S02_Attachment_Base Offer Price Breakdown (1 Page).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DA--PROJ: 516-23-109 Renovate & Abate Flooring in Three Bay Pines Buildings
Solicitation number
36C24823R0153
Issued by

About this file

This document contains a base offer price breakdown template for a federal construction project. The template requires offerors to provide pricing details by construction division including labor costs, material costs, overhead costs, profit amounts, and bond percentages. The total base offer price is to be included. Offerors are instructed to avoid lump sum pricing and provide additional breakdown.

The related federal contract opportunity is a solicitation to renovate and abate flooring in three buildings at the Bay Pines VA facility. Offerors are to use the price breakdown template to submit pricing details in response to the solicitation, which is issued by the Department of Veterans Affairs Veterans Health Administration VISN 8 for project number 516-23-109. The response deadline is not provided.

View the file

Other files

File Type Posted
S04 Site Walk Sign In 06152023.pdf PDF
Revised RFIs Q_As 08-21-2023.pdf PDF
36C24823R0153 0004.docx DOCX document
(11) 08152023 Bldg 102 Final ACM Report.pdf PDF
(1) 08152023 2023 07 10 516-23-109 SOW R1.pdf PDF
36C24823R0153 0003.docx DOCX document
(3) 08152023 516-23-109 Room Finish Schedule Template.xlsx XLSX spreadsheet
(8) 08152023 Bldg 2 Representative Furniture Photos.pdf PDF
(10) 08152023 RR 516-23-109 Specification Manual.pdf PDF
(12) 08152023 RFIs Q_As.pdf PDF
(4) 08152023 516-23-109 Dimensioned Plans Combine.pdf PDF
(2) 08152023 01-516-23-109 Flooring Finish Schedule Plan.pdf PDF
(6) 08152023 Bldg 2 Furniture Demo Instructions.pdf PDF
(9) 08152023 2022 VAMC Asbestos Re-Inspection Report.pdf PDF
(7) 08152023 Bldg 102 Hub Furniture Photos.pdf PDF
(5) 08152023 516-23-109 Contractor Laydown Areas.pdf PDF
36C24823R0153 0002.docx DOCX document
36C24823R0153 0001.docx DOCX document
Edited evaluation factors 02.docx DOCX document
S02_Attachment_DBA FL20230222 01-13-2023 Pinellas County (6 Pages).docx DOCX document
S02_Attachment_Site Plan Combined (4 Pages).pdf PDF
S02_Attachment EMR (1 Page).pdf PDF
S02_Attachment_SOW (9 Pages).docx DOCX document
S02_Attachment_Specification Manual (215 pages).pdf PDF
S02_Attachment_Limitations on Subcontracting (2 Pages) abatement.docx DOCX document
S02_Attachment_Past Performance Questionnaire Form (6 Pages).docx DOCX document
36C24823R0153_2.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis