01B DAMEN
SECOND FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01B
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
1 BED 1 BED
CARDIOLOGY
1 BED
DIALYSIS
DIALYSIS
OFFICE
HAC
TOILET
3426A
UNISEX
TOILET
3475A
SOILED
UTILITY
ELECTRICAL CLOSET
3487TOILET
FAC
ELECTRICAL
34E4
BACKUP
GENERATOR RM
3472C
STORAGE
3472B
STORAGE
3455A
ELECTRICAL
3495A
ELECTRICAL
3497A
VESTIBULE/
CHASE
LINEN CHUTE
ELECTRICAL
34E2
TOILET
3443A
VESTIBULE
3439ASUPPLY CLOSET
TOILET
3424A
TOILET
3428A
TOILET
3432A
STORAGE
CLOSET
3434A
TOILET
3429A
TOILET
3427A
MENS
SHOWER
3425A
ELECTRICAL CLOSET
34E1
STORAGE
3485A
FAC
TOILET
3439B
FAC
3447A
CLOSET
CORRIDOR
C3401
CORRIDOR
C3405
NUTRITION AND FOOD
KITCHEN
CORRIDOR
C3402
CORRIDOR
C3404
CORRIDOR
C3403
CORRIDOR
C3406
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
ELEVATOR
P-4
FOOD SVC
AND SUPV
ELEVATOR
P-3
ELEVATOR
P-2
ELEVATOR
P-1
HAC
HAC
OXYGEN
TANKS
DRESSING
ROOM
3475B
STORAGE
3475C LOCKER ROOM
DOCTORS
OFFICE
STAIR
NO 5
RESIDENT
GROUP
DOCTORS
OFFICE
DOCTORS
OFFICE
CHIEF
ENT
DOCTORS
OFFICE
DOCTORS
OFFICE
3494A
DOCTORS
OFFICE
RESIDENT
COORD.
DOCTORS
OFFICE
3488SURGERY STAFF
SECRETARY/
COPIER
HAC
BREAK ROOM
OFFICE
OFFICE
STORAGE
MECH RM
3472A
EQUIPMENT
STORAGE
LAB
MECH RM
3466A
SUPPLY RM
RECEPTION
3461CHIEF OFFICE
3460TANK RM
3454A
STORAGE
3454BDIALYSIS
STORAGE
CARDIO
STORAGE
NON
VA MED
CARE
DIALYSIS RM
DIALYSIS
EQUIPMENT
FILE
STORAGE
SPD SUPPLY
DIALYSIS
SOLUTIONS-B
DIALYSIS
SOLUTIONS-A
STORAGE
STORAGE
MECH RM
ELEVATOR
P-7
ELEVATOR
P-8
CLINIC NUTRITION
TEL
34T1
STAIR
NO 1
DIALYSIS
WAITING
NURSE
STATION
LOCKER
3439C
LOUNGE
CRASH CART
STORAGE
OFFICE
CUBICLE
STAIR
NO 2
SUPPLY
ANALYSIS
SPD
SUPERVISOR
SYSTEM
ANALYST
STORAGE
3406 DIALYSIS
RM
SOCIAL
WORK
NURSE
MGR
OXYGEN TANKS
IV RM
MENS TOILET
LEAD TECH
HEMO DIALYSIS
DIR OFFICE
CONSL MGR
MECH RM
S-5
S-6
CORRIDOR
3468A
ROOF
ROOF
ROOF
ROOF
ELECTRICAL
CLOSET
34E4
3A
3 3
3A
3 3
4 4
B01B ED103
B01A ED103
ED103
BUILDING 01A DAMEN
THIRD FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
3.
