S02 Combined Drawing Set.pdf
PDF 19 MB Posted
- Attached to
- Z1DA--Correct Radiology HVAC
- Solicitation number
- 36C24524B0017
About this file
This document appears to be a combined drawing set related to the federal contract opportunity for Solicitation Number 36C24524B0017, titled "Z1DA--Correct Radiology HVAC". The solicitation is for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5 to correct the HVAC system for a radiology project, number 517-21-002. The drawing set likely contains technical specifications and diagrams for the HVAC system work required under this solicitation. As this appears to be just a drawing set and not the full solicitation document, it does not contain details on the required products or services, response dates, award information, pricing terms, set asides, or other key contract details. The summary is focused on identifying the nature and purpose of this particular document within the overall federal contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24524B0017 0006.docx | DOCX document | |
| S07 Bid Abstract 7-16-24 Correct Radiology HVAC.pdf | ||
| S07 attendance bid opening 7-16-24.pdf | ||
| S06 Answers to RFI Follow Up Correct Radiology HVAC.pdf | ||
| 36C24524B0017 0005.docx | DOCX document | |
| S06 Roof Picture RFI.pdf | ||
| 36C24524B0017 0004.docx | DOCX document | |
| 36C24524B0017 0003.docx | DOCX document | |
| S05 pre-bid RFI Correct Radiology HVAC combine.pdf | ||
| S04 pre bid attendance 6-21-24.pdf | ||
| 36C24524B0017 0002.docx | DOCX document | |
| S04 Pre Bid Agenda Correct Radiology HVAC.pdf | ||
| 36C24524B0017 0001.docx | DOCX document | |
| S02 Specifications.pdf | ||
| S02 ICRA Radiology HVAC .pdf | ||
| S02 Wage Determination 5-3-2024 .pdf | ||
| 36C24524B0017.docx | DOCX document | |
| S02 SOW Correct Radiology HVAC - Construction-FINAL rev2 - Copy.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 6:
A
M
GI001
COVER CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DR TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
BECKLEY VAMC
200 VETERANS AVE, BECKLEY WV 25801
VAMC PROJECT #: 517-21-002
CORRECT RADIOLOGY HVAC
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER
GI002 GENERAL INFORMATION AND ABBREVIATIONS
GI004 LIFE SAFETY PLAN - SECOND FLOOR
GI005A PROJECT PHASING - SECOND FLOOR - PHASE 1
GI005B PROJECT PHASING - SECOND FLOOR - PHASE 2
STRUCTURAL
S-001 STRUCTURAL NOTES
SF112 FRAMING PLAN - LEVEL 2 & LEVEL 3
SF411 ENLARGED FRAMING PLANS & DETAILS
ARCHITECTURAL
AD112 SECOND FLOOR DEMOLITION PLAN
AE121 SECOND FLOOR PLAN (SCOPE AREA 2)
AE122 SECOND FLOOR REFLECTED CEILING PLAN (SCOPE AREA 2)
AE131 THIRD FLOOR PLAN
AE133 THIRD FLOOR ROOF PLAN (SCOPE AREA 3)
AE163 SIXTH FLOOR ROOF PLAN (SCOPE AREA 6)
AE220 DETAILS
PLUMBING
P-001 PLUMBING ABBREVIATIONS, SYMBOLS, AND LEGENDS
PD122 PLUMBING SECOND FLOOR DEMOLITION PLAN
PG122 PLUMBING SECOND FLOOR MEDICAL GAS PLAN
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS AND GENERAL NOTES
M-002 MECHANICAL SYMBOLS AND LEGENDS
MD121 MECHANICAL SECOND FLOOR DEMOLITION PLAN
MD131 MECHANICAL THIRD FLOOR DEMOLITION PLAN
MD401 MECHANICAL DEMOLITION ENLARGED PLANS
MD402 MECHANICAL DEMOLITION ENLARGED PLANS
MH121 MECHANICAL SECOND FLOOR HVAC PLAN
MH131 MECHANICAL THIRD FLOOR HVAC PLAN
MP121 MECHANICAL SECOND FLOOR PIPING PLAN
MP131 MECHANICAL THIRD FLOOR PIPING PLAN
MI121 MECHANICAL SECOND FLOOR INSTRUMENTATION PLAN
MH301 MECHANICAL SECTIONS
MH302 MECHANICAL SECTIONS
MH401 MECHANICAL HVAC ENLARGED PLANS
MH402 MECHANICAL HVAC & PLUMBING ENLARGED PLANS
MP401 MECHANICAL PIPING ENLARGED PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL SEISMIC DETAILS
M-506 MECHANICAL SEISMIC DETAILS
M-601 MECHANICAL EQUIPMENT SCHEDULES
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED121 ELECTRICAL SECOND FLOOR DEMOLITION PLAN
ED131 ELECTRICAL THIRD FLOOR DEMOLITION PLAN
ED141 ELECTRICAL ROOF DEMOLITION PLANS
EP121 ELECTRICAL SECOND FLOOR POWER PLAN
EP131 ELECTRICAL THIRD FLOOR POWER PLAN
EP141 ELECTRICAL ROOF POWER ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAMS
SHEET INDEXVICINITY MAP
SITE MAP
AXONOMETRIC VIEW
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 02/29/2024
A. CONTRACTORS AND THEIR SUPERVISORY PERSONNEL MUST REVIEW THE GENERAL AND SUPPLEMENTARY
CONDITIONS TO THE CONTRACT.
B. WORK MUST CONFORM WITH APPLICABLE BUILDING CODES, REGULATIONS AND ORDINANCES.
C. CONTRACTOR MUST OBTAIN REQUIRED BUILDING AND OCCUPANCY PERMITS.
D. CONTRACTOR MUST BECOME FULLY ACQUAINTED WITH CONDITIONS RELATED TO THE WORK.
E. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND THE SAFETY OF CONSTRUCTION PERSONNEL AND VISITORS.
F. DRAWINGS CONTAINED IN THIS SET MUST NOT BE REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP DRAWINGS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.
G. EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED AND REPORT TO THE CONTRACTOR IN WRITING CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THAT INSTALLER'S WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE VHA CORRECTED. COMMENCING WITH INSTALLATION WILL CONSTITUTE ACCEPTANCE OF THE
SUBSTRATE AND/OR CONDITIONS.
H. DO NOT SCALE DRAWINGS: FOLLOW WRITTEN DIMENSIONS AND NOTES. CONTACT VHA COR FOR
CLARIFICATIONS, IF REQUIRED.
I. DIMENSIONS SHOWN ON THE FLOOR PLAN ARE TO THE FACE OF GYPSUM WALL BOARD (FOG), FACE OF MASONRY (FOM), FACE OF CONCRETE WALLS (FOC) AND COLUMN GRID LINES, UNLESS OTHERWISE NOTED
OR INDICATED.
J. "TYPICAL", AS USED IN THESE DOCUMENTS, MEANS THAT THE CONDITION OR DIMENSION IS
REPRESENTATIVE OF, OR THE SAME, FOR SIMILAR CONDITIONS THROUGHOUT.
K. IF THERE IS A DISCREPANCY BETWEEN SMALL SCALE AND LARGE SCALE DRAWINGS, (PLAN, SECTION, & DETAIL DRAWINGS, AND SO FORTH), CONTACT VHA COR FOR CLARIFICATION. FOR BIDDING PURPOSES: THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS MUST GOVERN. FOR CLARIFICATIONS DURING CONSTRUCTION, THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS, AS INDICATED BY THE VHA COR, MUST GOVERN.
L. IF THERE ARE DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS, CONTACT VHA COR FOR CLARIFICATION. FOR BIDDING PURPOSES: THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS MUST GOVERN. FOR CLARIFICATIONS DURING CONSTRUCTION: THE MOST EXPENSIVE AND/OR STRICTEST
REQUIREMENTS, AS INDICATED BY THE VHA COR, MUST GOVERN.
M. DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS MUST BE REPORTED TO THE VHA COR
IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK.
N. DISCREPANCIES MUST BE REPORTED TO THE VHA COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK. IN THESE INSTANCES, NO CHANGE ORDERS OR EXTENSIONS OF TIME WILL BE ALLOWED OR ACCEPTED FOR PROCEEDING WITH THE WORK WITHOUT THE VHA COR'S WRITTEN DIRECTION
AND APPROVAL.
O. CONTRACTOR MUST REPAIR AND/OR REPLACE UNAUTHORIZED WORK, AS INDICATED BY THE VHA COR, AT
NO ADDITIONAL COST TO THE OWNER.
P. DISSIMILAR METAL MATERIALS MUST BE ISOLATED WITH AN APPROVED NONMETAL ISOLATION MATERIAL.
Q. EXTERIOR EXPOSED STEEL MUST BE PAINTED.
R. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALL PANELS AND AT PENETRATIONS OF UTILITIES THROUGH THE BUILDING ENVELOPE, AND SO FORTH, MUST BE SEALED, CAULKED, FLASHED OR WEATHER-STRIPPED AS REQUIRED FOR COMPATIBILITY
WITH ADJACENT MATERIALS AND TO ELIMINATE AIR LEAKAGE AND WATER ENTRY.
S. PROVIDE SEALANT AND/OR CAULKING BETWEEN DISSIMILAR ADJOINING INTERIOR MATERIALS. (THAT IS
WINDOW SILLS TO GWB, ACT CEILINGS TO MASONRY WALLS, AND SO FORTH.)
T. DOOR OPENINGS NOT LOCATED BY DIMENSION MUST BE CENTERED IN WALL SHOWN OR LOCATED 2" FROM FINISH WALL TO FINISH JAMB, ALWAYS ALLOWING A MINIMUM OF 18" FROM THE PULL SIDE OF THE DOOR TO
THE INTERSECTING WALL.
U. CONTRACTOR MUST VERIFY THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES AND THEIR SERVICE
CONNECTIONS WITH THE PROPER UTILITY COMPANY.
V. CONTRACTOR MUST COORDINATE SIZE, LOCATIONS AND NUMBER OF ROOF OPENINGS AND ROOF
ACCESSORIES WITH OTHER TRADES. REFER TO THE ARCHITECTURAL, STRUCTURAL, PLUMBING,
MECHANICAL AND ELECTRICAL DRAWINGS.
W. LOCATIONS AND SIZES OF CONCRETE MECHANICAL AND ELECTRICAL PADS MUST BE COORDINATED BY THE MECHANICAL AND ELECTRICAL CONTRACTORS WITH THE SELECTED EQUIPMENT MANUFACTURER AND/OR SUPPLIER. LOCATIONS AND SIZES ARE TO BE APPROVED BY THE VHA COR PRIOR TO PROCEEDING WITH THE
WORK.
X. EXCEPT AT FIRE-RATED PARTITIONS, WALL AND COLUMN GYPSUM BOARD FACING MUST BE HELD AT 5/8"
BELOW STRUCTURE, UNLESS DETAILED OR NOTED OTHERWISE.
Y. PROVIDE INDEPENDENT FRAMING AND ATTACHMENTS TO THE STRUCTURE, ADEQUATE TO SUPPORT THE CEILING SYSTEM, LIGHT FIXTURES, DUCTS, DIFFUSERS, SPRINKLER PIPING AND BUS DUCTS.
Z. CLOSETS AND ALCOVES WITHOUT A SPACE IDENTIFICATION NUMBER MUST HAVE THE SAME FINISHES AS
ADJOINING SPACES.
AA. CONTRACTOR TO INSTALL WOOD BLOCKING AND PLYWOOD AS REQUIRED FOR THE MOUNTING OF TOILET ACCESSORIES, MILLWORK, CASEWORK, AV EQUIPMENT, MEP ITEMS AND RADIOLOGY EQUIPMENT, AND SO
FORTH.
BB. REFER TO SPECIFICATIONS FOR REQUIRED TESTING AND INSPECTIONS.
GENERAL NOTES
EARTH /
COMPACT FILL
GRAVEL /
GRANULAR FILL
CONCRETE
SAND / MORTAR /
PLASTER / CUT STONE
BRICK
CONCRETE
MASONRY UNIT
STONE (ELEVATION)
BATT INSULATION
RIGID INSULATION
ACOUSTICAL TILE
(SECTION)
GYPSUM BOARD
COVER BOARD
STEEL / METAL
FINISH WOOD
CONTINUOUS WOOD
BLOCKING / ROUGH
FRAMING
CAST STONE
DISCONTINUOUS
WOOD BLOCKING /
SHIM
PLYWOOD / OSB
MASONRY INSULATION
FIREPROOFING
METAL / WALL PANELS
SPANDREL GLASS
MATERIALS LEGEND
PLASTIC LAMINATE
FLOOR PLAN SYMBOLS LEGEND
ROOM NAME
VIEW TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
ENLARGED CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION OR DETAIL SYMBOL IDENTIFIERS
DETAIL NAME
DRAWING NUMBER
DESIGNATOR ON SHEET
DRAWING SEQUENCE
NUMBER INDICATES
WHERE DRAWING IS
LOCATED
TWO CHARACTER
DISCIPLINE DESIGNATOR
AE101
DOOR
NUMBER TAG
WALL
TYPE TAG
WINDOW
TYPE TAG
CENTER LINE
COLUMN
BUBBLE
ROOM TAG
MATCH LINE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
NEW LINE TYPE
EXISTING LINE TYPE
DEMOLITION LINE TYPE
AREA OF DEMOLITION
VIEW NAME
1/8" = 1'-0"
AE101
AE101
AS101
AE101
EXTERIOR
INTERIOR
KEYNOTE
REVISION TAG
DRAWING SCALE
MATERIAL
KEYNOTE
FIXTURE
KEYNOTE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
W3
######-A
######-A
F1
A
A2
DETAIL NUMBER
1-HR FIRE
2-HR FIRE
3-HR FIRE
4-HR FIRE
1-HR FIRE/SMOKE
2-HR FIRE/SMOKE
3-HR FIRE/SMOKE
4-HR FIRE/SMOKE
0-HR SMOKE
0.5-HR SMOKE
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 6:
A
M
GI002
GENERAL INFORMATION AND
ABBREVIATIONS
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DR TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
SECT SECTION
SF SQUARE FOOT (SQFT)
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
SPKLR SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SY SQUARE YARD (SQ YD)
SYM SYMMETRICAL / SYMBOL
SYS SYSTEM
T
T TREAD
TEL TELEPHONE
TEMP TEMPORARY / TEMPERED
TG TONGUE & GROOVE
THK THICK (NESS)
THRU THROUGH
TKBD TACK BOARD
TO TOP OF
TOC TOP OF CURB / CONCRETE
TOD TOP OF DECK
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TOW TOP OF WALL
TPO THERMOPLASTIC POLYOLEFIN
TRANSF TRANSFORMER
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VB VAPOR BARRIER (VPR BR)
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
VNR VENEER
VTR VENT THROUGH ROOF
VWC VINYL WALLCOVERING
W
W WEST, WIDTH, WIDE
W/ WITH
W/IN WITHIN
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HYDRANT / WATER HEATER
WP WATERPROOFING / WORKING POINT
WR WEATHER RESISTANT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
WWF WELDED WIRE FABRIC
X, Y, Z, MISC
& AND
@ AT
XPS EXTRUDED POLYSTYRENE
YD YARD
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NSF NET SQUARE FEET
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD / OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
P
PA PUBLIC ADDRESS
PB PUSH BUTTON
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATE (D)
PERM PERMANENT
PERP PERPENDICULAR
PL PLATE / PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYETHYLENE
PR PAIR
PREFAB PREFABRICATE (D)
PREFIN PREFINISHED
PRELIM PRELIMINARY
PREP PREPARE (D)
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
Q
QT QUARRY TILE
QTB QUARRY TILE BASE
QTY QUANTITY
R
R RISER / RADIUS
RA RETURN AIR
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
REINF REINFORCE (D), (ING)
REQD REQUIRED
REV REVISED/ REVISION
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RESTROOM
RSF RESILIENT SHEET FLOORING
RTU ROOF TOP UNIT
S
S SOUTH
SAN SANITARY SEWER
SC SOLID CORE
SCH SCHEDULE
SCRN SCREEN
H
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HK HOOK
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING / VENTILATING / AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
I
IBC INTERNATIONAL BUILDING CODE
ICRA INFECTION CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER
ILSM INTERIM LIFE SAFETY MEASURES
IN INCH
INCL INCLUDE (D), (ING)
INFO INFORMATION
INST INSTALL / INSTALLATION
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KIT KITCHEN
KO KNOCKOUT
KPL KICK PLATE
L
L LONG / LENGTH
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LH LEFT HAND
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LPT LOW POINT
LRG LARGE
LT LIGHT
LTG LIGHTING
LVR LOUVER
LVT LUXURY VINYL TILE
LWC LIGHTWEIGHT CONCRETE
M
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODULAR
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DMT DEMOUNTABLE
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E
E EAST
EA EACH
EF EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
EST ESTIMATE
ETR EXISTING TO REMAIN
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION / EXPOSED
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC
FB FACE BRICK
FBO FURNISHED BY OWNER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF&E FIXTURES, FURNITURE & EQUIPMENT
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH / FINISHED
FIXT FIXTURE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOG FACE OF GYPSUM BOARD / WALL
FOM FACE OF MASONRY
FOS FACE OF STUDS
FR FIRE RATED
FRMG FRAMING
FRP FIBER REINFORCED PANEL
FS FLOOR SINK
FT FOOT/ FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS / GLAZING
GOVT GOVERNMENT
GPM GALLON PER MINUTE
GSF GROSS SQUARE FEET
GWB GYPSUM WALL BOARD
GYP GYPSUM
A
ABA ARCHITECTURAL BARRIERS ACT
AC AIR CONDITIONING
ACP ACOUSTICAL CEILING PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADJ ADJUSTABLE / ADJACENT
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ARCH PRECAST CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
ATTEN ATTENUATION
AUTO AUTOMATIC
AV AUDIO / VISUAL
AVG AVERAGE
AWP ACOUSTICAL WALL PANEL
B
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK / BEAM
BO BOTTOM OF
BOC BACK OF CURB
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BVL BEVELED
C
C COURSE
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CCTV CLOSED CIRCUIT TV
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLOS CLOSET
CLR CLEAR / CLEARANCE
CMP CORRUGATED METAL PIPE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION / CONNECT
CONST CONSTRUCT / CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR / CORRUGATED
CP CONCRETE PIPE
CPT CARPET
CS COUNTERSINK
CSMT CASEMENT
CT CERAMIC TILE
CU CUBIC
CW COLD WATER
D
DBL DOUBLE
DEMO DEMOLISH / DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
ARCHITECTURAL ABBREVIATIONS
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL)
VA FIRE PROTECTION DESIGN MANUAL (7TH EDITION - DECEMBER 2015)
NFPA NATIONAL FIRE CODES (EXCEPTIONS : NFPA 5000 AND NFPA 900)
NFPA 101 LIFE SAFETY CODE - 2021 (LSC)
REFERENCED PUBLICATIONS (APPLICABLE BUT NOT ALL INCLUSIVE):
NFPA 1 FIRE CODE - 2021
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS - 2018
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS -
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE
SYSTEMS - 2019
NFPA 54, NATIONAL FUEL GAS CODE, 2021
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE - 2019
NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING
PROTECTIVES - 2019
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS, 2021
NFPA 90B, STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND
AIR-CONDITIONING SYSTEMS, 2021
NFPA 70 NATIONAL ELECTRICAL CODE - 2020 (NEC)
INTERNATIONAL BUILDING CODE - 2018 (IBC)
INTERNATIONAL PLUMBING CODE - 2018 (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF
MECHANICAL ENGINEERS (ASME) A17.1. 2019
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING
VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
APPLICABLE CODES AND STANDARDS
BUILDING CONSTRUCTION TYPE: TYPE I-B -- 2018 IBC & TYPE II (222) - 2018 LSC
BUILDING OCCUPANCY:
BASEMENT = EXISTING HEALTH CARE (LSC)
FIRST FLOOR = EXISTING HEALTH CARE (LSC)
SECOND FLOOR = EXISTING HEALTH CARE (LSC)
THIRD FLOOR = EXISTING HEALTH CARE (LSC)
FOURTH FLOOR = EXISTING/ NEW HEALTH CARE (LSC),
LODGING OR ROOMING HOUSES
FIFTH FLOOR = EXISTING HEALTH CARE (LSC)
SIXTH FLOOR = EXISTING HEALTH CARE (LSC)
BUILDING IS FULLY SPRINKLERED
PROJECT DESCRIPTION: RENOVATION OF MULTIPLE EXISTING SPACES, NO
CHANGES TO OCCUPANCY CLASSIFICATION OR OCCUPANT LOAD.
CODE INFORMATION
WALL TYPE FIRE
RATING
(HOUR)
OPENING
FIRE RATING
(HOUR)
WALL
PENETRATION
RATING (HOUR)
WALL TYPE LEGEND
DOORS 3/4
WINDOWS 3/4 1
22-HR FIRE RATED BARRIER
DOORS 1-1/2
WINDOWS 1-1/2 1
0SMOKE PARTITIONS (IBC) & WALLS THAT
RESIST PASSAGE OF SMOKE (LSC)
DOORS 0
WINDOWS 0
2-HR FIRE RATED SHAFT ENCLOSURE
2SE
2 1N/A
2SE
2FB 2FB
1FB 1FB
RPS RPS
1-HR FIRE RATED BARRIER
HEALTH CARE CORRIDOR & SUITES
HCS
0 0N/A
HCS
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 6:
A
M
GI004
LIFE SAFETY PLAN - SECOND
FLOOR
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DR TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
1/8" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
F3
IN ORDER TO LIMIT DISRUPTION OF FACILITY OPERATIONS AND CONTAIN
AIRBORNE DUST & CONTAMINATION FROM CONSTRUCTION ACTIVITIES, WORK
UNDER THIS CONTRACT SHALL BE DIVIDED INTO AREAS AS IDENTIFIED IN
PHASING PLAN DRAWINGS. REFER TO SPECIFICATION 01 35 26 FOR ICRA
BARRIER REQUIREMENTS.
PERFORM WORK PER PHASING REQUIREMENTS AS SHOWN. PROVIDE A
SCHEDULE TO THE VHA FOR APPROVAL PER SPECIFICATION 01 32 16 AND 01 00
00.
SEQUENCING OF DEMOLITION AND CONSTRUCTION ACTIVITIES WITHIN PROJECT
PHASES SHALL BE DETERMINED BY THE CONTRACTOR. THE EXTENT AND
SEQUENCING OF CONSTRUCTION ACTIVITIES SHALL BE CONFIRMED AND
COORDINATED WITH THE VHA COR. ASSOCIATED MEP, FIRE, LOW
VOLTAGE/COMMUNICATIONS ITEMS TO BE COORDINATED BY CONTRACTOR
WITH VHA COR.
REFER TO DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.
GENERAL NOTES - PHASING
17 18.8
19.5 20 21 22 23.5 23.9 25.5
B.9
B.8
B.7
B.5
B.6
A.5
AA
AA.1
BB
CC
DD
EE
FF
GG
17.1 18.5 19.3 20.117.5
B.95
D
F
H.1
H.2
H.5
H.75
26.5 28.1 28.5
OPEN TO BELOW
CORRIDOR
2A-C1
RECEPTION
2A-134
C O
R R
ID
O
R
X-RAY
2A-101
CONTROL RM
2A-102
X-RAY
2A-103
OFFICE
2A-144
STORAGE
2A-143
OFFICE
2A-142 EXAM RM
2A-141A
CT SCAN
2A-112
BONE DENSITY
2A-111
CONTROL RM
2A-111C
EQUIPMENT
2A-113
ELEC
2A-111B
ULTRASOUND
2A-108A
ULTRASOUND
2A-108B
ULTRASOUND
2A-108
CHANGING ROOM
2A-108E
EXAM RM
2A-106
MRI EXAM
2A-110E
MRI EQUIP
2A-110F
MRI CONTROL
2A-110
EQUIP STOR
2A-110C
HOLDING
2A-110B
MECH
2A-123A
WAITING
2A-107
RECEPTION
2A-132
SUPPLY
2A-140
OFFICE
2A-139
HAC
2A-137
BREAK RM
2A-133
RADIOGRAPHY/
FLUOROSCOPY
2A-130A
RADIOLOGIST OFFICE
2A-130
TOILET
2A-108C
TOILET
2A-100B
SUPPLY
2A-130B
RECEPTION
2A-109
TOILET
2A-104
TOILET
2A-105
TOILET
2A-103B
CHANGING ROOM
2A-103A
TOILET
2A-138A
CHNG RM
2A-138
TOILET
2A-141C
OFFICE
2A-141
EXAM
2A-141B
CORRIDOR
FIRE
HOSE
CLOSET
MECH
2A-123
4 1 4
4 3
1 1
PHASE 1
PHASING REQUIREMENTS - PHASE 1 #
NOT IN SCOPE
EXISTING DOOR
EXISTING WALL
NEW WALL
LEGEND
1-HR FIRE
2-HR FIRE
FIRE RESISTIVE WALLS:
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
##KEYNOTES
KEY PLAN
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 7:
A
M
GI005A
PROJECT PHASING - SECOND
FLOOR - PHASE 1
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DR TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
1/8" = 1'-0"
PROJECT PHASING - PHASE 1
F3
1. NIGHT/WEEKEND WORK ONLY
2. NO SCHEDULING RESTRICTIONS AT THIS AREA
3. WEEKENDS - 3 DAY MAXIMUM DOWNTIME - SCHEDULED IN ADVANCE
4. WEEKENDS - 4 DAY MAXIMUM DOWNTIME - SCHEDULED IN ADVANCE
1. TEMPORARY COOLING WILL BE REQUIRED AT THIS AREA FOR DURATION OF
AHU-7 CHANGE OVER
2. ONE ROOM SHALL REMAIN OPERATIONAL DURING CONSTRUCTION
3. WORK TO COMMENCE 5PM FRIDAY, WITH TEMP UNIT FUNCTIONAL BY 4PM
SUNDAY
4. VHA INSPECTION OF TEMPORARY EQUIPMENT PRIOR TO USAGE
5. SPOT COOLERS IN SEVERAL ROOMS, ADDITIONAL ROOMS IF CHANGE OVER
SEQUENCE NOT COMPLETE BY SUNDAY 4PM
IN ORDER TO LIMIT DISRUPTION OF FACILITY OPERATIONS AND CONTAIN
AIRBORNE DUST & CONTAMINATION FROM CONSTRUCTION ACTIVITIES, WORK
UNDER THIS CONTRACT SHALL BE DIVIDED INTO AREAS AS IDENTIFIED IN
PHASING PLAN DRAWINGS. REFER TO SPECIFICATION 01 35 26 FOR ICRA
BARRIER REQUIREMENTS.
PERFORM WORK PER PHASING REQUIREMENTS AS SHOWN. PROVIDE A
SCHEDULE TO THE VHA FOR APPROVAL PER SPECIFICATION 01 32 16 AND 01 00
00.
SEQUENCING OF DEMOLITION AND CONSTRUCTION ACTIVITIES WITHIN PROJECT
PHASES SHALL BE DETERMINED BY THE CONTRACTOR. THE EXTENT AND
SEQUENCING OF CONSTRUCTION ACTIVITIES SHALL BE CONFIRMED AND
COORDINATED WITH THE VHA COR. ASSOCIATED MEP, FIRE, LOW
VOLTAGE/COMMUNICATIONS ITEMS TO BE COORDINATED BY CONTRACTOR
WITH VHA COR.
REFER TO DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.
GENERAL NOTES - PHASING
17 18.8
19.5 20 21 22 23.5 23.9 25.5
B.9
B.8
B.7
B.5
B.6
A.5
AA
AA.1
BB
CC
DD
EE
FF
GG
17.1 18.5 19.3 20.117.5
B.95
D
F
H.1
H.2
H.5
H.75
26.5 28.1 28.5
NUCLEAR MED
CAMERA
2A-118
HOT LAB
2A-117
NUCLEAR MEDICINE
2A-127
NUCLEAR STRESS
LAB/ EXAM RM
2A-125
OFFICE
2A-128
INJECTION
2A-116
EXAM
2A-121A
EXAM
2A-121
EXAM
2A-122
ELEC
2A-120
TOILET
2A-115
OFFICE
2A-114
HAC
2A-124
3 1
2 2
2 1
1 2
PHASE 2
PHASING REQUIREMENTS - PHASE 2 #
NOT IN SCOPE
EXISTING DOOR
EXISTING WALL
NEW WALL
LEGEND
1-HR FIRE
2-HR FIRE
FIRE RESISTIVE WALLS:
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
##KEYNOTES
KEY PLAN
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 7:
A
M
GI005B
PROJECT PHASING - SECOND
FLOOR - PHASE 2
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DE TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
1/8" = 1'-0"
PROJECT PHASING - PHASE 2
F3
1. TEMPORARY COOLING WILL BE REQUIRED AT THIS AREA FOR DURATION OF
AHU-10 CHANGE OVER
2. AHU SERVING THIS SPACE LOCATED ON 3RD FLOOR/ ROOM 3A-111A . RE:
THIS SHEET FOR PHASING REQUIREMENTS
1. NIGHT/WEEKEND WORK ONLY
2. WEEKENDS - 4 DAY MAXIMUM DOWNTIME - SCHEDULED IN ADVANCE
3. 4 DAYS MAXIMUM DOWNTIME FOR DEMO WORK. WORK AT THIS AREA
SHALL BE SCHEDULED DURING WORKWEEK, M-F 8AM - 5PM. RADIATION
EXPOSURE NOT LIKELY, HOWEVER ACCESS TO THIS ROOM REQUIRES
RADIATION BADGING. COORDINATION WITH VHA COR REQUIRED FOR ROOM
ACCESS.
A. UNLESS NOTED OTHERWISE, ALL WORK SHALL CONFORM WITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. SPECIFICATIONS SHALL TAKE PRECEDENCE OVER GENERAL NOTES & TYPICAL
DETAILS.
B. PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL COMPARE THE INITIAL CONDITIONS SHOWN
ON THE DRAWINGS WITH THE EXISTING SITE CONDITIONS. ANY DISCREPANCIES BETWEEN THE
DRAWINGS AND SITE CONDITIONS SHALL BE REPORTED TO THE VHA COR AND RESOLVED BEFORE
PROCEEDING WITH THE WORK.
C. IN CASE OF CONFLICT BETWEEN REQUIREMENTS, FOLLOW THE MOST STRINGENT REQUIREMENT
INDICATED OR AS DIRECTED BY THE VHA CO WITHOUT ADDITIONAL COST TO THE OWNER.
D. THE CONTRACTOR SHALL COORDINATE & VERIFY ALL DIMENSIONS & ELEVATIONS SHOWN ON
STRUCTURAL DRAWINGS WITH THE DIMENSIONS AND ELEVATIONS SHOWN ON THE ARCHITECTURAL
DRAWINGS. DISCREPANCIES SHALL BE REPORTED TO THE VHA COR AND RESOLVED PRIOR TO
STARTING ANY RELATED WORK.
E. DETAILS, SECTIONS, & NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL & SHALL APPLY TO SIMILAR SITUATIONS WHERE APPROPRIATE UNLESS NOTED OR OTHERWISE INDICATED. DETAILS MAY NOT BE DRAWN TO SCALE OR DIMENSIONS INDICATED ON TYPICAL DETAILS AND SECTIONS MAY
REQUIRE ADJUSTMENT TO SUIT SPECIFIC CONDITIONS.
F. MEANS AND METHODS AS WELL AS MAINTAINING SITE SAFETY ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
1. SHORING AND BRACING REQUIREMENTS: WALLS ABOVE GRADE SHALL BE BRACED AND/OR SHORED
UNTIL THE STRUCTURAL SYSTEM IS COMPLETE. WALLS ARE NOT SELF-SUPPORTING.
2. FLOOR AND ROOF STRUCTURES: THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE METHOD
AND SEQUENCE OF ALL STRUCTURAL ERECTION. PROVIDE TEMPORARY SHORING AND BRACING AS
REQUIRED TO PROVIDE ADEQUATE INTERIM VERTICAL & LATERAL SUPPORT. SHORING AND
BRACING SHALL REMAIN IN PLACE UNTIL ALL PERMANENT MEMBERS ARE IN PLACE AND ALL FINAL CONNECTIONS ARE COMPLETE. THIS INCLUDES, BUT IS NOT LIMITED TO, ALL ROOF AND FLOOR
CONNECTIONS. THE BUILDING SHALL BE ADEQUATELY SHORED AND BRACED UNTIL ALL
STRUCTURAL COMPONENTS ARE COMPLETE AND CONNECTED AS INDICATED ON THE DRAWINGS
AND IN THE SPECIFICATIONS.
G. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATE THE WORK WITH
ALL TRADES & ALL ITEMS TO BE INTEGRATED INTO STRUCTURAL SYSTEM. OPENINGS OR
PENETRATIONS THROUGH, OR ATTACHMENTS TO THE STRUCTURAL SYSTEM THAT ARE NOT INDICATED
ON DRAWINGS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR & SHALL BE
COORDINATED WITH THE CO. THE ORDER OF CONSTRUCTION IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR. IT IS THE CONTRACTOR'S OBLIGATION TO PROVIDE ITEMS NECESSARY FOR THE
SELECTED CONSTRUCTION PROCEDURE.
H. OBSERVATION VISITS TO THE SITE BY ARCHITECT'S/ENGINEER'S REPRESENTATIVES SHALL NOT BE
CONSTRUED AS INSPECTIONS OR APPROVALS OF CONSTRUCTION.
I. ALL CONSTRUCTION AND INSPECTIONS SHALL BE IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED INSPECTIONS AND SHALL NOT PROCEED WITH THE WORK INVOLVED UNTIL THE INSPECTIONS HAVE BEEN COMPLETED AND THE WORK
APPROVED BY CO.
J. THE CONTRACTOR MUST SUBMIT A WRITTEN REQUEST AND OBTAIN THE CO'S PRIOR WRITTEN APPROVAL FOR ANY CHANGES, MODIFICATIONS, OMISSIONS, AND/OR SUBSTITUTIONS TO THE WORK
INDICATED HEREIN.
K. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY AND PROTECTIONS IN AND AROUND THE JOB
SITE AND/OR ADJACENT PROPERTIES THAT MAY BE AFFECTED BY THE WORK. ALL SUPPORT OF
CONSTRUCTION LOADS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. ALL SHORING AND BRACING REQUIRED FOR THE PROTECTION OF LIFE & PROPERTY DURING THE CONSTRUCTION PROCESS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. ALL PROCEDURES OF SOIL EXCAVATION, BACKFILL, & SUPPORT OF ADJACENT PROPERTY DURING EARTHWORK SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
L. ALL DIMENSIONS INDICATED ON PLANS SHALL BE TO FACE OF STUDS, FACE OF CONCRETE BLOCK, FACE OF ROUGH CONCRETE, CENTERLINE OF COLUMNS, TOP OF STEEL, OR TOP OF SLAB, UNLESS NOTED OR INDICATED OTHERWISE. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS NOT INDICATED
ON STRUCTURAL DRAWINGS.
PART I - GENERAL REQUIREMENTS
A. GENERAL BUILDING CODE
1. THE CONSTRUCTION DOCUMENTS ARE BASED ON THE REQUIREMENTS, CODES AND DESIGN GUIDES
SPECIFIC TO THE VETERAN'S HEALTH ADMINISTRATION AS FOLLOWS:
• VA CFM, 2014 STRUCTURAL DESIGN MANUAL
• BUILDING CODE
A. BUILDING CODE: 2015 INTERNATIONAL BUILDING CODE WITH WEST VIRGINIA AMENDMENTS.
B. NATIONAL LOADING STANDARD: ASCE 7-16 - MINIMUM DESIGN LOADS FOR BUILDINGS AND
OTHER STRUCTURES
C. STEEL: AISC 360-10 - SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS
2. DESIGN LOADS:
A. FLOOR:
1. DEAD LOADS:
• EXISTING ROOF: SELF WEIGHT OF EXISTING MATERIAL
2. LIVE LOADS:
• FLOOR: 100 PSF (PER ORIGINAL DRAWINGS)
3. EQUIPMENT LOADS
PART II - DESIGN CRITERIA
UNIT IDENTIFIER MAX DIMENSIONS MAX HOISTED
WEIGHT (LB)L (IN) W (IN) H (IN)
AHU 7
AHU 10
291 80 53 5600
43604266.5286
B. SEISMIC LOADS
1. SEISMIC DESIGN CATEGORY: D
2. SOIL SITE CLASS: C - VERY DENSE SOIL AND SOFT ROCK
3. SEISMIC DESIGN CRITERIA:
• SS, 0.2 SEC. SPECTRAL ACCELERATION, (%g) = 0.949
• S1, 1 SEC. SPECTRAL ACCELERATION, (%g) = 0.331
• SDS, 0.2 SPECTRAL RESPONSE COEFFICIENT, (%g) = 0.803
• SD1, 1 SPECTRAL RESPONSE COEFFICIENT, (%g) = 0.334
• OCCUPANCY CATEGORY: IV
• EARTHQUAKE LOADS:
1. OCCUPANCY CATEGORY = IV
2. SPECTRAL RESPONSE COEFFICIENT
A. Ss = 0.223 g B. S1 = 0.071 9
3. SPECTRAL RESPONSE ACCELERATION
A. Sds = 0..237 g B. Sd1 = 0.114 g
4. SEISMIC DESIGN CATEGORY = C
5. SITE CLASS = D
6. ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE PROCEDURE
• 1.2 DEFLECTION CRITERIA: REFER TO TABLE 1604.3 FOR DEFLECTION LIMITS.
4. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS:
• NONSTRUCTURAL COMPONENTS ENGINEERED AS PART OF DEFERRED SUBMITTALS, AND
CONNECTIONS OF THOSE COMPONENTS TO THE PRIMARY STRUCTURE SHALL BE DESIGNED IN
ACCORDANCE WITH THE AFOREMENTIONED BUILDING CODE, THE GENERAL SEISMIC CRITERIA
LISTED ABOVE, AND THE REQUIREMENTS OF ASCE 7-16 AS APPROPRIATE.
A. SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH CHAPTER 17 OF THE
BUILDING CODE REFERENCED ABOVE AND AS DEFINED BELOW. A QUALIFIED SPECIAL
INSPECTOR APPROVED BY THE GOVERNMENT SHALL MAKE SPECIAL INSPECTIONS. THE SPECIAL
INSPECTOR SHALL OBSERVE WORK FOR CONFORMANCE WITH THE APPROVED DRAWINGS AND
SPECIFICATIONS.
B. INSPECTION REPORTS SHALL BE FURNISHED TO THE GOVERNMENT, ARCHITECT, AND
STRUCTURAL ENGINEER. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTOR, AND, IF NOT CORRECTED, SHALL BE REPORTED TO THE GOVERNMENT,
ARCHITECT, AND STRUCTURAL ENGINEER.
C. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT STATING THAT THE STRUCTURAL WORK
WAS, TO THE BEST OF HIS KNOWLEDGE, PERFORMED IN ACCORDANCE WITH THE APPROVED
DRAWINGS, SPECIFICATIONS, AND THE BUILDING CODE.
D. THE FOLLOWING TYPES OF WORK REQUIRE SPECIAL INSPECTION: (REFER TO THE BUILDING
CODE AND SPECIFICATIONS FOR DETAILED INSPECTION REQUIREMENTS.)
1. STEEL CONSTRUCTION
• MATERIAL VERIFICATION OF:
• HIGH-STRENGTH BOLTS, NUTS AND WASHERS
• STRUCTURAL STEEL
• INSPECTION OF:
• HIGH-STRENGTH BOLTING
PART III - SPECIAL INSPECTIONS
A. EQUIPMENT COORDINATION
1. THE CONTRACTOR SHALL COORDINATE DIMENSIONAL AND UTILITY REQUIREMENTS OF
ACTUAL EQUIPMENT PURCHASED WITH PROVISIONS SHOWN ON THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ANY CHANGES
NECESSARY TO MAKE SUCH COORDINATION WITHOUT ADDITIONAL COST TO THE
GOVERNMENT.
B. EQUIPMENT ANCHORAGE
1. THE CONTRACTOR SHALL ENGINEER, FURNISH AND INSTALL NECESSARY ANCHORAGE AND
VIBRATION ISOLATION FOR ALL EQUIPMENT AND RAILS TO RESIST ALL LOADING INCLUDING
BUT NOT LIMITED TO VIBRATORY, WIND AND EARTHQUAKE LOADS AT NO ADDITIONAL COST TO
THE GOVERNMENT.
2. THE CONTRACTOR SHALL PREPARE AND SUBMIT ANCHORAGE DETAILS AND SUPPORTING
CALCULATIONS PREPARED AND SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE
STATE OF THE PROJECT FOR ALL MOUNTED EQUIPMENT, AND ASSOCIATED CURBS, FOR
REVIEW AND APPROVAL PRIOR TO FABRICATION AND INSTALLATION AT NO ADDITIONAL COST
TO THE GOVERNMENT.
C. EQUIPMENT STRUCTURAL SUPPORT
1. THE STRUCTURAL DESIGN DEPICTED ON THESE DRAWINGS IS BASED ON THE EQUIPMENT
DIMENSIONS AND WEIGHTS OUTLINED ABOVE. IN THE EVENT THE CONTRACTOR SELECTS
EQUIPMENT WITH WEIGHT GREATER THAN THAT DEPICTED IN THE TABLE SHOWN ON THIS
SHEET, OR DIMENSIONS MORE THAN 10% GREATER THAN THOSE DEPICTED IN THE TABLE
SHOWN ON THIS SHEET, THE CONTRACTOR SHALL HAVE THE AFFECTED SUPPORTING
STRUCTURE (NEW AND EXISTING) EVALUATED AND REINFORCED AS NECESSARY BY A
STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE PROJECT, AND SUBMIT SEALED
CALCULATIONS AND DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF
FABRICATION. COSTS ASSOCIATED WITH ENGINEERING ANALYSIS, DESIGN AND
CONSTRUCTION OF REPAIRS SHALL BE BORNE BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
PART IV - EQUIPMENT
A. GENERAL
1. GENERAL REQUIREMENTS
A. DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE
WITH THE MANUAL OF STEEL CONSTRUCTION, BY THE AMERICAN INSTITUTE OF STEEL
CONSTRUCTION, INC AND PROJECT SPECIFICATIONS.
2. SUBMITTALS
A. SHOP DRAWINGS: ERECTION AND FABRICATION DRAWINGS. SHOP DRAWINGS SHALL NOT
CONTAIN REPRODUCTIONS OF THE CONTRACT DRAWINGS. MEMBER SUBSTITUTION AND
DEVIATIONS FROM THE CONTRACT DRAWINGS SHALL BE CLEARLY IDENTIFIED WITH AN
EXPLANATION FOR THE PROPOSED DEVIATION. ALL SHOP DRAWINGS SHALL BE SUBMITTED
FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. ALL REQUIRED FIELD VERIFICATION OF
EXISTING CONDITIONS AND DIMENSIONS SHALL BE CONDUCTED AND COORDINATED WITH THE
SHOP DRAWINGS PRIOR TO SUBMISSION.
3. DELIVERY, STORAGE AND HANDLING
A. PROTECT FROM CORROSION, DEFORMATION, AND OTHER TYPES OF DAMAGE. STORE ITEMS
IN AN ENCLOSED AREA FREE FROM CONTACT WITH SOIL AND WEATHER. REMOVE AND
REPLACE DAMAGED ITEMS WITH NEW ITEMS.
B. PRODUCTS
1. MATERIALS:
A. ALL WIDE FLANGE W'S & WT'S SHALL BE IN CONFORMANCE WITH ASTM A 992, LATEST
ADOPTED EDITION, UNO.
B. ALL OTHER SHAPES, PLATES AND BARS SHALL BE IN CONFORMANCE WITH ASTM A 36, LATEST
ADOPTED EDITION, UNO.
C. ALL SQUARE, RECTANGULAR AND ROUND TUBING SHALL BE IN CONFORMANCE WITH ASTM A
500, LATEST ADOPTED EDITION, GRADE B.
D. ALL ROUND PIPE SHALL BE IN CONFORMANCE WITH ASTM A 53, LATEST ADOPTED EDITION, GRADE B.
E. BOLTS SHALL CONFORM TO F 1852 (A 325) TYPE 1 LOAD INDICATOR BOLTS, UNO.
F. THREADED RODS SHALL COMPLY WITH ASTM A 36, LATEST ADOPTED EDITION, UNO.
G. HARDENED STEEL WASHERS SHALL COMPLY WITH ASTM F 436.
H. HEAVY HEX NUTS SHALL COMPLY WITH ASTM A 563.
I. ABRASIVE FINISH FLOOR PLATE SHALL COMPLY WITH ASTM A 786 AND ASTM A 36, LATEST
ADOPTED EDITION, UNO.
2. FABRICATION
A. ALL NATURAL AND FABRICATED CAMBER SHALL BE INSTALLED UPWARD.
B. THE MINIMUM THICKNESS OF GUSSET AND FIN PLATES SHALL BE 3/8 IN.
C. BOLTED CONNECTIONS:
a. ALL OTHERS MAY BE CONSIDERED AS "BEARING" TYPE N.
b. THE MINIMUM NUMBER OF BOLTS IN STRUCTURAL STEEL CONNECTIONS SHALL BE AS
FOLLOWS:
• A MINIMUM OF TWO BOLTS PER CONNECTION SHALL BE USED, UNO.
3. FINISH
A. SURFACE PREPARATION:
a. UNLESS NOTED OTHERWISE, SHOP CLEAN THE SURFACE OF ALL STRUCTURAL STEEL IN
ACCORDANCE WITH THE REQUIREMENTS OF SSPC-SP2.
B. PRIMER:
a. UNLESS NOTED OTHERWISE SHOP PAINT WITH A MINIMUM OF 1.0 MILS OF THE
FABRICATORS STANDARD RUST INHIBITIVE PRIMER.
C. FINISH COATING
a. PAINT AS SPECIFIED
b. STANDARD COLORS AS SPECIFIED.
C. PART 3 EXECUTION
1. EXAMINATION
A. PRIOR TO STRUCTURAL STEEL ERECTION, ERECTOR SHALL INSPECT EXISTING
CONSTRUCTION FOR CORRECT SIZE, LAYOUT AND ALIGNMENT. ANY INCONSISTENCIES
DEEMED DETRIMENTAL TO THE ERECTION OF STEEL SHALL BE REPORTED TO THE COR AND
REPAIRED PRIOR TO INSTALLATION.
2. INSTALLATION
A. WELDED CONNECTIONS SHALL BE MADE WITH E70XX ELECTRODES IN ACCORDANCE WITH
AWS D1.1, STRUCTURAL WELDING CODE BY THE AMERICAN WELDING SOCIETY, AND SHALL BE
PERFORMED BY CERTIFIED WELDERS. WELDER CERTIFICATION SHALL BE AVAILABLE ON SITE
FOR INSPECTION.
3. FIELD QUALITY CONTROL
A. TOLERANCES
a. MAXIMUM VARIATION FROM PLUMB: 1/4" (6 MM) PER STORY, NON-CUMULATIVE.
b. MAXIMUM OFFSET FROM TRUE ALIGNMENT
B. WELDED CONNECTIONS:
a. ALL WELDS SHALL BE VISUALLY EXAMINED.
b. 15% OF ALL WELDS SHALL BE TESTED IN ACCORDANCE WITH THE FOLLOWING METHODS:
• TESTED BY THE LIQUID PENETRANT METHOD IN ACCORDANCE WITH ASTM E 165 OR
THE MAGNETIC PARTICLE METHOD IN ACCORDANCE WITH ASTM E 709.
4. REPAIR
A. PROTECTIVE COATINGS DAMAGED DURING THE TRANSPORTATION, ERECTION AND FIELD
WELDING PROCESSES SHALL BE REPAIRED IN THE FIELD TO MATCH THE SHOP APPLIED
COATING.
5. CLEANING AND PROTECTION
A. CLEAN AFTER INSTALLATION EXPOSED PRE-FINISHED ITEMS IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
B. PROTECT INSTALLED ITEMS FROM DAMAGE CAUSED BY SUBSEQUENT CONSTRUCTION.
PART V - STRUCTURAL STEEL
A. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION
DOCUMENTS. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS
WITH EXISTING REBAR. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE
MANUFACTURER'S WRITTEN INSTRUCTIONS. DESIGN BASIS ANCHORS ARE SHOWN BELOW. POST-
INSTALLED ANCHORS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO ORDERING. THE
CONTRACTOR SHALL SUBMIT CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED
PROFESSIONAL ENGINEER IN THE STATE OF THE PROJECT AND ALL TECHNICAL DATA ASSOCIATED WITH THE SUBSTITUTE POST-INSTALLED ANCHOR IF THE CONTRACTOR CHOOSES TO DEVIATE FROM
THE DESIGN BASIS POST-INSTALLED ANCHORS SHOWN BELOW. THE CALCULATIONS SHALL
DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERTINENT
EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE
APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE BUILDING CODE.
B. CONCRETE ANCHORS
1. EXPANSION ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN IN
ACCORDANCE WITH ACI 318 APPENDIX D.
2. PRE-APPROVED ANCHOR MANUFACTURERS
A. SIMPSON STRONG-TIE ANCHORING SYSTEMS
B. HILTI
C. POWERS
PART VI - POST INSTALLED ANCHORS
STRUCTURAL ABBREVIATIONS
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
S tru c_
R
_m ho ile s6
Q 2Y
B .rv t 2/
/2
3:
:4
P M
S-001
STRUCTURAL NOTES CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
SL AGW
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
STRUCTURAL GENERAL NOTES
LF LINEAR FOOT (FEET)
LLBB LONG LEG BACK-TO-BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LWC LIGHTWEIGHT CONCRETE
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
PC PRECAST CONCRETE
PL PLATE
PLYWD PLYWOOD
PREFAB PREFABRICATE (D)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
REINF REINFORCE (D), (ING)
REQD REQUIRED
RO ROUGH OPENING
RTU ROOF TOP UNIT
SC SLIP CRITICAL
SCH SCHEDULE
SF SQUARE FOOT (SQFT)
SIM SIMILAR
SLBB SHORT LEG BACK-TO-BACK
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
STD STANDARD
STL STEEL
STRUCT STRUCTURE / STRUCTURAL
SYM SYMMETRICAL
T&B TOP AND BOTTOM
TF TOP OF FOOTING
TO TOP OF
TOC TOP OF CONCRETE
TOD TOP OF DECK
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOP OF PLATE
TW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
W WIDTH, WIDE
W/ WITH
W/O WITHOUT
WP WORK POINT
WT WEIGHT
WWR WELDED WIRE REINFORCEMENT
AB ANCHOR BOLT
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ARCH ARCHITECT / ARCHITECTURAL
BF BOTTOM OF FOOTING
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BW BOTTOM OF WALL
CFMF COLD FORMED METAL FRAMING
CFS COLD FORMED STEEL
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCT / CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
DEMO DEMOLISH / DEMOLITION
DIM DIMENSION
DWG DRAWING
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EW EACH WAY
EXIST EXISTING
EXP EXPANSION / EXPOSED
FDN FOUNDATION
FF FINISH FLOOR
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUDS
FRMG FRAMING
FT FOOT/ FEET
FTG FOOTING
GA GAUGE
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
HAS HEADED ANCHOR STUD
HDR HEADER
HORIZ HORIZONTAL
HS HIGH STRENGTH
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
IBC INTERNATIONAL BUILDING CODE
IN INCH
INCL INCLUDE (D), (ING)
JST JOIST
K KIPS
L LONG / LENGTH
LBS/# POUNDS
0 100% CONSTRUCTION DOCUMENTS 02-29-2024
17 18.8 19.5 20 21 22 23.5 23.9 25.5
B.9
B.8
B.7
B.5
B.6
A.5
AA
AA.1
BB
CC
DD
EE
FF
GG
17.1 18.5 19.3 20.117.5
B.95
D
F
H.1
H.2
H.5
H.75
26.5 28.1 28.5
SF411
F7
SF411
C7
LEVEL 2 LEVEL 3
A. UNLESS NOTED OTHERWISE, ALL WORK SHALL CONFORM WITH THE
REQUIREMENTS OF THE PROJECT SPECIFICATIONS. SPECIFICATIONS
SHALLE TAKE PRECEDENCE OVER GENERAL NOTES & TYPICAL DETAILS.
B. PRIOR TO STARTING THE WORK, THE CONTRACTORS SHALL COMPARE THE
INITIAL CONDITIONS SHOWN ON THE DRAWINGS WITH THE EXISTING SITE
CONDITIONS. ANY DISCREPENCIES BETWEEN THE DRAWINGS AND SITE
CONDITIONS SHALL BE REPORTED TO THE VHA COR AND RESOVLED BEFORE
PROCEEDING WITH THE WORK.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
##KEYNOTES
KEY PLAN
GENERAL NOTES
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
S tru c_
R
_m ho ile s6
Q 2Y
B .rv t 2/
/2
3:
:4
P M
SF112
FRAMING PLAN - LEVEL 2 & LEVEL 3 CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
SL AGW
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
32'16'8'4'2'0'
P la n N or th
True North1/8" = 1'-0"
FRAMING PLAN - LEVEL 2 & LEVEL 3
F3
01. AHU - 7, LEVEL 2
02. AHU - 10, LEVEL 3
17 18.8
B.8
B.7
B.5
B.6
A.5
AA
17.1 18.517.5
6' - 5"
E Q
E Q
E Q
E Q
(W 8X
(W 8X
(W 8X
(W 8X
(W8X10)
(W8X10)
(W8X10)
(W8X10)
(W8X10)
HSS3X3X1/4
F4
SF411
(W 8X
(W 8X
(W 8X
(W 8X
TYP
(L3X3X1/4)
(L3X3X1/4)
(L3X3X1/4)
(L 3X
3X 1/4
20 21 22 23.5 23.9
AA
AA.1
BB
CC
20.1
23' - 7"
EQ EQ EQ EQ
(W8X10)(W8X10)(W8X10)(W8X10)
(W8X10) (W8X10) (W8X10) (W8X10)
(L 3X
3X 1/
4)
HSS3X3X1/4
(W 8X
(W 8X
(W 8X
(W 8X
5'
F4
SF411
(W 8X
)(L3X3X1/4)
(L 3X3X1/4)
BEAM, SEE
STEEL COLUMN, SEE
1" NON-SHRINK GROUT
(2) 3/4" Ø BOLTS TYP
3/8"x6"x0-'4" PLATE TYP
(4) 1/2" DIA x 4 1/2" EMBED
EXPANSION ANCHORS
ANGLE BRACE, SEE
BEAM, SEE
EXISTING 7" REINFORCED CONCRETE
SLAB. LOCATE EXISTING REBAR PRIOR
TO FABRICATION BY NON-
DESTRUCTIVE MEANS. DO NOT
DAMAGE OR CUT EXISTING REBAR.
1/2"x9"x0'-9" BASE PLATE TYP SEE
FOR BASE PLATE DETAILS
3/16
TYP
1/4
TYP
T/ STL
SEE
1/
2"
3"
1/
2"
1 1/2" 2 1/2"
CL
/F7 SF411
/F7 SF411
/F7 SF411
/F7 SF411
/F7 SF411
/C4 SF411
1/8
1/4 PLATE TO TOP
OF COL TYP
BEAM, SEE /F7 SF411
ANGLE BRACE, SEE
/F7 SF411
HSS POST SEE
13/16" DIA HOLE
1/2"x9"x0'-9" BASE PLATE 3"
3"
1 1/2"
1/
2"
1/4
CL
CL
/F7 SF411
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
S tru c_
R
_m ho ile s6
Q 2Y
B .rv t 2/
/2
3:
:4
P M
SF411
ENLARGED FRAMING PLANS &
DETAILS
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
SL AGW
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
16'8'4'2'1'0'
P la n N or th
True North1/4" = 1'-0"
FRAMING PLAN - LEVEL 2
F7
16'8'4'2'1'0'
P la n N or th
True North1/4" = 1'-0"
FRAMING PLAN - LEVEL 3
C7
3'1'-6"8"4"2"0'
1 1/2" = 1'-0"
TYPICAL SECTION AT EQUIPMENT FRAME
F4
3'1'-6"8"4"2"0'
1 1/2" = 1'-0"
EQUIPMENT FRAME POST BASE PLATE DETAIL
C4
B.8
B.7
B.5
B.6
A.5
AA
AA.1
BB
CC
DD
EE
FF
GG
17.1 18.5 19.3 20.117.5
B.95
D
F
H.1
H.2
H.5
H.75
26.5 28.1 28.5
OPEN TO BELOW
X-RAY
2A-101
CONTROL RM
2A-102
X-RAY
2A-103
OFFICE
2A-144 STORAGE
2A-143
OFFICE
2A-142
EXAM RM
2A-141A
NUCLEAR MED
CAMERA
2A-118
HOT LAB
2A-117
CT SCAN
2A-112
NUCLEAR MEDICINE
2A-127
NUCLEAR STRESS
LAB/ EXAM RM
2A-125
OFFICE
2A-128
BONE DENSITY
2A-111
CONTROL RM
2A-111C
INJECTION
2A-116
EQUIPMENT
2A-113
ELEC
2A-111B
CORRIDOR
2A-C1
ULTRASOUND
2A-108A
ULTRASOUND
2A-108B
ULTRASOUND
2A-108CHANGING ROOM
2A-108E
EXAM RM
2A-106
MRI EXAM
2A-110E
MRI EQUIP
2A-110F
MRI CONTROL
2A-110
EQUIP STOR
2A-110C
HOLDING
2A-110B
MECH
2A-123A
WAITING
2A-107
RECEPTION
2A-109
SUPPLY
2A-140
OFFICE
2A-139
HAC
2A-137
BREAK RM
2A-133
2A-134
RADIOGRAPHY/
FLUOROSCOPY
2A-130A
EXAM
2A-121A
EXAM
2A-121
EXAM
2A-122
ELEC
2A-120
TOILET
2A-115
OFFICE
2A-114
CORRIDOR
HAC
2A-124
RADIOLOGIST OFFICE
2A-130
TOILET
2A-108C
TOILET
2A-100B
SUPPLY
2A-130B
2A-132
TOILET
2A-138A
TOILET
2A-104
TOILET
2A-105
TOILET
2A-103B
CHNG RM
2A-138
HAC
2A-XXX
ELEVATOR
LOBBY
TOILET
2A-141C
OFFICE
2A-141
EXAM
2A-141B
CORRIDOR
A. PROVIDE AN INFECTION CONTROL RISK ASSESSMENT (ICRA) BARRIER
AROUND THE PROJECT AREA CONSISTENT WITH THE CONTRACTOR'S
PHASING PLAN AS APPROVED BY THE VHA COR.
B. NO EXISTING LEAD PAINT IS ANTICIPATED TO BE FOUND IN THE PROJECT
AREA. HOWEVER, IF THE CONTRACTOR DISCOVERS OR UNCOVERS
SUSPECTED LEAD PAINT OR OTHER HAZARDOUS SUBSTANCE, THE VHA COR
SHALL BE NOTIFIED. WORK WITH SUCH SUSPECTED HAZARDOUS MATERIALS
SHALL CEASE UNTIL THE SUSPECTED HAZARDOUS MATERIAL IS TESTED,
ABATED IF NECESSARY, AND WORK AUTHORIZED TO PROCEED BY THE VHA
COR.
C. MECHANICAL & ELECTRICAL & PLUMBING DRAWINGS FOR OTHER
DEMOLITION INFORMATION & REQUIREMENTS.
D. REMOVE, REFURBISH/ CLEAN, PROTECT AND STORE FIXTURES TO BE
REINSTALLED.
E. VERIFY AND COORDINATE ACCESS TO AND SCHEDULE OF REQUIRED
UTILITY SHUT-OFFS TO ACCOMPLISH SCOPE OF WORK WITH VHA COR A
MINIMUM OF 7 WORKING DAYS PRIOR TO START OF WORK.
NOT IN SCOPE
EXISTING WALL - TO REMAIN
EXISTING WALL - DEMO
EXTENTS OF DEMOLITION
EXISTING DOOR - TO REMAIN
EXISTING DOOR - DEMO
LEGEND - DEMOLITION
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
##KEYNOTES
KEY PLAN
GENERAL NOTES
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 6:
A
M
AD112
SECOND FLOOR DEMOLITION PLAN CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DE TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN
F3
1. DEMO WALL TO EXTENT SHOWN
2. DEMO MECHANICAL EQUIPMENT RE: MECHANICAL PLANS
3. DEMO FUME HOOD RE: MECH, ELEC
4. DEMO SOFFIT ENCLOSING MED GAS. PATCH AND REPAIR AREA IN NEW
WORK PHASE.
T
B.9
B.8
B.7
B.5
B.6
A.5
AA
AA.1
BB
CC
DD
EE
FF
GG
17.1 18.5 19.3 20.117.5
B.95
D
F
H.1
H.2
H.5
H.75
26.5 28.1 28.5
OPEN TO BELOW
CORRIDOR
2A-C1
RECEPTION
2A-134
C O
R R
ID
O
R
AE220F8
X-RAY
2A-101
CONTROL RM
2A-102
X-RAY
2A-103
OFFICE
2A-144
STORAGE
2A-143
OFFICE
2A-142
EXAM RM
2A-141A
NUCLEAR MED
CAMERA
2A-118
HOT LAB
2A-117
CT SCAN
2A-112
NUCLEAR MEDICINE
2A-127
NUCLEAR STRESS
LAB/ EXAM RM
2A-125 OFFICE
2A-128
BONE DENSITY
2A-111
CONTROL RM
2A-111C
INJECTION
2A-116
EQUIPMENT
2A-113
ELEC
2A-111B
ULTRASOUND
2A-108A
ULTRASOUND
2A-108B
ULTRASOUND
2A-108CHANGING ROOM
2A-108E
EXAM RM
2A-106
MRI EXAM
2A-110E
MRI EQUIP
2A-110F
MRI CONTROL
2A-110
EQUIP STOR
2A-110C
HOLDING
2A-110B
MECH
2A-123A
WAITING
2A-107
RECEPTION
2A-132
SUPPLY
2A-140
OFFICE
2A-139
HAC
2A-137
BREAK RM
2A-133
RADIOGRAPHY/
FLUOROSCOPY
2A-130A
EXAM
2A-121A
EXAM
2A-121
EXAM
2A-122
ELEC
2A-120
TOILET
2A-115
OFFICE
2A-114
HAC
2A-124
RADIOLOGIST OFFICE
2A-130
TOILET
2A-108C
TOILET
2A-100B
SUPPLY
2A-130B
RECEPTION
2A-109
TOILET
2A-104
TOILET
2A-105
TOILET
2A-103B
CHANGING ROOM
2A-103A
TOILET
2A-138A
CHNG RM
2A-138
ELEVATOR
LOBBY
TOILET
2A-141C
OFFICE
2A-141
EXAM
2A-141B
CORRIDOR
FIRE
HOSE
CLOSET
MECH
2A-123
FIRST FLOOR ROOF
CORRIDOR
1'
0"
4'
4 1/2"
A. RE: MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR MORE
INFORMATION.
B. RE: SHEET GI002 FOR ADDITIONAL INFORMATION.
C. SCOPE AREA AS INDICATED IN KEYPLAN(S) SHALL REFER TO AREA IN WHICH
WORK IS TO BE PERFORMED.
1-HR FIRE
2-HR FIRE
FIRE RESISTIVE WALLS:
NOT IN SCOPE
EXISTING DOOR
EXISTING WALL
NEW WALL
LEGEND
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
##KEYNOTES
KEY PLAN
GENERAL NOTES
P la n N or th
True North
P la n N or th
True North
BLDG 1
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 1.
A rc h_
R
_k m ar on ey D
A N
B U
.r vt
2/
/2
:1 6:
A
M
AE121
SECOND FLOOR PLAN (SCOPE
AREA 2)
CORRECT RADIOLOGY HVAC
200 VETERANS AVE, BECKLEY WV 25801
517-21-002
DE TK
100% CONSTRUCTION
DOCUMENTS
VEG 21.13
1/8" = 1'-0"
SECOND FLOOR PLAN (SCOPE AREA 2)
F3
1. EXISTING VALVE CABINET RELOCATED FROM CORRIDOR 2A-C: RE
PLUMBING
2. PATCH WALL OPENING OF RELOCATED VALVE CABINET. MATCH EXISTING
GYP WALLBOARD, TEXTURE & PAINT
3. PATCH WALL, CEILING AND FLOOR WHERE WALL DEMOLISHED. FLOORING &
PAINT TO MATCH EXISTING
4. PATCH & PAINT WALL TO MATCH EXISTING
5.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .