S02 AUTODESK Contractors Access Instructions.pdf
PDF 1 MB Posted
- Attached to
- Y1DA--Supply and Install Welded Sheet Flooring Federal contract opportunity
- Solicitation number
- 36C24226Q0719
About this file
This document is an access and training guide for granting external contractors access to ProductivityNOW eLearning platform to complete Autodesk Build Construction management required training.
The guide establishes a structured process beginning after contract award (Design or Construction). Contractors must request access in writing through the Contracting Officer's Representative (COR) no later than 14 days from contract award, providing staff names and email addresses. The COR then grants access with an expiration date set to 12 calendar days and assigns Autodesk training courses to the requested staff. Access invitations are sent via email with platform login instructions. Once contractors' staff accept the invitation, they begin training and must submit completion certificates or competency memos to the COR. The ProductivityNOW License agreement and contract permit a maximum of 52 external users for the entire VISN (Veterans Integrated Service Network). The guide clarifies that access to ProductivityNOW is separate from access to Autodesk Build and includes step-by-step instructions with screenshots for both granting external access and assigning training courses within the platform system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 NY Tax Exempt Form.pdf | ||
| 36C24226Q0719.docx | DOCX document | |
| S02 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| S02 VA ID PACKAGE UPDATED 10-29-2025.pdf | ||
| S02 SF1449 _36C24226Q0719_1 WELDED SHEET FLOORING.pdf | ||
| P07 WAGE DETERMINATION SUFFOLK COUNTY 5_18_2026.pdf | ||
| VA Notice of Limitations on Subcontracting.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product ivit yNOW eLea rn ing
Acces s Guide
Purpose: This guide is to provide step by step instructions on how to grant access to external contractors to complete Autodesk Build Construction management required training.
Process:
Contract has been awarded (Design or Construction) Contractor(s) request access to ProductivityNow NLT 14 days from contract award, and provide the following staff information to the COR:
Name Email
COR to grand access to the requested staff and ensure an expiration date is set to 12 calendar days.
COR to assign Autodesk training courses to the requested staff.
COR shall inform the contractor that access invite had been sent.
Contractor’s staff to acknowledge / accept access invite and start the training Contractor Shall submit Autodesk Build training completion certificates or competency memo to
COR.
Notes:
• Contractor MUST request access in writing through the COR.
• COR MUST establish access expiration date (ProductivityNOW License agreement and contract permit 52 external users for the entire VISN)
• Access to ProductivityNOW is separate from access to Autodesk Build.
Granting External Access Step by Step Instructions
1) Login to your ProductivityNOW account
2) Go to VISN 2 Contractors Group
3) Go to Members
4) Go to Invite External Members
5) Fill in the invited staff info, mark Membership Expires, set Expiration Date, and hit send.
6) An invitation email will be sent to the external person with a link to the platform and login instructions.
Assign Training Step by Step Instructions
1) Login to your ProductivityNOW account
2) Go to VISN 2 Contractors Group
3) Go to Assets, then Assign Learning
4) Select Learning, check Assign a due date, and set due date
5) Select member name(s) and click save
6) The member will be notified that training courses has been assigned.
7) Assigned trainings will be on member’s main page
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
File details come from the government source that posted it. Updated .