dw g B0
1A E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
UNIT DOSE
DRUG AND SUPPLY PROCESSING
NUTRITION AND FOOD SVC
PAVILION
MGR CLINICAL
NUTRITION
MULTIPURPOSE RM
VESTIBULE/
CHASE
LINEN CHUTE
STORAGE
3535A
STORAGE
3535B
REST RM NIC
3523 TELECOM
CORRIDOR
C3502
CORRIDOR
C3503
CORRIDOR
C3505
PHARMACY
NARCOTIC VAULT NIC
SUPV
CLEAN RM
DRUG AREA
MECH RM
FREEZER
STAGING AREA
REFR-1
REFR-2
35E1
STAIR
NO 3
OFFICE /
STORAGE
CAN FOOD STORAGE
FOOD MGNT
FOOD OPER
AUTO ASSIST
3553 CALL CENTER
DIETICIAN STAFF
OFFICE
CHIEF
NUTRITION AND
FOOD SVC OFFICE
STAIR
NO 4
PATIENT DINING RM
N AND FS
SERVING KITCHEN
3560A
CORRIDOR
C3501
NUTRITION AND FOOD
CORRIDOR
C3504
CONFERENCE
ROOM
SUPV OFFICE
SUPV OFFICE
3530REFR WALK-IN
MENS
TOILET
3535C
STORAGE
REFR
3534A
REFR
REFR
FEMALE
BREAK ROOM
WOMENS
TOILET
MECH RM
HAC
STORAGE
FEC
3560B
ELECTRICAL
FEC
VESTIBULE
3595A
VESTIBULE
3520C
ALCOVE
3520B
CLOSET
3520A
ROOF
ROOF
ROOF
3 3
B01B ED103
B01A ED103
B01B ED103
n/a
B01B ED103
n/a
ED103
BUILDING 01B DAMEN
THIRD FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
3.
dw g B0
1B E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
FEC
DN UP
FEC
DNUP
UP DN
PANORAMIC RM
ELECTRICAL
CLOSET
ELECTRIC
CLOSET
44E5
MED
CLOSET
SOILED
SPD CART
HOLDING
TEL/DATA
44T2
CLEAN SUPPLY
SOILED
SPD CART
HOLDING
4405A
STORAGE
4407A
CONTROL RM
BARIATRIC
TOILET
SOILED UTILITY
NITROUS TANK
STORAGE
VESTIBULE/CHASE
4507 LINEN CHUTE
ELECTRICAL
CLOSET
ELECTRICAL
44E2
CLOSET
4447A
OLD CLOSET
4496A
ELECTRIC/
FAC CLOSET
44E4
TREATMENT BAY
4418A
CORRIDOR
C4501
CORRIDOR
C4408
CORRIDOR
C4404
CORRIDOR
C4402
CORRIDOR
C4401
PATHOLOGY
RESIDENTS
NEUROLOGY
OFFICE
NURSE
OFFICE
STAFF LOUNGE
ELEVATOR
P-7
ELEVATOR
P-8
MOVE COORD
STORAGE
ELEVATOR
LOBBY
ELEVATOR
P-1
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
S-5
ELEVATOR
S-6
MED OFFICE
LOCKER
JANITOR
CLOSET
TOILET TOILET
TOILET TOILET
PATIENT
TOILET
SURGY
MGR
RECOVERY BAY
STAIR
NO 5
SURGY
TEAM RM
PATIENT
TOILET
OFFICE
MAXILLOFACIAL- 4 MAXILLOFACIAL-3
CONE BEAM
MAXILLOFACIAL-1
MAXILLOFACIAL-2
INSTRUMENT
PREP
ORAL SURGY RM
ORAL SURGY RM
CORRIDOR
C4403
OFFICE
ENDOSCOPY-2
ENDOSCOPY-1
STORAGE
CONSULT RM
PERIODONTAL-1
PERIODONTAL-2
INSTRUMENT
PREP
CLEAN
LINEN
MECH RM
RECEPTION / ADMISSION
4427A
WAITINGWAITING
TEL
44T1
STAIR
NO 1
CORRIDOR
C4405
CORRIDOR
C4406
CORRIDOR
C4407
ORAL SURGERY-2
INSTRUMENT
PREP
HYGIENIST
OFFICE PREP
ORAL SURGERY-1
TREATMENT BAY
MECH RM
OFFICE
OFFICE
INSTRUMENT
PREP
ORAL
SURGERY-3
OFFICE
STAIR
NO 2
TREATMENT BAY
4407ALCOVE
TREATMENT BAY
HYGIENIST
STORAGE
RESIDENT
TEAM RM
CERAMICS
4401A 44E1
TREATMENT BAY
ROOF
ROOF
ROOF
ROOF
ROOF
ELECTRICAL
CLOSET
44E3
CORRIDOR4427B
STORAGE
B01B ED104
B01A ED104
ED104
BUILDING 01A DAMEN
FOURTH FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
4.
dw g B0
1A E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
PATHOLOGY &
LABORATORY
MEDICINE
LAB(PATHOLOGY)
MENS
TOILET
WOMENS
TOILET
STORAGE
4584A
FAC
4581A
VESTIBULE/CHASE
ELECTRICAL
45E1
LINEN CHUTE
CLOSET
4516A
SUPPLY
CLOSET
CORRIDOR
C4502
CORRIDOR
C4503
STAIR
NO 4
MICRO BIOLOGY LAB
4549B
MECH
4549A
MICRO BIOLOGY LAB
LAB MGR
SUPPLY
BLOOD
DRAW AREA
TEL
45T1
ELECTRICAL
45E2
STAIR
NO 3
MENS LOCKER
CONFERENCE RM
LOUNGE
STORAGE
WALK IN
REFR
STORAGE
LEAD PATHOLOGIST
PATH AND LAB
MEDICINE OFFICE
HAC
FROZEN
SECTION
ACCESSIONING
LAB
LAB
LAB
LAB
GYTOLOGY
WOMENS
LOCKER
TOILET
WOMENS
LOUNGE
4526 SUPV
OFFICE
LAB OFFICE
TOILET
PLMS SECY
OFFICE
PATHOLOGIST
OFFICE
UIC PATHOLOGISTS
AND DIRECTOR OF
OPERATIONS
OFFICE
PATHOLOGY
RESIDENTS
CLEAN
SUPPLIES
4515A
COMPRESSOR
RM
NEUROLOGY
OFFICE
WALK IN
REFR
4545A
ROOF
ROOF
ROOF
ROOF
ROOF
4543A
RESIDENTS
OFFICE
4508A
B01B ED104
B01A ED104
B01B ED104
B40 ED104-E
B01B ED104
B40 ED104-E
ED104
BUILDING 01B DAMEN
FOURTH DEMOLITION FLOOR PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
4.
dw g B0
1B E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
STORAGE
SUPPLY CLOSET
FIRE CLOSET
5447A
WOMENS
LOCKER
TOILET
5434A
TOILET
5430A
DRESSING
RM
DRESSING
RM
TOILET
5429A
TOILET
5425A
TOILET
5423A
SOILED
UTILITY
LOCKER
RM
CLEAN LINEN
TOILET
5424A
TOILET
5439A
TOILET
5433A
ELECTRICAL
PANEL
54E4SUPPLY CLOSET
ELECTRICAL
CLOSET
5412A
STORAGE
5496A
TELECOM
CLOSET
54E2
REGISTRATION
DESK
ELECTRICAL
CLOSET
54E5
CORRIDOR
C5406
CORRIDOR
C5401
CORRIDOR
C5402
CORRIDOR
C5403
CORRIDOR
C5404
CORRIDOR
5500C
MENS TOILET
GROUP RM
PROCEDURE RM
RESEARCH
OFFICE
MEDICINE
PREP
STAIR
NO 2
TEAM RM
LOCKER
WAITING
EQUIPMENT
STORAGE
EXAM RM
EXAM RM
DAY
SURGY
EXAM RM
PHARMACIST
OFFICE
TOILET
5435A
TOILET
5436A
OFFICE
PSYCHOLOGIST
EXAM RM
EXAM RM
NURSE
STATION
BREAK
RM
WAITING RM
LINEN
HAC
5440 PATIENT
EDUCATION
RM
CLEAN
SUPPLY
TOILET
WAITING AREA
OFFICE
DOCTOR
LOUNGE
HAC
5462 CLEAN LINEN
TOILET
TOILET
5458A
MENS
LOCKER
NURSE
STATION
TOILET
RECOVERY AREA
DRESSING
TOILET
STORAGE
TOILET
5482 PROCEDURE
RM-5
PROCEDURE
RM-4
SCOPE
REPROCESSING
CLEAN RM
PROCEDURE
RM-3
PROCEDURE
RM-2
SUPPLY
CLEANING RM
MECH
RM
5489PROCEDURE
RM-1
STAIR
NO 5
OFFICE
MED
ATTEND
NURSE
MGR
FELLOW
OFFICE
OFFICE
ENDO
OFFICE
ENDO
DIRECTOR
SPD
SUPPLIES
ELEVATOR
P-1
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
S-5
ELEVATOR
S-6
TEL
54T1
STAIR
NO 1
CHECK-IN
ELEVATOR
P-8
ELEVATOR
P-7
FIRE/ELECTRICAL CLOSET
5417A
SERVICE
ELEVATOR
ROOF
ROOF
ROOF
ROOF
ROOF
ELECTRICAL CLOSET
54E3
UNISEX TOILET
UNISEX TOILET
DRESS
RM
DRESS
RM
TOILET
STAFF LOCKER RM
TRAINING RM
FILE
CABINET
VESTIBULE/CHASE
TOILET
CORRIDOR
C5501
4A
3 3
3 3
4 4
4 4
4 4
B01B ED105
B01A ED105-N
B0 1A
E D
5-
N B0
1A E
D
5- S
ED105-N
BUILDING 01A DAMEN
FIFTH FLOOR DEMOLITION PLAN NORTH
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
5.
dw g B0
1A E
D
5- N
5/ 2/
:5
PM
B y
U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
SICU SUPPLY CLOSET
UNISEX
TOILET
ELECTRICAL
CLOSET
54E1
DIRTY LINEN
5400B
CLEAN LINEN
5400A
TOILET
5423A
SUPPLY CLOSET
RECEPTION
AREA
CORRIDOR
C5405
RESEARCH
OFFICE
MEDICINE
PREP
STAIR
NO 2
TEAM RM
LOCKER
5412LOUNGE
TREATMENT BED-5
TREATMENT BED-4
TREATMENT BED-3
TREATMENT BED-2
TREATMENT BED-1
TOILET
5406A
WAITING
EQUIPMENT
STORAGE
EXAM RM
EXAM RM
DAY
SURGY
EXAM RM
PHARMACIST
OFFICE
TOILET
5435A
FIRE/ELECTRICAL CLOSET
5417A
ROOF
13 13
4 4
4 4
4 4
B01B ED105
B01A ED105-N
B0 1A
E D
5-
N B0
1A E
D
5- S
ED105-N
BUILDING 01A DAMEN
FIFTH FLOOR DEMOLITION PLAN SOUTH
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
5.
dw g B0
1A E
D
5- S
5/ 2/
:5
PM
B y
U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
ELECTRICAL
55E1
FIRE
CLOSET
ELECTRICAL
55E2
ROOF
ROOF
ROOF
ROOF
FEC
FEC
FEC
FEC
JANITOR
CLOSET
EMS
UPS
5560A
EQUIP
5524A
ADA
TOILET
5524B
CLOSET
5558B
WORK
RM
ECHO
PROCEDURE
RM
ECHO
PROCEDURE
RM
ECHO
PROCEDURE
RM
HOLTER
READING
STERILE
SUPPLY
LINEN
DOCTOR
OFFICE
DOCTOR
OFFICE
ECHO
READING
RM
DOCTOR
OFFICE
EKG
STRESS
LAB
STRESS
ECHO LAB
CONSULT
ELECTRICAL
CLOSET
5520A
CHIEF
CARDIOLOGY
OFFICE
DOCTOR OFFICE
UNISEX TOILET
TRAINING RM
FILE
CABINET
VESTIBULE/CHASE
EP ATTENDING
SUB
WAITING
NURSE
MANAGER
FELLOWS
OFFICE
SOILED UTILITY
INVENTORY
MGR.
