This document provides guidelines for emergency generator power systems at Department of Veterans Affairs off-site care facilities in Veterans Integrated Service Network 8. Health care centers, multi-specialty community-based outpatient clinics of more than 25,000 net usable square feet, and some primary care clinics must have an installed emergency generator to provide 100% power for at least 96 hours with on-site fuel storage. They must also have a priority fuel delivery contract. For leases under two years, the standard applies to new contracts; leases over two years require amendments. A quick-connect generator standard applies to smaller primary care clinics when permanent systems are infeasible. The related federal contract opportunity is for outpatient clinic services in West Palm Beach, solicited by the West Palm Beach VA Medical Center in VISN 8.

View the file

Other files

File Type Posted
36C24821R0092 A0002.pdf PDF
36C24821R0092 A0001.pdf PDF
S02 Attachment Three 3 PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
S02 Attachment Twenty Seven 27 VHA Directive 1660.06 Tricare Network Agreements.pdf PDF
S02 Attachment Six 6 Davis Bacon Act Wage Determination Ft Pierce.pdf PDF
S02 Attachment Thirty 30 VHA HB 1101 11 Coordinated Care For Traveling Veterans.pdf PDF
S02 Attachment Fifteen 15 Medical Care Memorandum Number 548 99 246 Medication Reconcilliation.pdf PDF
S02 Attachment Twenty Two 22 VHA Program Guide.pdf PDF
S02 Attachment Four 4 IMMIGRAT CERT.pdf PDF
S02 Attachment Eleven 11 VHA Notice 2020-02 -Storage of Vaccines and Medications.pdf PDF
S02 Attachment Twenty Six 26 Environment of Care Assessment and Compliance Rounding Process Guide.pdf PDF
S02 Attachment Seven 7 Quality Assurance Surveillance Plan.pdf PDF
S02 Attachment One 1 ORG CONFLICT CERT.pdf PDF
S02 Attachment Twenty Four 24 Path and Lab Medicine Service Reference Manual.pdf PDF
S02 Attachment Twenty Three 23 CBOC Laboratory Supplies and Panels.pdf PDF
S02 Attachment Five 5 Service Contract Act Wage Determination Vero Beach.pdf PDF
S02 Attachment Five 5 Service Contract Act Wage Determination Ft Pierce Stuart.pdf PDF
S02 Attachment Eight 8 Patients Rights and Responsibilitiees.pdf PDF
S02 RFP 36C24821R0092.pdf PDF
S02 Attachment Nineteen 19 Updated Pre treatment and Transportation of Soiled Critical and Semi Critical RME.pdf PDF
S02 Attachment Ten 10 Specimen Collection.pdf PDF
S02 Attachment Twenty 20 Pre treatment and Transportation of Soiled Critical and Semi Critical RME_.pdf PDF
S02 Attachment Thirteen 13 VHA Directive 1137.pdf PDF
S02 Attachment Twenty Nine 29 VA Directive 2011 012.pdf PDF
S02 Attachment Five 5 Service Contract Act Wage Determination Okeechobee.pdf PDF
S02 Attachment Twenty Five 25 Service Specific Environment of Care Rounds.pdf PDF
S02 Attachment Twelve 12 Design Framework for Whole Health Implementation.pdf PDF
S02 Attachment Sixteen 16 Medical Care Memorandum Number 548 113 97 Pathology and Laboratory Medicine Service.pdf PDF
S02 Attachment Six 6 Davis Bacon Act Wage Determination Vero Beach.pdf PDF
S02 Attachment Fourteen 14 Medical Care Memorandum Number 548 110 305 Womens Veterans Health Care.pdf PDF
S02 Attachment Nine 9 VHA Directive 1033 Anticoagulation Therapy Management.pdf PDF
S02 Attachment Twenty One 21 VHA Directive 1608 Comperhensive and Compliance Rounding Process Guide.pdf PDF
S02 Attachment Seventeen 17 Medical Care Memorandum Number 548 116 173 Identification and Management of Veterans.pdf PDF
S02 Attachment Thirty Two 32 VHA Directive 1608 Comprehensive Enviroment of Care Program.pdf PDF
S02 Attachment Five 5 Service Contract Act Wage Determination Boca Raton.pdf PDF
S02 Attachment Twenty Eight 28 Medical Care Memorandum Number 548 136 376 Patient Care Data Capture.pdf PDF
S02 Attachment Six 6 Davis Bacon Act Wage Determination Okeechobee.pdf PDF
S02 Attachment Six 6 Davis Bacon Act Wage Determination Boca Raton.pdf PDF
S02 Attachment Eighteen 18 Medical Care Memorandum Number 548 113 074 Point of Care Ancillary Testing Policy.pdf PDF
S02 Attachment Six 6 Davis Bacon Act Wage Determination Stuart.pdf PDF
S02 Attachment Two 2 CONTRACTOR RULES OF BEHAVIOR.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final: April 2019

VISN 8 GUIDELINES ON EMERGENCY GENERATOR POWER SYSTEMS

FOR OFF-SITE CARE FACILITIES

A. Standard for Onsite Generators (Health Care Centers (HCC), Multi-Specialty CBOC’s, and

Primary Care CBOC’s >25K Net Usable Square Feet (NUSF):

Health Care Center (HCC). A HCC is a VA-owned, VA-leased, contract, or shared clinic operated at least 5 days per week that provides primary care, mental health care, on site specialty services, and performs ambulatory surgery and/or invasive procedures which may require moderate sedation or general anesthesia.

Multi-Specialty CBOC. A multi-specialty CBOC is a VA-owned, VA-leased, mobile, contract, or shared clinic that offers both primary and mental health care and two or more specialty services physically on site. Access to additional specialty services may be offered by referral or telehealth. These clinics may offer support services, such as pharmacy, laboratory, and x-ray. The clinic may be operational from 1 to 7 days per week.

Primary Care CBOC (>25K NUSF). Primary care CBOCs are VA-owned, VA-leased, mobile, contract, or shared clinics that offer both medical (physically on site) and mental health care (either physically on site or by telehealth) and may offer support services such as pharmacy, laboratory, and x-ray. The clinic may be operational 1 to 7 days per week. Access to specialty care is not provided on site, but may be available through referral or telehealth.

1. Have installed, emergency generator capability to provide 100% full power (normal and emergency) with on-site fuel storage capacity to provide power for at least 96 hours (4 days). [Medical Centers are encouraged to plan for longer durations as needed based on geography (i.e. Puerto Rico) or experience with refueling delays]

2. Have in place a contract or MOA for priority fuel delivery to the clinic.

3. If the hard termination date of a current lease contract is less than two years from the date of publishing the VISN 8 standard, apply the standard to the new upcoming lease contract.

4. If the hard termination date of a current lease contract is greater than two years from the date of publishing the VISN 8 standard, the contract is to be amended to meet the standard, if the lessor agrees to amend the lease contract.

5. When determined not feasible for a permanently installed emergency generator system Standard B shall apply.

Attachment Thirty one (31)-VISN 8 Guidelines on Emergency Generator Power Systems for Off-site Care Facilities 36C24821R0092 A==

Final: April 2019

B. STANDARD for Quick-Connect Generator Capability (Primary Care CBOC’s <25K NUSF):

Primary Care CBOC (<25K NUSF). Primary care CBOCs are VA-owned, VA-leased, mobile, contract, or shared clinics that offer both medical (physically on site) and mental health care (either physically on site or by telehealth) and may offer support services such as pharmacy, laboratory, and x-ray. The clinic may be operational 1 to 7 days per week. Access to specialty care is not provided on site, but may be available through referral or telehealth.

1. If VA is the only occupant of the leased building, the following applies:

a. Provide “Quick-Connect” capability for connecting a mobile emergency generator capability to provide 100% full power (normal and emergency).

b. Have in place a contract or MOA for priority fuel delivery to the clinic.

2. If VA shares the building space with other tenants, the following applies:

a. Determine if the Lessor is willing to agree to an amended lease contract to provide “Quick-Connect” capability.

1) If yes, the proceed with B.1 noted above.

2) If no, submit a request for exemption.

C. EXEMPTIONS:

Should the facility either determine the above guideline cannot be met, is determined infeasible, or preference is to exceed the above standards, notification from the Medical Center Director must be provided to the Network Director and VISN Emergency Manager with an explanation and justification for the determination.