TECH
OFFICE
JANITORS
CLOSET
RECOVERY
RECOVERY
RECOVERY
RECOVERY
TOILET
5549A
ADA
TOILET
5547 DRESS RM
5549B
DRESS RM
5549D
STAIR
NO 4
VIEWING
ALCOVE
LEAD VEST
STORAGE
5553 EQUIP
5555A
EP LAB
CONTROL
OBSERVATION
CATH LAB
CATH
EQUIP
5551A
STERILE
STORAGE
TEE
STORAGE
5546A
SOILED
WORK TEE
TEE
STORAGE
5544B
MEDS/NOURISH
5544A
NURSE
STATION
LAB NURSE
5542NURSE
MGR
ELECTRICAL
55E3
STAIR
NO 3
CORRIDOR
C5503
CORRIDOR
CORRIDOR
C5506
CORRIDOR
C5504
CORRIDOR
C5502
UNISEX
LOCKERS
CORRIDOR
C5507
CLEAN LINEN
STORAGE
STAFF LOUNGE
5564 TOILET
5563A
BED RM-6
BED RM-5
CORRIDOR
C5508
TOILET-4
5568A
TOILET-5
5565A
BED RM-4
BED RM-3
5569SOILED
LINEN
TOILET-1
5570A
BED RM-1
BED RM-2
TOILET-2
5571A
TOILET-3
5569A
FEC
FEC
C5505
CHASE
13 5 4
2313 4
13 23
4 4 4
4 4 44 4 4
B01B ED105
B01A ED105-N
B01B ED105
B40 ED105-E
B01B ED105
B40 ED105-E
ED105
BUILDING 01B DAMEN
FIFTH FLOOR DEMOLITION PLAN
03/09/2020
ISSUED FOR BID AND
CONSTRUCTION
ISSUED FOR BID AND CONSTRUCTION 03/09/2020
B01B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering discipline: Electrical Virtual Energy Solutions 31 E Ogden Ave Suite 304 LaGrange, IL 60535 312.583.7023 POC: Gary Collins
Nurse Call Jesse Brown VAMC
Chicago, IL
537-19-124
Project Director
Revisions: Date:
1/8"=1'-0"
4' 8'0 16'
Keyplan:
© 2020 Virtual Energy Solutions, Inc.
M :\E ng in ee rin g\ Pr oj ec ts \1
5- M
AT
O
C -J
B N ur se
C al l 5
-1 9-
4\
Pr od uc tio n D oc um en ts
\E le ct ric al \B
E
D
5.
dw g B0
1B E
D
5/
2/
:5
PM
B y U se r
B30-S
B11A B11B B01B
B01A-N
B40-E
B40 -W
B01A-S
B30-N
B32
GENERAL SHEET NOTES :
1. SEE DRAWING E001 FOR THE SYMBOLS AND GENERAL
ELECTRICAL NOTES.
2. DISCONNECT AND REMOVE THE EXISTING NURSE CALL
DEVICES AND ASSOCIATED WIRING IN THEIR ENTIRETY BACK
TO THEIR ASSOCIATED HEAD ENDS. REMOVE THE HEADENDS,
LEAVING THE 120V POWER CONNECTIONS. THE EXISTING
RACEWAY IN THE WALL, UP TO THE ACCESSIBLE CEILING
SPACE, SHALL REMAIN TO BE RE-USED WHERE DEVICES ARE
BEING REPLACED ON THE NEW NURSE CALL DEVICE PLANS.
SHOWER
AREA
LOCKER LOCKER
STORAGE
TOILET
6423A
SIMULATION LAB
SUPPLY
ATTENDING
SOIL ROOM
TOILET
6461A
TOILET
6457A
LINEN CHUTE
FAC
NURSE UNION
ELECTRICAL
64E4
TOILET
6471A
TOILET
6473A
TOILET
6477A
E E O
STORAGE
6466TOILET
6468A
TOILET
6470A
TOILET
6472A
TOILET
6476A
TOILET
6422A
TOILET
6424A
TOILET
6426A
TOILET
6430A
ELECTRICAL
CLOSET
64E1
SUPPLY
TOILET
6425A
TOILET
6427A
TOILET
6431A
ELECTRICAL
CLOSET
64E2
TOILET
6439A
TOILET
6435A
FAC
PHONE
6453A
CLOSET
6497A
CORRIDOR
C6404
GENERAL
FOREMAN EMS
OFFICE
EMS SUPV
OFFICE
ELEVATOR
P-1
ELEVATOR
P-4
ELEVATOR
P-3
ELEVATOR
P-2
ELEVATOR
ELEVATOR
ELEVATOR
LOBBY
NURSE RECRUITER
ELEVATOR
P-7
ELEVATOR
P-8
CHIEF UROLOGY
OFFICE
TEL
64T1
6469A
CORRIDOR
C6402
STORAGE
CORRIDOR
C6403 CORRIDOR
C6401
STAIR
NO 1
NURSE
OFFICE
SOCIAL
WORKER
OFFICE
RECEPTION
RECEPTION
STAIR
NO 2
OFFICE
OFFICE
6434A
STORAGE
VACANT
6482STORAGE
SINK RM
FILE
STORAGE
STORAGE
TELE MOVE
PGM OFFICE
OFFICE
HOME
TELEHEALTH
STORAGE
6462A
SAFETY
STORAGE
STORAGE
UNISEX TOILET
STAIR
NO 5
UNION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .